Search NASA⌕ Search

SEARCH · Search NASA

Results for “demand forecasts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Seasonal Drought Prediction in East Africa: Can National Multi-Model Ensemble Forecasts Help?

The increasing food and water demands of East Africa's growing population are stressing the region's inconsistent water resources and rain-fed agriculture. As recently as in 2011 part of this region underwent one of the worst famine events in its history. Timely and skillful drought forecasts at seasonal scale for this region can inform better water and agro-pastoral management decisions, support optimal allocation of the region's water resources, and mitigate socio-economic losses incurred by droughts. However seasonal drought prediction in this region faces several challenges. Lack of skillful seasonal rainfall forecasts; the focus of this presentation, is one of those major challenges. In the past few decades, major strides have been taken towards improvement of seasonal scale dynamical climate forecasts. The National Centers for Environmental Prediction's (NCEP) National Multi-model Ensemble (NMME) is one such state-of-the-art dynamical climate forecast system. The NMME incorporates climate forecasts from 6+ fully coupled dynamical models resulting in 100+ ensemble member forecasts. Recent studies have indicated that in general NMME offers improvement over forecasts from any single model. However thus far the skill of NMME for forecasting rainfall in a vulnerable region like the East Africa has been unexplored. In this presentation we report findings of a comprehensive analysis that examines the strength and weakness of NMME in forecasting rainfall at seasonal scale in East Africa for all three of the prominent seasons for the region. (i.e. March-April-May, July-August-September and October-November- December). Simultaneously we also describe hybrid approaches; that combine statistical approaches with NMME forecasts; to improve rainfall forecast skill in the region when raw NMME forecasts lack in skill.

Shukla, Shraddhanand↗

Modern deep neural networks for Direct Normal Irradiance forecasting: A classification approach

The escalating energy demand and the adverse environmental impacts of fossil-fuel use necessitate a shift towards cleaner and renewable alternatives. Concentrated Solar Power (CSP) technology emerges as a promising solution, offering a carbon-free alternative for power generation. The efficiency and profitability of CSP depend on the Direct Normal Irradiance (DNI) component of solar radiation; hence, accurate DNI forecasting can help optimize CSP plants’ operations and performance. The unpredictable nature of weather phenomena, particularly cloud cover, introduces uncertainty into DNI projections. Existing DNI forecasting models use meteorological factors, which are both challenging to estimate numerically over short prediction windows and expensive to model through data at a sufficiently high spatial and temporal resolution. This research addresses the challenge by presenting a novel approach that formulates DNI prediction as a multi-class classification problem, departing from conventional regression-based methods. The primary objective of this classification framework is to identify optimal periods aligning with specific operational thresholds for CSP plants, contributing to enhanced dispatch optimization strategies. We model the DNI classification problem using four advanced deep neural networks – rectified linear unit (ReLU) networks, 1D residual networks (ResNets), bidirectional long short-term memory (BiLSTM) networks, and transformers – achieving accuracies up to 93.5% without requiring meteorological parameters.

14 SOLAR ENERGY↗

Windows of Opportunity for Skillful Forecasts Subseasonal to Seasonal and Beyond

There is high demand and a growing expectation for predictions of environmental conditions that go beyond 0–14-day weather forecasts with outlooks extending to one or more seasons and beyond. This is driven by the needs of the energy, water management, and agriculture sectors, to name a few. There is an increasing realization that, unlike weather forecasts, prediction skill on longer time scales can leverage specific climate phenomena or conditions for a predictable signal above the weather noise. Currently, it is understood that these conditions are intermittent in time and have spatially heterogeneous impacts on skill, hence providing strategic windows of opportunity for skillful forecasts. Research points to such windows of opportunity, including El Niño or La Niña events, active periods of the Madden–Julian oscillation, disruptions of the stratospheric polar vortex, when certain large-scale atmospheric regimes are in place, or when persistent anomalies occur in the ocean or land surface. Gains could be obtained by increasingly developing prediction tools and metrics that strategically target these specific windows of opportunity. Across the globe, reevaluating forecasts in this manner could find value in forecasts previously discarded as not skillful. Users’ expectations for prediction skill could be more adequately met, as they are better aware of when and where to expect skill and if the prediction is actionable. Given that there is still untapped potential, in terms of process understanding and prediction methodologies, it is safe to expect that in the future forecast opportunities will expand. Process research and the development of innovative methodologies will aid such progress.

Annarita Mariotti↗

Planning India's long-term energy shipment infrastructures for electricity and coal

The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both the expansion of transmission and generation capacity. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions. 15 refs., 10 figs., 7 tabs.

20 FOSSIL-FUELED POWER PLANTS↗

A method for the determination of potentially profitable service patterns for commuter air carriers

A methodology for estimating market conception was developed as a part of the short-haul air transportation program. It is based upon an analysis of actual documents which provide a record of known travel history. Applying this methodology a forecast was made of the demand for an air feeder service between Charlottesville, Virginia and Dulles International Airport. Local business travel vouchers and local travel agent records were selected to provide the documentation. The market was determined to be profitable for an 8-passenger Cessna 402B aircraft flying a 2-hour daily service pattern designed to mesh to the best extent possible with the connecting schedules at Dulles. The Charlottesville - Dulles air feeder service market conception forecast and its methodology are documented.

Ransone, R. K.↗

Foresee: A user-centric home energy management system for energy efficiency and demand response

This paper presents foresee, a user-centric home energy management system that can help optimize how a home operates to concurrently meet users' needs, achieve energy efficiency and commensurate utility cost savings, and reliably deliver grid services based on utility signals. Foresee is built on a multiobjective model predictive control framework, wherein the objectives consist of energy cost, thermal comfort, user convenience, and carbon emission. Foresee learns user preferences on different objectives and acts on their behalf to operate building equipment, such as home appliances, photovoltaic systems, and battery storage. In this work, machine-learning algorithms were used to derive data-driven appliance models and usage patterns to predict the home's future energy consumption. This approach enables highly accurate predictions of comfort needs, energy costs, environmental impacts, and grid service availability. Simulation studies were performed on field data from a residential building stock data set collected in the Pacific Northwest. Results indicated that foresee generated up to 7.6% whole-home energy savings without requiring substantial behavioral changes. When responding to demand response events, foresee was able to provide load forecasts upon receipt of event notifications and delivered the committed demand response services with 10% or fewer errors. Foresee fully utilized the potential of the battery storage and controllable building loads and delivered up to 7.0-kW load reduction and 13.5-kW load increase. As a result, these benefits are provided while maintaining the occupants' thermal comfort or convenience in using their appliances.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Long term load forecasting accuracy in electric utility integrated resource planning

Forecasts of electricity consumption and peak demand over time horizons of one or two decades are a key element in electric utilities’ meeting their core objective and obligation to ensure reliable and affordable electricity supplies for their customers while complying with a range of energy and environmental regulations and policies. These forecasts are an important input to integrated resource planning (IRP) processes involving utilities, regulators, and other stake-holders. Despite their importance, however, there has been little analysis of long term utility load forecasting accuracy. We conduct a retrospective analysis of long term load forecasts on twelve Western U. S. electric utilities in the mid-2000s to find that most overestimated both energy consumption and peak demand growth. A key reason for this was the use of assumptions that led to an overestimation of economic growth. We find that the complexity of forecast methods and the accuracy of these forecasts are mildly correlated. In addition, sensitivity and risk analysis of load growth and its implications for capacity expansion were not well integrated with subsequent implementation. As a result, we review changes in the utilities load forecasting methods over the subsequent decade, and discuss the policy implications of long term load forecast inaccuracy and its underlying causes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Establishing a Numerical Modeling Framework for Hydrologic Engineering Analyses of Extreme Storm Events

In this study a numerical modeling framework for simulating extreme storm events was established using the Weather Research and Forecasting (WRF) model. Such a framework is necessary for the derivation of engineering parameters such as probable maximum precipitation that are the cornerstone of large water management infrastructure design. Here this framework was built based on a heavy storm that occurred in Nashville (USA) in 2010, and verified using two other extreme storms. To achieve the optimal setup, several combinations of model resolutions, initial/boundary conditions (IC/BC), cloud microphysics and cumulus parameterization schemes were evaluated using multiple metrics of precipitation characteristics. The evaluation suggests that WRF is most sensitive to IC/BC option. Simulation generally benefits from finer resolutions up to 5 km. At the 15km level, NCEP2 IC/BC produces better results, while NAM IC/BC performs best at the 5km level. Recommended model configuration from this study is: NAM or NCEP2 IC/BC (depending on data availability), 15km or 15km-5km nested grids, Morrison microphysics and Kain-Fritsch cumulus schemes. Validation of the optimal framework suggests that these options are good starting choices for modeling extreme events similar to the test cases. This optimal framework is proposed in response to emerging engineering demands of extreme storm events forecasting and analyses for design, operations and risk assessment of large water infrastructures.

atmospheric model↗

Application of Numerical Atmospheric Models

In this study, a numerical modeling framework for simulating extreme storm events was established using the Weather Research and Forecasting (WRF) model. Such a framework is necessary for the derivation of engineering parameters such as probable maximum precipitation that are the cornerstone of large water-management infrastructure design. Here, this framework was built based on a heavy storm that occurred in Nashville, Tennessee (U.S.), in 2010, and verified using two other extreme storms. To achieve the optimal setup, several combinations of model resolutions, initial/boundary conditions (IC/BC), cloud microphysics, and cumulus parameterization schemes were evaluated using multiple metrics of precipitation characteristics. The evaluation suggests that WRF is most sensitive to the IC/BC option. Simulation generally benefits from finer resolutions up to 5 km. At the 15 km level, NCEP2 IC/BC produces better results, whereas NAM IC/BC performs best at the 5 km level. The recommended model configuration from this study is: NAM or NCEP2 IC/BC (depending on data availability), 15 km or 15–5 km nested grids, Morrison microphysics, and Kain-Fritsch cumulus schemes. Validation of the optimal framework suggests that these options are good starting choices for modeling extreme events similar to the test cases. This optimal framework is proposed in response to emerging engineering demands of extreme storm event forecasting and analyses for design, operations, and risk assessment of large water infrastructures.

Chen, Xiaodong↗

Ohio River Basin Water Resources: Monitoring Flash Drought Potential and Quantifying the Hydrologic Impacts in the Ohio River Basin

Flash drought conditions emerge in a matter of weeks following persistent weather anomalies, such as high temperatures or large vapor pressure deficits, that drive increased evaporative demand. Vegetation response rapidly depletes soil moisture, threatening surface water supplies, triggering significant crop loss, and increasing wildfire risk. Drought indices sensitive to flash drought are currently not included in drought forecast models in the Ohio River Basin (ORB). The team assessed and compared drought indices, gauge-based data, and satellite measurements over the course of the September 2019 flash drought event in the Ohio River Basin to investigate environmental fingerprints throughout flash drought evolution. Potential leading flash drought indicators were compared to the Standardized Precipitation Index (SPI) to aid the National Weather Service (NWS) Ohio River Forecast Center and Kentucky Climate Center in producing early warning flash drought forecasts. These drought indices included Evaporative Demand Drought Index (EDDI), Standardized Precipitation Evapotranspiration Index (SPEI), and Landscape Evaporative Response Index (LERI) (derived from Terra Moderate Resolution Imaging Spectroradiometer (MODIS)). Drought index behavior inherently varies based on parameters incorporated - EDDI measures evaporative demand through potential evapotranspiration, and demonstrates more variations due to sensitivity to seasonal changes in evaporative demand throughout the 2010-2019 study period. Conversely, LERI measures evaporative response through actual evapotranspiration, representing different environmental changes. Soil moisture response was evaluated using Soil Moisture Active Passive (SMAP) L-band radiometer data and Kentucky Mesonet gauge-based measurements. This analysis enables climatologists and weather forecasters to keep decision-makers and stakeholders better informed about drought risks, and to implement the appropriate actions for preparation of drought onset.

Adelaide Schmid↗

Ohio River Basin Water Resources: Monitoring Flash Drought Potential and Quantifying the Hydrologic Impacts in the Ohio River Basin Utilizing NASA Earth Observations

Flash drought conditions emerge in a matter of weeks following persistent weather anomalies, such as high temperatures or large vapor pressure deficits, that drive increased evaporative demand. Vegetation response rapidly depletes soil moisture, threatening surface water supplies, triggering significant crop loss, and increasing wildfire risk. Drought indices sensitive to flash drought are currently not included in drought forecast models in the Ohio River Basin (ORB). The team assessed and compared drought indices, gauge-based data, and satellite measurements over the course of the September 2019 flash drought event in the Ohio River Basin to investigate environmental fingerprints throughout flash drought evolution. Potential leading flash drought indicators were compared to the Standardized Precipitation Index (SPI) to aid the National Weather Service (NWS) Ohio River Forecast Center and Kentucky Climate Center in producing early warning flash drought forecasts. These drought indices included Evaporative Demand Drought Index (EDDI), Standardized Precipitation Evapotranspiration Index (SPEI), and Landscape Evaporative Response Index (LERI) (derived from Terra Moderate Resolution Imaging Spectroradiometer (MODIS)). Drought index behavior inherently varies based on parameters incorporated -EDDI measures evaporative demand through potential evapotranspiration, and and demonstrates more variations due to sensitivity to seasonal changes in evaporative demand throughout the 2010-2019 study period. Conversely, LERI measures evaporative response through actual evapotranspiration, representing different environmental changes. Soil moisture response was evaluated using Soil Moisture Active Passive (SMAP) L-band radiometer data and Kentucky Mesonet gauge-based measurements. This analysis enables climatologists and weather forecasters to keep decision-makers and stakeholders better informed about drought risks to implement the appropriate actions for preparation of drought onset.

DEVELOP Project Summary↗

Assessing the WRF-Solar Model Performance Using Satellite-Derived Irradiance from the National Solar Radiation Database

Abstract WRF-Solar is a numerical weather prediction model specifically designed to meet the increasing demand for accurate solar irradiance forecasting. The model provides flexibility in the representation of the aerosol–cloud–radiation processes. This flexibility can be argued to make it more difficult to improve the model’s performance because of the necessity of inspecting different configurations. To alleviate this situation, WRF-Solar has a reference configuration to use as a benchmark in sensitivity experiments. However, the scarcity of high-quality ground observations is a handicap to accurately quantify the model performance. An alternative to ground observations are satellite irradiance retrievals. Herein we analyze the adequacy of the National Solar Radiation Database (NSRDB) to validate the WRF-Solar performance using high-quality global horizontal irradiance (GHI) observations across the contiguous United States (CONUS). Based on the sufficient performance of NSRDB, we further analyze the WRF-Solar forecast errors across the CONUS, the growth of the forecasting errors as a function of the lead time, and sensitivities to the grid spacing and the representation of the radiative effects of unresolved clouds. Our results based on WRF-Solar forecasts spanning 2018 reveal a 7% median degradation of the mean absolute error (MAE) from the first to the second daytime period. Reducing the grid spacing from 9 to 3 km leads to a 4% improvement in the MAE, whereas activating the radiative effects of unresolved clouds is desirable over most of the CONUS even at 3 km of grid spacing. A systematic overestimation of the GHI is found. These results illustrate the potential of GHI retrievals to contribute to increasing the WRF-Solar performance.

14 SOLAR ENERGY↗

A hydrogen energy carrier. Volume 2: Systems analysis

A systems analysis of hydrogen as an energy carrier in the United States indicated that it is feasible to use hydrogen in all energy use areas, except some types of transportation. These use areas are industrial, residential and commercial, and electric power generation. Saturation concept and conservation concept forecasts of future total energy demands were made. Projected costs of producing hydrogen from coal or from nuclear heat combined with thermochemical decomposition of water are in the range $1.00 to $1.50 per million Btu of hydrogen produced. Other methods are estimated to be more costly. The use of hydrogen as a fuel will require the development of large-scale transmission and storage systems. A pipeline system similar to the existing natural gas pipeline system appears practical, if design factors are included to avoid hydrogen environment embrittlement of pipeline metals. Conclusions from the examination of the safety, legal, environmental, economic, political and societal aspects of hydrogen fuel are that a hydrogen energy carrier system would be compatible with American values and the existing energy system.

Savage, R. L.↗

AERoBOND Project Summary

Under NASA’s Convergent Aeronautics Solutions (CAS) project, the Adhesive-Free Bonding of Complex Composites (AERoBOND) project investigated off-stoichiometric epoxy polymers for fast, reliable assembly of epoxy matrix composite structures. The project goal was to demonstrate feasibility of the AERoBOND joining method by demonstrating mechanical properties greater than 80% of conventional co-cured materials while reducing structure weight by 1%. The project consisted of three convergent research areas: material and process development, systems analysis, and material and process modeling. Material and process development was the largest component of AERoBOND with approximately 6 FTE and 1WYE of support to formulate and characterize new resins, prepare carbon fiber prepregs, fabricate laminates, measure mechanical properties, analyze failure results, and select material and process improvements. The systems analysis activity estimated the potential reduction in part count and aircraft weight by comparing models of composite wing boxes with no fasteners (co-cured structure), fasteners in major joints (co-cured stringers), and fasteners in all joints. The materials and process modeling activity included a molecular model of the AERoBOND materials system to predict mechanical properties of resins with offset stoichiometry and a process model to predict the effect of resin formulation and processing conditions on the extent of mixing and degree of cure in a finished joint. As the number of airline passenger trips doubles in the next 20 years (IATA/Tourism Economics Air Passenger Forecasts, April 2019), the increased demand for new commercial aircraft is now the single greatest technical challenge to the airframe manufacturing industry. To meet efficiency requirements, new aircraft must be fabricated primarily from high performance structural composites, but manufacturing processes are inherently slow with the largest bottleneck attributed to assembly and installation of fasteners (NASA/TM–2019-220428). Manufactures of commercial transport aircraft are compelled to install more than 100,000 redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. In structural adhesive bonds, the interface between adherend and adhesive is nearly two-dimensional making it susceptible to minute quantities of contamination, which can cause weak bonds. Currently, bond strength assessment is only possible through destructive testing (i.e., breaking the joint). For these reasons, regulatory organizations such as the Federal Aviation Administration (FAA) often require redundant load paths in secondary-bonded, primary-structures to alleviate concerns with bond performance. The AERoBOND process enables reflow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion. The AERoBOND joint is equivalent to the interlaminar region obtained during a co-cure process, so joint performance depends on the cohesive properties of the matrix resin. Conventional co-cured structures, although too costly and complex for large-scale manufacturing, are trusted by manufacturers and regulators, and are certified for flight with few or no redundant fasteners.Systems analysis performed on a composite wing model at the scale of a single-aisle commercial transport aircraft indicated that >20,000 redundant fasteners per wing could be eliminated by implementing the AERoBOND joining method. A total weight reduction of 15% was predicted in a wing box by eliminating fasteners and thinning components that must no longer support localized fastener loads and accommodate fastener dimensions. Interlaminar shear fracture toughness measured by the end-notched flexure test was greater than 1 kJ/m2 (nearly 140% of the co-cured benchmark property), which is greatly in excess of the project goals for mechanical properties. Testing was planned to measure interlaminar tensile fracture toughness as well as interlaminar tensile and shear strengths using the same AERoBOND configuration, but was delayed due to closure of LaRC facilities during the COVID-19 pandemic. The AERoBOND process model is partially validated and available for experimental use. It allows the user to input AERoBOND process parameters such as material composition, laminate configuration, and cure cycle to predict the final cure state of the AERoBOND joint. A preliminary, multi-scale material model was developed to predict AERoBOND joint mechanical properties (stiffness and strength) based on the cure state of the joint provided by the process model. The timing for transition of this technology within NASA is excellent as NASA initiates new enduring projects to address composites manufacturing rate challenges. AERoBOND technology is well suited to AAVP/AATT objectives for rapid manufacturing of a composite wing. A minimal effort (1 FTE/$15k procurement/0 WYE) is proposed in FY21 to continue a minor mechanical testing effort and maintain a SAA with ASX composites to develop commercial quality prepreg material. An RFI with the composites industry is suggested to quantify the technology gap between the current TRL and the TRL needed for transition to industry. A moderate effort [3-4 FTE/$150k/1 WYE (~$115k)] is proposed in FY22 for the “high rate composites manufacturing” project currently in planning. The partnership with ASX Composites will be expanded to produce material for sub-element/element-scale “panel-off” activities. Industry partnerships with airframe manufacturers is an expected component to explore damage tolerance and environmental stability. Further development of multi-scale modeling tools (process model, meso-scale model, and molecular model) is planned to enhance and deliver tools for rapid manufacturing infusion.

Frank Louis Palmieri↗

NASA’s Simulation Activities for Evaluating UAM Concept of Operations

NASA’s vision for Advanced Air Mobility (AAM) is to help emerging aviation markets to safely develop an air transportation system that moves people and cargo between places previously not served or underserved by aviation using revolutionary new aircraft types. Urban Air Mobility (UAM), the concept of expanding transportation networks by serving short flights to transport people and goods around metropolitan areas, is part of a larger paradigm shift toward AAM, in which new technologies and business models are enabling transformational applications of aviation. In NASA’s Concept of Operations for UAM, Providers of Services for UAM (PSU) play a key role to enable safe and efficient UAM operations by sharing operational data among UAM operators. PSUs provide a pre-departure strategic conflict management service that establishes operational plans for new flights and coordinates them with all relevant operations in shared airspace. The strategic conflict management aims to minimize the need for tactical separation provision, while considering anticipated traffic demand, vertiport capacity and availability, forecasted weather, and airspace restrictions. NASA is currently preparing a new lab evaluation activity with aviation industry partners, called the X4 simulation, to demonstrate their airspace services and capabilities and test new information exchange requirements for UAM operations. This simulation activity will support NASA’s National Campaign (NC) flight tests which are planned over the next several years to guide the collective community and stakeholders through a series of scenario-based test activities that involve vehicles and airspace management services operating in a live test environment. This presentation will provide an overview of the X4 simulation, including objectives, scenarios, assumptions, system architecture, and test schedule. The X4 simulation will evaluate the interconnectivity and operational intent sharing between PSUs for multiple operators, as well as the performance of strategic conflict management.

Urban Air Mobility, Simulation, Advanced Air Mobil↗

Communication Demand in the National Airspace - A Federated Learning Approach

Within the national airspace system (NAS), efficient use of spectrum remains a challenge; as UAS and UAM missions evolve, the amount of mission-critical aircraft communications are expected to significantly grow. To accommodate the increased demand, NASA Glenn Research Center is investigating artificial intelligence approaches that could dynamically allocate spectrum; however, these solutions are driven by communication and aviation data items, many of which are not directly available. One such cornerstone data item is communication demand, parameterizing the needs within a sector in terms that may directly inform spectrum allocation, such as channel access duration, bandwidth, and modulation type. This paper considers the complexity of predicting communication demand as a function of NAS behaviors. Unlike prior prediction work in communications, this research must consider how the NAS may be impacted by external factors - such as convective weather and closures - rather than estimating demand from time-series forecasting alone. Much of this research considers a federated learning design to predict communication events in terms of the type of event occurring (sector coordination, conflict resolution, etc.). To do so, an investigation of products from Sherlock Data Warehouse is conducted, identifying the trends, sufficiency, and correlations of each product to identified events. Additionally, a preliminary discussion for inferring associations between these event types and their communication parameters (duration, bandwidth, modulation) is presented. By utilizing federated learning, imbalances in the types of events and data present throughout the NAS can inform local models without impairing global training. Furthermore, the two-stage approach proposed allows for robust and speculative communication modelling, as communication techniques continue to evolve. As a result, this model enables a generalized approach to understanding NAS communications which is able to inform long-term changes to aviation spectrum management.

Nathan Schimpf↗