Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering↗

An Overview of Issues Related to IEEE Std 1547-2018 Requirements Regarding Voltage and Reactive Power Control

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018) was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concept and requires the appropriate information required to calculate relevant settings and configurations. Various stakeholders have different roles in implementing the standard, and portions of the standard are directed toward a specific audience who must possess specialized information and technical training to use and apply the requirements. This document aims to (1) summarize a specific portion of the standard as concisely as possible and (2) provide the reader with introductory knowledge and information to support the utilization of the requirements.

14 SOLAR ENERGY↗

Wind Generation Participation in Power System Frequency Response: Preprint

The electrical frequency of an interconnected power system must be maintained close its nominal level at all times. Excessive under- and overfrequency excursions can lead to load shedding, instability, machine damage, and even blackouts. There is a rising concern in the electric power industry in recent years about the declining amount of inertia and primary frequency response (PFR) in many interconnections. This decline may continue due to increasing penetrations of inverter-coupled generation and the planned retirements of conventional thermal plants. Inverter-coupled variable wind generation is capable of contributing to PFR and inertia with a response that is different from that of conventional generation. It is not yet entirely understood how such a response will affect the system at different wind power penetration levels. The modeling work presented in this paper evaluates the impact of wind generation's provision of these active power control strategies on a large, synchronous interconnection. All simulations were conducted on the U.S. Western Interconnection with different levels of instantaneous wind power penetrations (up to 80%). The ability of wind power plants to provide PFR - and a combination of synthetic inertial response and PFR - significantly improved the frequency response performance of the system.

17 WIND ENERGY↗

Electrical four-point probing of spherical metallic thin films coated onto micron sized polymer particles

Micron-sized metal-coated polymer spheres are frequently used as filler particles in conductive composites for electronic interconnects. However, the intrinsic electrical resistivity of the spherical thin films has not been attainable due to deficiency in methods that eliminate the effect of contact resistance. In this work, a four-point probing method using vacuum compatible piezo-actuated micro robots was developed to directly investigate the electric properties of individual silver-coated spheres under real-time observation in a scanning electron microscope. Poly(methyl methacrylate) spheres with a diameter of 30 μm and four different film thicknesses (270 nm, 150 nm, 100 nm, and 60 nm) were investigated. By multiplying the experimental results with geometrical correction factors obtained using finite element models, the resistivities of the thin films were estimated for the four thicknesses. These were higher than the resistivity of bulk silver.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Electrically pumped continuous wave quantum dot lasers epitaxially grown on patterned, on-axis (001) Si

High performance III-V lasers at datacom and telecom wavelengths on on-axis (001) Si are needed for scalable datacenter interconnect technologies. We demonstrate electrically injected quantum dot lasers grown on on-axis (001) Si patterned with {111} v-grooves lying in the [110] direction. No additional Ge buffers or substrate miscut was used. The active region consists of five InAs/InGaAs dot-in-a-well layers. Here, we achieve continuous wave lasing with thresholds as low as 36 mA and operation up to 80°C.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Inputs to GCAM-USA: IM3 Phase 2 Experiments

Overview This dataset contains XML input files for the IM3 Phase 2 version of GCAM-USA. The files are organized into two categories: Scenario-specific inputs represent hydroclimate and socioeconomic effects on water availability, heating and cooling degree-hours, and agricultural productivity. They support eight IM3 canonical scenarios: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Model-improvement inputs extend GCAM-USA v5.3 with updated representations of coal and nuclear power plant retirements, electricity trade among U.S. interconnections, offshore carbon storage costs, and groundwater depletion constraints. Data structure Scenario-specific inputs rcp45_runoff/ and rcp85_runoff/XML files describing water availability by HUC2 basin under the RCP 4.5 and RCP 8.5 scenarios. rcp45_hdcd/ and rcp85_hdcd/XML files containing monthly-day and monthly-night heating and cooling degree-hours at the U.S. state level for different RCP-SSP combinations. rcp45_agyields/ and rcp85_agyields/XML files describing changes in agricultural productivity at the intersection of GCAM regions and HUC2 water basins for different RCP-SSP combinations. rcp45_emissions_pathway/The emissions-constraint XML file used to represent the RCP 4.5 pathway. Model-improvement inputs core_retire/Updates coal-fired power plant retirement schedules based on New England ISO. GCAMUSA_IM3_elec_trade_interconnect.xmlRestricts electricity trade to occur within the ERCOT, WECC, and IE interconnections. nuclear_USA.xmlUpdates the retirement schedules of the Diablo Canyon and Palisades nuclear power plants. high_cost_offshore_carbon.xmlUpdates the assumed cost of offshore carbon storage. water_supply_constrained_gleeson_5pct.xmlReplaces WaterGAP historical groundwater-depletion estimates with data from the Gleeson dataset and limits groundwater extraction to 5% of the available groundwater in each Superwell grid cell. How to use the data This dataset is designed for use with the IM3 version of GCAM-USA. Download or clone GCAM-USA from the IM3 GCAM GitHub repository at https://github.com/IMMM-SFA/gcam-core and check out the gcam-usa-im3 branch. Place the downloaded folder im3scenarios in the gcam-core/input directory while preserving the provided folder structure.

Energy↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Rate, Durable Sodium-Ion Battery Cathode Enabled by Carbon-Coated Micro-Sized Na 3 V 2 (PO 4 ) 3 Particles with Interconnected Vertical Nanowalls

Na-ion batteries have been regarded as promising alternatives for Li-ion batteries due to the extensive sodium reserves in the world. Na3V2(PO4)3 has been proved to be a good candidate of the cathode materials in Na-ion batteries but the intrinsic low electrical conductivity and sluggish kinetics handicapped its application. Here, 3D hierarchical Na3V2(PO4)3 particles are synthesized by a facile hydrothermal method, constructed by carbon-coated 2D Na3V2(PO4)3 nanowalls. Superior cell performance of high rate capability and cycle stability are observed in the well-defined structure. As the cathode in Na-ion batteries, it delivers a high capacity almost reaching the theoretical one and exhibits high capacity retention. The enhanced rate capability and cycle performance can be attributed to the improved electrical conductivity from the interconnected carbon layer and the shortened ion diffusion length and high specific surface area from the nanowalls.

36 MATERIALS SCIENCE↗

Electrical and Optical Performance Characteristics of p/n InGaAs Monolithic Interconnected Modules

There has been a traditional trade-off in ThermoPhotoVoltaic (TPV) energy conversion development between system efficiency and power density. This trade-off originates from the use of front surface spectral controls such as selective emitters and various types of filters. A Monolithic Interconnected Module (MIM) structure has been developed which allows for both high power densities and high system efficiencies. The MIM device consists of many individual Indium Gallium Arsenide (InGaAs) devices series-connected on a single semi-insulating Indium Phosphide (InP) substrate. The MIMs are exposed to the entire emitter output, thereby maximizing output power density. An InfraRed (IR) reflector placed on the rear surface of the substrate returns the unused portion of the emitter output spectrum back to the emitter for recycling, thereby providing for high system efficiencies. Initial MIM development has focused on a 1 sq cm device consisting of eight (8) series interconnected cells. MIM devices, produced from 0.74eV InGaAs, have demonstrated V(sub infinity) = 3.2 volts, J(sub sc) = 70 mA/sq cm and a fill factor of 66% under flashlamp testing. IR reflectance measurements (greater than 2 microns) of these devices indicate a reflectivity of greater than 82%. MIM devices produced from 0.55 eV InGaAs have also been demonstrated. In addition, conventional p/n InGaAs devices with record efficiencies (11.7% AM0) have been demonstrated.

Wilt, David M.↗

Background Information on the Power Quality Requirements in IEEE Std 1547-2018

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547-2018, Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, and energy storage systems with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects that are important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concepts and requires appropriate information to calculate relevant settings and configurations. This document provides informative material on the requirements related to electrical power quality in IEEE Std 1547-2018, with the intent to equip the reader with basic knowledge and background information to improve understanding and use of the requirements specified.

14 SOLAR ENERGY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

electricity↗

IRES Microgrid Energy Integration Report Version 1.0

This report presents technical information and guidance for the planned Integrated Renewable Energy System (IRES) microgrid project. This deployment of the microgrid and its associated assets was initiated in the beginning of 2022 at the Marine and Coastal Research Laboratory (MCRL) facility of Pacific Northwest National Laboratory (PNNL)-Sequim, Washington. The information in the report is organized under two main focus areas: electrical power interface, or interconnection, information of planned IRES assets; and communication and control interface, or interoperability, information of the planned IRES assets. The information will provide technical input for the development of the IRES microgrid controller technical specification, and also provide input for PNNL’s evaluation of adequacy of the electrical service infrastructure at MCRL to support the IRES project and help identify any gaps that will require facility-based upgrades. From an R&D aspect, this study and report will build on PNNL’s research and development work relating to energy storage (ES) codes and standards (C&Ss), including hybrid systems, performed on behalf of the Department of Energy (DOE) Office of Electricity (OE) ES. The current state of C&Ss for advanced technologies and their application, including microgrid-based technology is limited. For cases where formal standards issued by recognized Standards Developing Organizations do not yet exist, guidance is provided based on emerging best practices, including industry-group references that can be leveraged for microgrid technology which is in its early stages of development and use.

24 POWER TRANSMISSION AND DISTRIBUTION↗