Search NASASearch

SEARCH · Search NASA

Results for “high current pulses”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

669 records · Page 15

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

NASA's RPS Program Status Update and Future Outlook

Radioisotope Power Systems (RPS) have been safely providing the United States with the power to explore space for almost 65 years. NASA established the RPS Program in 2010 to support specialized science missions and potential future opportunities more effectively and efficiently. The RPS Program ensures the availability of RPS for the exploration of the solar system in environments where conventional solar or chemical power generation is impractical or impossible. NASA missions have utilized space nuclear power to explore planets, moons, and interstellar space, enabling missions to some of the deepest, darkest, and dustiest regions in the solar system and beyond. This scientific exploration has deepened our understanding of the solar system and our role within. The RPS Program, in partnership with the Department of Energy (DOE) Office of Nuclear Energy continues to operate as an interagency partnership to provide robust radioisotope power system solutions to spacecraft that conduct missions to extreme environments for science and exploration. This Program invests in systems and technologies to ensure that NASA maintains this capability well into the future and it manages processes that ensure the safe use and launch of these systems. This paper provides a synopsis of current activities of the RPS Program, and it introduces a focus on the commercialization of RPS to enable a variety of future mission applications.

radioisotope power systems

High-energy, high-power, long-life battery

High-energy-density primary battery achieves energy densities of up to 130 watt hrs./lb. The electrochemical couple consists of a lithium anode, a copper-fluoride cathode, and uses methyl formate/lithium hexafluoroarsenate for the electrolyte. Once achieved, battery life is approximately 30 hours.

Abens, S. G.

The Future of in-Situ Sequencing-Based Microbial Monitoring: Development of a Shelf-Stable Method for Artemis and Beyond

Microbial monitoring onboard the International Space Station (ISS) is essential for assessing the efficiency of the Environmental Control and Life Support Systems (ECLSS) and providing insight into potential risk to both crew and spacecraft. Historically, this monitoring required the need to culture organisms onboard, return these cultures to Earth, and then complete the identifications, a process that would take months. Over the past decade, and through numerous payloads, advances in molecular biology have enabled in-flight microbial identifications using nanopore sequencing. The swab-to-sequencer method resulting from these efforts was transitioned from research to operations for microbial monitoring under the Crew Health Care Systems (CHeCS) BioMole. Collectively, these accomplishments have propelled the swab-to-sequencer method to be selected as the Microbial Surface Monitor (MSM) for Gateway, as well as a payload on Artemis IV. However, the lack of cold stowage availability for Artemis requires modifications to the entire method due to the thermal instability of the reagents required for sample preparation. To achieve this, new development, optimization, and validations were undertaken. Key considerations included enzyme concentration, buffer compatibility, and equal or enhanced sensitivity and specificity. At each step, thorough side-by-side comparisons with the current ISS method were performed. The development of a robust shelf-stable method will ensure continued sequencing-based microbial monitoring for Artemis and beyond, providing data in near real-time, enhancing risk response time, and yielding clear insight into the microbiome of spacecraft.

Christian G Mena

Integrated Computational Materials Engineering (ICME) Capability Maturity Levels for Ecosystems Enabling Digital Transformation

Digital engineering (DE) and integrated computational materials engineering (ICME) are widely recognized as critical enablers of faster, more affordable, and more reliable aerospace systems. However, many organizations have struggled to realize the promised return on investment (ROI) from digital initiatives. A primary reason is the absence of a shared, decision-focused framework that distinguishes simple digitization of existing workflows from true digital transformation that fundamentally changes how engineering decisions are made. This paper introduces an ICME capability maturity framework that fills this gap. The framework defines six cumulative ICME capability maturity levels (CMLs), explicitly tied to decision authority, engineering integration, optimization, and uncertainty management across material, process, structure, and performance scales. It is designed to complement established readiness metrics such as technology readiness levels (TRLs), manufacturing readiness levels (MRLs), and integration readiness levels (IRLs), by addressing a missing dimension: the conditions required for model-informed decision authority across scales. A unifying figure and capability table illustrate the six-level ICME Capability Maturity Framework, showing how organizations progress from digitization—with limited or negative ROI—to true digital transformation, where ICME-enabled workflows deliver measurable improvements in decision quality, cycle time, risk reduction, and reuse. The framework is intended for both technical practitioners and executive leadership, providing a common language to assess current state, guide roadmaps, align software ecosystem investments, and set realistic expectations for digital transformation outcomes. A regulatory-relevant statement clarifying the relationship between ICME capability and existing certification frameworks is provided.

ICME

First-Principles Investigation of Phase Transitions in RuNb, RuTa, and Ru-Nb-Ta Ultrahigh Temperature Shape Memory Alloys

Ultrahigh temperature shape memory alloys (UHT-SMAs) have transition temperatures above 600 C, and they have found applications for sensing and actuating devices in aerospace industry. Among very few such UHT-SMAs currently known are Ru-based alloys such as RuNb and RuTa, whose martensite structures and phase transitions are totally different from those of NiTi-based SMAs and were poorly understood. In this work, we carried out a systematical study of RuNb using first-principles total energy calculations and molecular dynamics (MD) simulations. The transition paths and mechanisms in cubic → tetragonal →monoclinic transitions are revealed. and the transition sequence and martensitic transition temperatures are determined (MTTs) by evaluating the Gibbs free energies using thermodynamic integration. The calculated MTTs are in very good agreement with the experimental data. We found that the monoclinic phase at the second transition has the 𝑃21/m symmetry instead of experimentally identified 𝑃2/m. Our calculations demonstrate that RuTa has very similar phase transitions to those of RuTa. Furthermore, we studied the Ru0.5Nb0.25Ta0.25 ternary. Our results can explain the measured significant drop of MTT (~ 200 C) in the second transition for Ru0.5Nb0.25Ta0.25 compared with those of RuNb and RuTa, while in the first transition its MTT is between MTTs of RuNb and RuTa. The insights gained by this study and the verified ab initio methods for accurate MTT calculations can be applied to fast screen and quantitatively design novel UHT-SMAs having similar properties with desirable MTTs and much reduced cost.

Zhigang Wu