Search NASA⌕ Search

SEARCH · Search NASA

Results for “design analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Development of Design Analysis Methods for C/SiC Composite Structures

The stress-strain behavior at room temperature and at 1100 C (2000 F) was measured for two carbon-fiber-reinforced silicon carbide (C/SiC) composite materials: a two-dimensional plain-weave quasi-isotropic laminate and a three-dimensional angle-interlock woven composite. Micromechanics-based material models were developed for predicting the response properties of these two materials. The micromechanics based material models were calibrated by correlating the predicted material property values with the measured values. Four-point beam bending sub-element specimens were fabricated with these two fiber architectures and four-point bending tests were performed at room temperature and at 1100 C. Displacements and strains were measured at various locations along the beam and recorded as a function of load magnitude. The calibrated material models were used in concert with a nonlinear finite element solution to simulate the structural response of these two materials in the four-point beam bending tests. The structural response predicted by the nonlinear analysis method compares favorably with the measured response for both materials and for both test temperatures. Results show that the material models scale up fairly well from coupon to subcomponent level.

Sullivan, Roy M.↗

Trajectory Design Analysis over the Lunar Nodal Cycle for the Multi-Purpose Crew Vehicle (MPCV) Exploration Mission 2 (EM-2)

The first crewed mission, Exploration Mission 2 (EM-2), for the MPCV Orion spacecraft is scheduled for August 2021, and its current mission is to orbit the Moon in a highly elliptical lunar orbit for 3 days. A 21-year scan was performed to identify feasible missions that satisfy the propulsive capabilities of the Interim Cryogenic Propulsion Stage (ICPS) and MPCV Service Module (SM). The mission is divided into 4 phases: (1) a lunar free return trajectory, (2) a hybrid maneuver, during the translunar coast, to lower the approach perilune altitude to 100 km, (3) lunar orbit insertion into a 100 x 10,000 km orbit, and (4) lunar orbit loiter and Earth return to a splashdown off the coast of Southern California. Trajectory data was collected for all feasible missions and converted to information that influence different subsystems including propulsion, power, thermal, communications, and mission operations. The complete 21-year scan data shows seasonal effects that are due to the Earth-Moon geometry and the initial Earth parking orbit. The data and information is also useful to identify mission opportunities around the current planned launch date for EM-2.

Gutkowski, Jeffrey P.↗

Trace Contaminant Control for the International Space Station's Node 1- Analysis, Design, and Verification

Trace chemical contaminant generation inside crewed spacecraft cabins is a technical and medical problem that must be continuously evaluated. Although passive control through materials selection and active control by adsorption and catalytic oxidation devices is employed during normal operations of a spacecraft, contaminant buildup can still become a problem. Buildup is particularly troublesome during the stages between the final closure of a spacecraft during ground processing and the time that a crewmember enters for the first time during the mission. Typically, the elapsed time between preflight closure and first entry on orbit for spacecraft such as Spacelab modules was 30 days. During that time, the active contamination control systems are not activated and contaminants can potentially build up to levels which exceed the spacecraft maximum allowable concentrations (SMACs) specified by NASA toxicology experts. To prevent excessively high contamination levels at crew entry, the Spacelab active contamination control system was operated for 53 hours just before launch.

Perry, J. L.↗

Mission Design Analysis for the Martian Moon Phobos: Close Flybys, Missed Thrusts, and Other In-Flight Entertainment

A robotic mission to the Martian moons Phobos and Deimos would offer a wealth of scientific information and serve as a useful precursor to potential human missions. In this paper, we investigate a prospective mission enabled by solar electric propulsion that would explore Phobos via a series of flybys followed by capture into orbit around the moon. Of particular interest are low-cost options for capture and walkdown to the target science orbits aided by multi-body effects due to the mutual gravitational interaction of Phobos and Mars. We also consider contingency operations in the event of missed thrust or maneuver execution errors.

SEP↗

Maven Orbital Trajectory Analysis: Design and Implementation of Lander Relay Support

NASA’s successful Mars Atmosphere and Volatile Evolution Mission (MAVEN), currently engaged in a survey of the Martian atmosphere and its evolution over time, has successfully completed a series of orbit changes, including a two-month aerobraking campaign, to satisfy additional mission roles. Launched on 18 November 2013, it entered Martian orbit on 22 September 2014. Having finished its primary one-year mission, the NASA Mars Program Office (MPO) started discussions with the MAVEN project on feasible options for extending the mission lifetime along with providing support for various Mars lander functions. MAVEN is the latest of the three active NASA Mars orbiters, with no others planned for the foreseeable future. Given that the landers need orbital relay support for years to come, and the MRO and Odyssey orbiters are aging, MAVEN’s role in providing critical orbital relay support has become increasingly important. After several years of studies, MPO directed the MAVEN project in 2018 to reduce its orbit size to provide better telecommunications relay support for Martian surface landers and to support Mars 2020 EDL under the constraint that MAVEN will have enough fuel to operate until 2030. As a part of this effort, the recent aerobraking campaign was one of several steps crucial to accomplishing this goal. This paper discusses the challenges of the entire mission design and its distillation into a concrete set of targeted objectives. With the successful orbit change, MAVEN will be able to provide support for the Mars 2020 relay activities from EDL through surface operations beyond 2030. This effort can serve as an excellent example for future missions having similar needs and requirements.

Jakosky, B. M.↗

A TPS Design Analysis of Entry Probe Delivery from Orbit for Ice Giant Missions

Previous investigation of direct delivery of a probe into Neptune’s atmosphere showed said approach to be challenging due to high stagnation pressures and heat loads. Entering at a high entry flight path angle (EFPA) results in stagnation pressure beyond current Heatshield for Extreme Entry Environment Technology (HEEET) qualification, while entering at a lower EFPA results in higher heat loads, leading to required HEEET thicknesses beyond manufacturing capabilities. Aerocapture is an enticing alternative entry scenario because it enables a fast trip and the placement of a payload in orbit around Neptune that can also reach Triton. Here, we investigate entry conditions associated with delivering a probe from orbit to assess feasibility. We consider whether 1) this entry scenario results in reasonable conditions, and 2) HEEET single insulating layer (mid-density carbon phenolic, 3MDCP) can be used to decrease mass, risk, and cost.

H. S. Alpert↗

A TPS Design Analysis of Entry Probe Delivery from Orbit for Ice Giant Missions

Previous investigation of direct delivery of a probe into Neptune’s atmosphere showed said approach to be challenging due to high stagnation pressures and heat loads. Entering at a high entry flight path angle (EFPA) results in stagnation pressure beyond current Heatshield for Extreme Entry Environment Technology (HEEET) qualification, while entering at a lower EFPA results in higher heat loads, leading to required HEEET thicknesses beyond manufacturing capabilities. Aerocapture is an enticing alternative entry scenario because it enables a fast trip and the placement of a payload in orbit around Neptune that can also reach Triton. Here, we investigate entry conditions associated with delivering a probe from orbit to assess feasibility. We consider whether 1) this entry scenario results in reasonable conditions, and 2) HEEET single insulating layer (mid-density carbon phenolic, 3MDCP) can be used to decrease mass, risk, and cost.

Hannah S. Alpert↗