The case for Mars: Concept development for a Mars research station

A program to establish a permanent scientific research base on Mars is described. A Mars base as the much needed long-term focus for the space program is presented. A permanent base was chosen rather than the more conventional concept of a series of individual missions to different sites because the permanent base offers much greater scientific return plus greater crew safety and the potential for eventual growth into a settlement. The Mars base will strive for self-sufficiency and autonomy from Earth. Martian resources will be used to provide life support materials and consumables. The Martian atmosphere will provide a convenient source of volatiles: CO2, N2, and water. Rocket propellant (for returning vehicles), fuels, breathable air, and fertilizers will be manufactured from Mars air. Food will be grown on Mars using Martian materials as plant nutrients. A permanent human presence will be maintained on Mars beginning with the first manned landing via a strategy of crew overlap. This permanent presence will ensure safety and reliability of systems through continuous tending, maintenance, and expansion of the base's equipment and systems. A permanent base will allow the development of a substantial facility on Mars for the same cost (in terms of Earth departure mass) as a series of temporary camps. A base equipped with surface rovers, airplanes, and the ability to manufacture consumables and return propellant will allow far more extensive planetary exploration over a given period of years than would approaches featuring a series of short exploration missions such as the Apollo Moon program.

Welch, S. M.↗

The case for Mars concept

The Case for Mars workshops conducted in 1984 dealt with a program to establish a permanent scientific research base at Mars. The participants, viewed a Mars base as the much needed long-term focus for the space program. A permanent base was chosen rather than the more conventional concept of a series of individual missions to different sites became the permanent base offers much greater scientific return plus greater crew safety and the potential for growth into a true colony. This paper summarizes the results of the workshops. The Mars base will strive for self-sufficiency and autonomy from Earth. Martian resources will be used to provide life support materials and consumables. The Martian atmosphere will provide a convenient source of volatiles: C0 2 , N 2 , and water. Rocket propellant, fuels for surface and air vehicles and possibly power plants, breathable air, and fertilizers will be manufactured from the Mars atmosphere. Food will be grown on Mars using Martian regolith as a growth substrate. A permanent human presence will be maintained on Mars beginning with the first manned landing via a strategy of crew overlap. This permanent presence will ensure safety and reliability of systems through continuous tending, maintenance, and expansion of the base's equipment and systems. A permanent base will allow the development of a substantial facility on Mars for the same cost (in terms of Earth departure mass) as a series of temporary camps. A base equipped with surface rovers, airplanes, and the ability to manufacture consumables and propellant will provide far more extensive planetary exploration over a given period of years than would an Apollo-style approach.

J R French↗

NASA 60 GHz intersatellite communication link definition study. Addendum A: Mixed baseband and IF signals

As part of a definition study for a 60 GHz intersatellite communications link system (ICLS), baseline design concepts for a channelized crosslink were identified. The crosslink would allow communications between geostationary satellites of the planned Tracking and Data Acquisition System (TDAS) and would accommodate a mixture of frequency translation coherent links (bent pipe links) and baseband-in/baseband-out links (mod/demod links). A 60 GHz communication system was developed for sizing and analyzing the crosslink. For the coherent links this system translates incoming signals directly up to the 60 GHz band; trunks the signals across from one satellite to a second satellite at 60 GHz then down converts to the proper frequency for re-transmission from the second satellite without converting to any intermediate frequencies. For the baseband-in/baseband-out links the baseband data is modulated on to the 60 GHz carrier at the transmitting satellite and demodulated at the receiving satellite. The frequency plan, equipment diagrams, and link calculations are presented along with results from sizing and reliability analyses.

Source record↗

Manned testing in a simulated space environment

A view of the facility and operational requirements involved in performing a manned thermal vacuum test is presented. The requirements fall into two major categories. The first category deals with placing the suited crewmen in a hazardous environment and assuring their safety. The second category deals with the constraints and special requirements involved with a suited crewman operating flight hardware in a 1-G environment. Design areas that deal with man rating a chamber, including fire suppression, emergency repress, emergency power, backups, reliable instrumentation and data systems, communications, television monitoring, biomedical monitoring, material compatibilities, and equipment supporting the Extravehicular Mobility Unit (EMU) are discussed. The operational issues that are peculiar to manned testing such as test rules, test procedures, test protocol, emergency drills, availability of hyperbaric facilities, test team training and certification engineering concerns for a safe mechanical and instrumentation buildup, hazard analysis, and Failure Modes and Effects Analysis are discussed. The constraints and special requirements involved with a suited crewman operating flight hardware in a 1-G environment are addressed.

Fender, Donna L.↗

Improving Communications Systems

The Space Shuttle has many communications systems which are used throughout a typical mission. Given that the radio spectrum has become increasingly congested, the ability to hear extremely weak signals requires greater receiver sensitivity. Dryden Flight Research Center approached Angle Linear, a manufacturer of linear radio frequency products and peripherals for communications, to solve the problem. The solution was a receiving preamplifier specially crafted for NASA. Communications with the Space Shuttle are now more reliable,with Dryden being able to also support local missions without purchasing additional equipment. The work has carried over into the Mir Space Station communication support effort and is under evaluation by other NASA centers. The company's preamplifier line was greatly expanded to cover a broader range of frequencies, providing the same sensational improvement to other areas of communication including business, government, trucking, land mobile, cellular and broadcast.

Source record↗

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record↗

Ultrasonic Inspection

Automation Industries Inc. has had more than $2 million in contracts to produce innovative equipment for the Apollo program. When Marshall Space Flight Center sought a fast nondestructive way to inspect butt welds in aluminum alloys for spacecraft, the company developed a reliable ultrasonic device using multiple transducers called "delta manipulators" which detect lack of weld penetration not readily seen in radiograph automation. Industry soon adapted the ultrasonic equipment to a unique rail inspection device that saves countless man hours. Device is contained in self propelled railroad cars produced and operated by the company to check old track welds for deterioration.

Source record↗

Reliability inputs to Mariner 9 data explosion

This paper describes the prelaunch and post-launch reliability functions which contributed to the success of the Mariner 9 spacecraft. Examples are included to illustrate how each reliability activity was a vital part of each phase of the project. Prelaunch reliability functions included: (1) establishing, negotiating, and monitoring system and subsystem requirements, (2) participating in spacecraft system and subsystem design/hardware reviews, (3) monitoring preparation of failure mode effects and criticality analyses (FMECA), (4) establishing and managing a problem failure reporting (PFR) system for the spacecraft and its support equipment, (5) monitoring electronic parts activities, and (6) participating in spacecraft reviews. Particular emphasis is placed on mission operations reliability assurance activities, which included: (1) spacecraft problem/failure reporting, (2) managing an integrating failure reporting system which covered all mission operations activities, (3) real-time analysis of spacecraft anomalies, and (4) risk assessment.

Macgregor, D. S.↗

Reliability history of the Apollo guidance computer

The Apollo guidance computer was designed to provide the computation necessary for guidance, navigation and control of the command module and the lunar landing module of the Apollo spacecraft. The computer was designed using the technology of the early 1960's and the production was completed by 1969. During the development, production, and operational phase of the program, the computer has accumulated a very interesting history which is valuable for evaluating the technology, production methods, system integration, and the reliability of the hardware. The operational experience in the Apollo guidance systems includes 17 computers which flew missions and another 26 flight type computers which are still in various phases of prelaunch activity including storage, system checkout, prelaunch spacecraft checkout, etc. These computers were manufactured and maintained under very strict quality control procedures with requirements for reporting and analyzing all indications of failure. Probably no other computer or electronic equipment with equivalent complexity has been as well documented and monitored. Since it has demonstrated a unique reliability history, it is important to evaluate the techniques and methods which have contributed to the high reliability of this computer.

Hall, E. C.↗

Study of aircraft electrical power systems

The formulation of a philosophy for devising a reliable, efficient, lightweight, and cost effective electrical power system for advanced, large transport aircraft in the 1980 to 1985 time period is discussed. The determination and recommendation for improvements in subsystems and components are also considered. All aspects of the aircraft electrical power system including generation, conversion, distribution, and utilization equipment were considered. Significant research and technology problem areas associated with the development of future power systems are identified. The design categories involved are: (1) safety-reliability, (2) power type, voltage, frequency, quality, and efficiency, (3) power control, and (4) selection of utilization equipment.

Source record↗

Shuttle/Agena study. Annex A: Ascent agena configuration

Details are presented on the Agena rocket vehicle description, vehicle interfaces, environmental constraints and test requirements, software programs, and ground support equipment. The basic design concept for the Ascent Agena is identified as optimization of reliability, flexibility, performance capabilities, and economy through the use of tested and flight-proven hardware. The development history of the Agenas A, B, and D is outlined and space applications are described.

Source record↗

Repairing a communications satellite on orbit

A review of past failures indicates that module exchange can satisfy most repair requirements of communications satellites. Emphasis is placed on the design of a serviceable communications satellites with 20 modules, on the development of an on-orbit servicer designed to remove failed modules from a body-stabilized spacecraft and to replace them with good modules, and on servicing operations. Benefits of servicing or repair include increased satellite availability, increased reliability, decreased life cycle costs, replacement of worn-out items, installation of updated equipment, and correction of design failures. The use of servicing instead of replacement could result in cost savings in excess of 40 percent. Significant savings are possible when the lifetime of a program is long relative to the satellite lifetime.

Gordon, G. D.↗

Low-Cost Vertical Accelerometer For Aircraft

Self-aligning device measures vertical acceleration of aircraft but costs only small fraction of price of full inertial navigation system. Consists of accelerometer mounted vertically on inner gimbal of artificial horizon. Vertical accelerometer proves to be effective aid to Global Positioning System (GPS) navigation receivers in general-aviation aircraft and helicopters. Low-cost vertical accelerometer used to improve on vertical accuracy and reliability of GPS receiver alone. Also used to improve altitude accuracy for aircraft otherwise equipped with only baro-altimeter for altitude measurement.

Paielli, Russell A.↗

The US space station and its electric power system

The United States has embarked on a major development program to have a space station operating in low earth orbit by the mid-1990s. This endeavor draws on the talents of NASA and most of the aerospace firms in the U.S. Plans are being pursued to include the participation of Canada, Japan, and the European Space Agency in the space station. From the start of the program these was a focus on the utilization of the space station for science, technology, and commercial endeavors. These requirements were utilized in the design of the station and manifest themselves in: pressurized volume; crew time; power availability and level of power; external payload accommodations; microgravity levels; servicing facilities; and the ability to grow and evolve the space station to meet future needs. President Reagan directed NASA to develop a permanently manned space station in his 1984 State of the Union message. Since then the definition phase was completed and the development phase initiated. A major subsystem of the space station is its 75 kW electric power system. The electric power system has characteristics similar to those of terrestrial power systems. Routine maintenance and replacement of failed equipment must be accomplished safely and easily and in a minimum time while providing reliable power to users. Because of the very high value placed on crew time it is essential that the power system operate in an autonomous mode to minimize crew time required. The power system design must also easily accommodate growth as the power demands by users are expected to grow. An overview of the U.S. space station is provided with special emphasis on its electrical power system.

Thomas, Ronald L.↗

Requirements for soldered electrical connections

This publication is applicable to NASA programs involving solder connections for flight hardware, mission essential support equipment, and elements thereof. This publication sets forth hand and wave soldering requirements for reliable electrical connections. The prime consideration is the physical integrity of solder connections. Special requirements may exist which are not in conformance with the requirements of this publication. Design documentation contains the detail for these requirements, and they take precedence over conflicting portions of this publication when they are approved in writing by the procuring NASA installation.

Source record↗

Sensible and latent heat flux estimates in Antarctica

The assumption has been made that the net annual contribution of water by the processes of deposition and sublimation to the Antarctic Ice Sheet is zero. The U.S. Antarctic Program started installing reliable automatic weather stations on the Antarctic Continent in 1980. The initial units were equipped to measure wind speed, wind direction, air pressure, and air temperature. During the 1983-1984 field season in Antarctica, three units were installed that measured a vertical air temperature difference between the nominal heights of 0.5 m and 3.0 m and relative humidity at a nominal height of 3 m. The measurements of the vertical air temperature difference and the relative humidity are the minimum required to estimate the sensible and latent heat fluxes to the air, while not exceeding the available energy requirements for the weather stations. The estimates of the net annual sublimation and deposition on the Ross Ice Shelf amount to 20 to 80 percent of the annual accumulation. We conclude that the assumption that annual sublimation and deposition are zero is not valid under Antarctic conditions.

Stearns, Charles R.↗