Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.

terminal airspace↗

Airport Information Sharing Concept Architecture

The National Airspace System (NAS) Air Traffic management, control and operation depends on a timely and efficient distribution of real time information generated by stakeholders and published from a variety of sources. The Federal Aviation Administration System Wide Information Management (SWIM) is a service oriented architecture design to provide stakeholders with timely NAS information. However, there are other sources of useful information generated by stakeholders that can be included in the management of NAS operations. Airport facilities are host to most stakeholders operating in the NAS (airspace user, airport authority, ground handling, controller tower) and thus large information is generated and consumed at these facilities. The NASA Glenn Research center has been investigating an information exchange architecture framework that would enable the timely, efficient and secure gathering and distribution information generated at airport facilities. This presentation describes the framework architecture concept for the efficient information exchange of airport information.

Airports↗

Contractors Road Heavy Equipment Area (SWMU 055) 2021 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from January through December 2021. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with site-wide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; and - Semi-annual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act Corrective Action program. This report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under contract number 80KSC019F0096. The annual groundwater sampling results demonstrated that the footprint where chlorinated volatile organic compounds (VOC) are present above their State of Florida groundwater cleanup target levels (GCTLs) is not expanding overall. One non-chlorinated VOC (1,4-dioxane) is found above its GCTL at isolated points within the chlorinated VOC plume. The DPT groundwater investigation is being used to delineate the horizontal and vertical boundaries where chlorinated VOCs are present at levels above natural attenuation default concentrations. That data supports an evaluation of potential additional remedial actions. The potential for VI into the CRHE Area Office (K6-1996H) is evaluated by collected sub-slab vapor samples from four locations twice a year (once in the wet season and once in the dry season). The results for 2021 were all below the Environmental Protection Agency's vapor intrusion screening levels (VISLs) for both commercial and residential settings. The path forward for the site is to continue annual monitoring for chlorinated VOCs and 1,4-dioxane until additional remedies are implemented or the site is transitioned to long-term monitoring.

Contractors Road Heavy Equipment↗

A Flight Replanning Tool for Terminal Area Urban Air Mobility Operations

In this presentation we describe and evaluate a flight replanning tool, called the trial planner, for terminal area air transport applications. The trial planner employs predefined airspace structures to generate rerouting options between vertiports. In a simplified definition, vertiports are facilities that provide services for managing the take-off and landing of autonomous or manned electric vertical take-off or landing (eVTOL) aircraft. The airspace structures involved in our test cases are arrival routes that consist of predefined entry points to which a transitional path is computed dynamically from the current position of the aircraft. Rerouting options include the transitional path and approach segment along the arrival route; these rerouting options are not vetted for potential conflicts with other operations until a human operator commits to a choice and forwards the flight plan modification for approval from an automated airspace management service. A selected rerouting option is executed by loading a flight plan file to the aircraft ground control station. We conducted a qualitative evaluation of the trial planner using ratings provided by flight crews and air transportation human factors experts with relevant experience from air traffic control. Evaluation criteria included trust in the route recommendations and adequate explanation for the route options. We detail the logic and implementation of the trial planner, as well as report the results of the evaluation of the implementation herein.

Trial planning↗

Contractors Road Heavy Equipment Area (SWMU 055) 2022 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.

groundwater↗

Orbital transfer vehicle launch operations study: Manpower summary and facility requirements, volume 5

All manpower numbers, number of heads (by skill), serial time and manhours have been accumulated and compiled on a per subtask basis in spreadsheet format for both the ground based and the space based data flows. To aid in identifying the facility resources required to process the Ground Based Orbital Transfer Vehicle (GBOTV) and/or the space based orbital transfer vehicle (SBOTV) through the ground facilities at Kennedy Space Center (KSC), a software application package was developed using a general purpose data base management system known as Data Flex. The facility requirements are used as the basic input to this software application. The resources of the KSC facility that could be used by orbital transfer vehicle program were digitized in the same format used to identify facility requirements. The facility capabilities were digitized in this format for subsequent, automated comparative analyses. Composite facility requirements are compared to each of the baseline facility capabilities and the system generates a relative score that indicates how each facility weighs against the composite requirements in relation to the other facilities in the set.

Source record↗

Facility design consideration for continuous mix production of class 1.3 propellant

In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.

Williamson, K. L.↗

Space Station Freedom (SSF) crew systems SE&I

Space Station program office planning and requirements activity has accelerated during the past year to bring the Space Station Freedom Program (SSF) through the program requirements review phase during 1988. The preliminary design review cycle began in Jan. 89, and is now planned for completion, with formal preliminary design reviews between Apr. and Sept., 1990. This paper briefly describes the PROGRAMMATIC aspects of the engineering and integration management of the SSF crew systems. Emphasis is given to the Crew Health Care System, which includes the Health Maintenance Facility, the Exercise Countermeasure Facility, and the Environmental Health System; all managed within the Man-Systems, one of the twelve 'distributed systems.' Medical and engineering requirements to meet the needs of the mature Space Station operations environment and highlights of critical technologies and equipment in development will be reviewed.

Austin, Frank H., Jr.↗

Payload operations management of a planned European SL-Mission employing establishments of ESA and national agencies

Spacelab (SL)-missions with Payload Operations (P/L OPS) from Europe involve numerous space agencies, various ground infrastructure systems and national user organizations. An effective management structure must bring together different entities, facilities and people, but at the same time keep interfaces, costs and schedule under strict control. This paper outlines the management concept for P/L OPS of a planned European SL-mission. The proposal draws on the relevant experience in Europe, which was acquired via the ESA/NASA mission SL-1, by the execution of two German SL-missions and by the involvement in, or the support of, several NASA-missions.

Joensson, Rolf↗

NASA Data Acquisition System Software Development for Rocket Propulsion Test Facilities

Current NASA propulsion test facilities include Stennis Space Center in Mississippi, Marshall Space Flight Center in Alabama, Plum Brook Station in Ohio, and White Sands Test Facility in New Mexico. Within and across these centers, a diverse set of data acquisition systems exist with different hardware and software platforms. The NASA Data Acquisition System (NDAS) is a software suite designed to operate and control many critical aspects of rocket engine testing. The software suite combines real-time data visualization, data recording to a variety formats, short-term and long-term acquisition system calibration capabilities, test stand configuration control, and a variety of data post-processing capabilities. Additionally, data stream conversion functions exist to translate test facility data streams to and from downstream systems, including engine customer systems. The primary design goals for NDAS are flexibility, extensibility, and modularity. Providing a common user interface for a variety of hardware platforms helps drive consistency and error reduction during testing. In addition, with an understanding that test facilities have different requirements and setups, the software is designed to be modular. One engine program may require real-time displays and data recording; others may require more complex data stream conversion, measurement filtering, or test stand configuration management. The NDAS suite allows test facilities to choose which components to use based on their specific needs. The NDAS code is primarily written in LabVIEW, a graphical, data-flow driven language. Although LabVIEW is a general-purpose programming language; large-scale software development in the language is relatively rare compared to more commonly used languages. The NDAS software suite also makes extensive use of a new, advanced development framework called the Actor Framework. The Actor Framework provides a level of code reuse and extensibility that has previously been difficult to achieve using LabVIEW. The

Herbert, Phillip W., Sr.↗

Embracing Safe Ground Test Facility Operations and Maintenance

Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

Dunn, Steven C.↗

Design Principles and Algorithms for Air Traffic Arrival Scheduling

This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

Center TRACON↗

A Human-In-The-Loop Simulation for Urban Air Mobility in the Terminal Area

In this paper researchers propose a human-in-the-loop experiment to study human performance when tasked with tactical deconfliction in terminal area air taxi operations. The air taxi operations being considered herein are an advanced air transportation concept called Urban Air Mobility (UAM). The UAM concept aims to support not only air taxi operations, but also package delivery and emergency response among other use cases. The key innovation over current air transportation lies with the introduction of highly automated aircraft and air traffic management systems. Development of the UAM system will include transitional midterm phases where some operational services will be provided by a mixture of automation and human actors. Midterm operations present a unique challenge, since the scope of responsibility of automated systems is largely undefined, suggesting the need for direct human participation with little to inform how much human intervention is necessary. Here it is assumed that traffic management responsibilities require coordination between human actors and automated systems and focus on arrival flows for midterm operations. In the proposed human-in-the-loop simulation, virtual UAM traffic is strategically deconflicted by a Provider of Services for UAM at departure, then tactically managed by a human at the arrival facility. Generated traffic consists of UAM participants flying in UAM exclusive airspace structures, thus isolated from traditional traffic. The human operator is tasked with managing spacing of arrival traffic and executing speed adjustments as deemed necessary. Researchers propose the investigation of three levels of automation assistance: 1) no assistance; 2) spacing violation detection; 3) spacing violation detection and speed adjustment recommendations. Quantitative measures like throughput and delay are used to assess the human's capacity for accommodating airborne delays. Qualitative evaluations such as surveys and open-ended feedback are used to gain insight into human factors. These factors could introduce additional capacity constraints on traffic, independent of physical or technical constraints. Although findings for this study will not be reported as the study has not yet been executed, the authors conclude with potential outcomes informed by previous simulations in the literature and suggestions for the structure and procedures of midterm human-automation air traffic management.

UAM↗

A Human-In-The-Loop Simulation for Urban Air Mobility in the Terminal Area

In this presentation we propose a human-in-the-loop experiment to study the potential impact of human engagement in tactical mitigation of delay in terminal area air taxi operations. The air taxi operations being considered herein is an advanced air transportation concept called Urban Air Mobility (UAM). The UAM concept aims to support not only air taxi operations, but also package delivery and emergency response among other use cases. The key innovation over current air transportation lies with the introduction of autonomous aircraft and autonomous air traffic management systems. Development of the UAM system will include transitional midterm phases where some operational services will be provided by a mixture of automation and human actors. Midterm operations present a unique challenge, since the scope of responsibility of automated systems is largely undefined, suggesting the need for direct human participation with little to inform how much human intervention is necessary. Here we assume that traffic management responsibilities require coordination between human actors and automated systems and focus on arrival flows for midterm operations. In the proposed human-in-the-loop simulation, virtual UAM traffic is strategically deconflicted by a Provider of Services for UAM at departure, then tactically managed by a human at the arrival facility. Generated traffic consists of UAM participants flying in UAM exclusive airspace structures, thus isolated from traditional traffic. The human operator is tasked with managing spacing of arrival traffic and executing speed adjustments as deemed necessary. We propose the investigation of three levels of automation assistance: 1) no assistance; 2) spacing violation detection; 3) spacing violation detection and speed adjustment recommendations. Quantitative measures like throughput and delay are used to assess the human's capacity for accommodating airborne delays. Qualitative evaluations such as surveys and open-ended feedback are used to gain insight into human factors. These factors could introduce additional capacity constraints on traffic, independent of physical or technical constraints. Although findings for this study will not be reported as the study has not yet been executed, we conclude with potential outcomes informed by previous simulations in the literature and suggestions for the structure and procedures of midterm human-automation air traffic management.

UAM↗

Aerospace mechanical reliability practice

The impact of mechanical-reliability practice on the Saturn/Apollo launch program is considered with reference to the interrelationship of analysts and designers with management. Rocket engine development, ground testing, and launch facilities in the Saturn/Apollo program are discussed, and the Saturn reliability approach is examined in regard to management style, decision making, human error control, and reliability analyses. It is noted that the use of conservative design philosophy contributed to achieved reliability.

Fedor, O. H.↗

Integrated water management system - Description and test results

Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

Elden, N. C.↗

The Development of an Airborne Information Management System for Flight Test

An airborne information management system is being developed at the NASA Dryden Flight Research Facility. This system will improve the state of the art in management data acquisition on-board research aircraft. The design centers around highly distributable, high-speed microprocessors that allow data compression, digital filtering, and real-time analysis. This paper describes the areas of applicability, approach to developing the system, potential for trouble areas, and reasons for this development activity. System architecture (including the salient points of what makes it unique), design philosophy, and tradeoff issues are also discussed.

Liquid cooling↗