Search NASA⌕ Search

SEARCH · Search NASA

Results for “data center air management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Solar Thermal Upper Stage Liquid Hydrogen Pressure Control Testing

High-energy cryogenic propellant is an essential element in future space exploration programs. Therefore, NASA and its industrial partners are committed to an advanced development/technology program that will broaden the experience base for the entire cryogenic fluid management community. Furthermore, the high cost of microgravity experiments has motivated NASA to establish government/aerospace industry teams to aggressively explore combinations of ground testing and analytical modeling to the greatest extent possible, thereby benefitting both industry and government entities. One such team consisting of ManTech SRS, Inc., Edwards Air Force Base, and Marshall Space Flight Center (MSFC) was formed to pursue a technology project designed to demonstrate technology readiness for an SRS liquid hydrogen (LH2) in-space propellant management concept. The subject testing was cooperatively performed June 21-30, 2000, through a partially reimbursable Space Act Agreement between SRS, MSFC, and the Air Force Research Laboratory. The joint statement of work used to guide the technical activity is presented in appendix A. The key elements of the SRS concept consisted of an LH2 storage and supply system that used all of the vented H2 for solar engine thrusting, accommodated pressure control without a thermodynamic vent system (TVS), and minimized or eliminated the need for a capillary liquid acquisition device (LAD). The strategy was to balance the LH2 storage tank pressure control requirements with the engine thrusting requirements to selectively provide either liquid or vapor H2 at a controlled rate to a solar thermal engine in the low-gravity environment of space operations. The overall test objective was to verify that the proposed concept could enable simultaneous control of LH2 tank pressure and feed system flow to the thruster without necessitating a TVS and a capillary LAD. The primary program objectives were designed to demonstrate technology readiness of the SRS concept at a system level as a first step toward actual flight vehicle demonstrations. More specific objectives included testing the pressure and feed control system concept hardware for functionality, operability, and performance. Valuable LH2 thermodynamic and fluid dynamics data were obtained for application to both the SRS concept and to future missions requiring space-based cryogen propellant management.

Moore, J. D.↗

Analysis of ETMS Data Quality for Traffic Flow Management Decisions

The data needed for air traffic flow management decision support tools is provided by the Enhanced Traffic Management System (ETMS). This includes both the tools that are in current use and the ones being developed for future deployment. Since the quality of decision support provided by all these tools will be influenced by the quality of the input ETMS data, an assessment of ETMS data quality is needed. Motivated by this desire, ETMS data quality is examined in this paper in terms of the unavailability of flight plans, deviation from the filed flight plans, departure delays, altitude errors and track data drops. Although many of these data quality issues are not new, little is known about their extent. A goal of this paper is to document the magnitude of data quality issues supported by numerical analysis of ETMS data. Guided by this goal, ETMS data for a 24-hour period were processed to determine the number of aircraft with missing flight plan messages at any given instant of time. Results are presented for aircraft above 18,000 feet altitude and also at all altitudes. Since deviation from filed flight plan is also a major cause of trajectory-modeling errors, statistics of deviations are presented. Errors in proposed departure times and ETMS-generated vertical profiles are also shown. A method for conditioning the vertical profiles for improving demand prediction accuracy is described. Graphs of actual sector counts obtained using these vertical profiles are compared with those obtained using the Host data for sectors in the Fort Worth Center to demonstrate the benefit of preprocessing. Finally, results are presented to quantify the extent of data drops. A method for propagating track positions during ETMS data drops is also described.

Chatterji, Gano B.↗

Benefits Analysis of Multi-Center Dynamic Weather Routes

Dynamic weather routes are flight plan corrections that can provide airborne flights more than user-specified minutes of flying-time savings, compared to their current flight plan. These routes are computed from the aircraft's current location to a flight plan fix downstream (within a predefined limit region), while avoiding forecasted convective weather regions. The Dynamic Weather Routes automation has been continuously running with live air traffic data for a field evaluation at the American Airlines Integrated Operations Center in Fort Worth, TX since July 31, 2012, where flights within the Fort Worth Air Route Traffic Control Center are evaluated for time savings. This paper extends the methodology to all Centers in United States and presents benefits analysis of Dynamic Weather Routes automation, if it was implemented in multiple airspace Centers individually and concurrently. The current computation of dynamic weather routes requires a limit rectangle so that a downstream capture fix can be selected, preventing very large route changes spanning several Centers. In this paper, first, a method of computing a limit polygon (as opposed to a rectangle used for Fort Worth Center) is described for each of the 20 Centers in the National Airspace System. The Future ATM Concepts Evaluation Tool, a nationwide simulation and analysis tool, is used for this purpose. After a comparison of results with the Center-based Dynamic Weather Routes automation in Fort Worth Center, results are presented for 11 Centers in the contiguous United States. These Centers are generally most impacted by convective weather. A breakdown of individual Center and airline savings is presented and the results indicate an overall average savings of about 10 minutes of flying time are obtained per flight.

NAS based Benefits Analysis↗

A Data-Driven Analysis of a Tactical Surface Scheduler

NASA's Airspace Technology Demonstration-2 (ATD-2) integrates arrival, departure, and surface operations to extend integrated traffic sequencing all the way from the gate to the overhead stream and back again for multi-airport, metroplex environments. A key concept of ATD-2 centers on surface scheduling that allows aircraft to taxi, climb, and insert within the overhead stream with minimal interruptions. A core principle is to allow aircraft to absorb delay at the gate prior to engine start in order to reduce overall fuel burn and emissions. To achieve these goals, it is necessary for the scheduler to properly balance the demand at the runway with the available capacity while also predicting accurate takeoff times. This paper provides a data-driven analysis of the runway demand capacity balancing and measures the accuracy of schedules that are generated while running in a live operational environment at the Charlotte Douglas International Airport. We found that using minimum-time wake vortex separation constraints to define runway capacity resulted in scheduling departure operations at a slightly higher rate than the runway was operating and we discovered a surprising relationship between the runway rate and the accuracy of the schedules.

Tactical Surface Scheduler↗

Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

Barta, Daniel J.↗

Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30,60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

Barta, Daniel J.↗

Simulation of Controller Pilot Data Link Communications over VHF Digital Link Mode 3

The Federal Aviation Administration (FAA) has established an operational plan for the future Air Traffic Management (ATM) system, in which the Controller Pilot Data Link Communications (CPDLC) is envisioned to evolve into digital messaging that will take on an ever increasing role in controller to pilot communications, significantly changing the way the National Airspace System (NAS) is operating. According to FAA, CPDLC represents the first phase of the transition from the current analog voice system to an International Civil Aviation Organization (ICAO) compliant system in which digital communication becomes the alternate and perhaps primary method of routine communication. The CPDLC application is an Air Traffic Service (ATS) application in which pilots and controllers exchange messages via an addressed data link. CPDLC includes a set of clearance, information, and request message elements that correspond to existing phraseology employed by current Air Traffic Control (ATC) procedures. These message elements encompass altitude assignments, crossing constraints, lateral deviations, route changes and clearances, speed assignments, radio frequency assignments, and various requests for information. The pilot is provided with the capability to respond to messages, to request clearances and information, to report information, and to declare/rescind an emergency. A 'free text' capability is also provided to exchange information not conforming to defined formats. This paper presents simulated results of the aeronautical telecommunication application Controller Pilot Data Link Communications over VHF Digital Link Mode 3 (VDL Mode 3). The objective of this simulation study was to determine the impact of CPDLC traffic loads, in terms of timely message delivery and capacity of the VDL Mode 3 subnetwork. The traffic model is based on and is used for generating air/ground messages with different priorities. Communication is modeled for the en route domain of the Cleveland Center air traffic (ZOB ARTCC).

Bretmersky, Steven C.↗

Airspace Technology Demonstration 2 (ATD-2) Phase 2 Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline and Phase 2 Fused demonstrations of the Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration’s (NASA) Airspace Technology Demonstration 2 (ATD-2) project, which has been demonstrated since October of 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA has been developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport operators, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation’s most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research has been demonstrated at the CLT airport since the beginning of October 2017. Phase 1 provided data exchange and integration with the initial demonstration of the integrated system of strategic and tactical scheduling, collaborative tactical surface metering, tactical departure scheduling to an en route meter point and overhead stream insertion, initial integration of a TFDM SWIM prototype feed, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 The Phase 2 Fused IADS system provided substantial updates to baseline IADS Demonstration capability. Improvements were made to the IADS modeler; tactical surface scheduling, and metering; tactical departure scheduling for overhead stream insertion; Electronic Flight Data (EFD) and the integration with the FAA Advanced Electronic Flight Strip (AEFS); RTC/RMTC, and departure trajectories. New capabilities included a TFDM SWIM prototype feed and delivery of IADS data via the TFDM Terminal Publication (TTP) service of the FAA’s SWIM system; strategic surface scheduling and metering as well as fusion with tactical surface metering; integration and ingestion of data from TTP-connected Mobile App and texting industry for General Aviation (GA) flights; and expansion of airspace deployments to include adjacent Center automation, in particular interface with the Atlanta Center (ZTL) arrival metering TBFM system to evaluate pre-scheduling of flights. Improvements in Data Analysis and System Health (DASH) monitoring and updates were completed as well.

Talebi, Ehsan↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗

A Data-Driven Analysis of a Tactical Surface Scheduler

NASA's Airspace Technology Demonstration-2 (ATD-2) integrates arrival, departure, and surface operations to extend integrated traffic sequencing all the way from the gate to the overhead stream and back again for multi-airport, metroplex environments. A key concept of ATD-2 centers on surface scheduling that allows aircraft to taxi, climb, and insert within the overhead stream with minimal interruptions. A core principle is to allow aircraft to absorb delay at the gate prior to engine start in order to reduce overall fuel burn and emissions. To achieve these goals, it is necessary for the scheduler to properly balance the demand at the runway with the available capacity while also predicting accurate takeoff times. This paper provides a data-driven analysis of the runway demand capacity balancing and measures the accuracy of schedules that are generated while running in a live operational environment at the Charlotte Douglas International Airport. We found that using minimum-time wake vortex separation constraints to define runway capacity resulted in scheduling departure operations at a slightly higher rate than the runway was operating and we discovered a surprising relationship between the runway rate and the accuracy of the schedules.

Tactical Surface Scheduler↗

Scale Model Experiments on Sound Propagation From a Mach 2.5 Cold Nitrogen Jet Flowing Through a Rigid-Walled Duct With a J-Deflector

The Launch Systems Testbed (LST) represents the evolution of vibroacoustics research and development work performed at NASA John F. Kennedy Space Center (KSC) over the last 15 years. The LST is located at the Launch Equipment Test Facility (LETF) in the KSC industrial complex. The LETF is operated by Sierra Lobo, Inc., as a member of University-Affiliated Technology Development Contract (USTDC) to KSC Spaceport and Engineering and Technology Directorate (YA), with ASRC Aerospace Corporation as a the prime contractor. Trajectory Simulation Mechanism (TSM) is a major component of the LST, developed specifically to simulate nonstationary acoustic loads on launch pad structures, vehicles, and payloads. TSM enhances the capabilities within LST for simulating launch environments of future vehicles. The scaled launch environments will be used to predict the full-scale launch environment via an appropriate scaling procedure. Air Force Research Laboratory (AFRL) has tasked NASA KSC to perform a basic technology test program in support of developing a low-cost clean pad (incorporating passive mitigation techniques) for future launch vehicles. The overall goal of the program is to develop innovative launch exhaust management systems, which effectively reduce launch acoustic environment with innovative duct designs, while eliminating traditional sound suppression water systems. Passive techniques, such as nontraditional duct geometries, resonators, and diffusers, etc., will be investigated. The overall goals are to advance innovative concepts for a clean pad while developing ideas to reduce transmitted sound via investigation and modeling of jet exhaust acoustic and flow field characteristics. The series of tests outlined in this report represent baseline tests and are geared towards defining the acoustic load environment on the TSM pad for open and closed duct configurations. This report summarizes the cold jet acoustic testing for Mach 2.5 supersonic nitrogen jet issuing from a nozzle with 1-inch exit diameter. Acoustic data, including spectral sound power and Overall Sound Pressure Level (OASPL), are obtained both for a free jet and with the jet flowing through a rigid-walled duct with a J-deflector. The relative performance of closed duct and open duct is evaluated. The results show that the closed duct is superior to the partially open duct, and results in about 3-decibel (dB) noise reduction (near the duct axis) relative to the free jet. The location of the nozzle exit plane (NEP) relative to the duct inlet plane (DIP) has a significant effect on the acoustic field. The results suggest that the location of NEP at 10 inches above the DIP results in reduced acoustic loads relative to 5 inches above the duct inlet and 1 inch into the duct inlet.

Kandula, Max↗

The Effects of the Uncertainty of Departures on Multi-Center Traffic Management Advisor (TMA) Scheduling

The Multi-center Traffic Management Advisor (McTMA) provides a platform for regional or national traffic flow management, by allowing long-range cooperative time-based metering to constrained resources, such as airports or air traffic control center boundaries. Part of the demand for resources is made up of proposed departures, whose actual departure time is difficult to predict. For this reason, McTMA does not schedule the departures in advance, but rather relies on traffic managers to input their requested departure time. Because this happens only a short while before the aircraft's actual departure, McTMA is unable to accurately predict the amount of delay airborne aircraft will need to take in order to accommodate the departures. The proportion of demand which is made up by such proposed departures increases as the horizon over which metering occurs gets larger. This study provides an initial analysis of the severity of this problem in a 400-500 nautical mile metering horizon and discusses potential solutions to accommodate these departures. The challenge is to smoothly incorporate departures with the airborne stream while not excessively delaying the departures.' In particular, three solutions are reviewed: (1) scheduling the departures at their proposed departure time; (2) not scheduling the departures in advance; and (3) scheduling the departures at some time in the future based on an estimated error in their proposed time. The first solution is to have McTMA to automatically schedule the departures at their proposed departure times. Since the proposed departure times are indicated in their flight times in advance, this method is the simplest, but studies have shown that these proposed times are often incorrect2 The second option is the current practice, which avoids these inaccuracies by only scheduling aircraft when a confirmed prediction of departure time is obtained from the tower of the departure airport. Lastly, McTMA can schedule the departures at a predicted departure time based on statistical data of past departure time performance. It has been found that departures usually have a wheels-up time after their indicated proposed departure time, as shown in Figure 1. Hence, the departures were scheduled at a time in the future based on the mean error in proposed departure times for their airport.

Thipphavong, Jane↗

Initial Field Evaluation of Pilot Procedures for Flying CTAS Descent Clearances

The Center TRACON Automation System (CTAS) is a new support system that is designed to assist air traffic controllers in the management of arrival traffic. CTAS will provide controllers with more information about current air traffic, enabling them to provide clearances for efficient, conflict-free descents that help achieve an orderly stream of aircraft at the final approach fix. CTAS is a computer-based system that functions as a "ground-based FMS" that can predict flight trajectories and arrival times for all incoming aircraft. CTAS uses an aircraft's cruise airspeed; current air traffic, winds and temperature; performance characteristics of the aircraft type; and individual airline preferences to create a flight profile from cruise altitude to the final approach fix. Controllers can use this flight profile to provide a descent clearance that will allow an aircraft to fly an efficient descent and merge more smoothly with other arriving aircraft. A field test of the CTAS Descent Advisor software was conducted at the Denver Center for aircraft arriving at the Stapleton International Airport from September 12-29. CTAS Descent clearances were given to a NASA flight test aircraft and to 77 airline flights that arrived during low traffic periods. For the airline portion of the field test, cockpit procedures and pilot briefing packages for both FMS equipped and unequipped aircraft were developed in cooperation with an airline. The procedures developed for the FMS equipped aircraft were to fly a VNAV descent at a controller specified speed to cross a metering fix at a specified altitude and speed. For nonFMS aircraft, the clearance also specified a CTAS calculated top-of-descent point. Some CTAS related flight deck issues included how much time was available to the pilots' for compliance, the amount of information that needed to be interpreted in the clearance and possible repercussions of misunderstandings. Data collected during the study ranged from subjective data (including the airline pilots' opinions and comments about the new descent clearances and procedures) to objective data (including observations of aircraft performance from the flight deck). This paper will present data and the resulting changes in the design of the procedures and clearance phraseology.

Palmer, Everett↗

Analysis of At-Altitude LTE Power Spectra for C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration’s (NASA) Unmanned Aircraft Systems Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude small Unmanned Aerial Systems (sUAS, also known as drones) operations. This paper presents results of work completed in the paper [1] presented at the 2018 ICNS conference where proposed approaches were explored for evaluating and analyzing sUAS Command and Control (C2) links based on commercial cellular networks. This paper focuses on the UTM Project’s Technology Capability Level 3 (TCL-3) test results which address the communications portion identified within the same paper. A software defined radio (SDR) was flown as a sUAS payload to capture received signal spectrum in Long Term Evolution (LTE) frequency bands of interest. The purpose was to measure the RF environment at UTM altitudes to characterize the interference potential. The SDR payload was flown at various stationary altitudes where the LTE over-the-air complex (I/Q) samples were captured by the SDR and later post-processed. The SDR received inputs through an omnidirectional antenna. The complex samples captured were an aggregate of transmissions received from all line-of-sight (LOS) towers within the geographic area for the specific radio frequency bandwidth the SDR is programmed to capture. Using this approach, the complex samples captured do not distinguish between the various eNodeB's (Long Term Evolution (LTE) transmitting towers). The complex samples were post processed via a Discrete Fourier Transform (DFT) algorithm to view the captured spectrum along with the power levels across the captured LTE bandwidth. This SDR payload process of capturing complex samples was done at two different regions within the US: 1) NASA's Ames Research Center (ARC) in Moffett Field, CA, and 2) Griffiss Airfield in Rome, NY. The data capture at the ARC site was done at two physical locations within the Ames campus where many stationary altitude captures where done as high as 800 ft. above ground level (AGL). The data captured at the Griffiss Airport (also known as the NY Corridor Site) were acquired at one location with three specific stationary altitude levels – {Ground Level (GL), 300 ft., and 400 ft.}. The LTE spectrum power levels were captured for two LTE carriers, AT&T and Verizon, at both sites where their respective spectra and power levels were measured and compared at various altitudes. The overall results show that there is an increase in LTE spectrum power levels at higher altitudes for drones. A detailed analysis of this data and conclusions drawn from the results are presented in this paper.

Kerczewski, Robert J.↗

Non-Deterministic, Non-Traditional Methods (NDNTM)

The review effort identified research opportunities related to the use of nondeterministic, nontraditional methods to support aerospace design. The scope of the study was restricted to structural design rather than other areas such as control system design. Thus, the observations and conclusions are limited by that scope. The review identified a number of key results. The results include the potential for NASA/AF collaboration in the area of a design environment for advanced space access vehicles. The following key points set the context and delineate the key results. The Principal Investigator's (PI's) context for this study derived from participation as a Panel Member in the Air Force Scientific Advisory Board (AF/SAB) Summer Study Panel on 'Whither Hypersonics?' A key message from the Summer Study effort was a perceived need for a national program for a space access vehicle whose operating characteristics of cost, availability, deployability, and reliability most closely match the NASA 3rd Generation Reusable Launch Vehicle (RLV). The Panel urged the AF to make a significant joint commitment to such a program just as soon as the AF defined specific requirements for space access consistent with the AF Aerospace Vision 2020. The review brought home a concurrent need for a national vehicle design environment. Engineering design system technology is at a time point from which a revolution as significant as that brought about by the finite element method is possible, this one focusing on information integration on a scale that far surpasses current design environments. The study therefore fully supported the concept, if not some of the details of the Intelligent Synthesis Environment (ISE). It became abundantly clear during this study that the government (AF, NASA) and industry are not moving in the same direction in this regard, in fact each is moving in its own direction. NASA/ISE is not yet in an effective leadership position in this regard. However, NASA does have complementary software interoperability efforts that should be a part of any major ISE program. Software standards that assure interoperability of data systems and modeling representations are enabling for the proposed research advocated herein and should be a major element in the ISE initiative. The international standard for data interchange is known by the acronym 'STEP.' The NASA participation and lead for that effort is at the Goddard Space Flight Center. NASA/GRC is leading an effort to define CAD geometry standards through the Object Management Group (OMG). To enable the design environment so necessary to the above national vision for a unique space vehicle will require an integrating software environment with interoperability standards that allow the development and widespread deployment of tools and toolsets, rather than traditional "shrink-wrapped" software used by engineers today.

Cruse, Thomas A.↗

Portable Electron Microscopy for ISS and Beyond

Advances in space exploration have evolved in lockstep with key technology advances in diverse fields such as materials science, biological science, and engineering risk management. Research in these areas, where structure and physical processes come together, can proceed rapidly in part due to sophisticated ground-based analytical tools that help re-searchers develop technologies and engineering processes that push frontiers of human space exploration. Electron microscopes (EM) are an example of such a workhorse tool, lending a unique blend of strong optical scattering, high native resolution, large depth of focus, and spectroscopy via characteristic X-ray emission, providing exquisite high-magnification structural imaging and chemical analysis. Ground-based EM’s have been essential in NASA research for many years. In particular, in mineralogy and petrology, EM is used to understand the origin and evolution of the solar system, particularly rocky bodies. In microbiology, EM has helped visualize the architecture of tissues and cells. In engineering/materials science, EM has been used to characterize particulate debris in air and water samples, determine pore sizes in ceramics/catalysts, understand the nature of fibers, determine composition and morphology of new and existing materials, and characterize micro-textures of vapor deposited films. EM is highly effective at investigating a wide variety of nanoscale materials/biomaterials at the core of many of NASA’s inquiries. Despite exquisite optical performance and versatility, EM’s are traditionally large, heavy, and have high power consumption. They are also expensive so they tend to be housed at universities and large research institutions, or at major industrial laboratory sites with support staff, supplies, and skilled operators. Since most organizations cannot support their own EM, samples are often sent to these large institutions and service centers to be imaged, at great expense and of-ten with delay of weeks to months for complex analyses. Complexity, high cost, and maintenance associated with collecting EM image data has until now severely limited fields in which EM is used. Making EM accessible outside constrained terrestrial laboratory environments will bring EM’s performance and versatility to a much broader range of scientific and engineering endeavors, including in space.

Own, C. S.↗

National Virtual Biotechnology Laboratory: Report on Rapid R&D Solutions to the COVID-19 Crisis

With funding from the CARES Act, the U.S Department of Energy (DOE) established the National Virtual Biotechnology Laboratory (NVBL) in March 2020 to address key challenges associated with the COVID-19 crisis. NVBL brought together the broad scientific and technical expertise and resources of DOE’s 17 national laboratories to help tackle medical supply short ages, discover potential drugs to fight the virus, develop and validate COVID-19 testing methods, model disease spread and impact across the nation, and understand virus transport in buildings and the environment. National laboratory resources leveraged for this effort include a suite of world-leading user facilities broadly available to the research community, such as light and neutron sources, nanoscale science research centers, sequencing and biocharacterization facilities, and high-performance computing facilities. Within months, NVBL teams produced innovations in materials and advanced manufacturing that mitigated shortages in test kits and personal protective equipment (PPE), creating nearly 1,000 new jobs. They used DOE’s high-performance computers and light and neutron sources to identify promising candidates for antibodies and antivirals that universities and drug companies are now evaluating. NVBL researchers also developed new diagnostic targets and sample collection approaches, and supported U.S. Food and Drug Administration (FDA), Centers for Disease Control and Prevention (CDC), and U.S. Department of Defense (DoD) efforts to establish national guidelines used in administering millions of tests. Researchers used artificial intelligence and high-performance computing to produce near-real-time data analysis to forecast disease transmission, stress on public health infrastructure, and economic impact, which supported decision-makers at the local, state, and national levels. NVBL teams also studied how to control indoor virus movement to minimize uptake and protect human health. NVBL’s accomplishments demonstrate not only the powerful resource represented by DOE’s national laboratories working together to meet national needs, but also the effectiveness of the integrated NVBL framework for rapidly responding to emergencies with research and development (R&D) solutions. As the fight against COVID continues, sustained efforts are needed to confront this pandemic as well as future threats. Examples include: 1) Establishing “supply chains on demand” to meet emergency production needs by leveraging the materials and manufacturing expertise of DOE national laboratories and developing advances in electronics, sensing, robotics, and automation capabilities; 2) Improving the speed and robustness of drug discovery by integrating experimental platforms with DOE’s computational and experimental user facilities, which provide unique resources to support the discovery of high-potential therapeutic agents; 3) Protecting public, environmental, and animal health by developing new testing protocols and instrumentation adaptable to diverse sample types (both physiological and environmental) to quickly detect a wide range of pathogens and monitor other biorisks; 4) Supporting near-real-time data needs of decision-makers at the local, regional, state, and national levels by advancing data curation, analysis, and modeling using artificial intelligence and new data science tools for managing and evaluating large diverse datasets; 5) Harnessing DOE’s expertise in environmental modeling to design rooms and air handling for offices, classrooms, restaurants, and other structures to minimize biorisk transmissions. Going forward, NVBL is poised to apply the unique capabilities and expertise of the national laboratory complex to future national and international emergencies, both natural and engineered. Through this framework, the Office of Science will continue to be an integral component of agency wide efforts to prepare for and respond to biorisks and other crises.

42 ENGINEERING↗

Design of automation tools for management of descent traffic

The design of an automated air traffic control system based on a hierarchy of advisory tools for controllers is described. Compatibility of the tools with the human controller, a key objective of the design, is achieved by a judicious selection of tasks to be automated and careful attention to the design of the controller system interface. The design comprises three interconnected subsystems referred to as the Traffic Management Advisor, the Descent Advisor, and the Final Approach Spacing Tool. Each of these subsystems provides a collection of tools for specific controller positions and tasks. This paper focuses primarily on the Descent Advisor which provides automation tools for managing descent traffic. The algorithms, automation modes, and graphical interfaces incorporated in the design are described. Information generated by the Descent Advisor tools is integrated into a plan view traffic display consisting of a high-resolution color monitor. Estimated arrival times of aircraft are presented graphically on a time line, which is also used interactively in combination with a mouse input device to select and schedule arrival times. Other graphical markers indicate the location of the fuel-optimum top-of-descent point and the predicted separation distances of aircraft at a designated time-control point. Computer generated advisories provide speed and descent clearances which the controller can issue to aircraft to help them arrive at the feeder gate at the scheduled times or with specified separation distances. Two types of horizontal guidance modes, selectable by the controller, provide markers for managing the horizontal flightpaths of aircraft under various conditions. The entire system consisting of descent advisor algorithm, a library of aircraft performance models, national airspace system data bases, and interactive display software has been implemented on a workstation made by Sun Microsystems, Inc. It is planned to use this configuration in operational evaluations at an en route center.

Erzberger, Heinz↗