Search NASA⌕ Search

SEARCH · Search NASA

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

JPL preferred parts list: Reliable electronic components

The JPL Preferred Parts List was prepared to provide a basis for selection of electronic parts for JPL spacecraft programs. Supporting tests for the listed parts were designed to comply with specific spacecraft environmental requirements. The list tabulates the electronic, magnetic, and electromechanical parts applicable to all JPL electronic equipment wherein reliability is a major concern. The parts listed are revelant to equipment supplied by subcontractors as well as fabricated at the laboratory.

Covey, R. E.↗

Update on Douglas' high-speed civil transport studies

A summary is presented of high speed civil transport (HSCT) studies underway at Douglas Aircraft. A brief review is given of experience with design and development of advanced supersonic transport concepts and associated technology. A review is then presented of past NASA funded contract research studies focused on selection of appropriate concepts for high speed civil transport aircraft to be introduced in the year 2000 time frame for commercial service. Follow-on activities to those studies are then presented which were conducted under independent research studies as well as under further NASA funded efforts. Design Mach number selections and associated baseline design missions are then discussed along with forecasted passenger traffic and associated supersonic fleet sizes, and then proceeds into a discussion of individual issues related either to environmental acceptability or overall technology requirements in order to achieve the required economic viability of the program. A summary is given of current and future plans and activities.

Bunin, Bruce L.↗

Energy Management Programs at the John F. Kennedy Space Center

The Energy Management internship over the summer of 2011 involved a series of projects related to energy management on the John. F. Kennedy Space Center (KSC). This internship saved KSC $14.3 million through budgetary projections, saved KSC $400,000 through implementation of the recycling program, updated KSC Environmental Management System's (EMS) water and energy-related List of Requirements (LoR) which changed 25.7% of the list, provided a incorporated a 45% design review of the Ordnance Operations Facility (OOF) which noted six errors within the design plans, created a certification system and timeline for implementation regarding compliance to the federal Guiding Principles, and gave off-shore wind as the preferred alternative to on-site renewable energy generation.

Huang, Jeffrey H.↗

DOE Zero Energy Ready Homes

This article describes the U.S. Department of Energy's Zero Energy Ready Home Program and Housing Innovation Awards. Since 2013, builders around the country have certified over 1,170 homes to the high performance criteria of the DOE Zero Energy Ready Home program. Each year DOE recognizes the best innovators among this group with the DOE Housing Innovation Awards. 2017 winners will be announced at an awards event taking place at the Energy & Environmental Building Alliance (EEBA) high-performance home summit October 10-12, 2017, in Atlanta, Georgia. Twenty-five builders are expected to take home awards and grand award winners in each of the five competition categories will be revealed at the conference. Participating builders represent every climate zone in the country and DOE Zero Energy Ready labeled homes can be found in 34 states. Homes represent the full spectrum of the U.S. construction industry, from affordable to production to custom homes and from single-family detached to duplexes and up to five-story multifamily buildings as well as some retrofit projects have also met the criteria. Every DOE ZER certified home is certified through the ENERGY STAR Certified Homes (Version 3.0, revision 8) program and the U.S. Environmental Protection Agency’s Indoor airPLUS program. Each home must meet the hot water distribution requirements of the EPA’s WaterSense program and the insulation requirements of the 2012 International Energy Conservation Code. If the home has HVAC ducts, they must be installed within the conditioned space of the home. Appliances, exhaust fans, ceiling fans, and most of the lighting should be ENERGY STAR qualified. The DOE Zero Energy Ready Home program also requires homes to have solar electric panels installed or at a minimum to have the conduit and electrical panel space in place for future PV installation, if the home is in a location appropriate for solar power. Homes are constructed with enough energy efficiency built in so that, with a reasonable amount of solar PV panels (i.e., small enough to fit comfortably on the roof), the home could produce enough of its own power to equal the power it uses in a year.

U.S. Department of Energy Building Technologies Pr↗

A Transformational Graduate Program: Mines and NREL Join Forces To Shape the Future of Energy

Developing secure, resilient, and adaptive energy infrastructure that fosters economic growth while reducing environmental impact is among the most pressing challenges—and greatest opportunities—of our time. It will require the next generation of thought leaders to capably and creatively guide this vital energy sector transition. Through a new interdisciplinary graduate program, Colorado School of Mines (Mines) and the National Renewable Energy Laboratory (NREL) are cultivating the rich opportunity landscape needed to develop these future innovators. The Mines/NREL Advanced Energy Systems (AES) degree program prepares researchers at the doctoral level and energy professionals at the master’s level to address the full complexity of tomorrow's infrastructure, economic, and environmental challenges. The combination of a thriving cleantech market in Colorado, world-class resources and researchers at NREL, and rigorous educational and technical programs at Mines create a truly one-of-a-kind opportunity for advancing fields related to energy systems. These links can uniquely equip top-caliber students to become the scientists and engineers at the forefront of our global energy economy transformation.

Advanced Energy Systems↗

Requirements for regional short-haul air service and the definition of a flight program to determine neighborhood reactions to small transport aircraft

An evaluation of the current status and future requirements of an intraregional short haul air service is given. A brief definition of the different types of short haul air service is given. This is followed by a historical review of previous attempts to develop short haul air service in high density urban areas and an assessment of the current status. The requirements for intraregional air service, the need for economic and environmental viability and the need for a flight research program are defined. A detailed outline of a research program that would determine urban community reaction to frequent operations of small transport aircraft is also given. Both the operation of such an experiment in a specific region (San Francisco Bay area) and the necessary design modifications of an existing fixed wing aircraft which could be used in the experiment are established. An estimate is made of overall program costs.

Feher, K.↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

Source record↗

ESnet Requirements Review Program Through the IRI Lens: A Meta-Analysis of Workflow Patterns Across DOE Office of Science Programs (Final Report)

The Department of Energy (DOE) ensures America’s security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. The DOE’s Office of Science (SC) delivers groundbreaking scientific discoveries and major scientific tools that transform our understanding of nature and advance the energy, economic, and national security of the United States. The SC’s programs advance DOE mission science across a wide range of disciplines and have developed the research infrastructure needed to remain at the forefront of scientific discovery. The DOE SC’s world-class research infrastructure — exemplified by the 28 SC scientific user facilities — provides the research community with premier observational, experimental, computational, and network capabilities. Each user facility is designed to provide unique capabilities to advance core DOE mission science for its sponsor SC program and to stimulate a rich discovery and innovation ecosystem. Research communities gather and flourish around each user facility, bringing together diverse perspectives. A hallmark of many facilities is the large population of students, postdoctoral researchers, and early-career scientists who contribute as full-fledged users. These facility staff and users collaborate over years to devise new approaches to utilizing the user facility’s core capabilities. The history of the SC user facilities has many examples of wildly inventive researchers challenging operational orthodoxy to pioneer new vistas of discovery; for example, the use of the synchrotron X-ray light sources for study of proteins and other large biological molecules. This continual reinvention of the practice of science — as users and staff forge novel approaches expressed in research workflows — unlocks new discoveries and propels scientific progress. Within this research ecosystem, the high-performance computing (HPC) and networking user facilities stewarded by SC’s Advanced Scientific Computing Research (ASCR) program play a dynamic cross-cutting role, enabling complex workflows demanding high performance data, networking, and computing solutions. The DOE SC’s three HPC user facilities and the Energy Sciences Network (ESnet) high-performance research network serve all of the SC’s programs as well as the global research community. Argonne Leadership Computing Facility (ALCF), the National Energy Research Scientific Computing Center (NERSC), and Oak Ridge Leadership Computing Facility (OLCF) conceive, build, and provide access to a range of supercomputing, advanced computing, and large-scale data-infrastructure platforms, while ESnet interconnects DOE SC research infrastructure and enables seamless exchange of scientific data. All four facilities operate testbeds to expand the frontiers of computing and networking research. Together, the ASCR facilities enterprise seeks to understand and meet the needs and requirements across SC and DOE domain science programs and priority efforts, highlighted by the formal requirements reviews (RRs) methodology. In recent years, the research communities around the SC user facilities have begun experimenting with and demanding solutions integrated with HPC and data infrastructure. This rise of integrated-science approaches is documented in many community and high-level government reports. At the dawn of the era of exascale science and the acceleration of artificial intelligence (AI) innovation, there is a broad need for integrated computational, data, and networking solutions. In response to these drivers, DOE has developed a vision for an Integrated Research Infrastructure (IRI): To empower researchers to meld DOE’s world-class research tools, infrastructure, and user facilities seamlessly and securely in novel ways to radically accelerate discovery and innovation.

42 ENGINEERING↗

Data Quality Objectives Summary Report Supporting Radiological Air Surveillance Monitoring for the INL Site

This report documents the Data Quality Objectives (DQOs) developed for the Idaho National Laboratory (INL) Site ambient air surveillance program. The development of the DQOs was based on the seven-step process recommended “for systematic planning to generate performance and acceptance criteria for collecting environmental data” (EPA 2006). The process helped to determine the type, quantity, and quality of data needed to meet current regulatory requirements and to follow U.S. Department of Energy guidance for environmental surveillance air monitoring design. It also considered the current air monitoring program that has existed at INL Site since the 1950s. The development of the DQOs involved the application of the atmospheric dispersion model CALPUFF to identify likely contamination dispersion patterns at and around the INL Site using site-specific meteorological data. Model simulations were used to quantitatively assess the probable frequency of detection of airborne radionuclides released by INL Site facilities using existing and proposed air monitors.

54 ENVIRONMENTAL SCIENCES↗

Switchgrass selection as a "model" bioenergy crop: A history of the process

A review of several publications of the Oak Ridge National Laboratory's Biofuels Feedstock Development Program and final reports from the herbaceous crop screening trials show that technology, environmental, and funding issues influenced the decision to focus on a single herbaceous model crop species. Screening trials funded by the U.S. Department of Energy in the late 1980s to early 1990s assessed thirty-four herbaceous species on a wide range of soil types at thirty-one different sites spread over seven states in crop producing regions of the U.S. Several species, including sorghums, reed canarygrass, wheatgrasses, and other crops, were identified as having merit for further development. Six of the seven institutions performing the screening included switchgrass among the species recommended for further development in their region and all recommended that perennial grasses be given high research priority. Reasons for the selection of switchgrass included demonstration of relatively high, reliable productivity across a wide geographical range, suitability for marginal quality land, low water and nutrient requirements, and other positive environmental attributes. Crop screening results, economic and environmental assessments by the Biofuels Feedstock Development Program staff, and Department of Energy funding limitations all contributed to the decision to further develop only switchgrass as a model or prototype species in 1991. The following ten year focus on development of switchgrass as a bioenergy crop proved the value of focusing on a single model herbaceous crop. The advancements and attention gained were sufficient to give government leaders, policymakers, farmers, and biofuel industry developers the confidence that lignocellulosic crops could support an economically viable and environmentally sustainable biofuel industry in the U.S.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site Radiological Control Manual

This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

Nevada National Security Site Radiological Control Manual

Please have this STIP assigned, documented, and recorded in OSTI as Report Number DOE/NV/03624--0257 Revision 1 and Author as Radiological Control Managers' Council. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

Annual Site Environmental Report: 2009(ASER)

This report provides information about environmental programs during the calendar year of 2009 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2009/2010 (October 2009 through May 2010), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that Worker safety and health are protected, The environment is protected, and Compliance is ensured. Throughout 2009, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. SLAC's EMS was audited by a review team from the DOE Oak Ridge Office and the DOE SLAC Site Office (SSO) on March 31, 2009. The review team found the EMS to be in substantial conformance with the appropriate EMS requirements. Based on the audit results, SLAC and DOE were able to declare conformance with DOE Order 450.1A ahead of the June 30, 2009 mandated deadline. During 2009, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2009. Hazardous materials field verifications of 36 buildings identified a number of materials that could be removed from inventory due to lack of need or age of the material. In all, 124 chemical containers were removed from inventory. SLAC's chemical purchase approval process was reconfigured to allow for more effective control over purchase of highly toxic materials. One hundred percent of SLAC's purchased desktops, laptops, and monitors were either Silver or Gold level Electronic Product Environmental Assessment Tool (EPEAT) certified in fiscal year (FY) 2009. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in greenhouse gas (GHG) emissions. In 2009, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. During calendar year (CY) 2009, SLAC shipped 1324 cubic feet of low-level radioactive waste, legacy waste accounted for 40 percent of the volume, to appropriate treatment and disposal facilities for low-level radioactive waste. Moreover, SLAC continued its efforts in the inventory reduction of materials no longer needed for its mission: returned 28 sealed sources to the manufacturer, transferred additional 3 sources to Los Alamos National Laboratory, and disposed of 636 kilograms of depleted uranium tiles. In 2009, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region on October 19, 2009, for the investigation and remediation of impacted soil and groundwater at SLAC. Risk-based preliminary cleanup goals for impacted soil and groundwater have been established for SLAC, and the remedial efforts are being designed to meet these established goals.

Source record↗

Apollo experience report: Command and service module communications subsystem

The development of spacecraft communications hardware from design to operation is described. Programs, requirements, specifications, and design approaches for a variety of functions (such as voice, telemetry, television, and antennas) are reviewed. Equipment environmental problems such as vibration, extreme temperature variation, and zero gravity are discussed. A review of the development of managerial techniques used in refining the roles of prime and subcontractors is included. The hardware test program is described in detail as it progressed from breadboard design to manned flight system evaluations. Finally, a series of actions is recommended to managers of similar projects to facilitate administration.

Lattier, E. E., Jr.↗

Historical Perspective on How and Why Switchgrass was Selected as a "Model" High-Potential Energy Crop

A review of several publications of the Biofuels Feedstock Development Program, and final reports from the herbaceous crop screening trials suggests that there were several technical and non-technical factors that influenced the decision to focus on one herbaceous "model" crop species. The screening trials funded by the U.S. Department of Energy in the late 1980's to early 1990's assessed a wide range of about 34 species with trials being conducted on a wide range of soil types in 31 different sites spread over seven states in crop producing regions of the U.S. While several species, including sorghums, reed canarygrass and other crops, were identified as having merit for further development, the majority of institutions involved in the herbaceous species screening studies identified switchgrass as having high priority for further development. Six of the seven institutions included switchgrass among the species recommended for further development in their region and all institutions recommended that perennial grasses be given high research priority. Reasons for the selection of switchgrass included the demonstration of relatively high, reliable productivity across a wide geographical range, suitability for marginal quality land, low water and nutrient requirements, and positive environmental attributes. Economic and environmental assessments by Oak Ridge National Laboratory's Biofuels Feedstock Development Program staff together with the screening project results, and funding limitations lead to making the decision to further develop only switchgrass as a "model" or "prototype" species in about 1990. This paper describes the conditions under which the herbaceous species were screened, summarizes results from those trials, discusses the various factors which influenced the selection of switchgrass, and provides a brief evaluation of switchgrass with respect to criteria that should be considered when selecting and developing a crop for biofuels and bioproducts.

54 ENVIRONMENTAL SCIENCES↗

Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

54 ENVIRONMENTAL SCIENCES↗

Extendible-retractable electric field measurement antenna for IMP J

An antenna dispenser mechanism for the IMP J spacecraft was designed, fabricated, and tested. Upon command the mechanism deploys or retracts a conductor for use as a receiving antenna for an electric field measurement experiment. Five identical units were fabricated and tested to the IMP H & J environmental test specification. Of these, four are designated for flight on the IMP J spacecraft and one as a prototype flight spare. The testing program was successfully completed although certain design modifications were required as problems were uncovered by the testing; particularly thermal vacuum operation. The antenna mechanism functions well under the expected environmental and loading conditions. The wear life and load capability of the dry molybdenum disulphide lubricant originally used on the heavily loaded worm and gear pair were disappointing and a substitute material was applied. The lubricant finally applied performed well; although other problems were generated.

Larrick, W.↗