Search NASA⌕ Search

SEARCH · Search NASA

Results for “installed power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Space Nuclear Thermal Propulsion Critical Assembly Boron Worth Experiments

The Space Nuclear Thermal Propulsion (SNTP) project was an attempt to create a more powerful and more efficient rocket engine utilizing nuclear technologies. As part of this project a zero-power critical assembly referred to as SNTPCX was designed and installed at Sandia National Laboratories. The SNTP-CX was a light water moderated particle bed reactor utilizing highly enriched uranium fuel in the form of UC particles. The SNTP-CX performed 142 runs covering numerous experiments from the year 1989 to 1992. The program was canceled in 1994 as the nation’s priorities shifted. Now these experiments are being evaluated for use as criticality safety benchmarks. Nineteen of the 142 reactor runs were dedicated to a series of experiments to calculate the worth of the boron used in the light water moderator. This series of experiments has been selected for further evaluation as a critical benchmark for the International Criticality Safety Benchmark Evaluation Project (ICSBEP).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Renewable energy integration and system operation challenge: control and optimization of millions of devices

The electric power infrastructure, originally designed and built on large-scale power plants, is evolving into a more resilient power generation and delivery system in which millions of smaller units of distributed energy generation resources units will be installed in sub-transmission and distribution networks. In order to control, manage and optimize the future grid, a hierarchical design is presented in this chapter which enables the distributed control on grid edge while inheriting the existing centralized control structure. This layered design of large-scale power system operation and control uses the following principle: reactive power control is treated as a primary control for voltage stability, and the real power control is primarily a grid-level control but can also be a supplementary control for voltage support in the case of insufficient reactive power control capacity. For the purpose of active control and operation at the distribution level, a recursive power network model is derived from nodal injection and branch power flow models. Based on the model, the proposed algorithms of hierarchical control, grid-edge inference and dynamic hosting allowance are developed and presented for multi-level controlled operation. And, a co-simulation architecture of integrated T&D system is presented to validate and demonstrate the feasibility and scalability of proposed algorithms.

Xu, Ying↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Corroborating VNA and thermal measurements of transmission loss on the DIII-D ECH waveguide system

Electron cyclotron heating (ECH) and current drive (ECCD) will play a large role in tokamak-based fusion reactors. At the DIII-D tokamak, 110 GHz microwaves injected into the plasma can provide core heating and current drive as well as impurity control, neoclassical tearing mode mitigation, and breakdown assistance. Understanding the physics of these processes relies on accurate estimates of injected ECH power. DIII-D’s ECH system consists of six MW-class Microwave Power Products (MPP) gyrotron microwave sources. Operating the gyrotrons far from the tokamak removes them from magnetic field interference, so 31.75 mm inner-diameter corrugated waveguides transmit the microwave power the 80 m from the gyrotrons to steerable launchers in the tokamak chamber. Estimates of injected power rely on knowing the generated power at the source and then subtracting transmission loss. Conventional transmission loss measurements based on calorimetric dummy loads are onerous and only possible during extended maintenance periods. This work examines two tools that provide more flexibility for the transmission loss measurements. Furthermore, a resistive temperature detector (RTD) array installed along a waveguide measures heat lost to the transmission line, and low power time domain reflectometry (TDR) measurements with a vector network analyzer (VNA) allows loss measurements without burdensome hardware modifications.

ECH↗

The high-power helicon program at DIII-D: gearing up for first experiments

Helicon current drive, also called fast wave current drive in the lower hybrid range of frequencies, has long been regarded as a promising current drive tool for reactor grade plasmas. A newly installed MW-level system at DIII-D will be the first test of this technology in reactor-relevant plasmas, in the sense that full single-pass absorption is expected. A 30-module traveling wave antenna has been installed and optimized in-vessel in early 2020. The linear electromagnetic characteristics of the unloaded module array have been extensively tested both on the bench and in the vessel at instrumentation power levels. Excellent performance has been achieved, ~2% reflected power and ~1.5% dissipated power per module in air, in a 10 MHz band around 476 MHz. Stripline feeds on both ends of the antenna allow either co or counter current drive. The installation of a 1.2 MW klystron and associated high-power electronics was completed in Fall 2020. Commissioning of the antenna is ongoing. An important goal of this experiment is to validate the helicon current drive physics basis using an extensive set of new and upgraded diagnostics.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Ultra High-Temperature Magnetic Bearing System for s-CO 2 Turbines/Expanders. Phase II Final Report

The goal of this project is to design and construct of a prototype of ultra-high temperature permanent magnet (UHT–PM), which provides the force to pull the spinning shaft towards the target position in the magnetic bearing (MB) clearance circle. This project will develop a PM biased MB system, that is actively cooled to the 550°C maximum operating temperature limit of PMs. The MB test environment will include 700°C, 40krpm and 4,000 psi requirements to advance the supercritical carbon dioxide (sCO 2 ) and other types of Brayton power cycle systems. The proposed novel MBs combine PMs for supplying the bias field and electromagnets for supplying the control field, both in UHT conditions. The choice of material is the UHT Sm-Co PMs (US patent 6,451,132) due to their significantly better thermal stability. The 6-pole homopolar design permits uninterrupted force delivery via a redundant control capability (US patent 7,429,811) even if 3 poles were to fail. The Phase I efforts was to focus on development and demonstration of component technologies and detailed design of full scale components and a demonstrator test rig for use in Phase II. UHT–PMs were produced and used in the MB actuator. The operating environment of the EEC-T550 Sm-Co magnet material could be extended by implementing active cooling. Electromagnetic coils imbedded in the MB provide forces to stabilize the shaft position at the target via sensing and control stages. Shaft position sensors enable to identify the present position of the spinning shaft relative to its desired target position in the MB clearance circle (air gap). Auxiliary bearings will be installed to provide a backup support system in the event that power to the MB fails or there is a fault in a device providing current to the MB coils. For control, reliability and safety reasons the sensors and auxiliary bearings are typically located as close as possible to the MBs, which exposes them to the same environmental conditions. Development of only the actuator for the UHT environment is an inadequate approach to complete integration of the MB system in the turbine/expander. Therefore the UHT sensor and auxiliary bearing were designed and developed along with the actively cooled, UHT-PM actuator development. Although shaft position sensors are commercially available (Kaman) they may cost up to $10k per channel, and a full 5 axis magnetic suspension is best implemented with up to 20 sensors. Once successfully completed, this project will significantly extend the operating environment capability for turbomachinery applications such as nuclear power, concentrated solar thermal, fossil fuel, geothermal, and shipboard propulsion. The further advancement of UHT-PM-MB will also strengthen the US position in PM technology, which is presently heavily dominated by China. The UHT Sm-Co magnet material that will be utilized in the proposed work has been developed exclusively by the project proposer. Many actuators, motors, generators and other MB applications will greatly benefit from the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tracking the Sun: Pricing and Design Trends for Distributed Photovoltaic Systems in the United States, 2024 Edition [Slides]

Berkeley Lab’s annual Tracking the Sun report describes trends among grid-connected, distributed solar photovoltaic (PV) and paired PV+storage systems in the United States. For the purpose of this report, distributed solar includes residential systems, roof-mounted non-residential systems, and ground-mounted systems up to 5 MW-AC. Ground-mounted systems larger than 5 MW-AC are covered in Berkeley Lab’s companion annual report, Utility-Scale Solar. The latest edition of the report is based on 3.7 million systems installed through year-end 2023, representing close to 80% of systems installed to date. The report describes and discusses key trends related to: -Project characteristics, including system size, module efficiencies, roof-coverage ratios, prevalence of paired PV with storage, use of module-level power electronics, third-party ownership, mounting configurations, panel orientation, and customer segmentation -Median installed-price trends, both nationally and by state -Variability in pricing according to system size, state, installer, equipment type, and other factors, relying on both descriptive analysis and a multi-variate regression to estimate the effects of key pricing drivers for residential systems installed in 2023.

14 SOLAR ENERGY↗

Material Selection and Sizing of a Thermoelectric Generator (TEG) for Power Generation in a Self-Powered Heating System

By employing the high temperature heat source to directly generate the electricity needed to power auxiliary systems in a natural gas furnace, boiler or hot water heater, a “self-powered” heating system can provide several benefits. Compared with a traditional furnace, boiler or hot water heater, when overall fuel utilization is kept constant, the self-powered system will have a higher primary energy efficiency, lower operating costs, and dramatically improved building safety and resilience during electric grid outages. Furthermore, a self-powered heating system only has a single utility connection – natural gas, without an electric connection – thus simplifying installation. A thermoelectric generator can be used for direct energy conversion of thermal energy to electricity with no moving parts, which offers a very simple means to provide power for the self-powered heating system, and the operation is without noise or vibration and can thus provide a very long system life. This paper provides an analysis focused on materials selection and the thermal power requirements for a thermoelectric generator (TEG) for use in a self-powered heating system. The dimensionless figure of merit for thermoelectric materials, zT, is used to estimate the optimal efficiency that can be achieved with a TEG to produce the electric power required in such an application. Comparisons of the predicted efficiency, the required heat transfer rate to the TEG and the heat transfer area needed for sustained operation under thermal conditions relevant to the self-powered heating application are made for several potential thermoelectric materials. This analysis was used to develop system requirements for a self-powered hot water heater using a TEG for electric power generation.

Laclair, Tim↗

Recent Progress of JT-60SA Project toward Plasma Operation

Superconducting tokamak JT-60SA plays an essential role in fusion research and development by supporting and complementing ITER project, providing directions to the DEMO design activity and fostering next generation scientists and engineers. Since the incident of the Equilibrium Field coil #1 during the Integrated Commissioning (IC) in March 2021, both EU and JA Implementing agencies (IAs) have examined how to ensure safety operation of JT-60SA by mitigating the risk of possible discharge occurrence inside the cryostat. Based on the experience of the Global Paschen tests, the IAs have established a strategy of risk mitigation measures, which is a combination of (i) reinforcement of insulation, (ii) avoiding unnecessary voltage application to the coil systems and (iii) immediate de-energization of the coils when deteriorated vacuum condition is detected. Thanks to the considerable efforts of the Integrated Project Team (IPT) members, the IC restarted in May 2023. After the confirmation of superconducting state of coil systems (TF, EF and CS), the coil energization test and the plasma operation (OP-1) starts. The first plasma was successfully achieved on 23 October 2023 with a limited value of applied voltage and current to the coils. The plasma configuration control will be also confirmed with low plasma current and low auxiliary heating power conditions. Based on the IO-F4E-QST collaboration, activities of JT-60SA have been shared with the IO and provided an important lesson learned for ITER assembly and commissioning, and will provide an outstanding contribution to fusion research at large. After OP-1, Maintenance & Enhancement phase 1 (M/E-1) starts from January 2024, in which in-vessel components are installed, and heating system and diagnostic system are extensively upgraded to allow high power heating experiment planned in OP-2. In order to make the best use of JT-60SA, newly organized JT-60SA experiment team will refine the research plan in the future high heating power operation phase.

Broader Approach activities↗

Application of Cable Condition Monitoring Technologies to Assess Age-Related Degradation of Industrial Cables Installed in Harsh Environments

The aging of electrical cables has been the subject of substantial research and development (R&D) projects performed by national and international laboratories, universities, and private organizations for many years. This R&D was conducted to develop guidance, equipment, and techniques to support aging management of in-service cables in industrial facilities such as nuclear power plants, research reactors, waste facilities, and fuel fabrication plants. Through these research efforts, condition monitoring technologies have been developed that can determine the severity of age-related degradation that occurs in industrial cables and insulation polymers during service. This paper summarizes the results of aging assessments that were performed for cables installed in two U.S. nuclear power plants, one a pressurized water reactor and one a boiling water reactor. These cables had been in service for over 40 years and during plant operation were exposed to harsh environmental conditions including elevated temperatures and radiation. For these assessments, a comprehensive series of measurements was performed to assess the aged condition of the cables. These cables came from different manufacturers, were manufactured in different years, and were constructed with a variety of jacket and insulation polymers including chloro-sulfonated polyethylene (CSPE), cross-linked polyethylene (XLPE)/cross-linked polyolefin (XLPO), neoprene, and ethylene propylene rubber (EPR). The goal of these assessments was to determine the current aged condition of the cable polymers and provide an estimate of how long the cable insulation materials could remain exposed to their in-service environmental conditions before reaching their end-of-life condition. Both nuclear power plants have received license renewals to extend their operation from 40 to 60 years, and the utilities need objective evidence to show that critical components such as cables will be able to function safely and reliably during the extended operating period. Furthermore, the results of these assessments showed that the cables exhibited different aged conditions depending on the type of polymers they were constructed with and the environment they were exposed to during service. Some of the cables and insulation polymers showed signs of significant age-related degradation and were estimated to have approximately 5 years of remaining service life. Other cables exhibited no signs of significant age-related degradation and were estimated to have 50 years or more of remaining service life. Using the results of these cable aging assessments, plant personnel were able to (1) determine the overall aged condition of cables and insulation polymers using objective test results, (2) identify aged or degraded cables before they caused operability issues, and (3) avoid unnecessary and costly replacement of cables that can continue to operate safely and reliably.

36 MATERIALS SCIENCE↗

Experimental Setup for Grid Control Device Software Updates in Supply Chain Cyber-Security

Supply chain cyberattacks that exploit insecure third-party software are a growing concern for the security of the electric power grid. These attacks seek to deploy malicious software in grid control devices during the fabrication, shipment, installation, and maintenance stages, or as part of routine software updates. Malicious software on grid control devices may inject bad data or execute bad commands, which can cause blackouts and damage power equipment. This paper describes an experimental setup to simulate the software update process of a commercial power relay as part of a hardware-in-the-loop simulation for grid supply chain cyber-security assessment. The laboratory setup was successfully utilized to study three supply chain cyber-security use cases.

Keller, Joseph↗

Energy Savings Potential of SSL in Agricultural Applications

A report on the energy-savings potential of solid-state lighting in agricultural applications, which updates a prior edition that focused on horticultural lighting only, with an expanded focus that includes animal lighting. The analysis considered three indoor horticultural lighting categories: lighting supplemented greenhouses, high intensity sole-source farms, and sole-source indoor vertical farms typically growing leafy greens. To characterize animal lighting, the analysis investigated the three largest markets of livestock in the U.S. that use lighting – poultry, swine, and dairy farming. To estimate energy consumption of agricultural lighting, the analysis utilized interviews with lighting manufacturers, growers, utility companies, academic professionals, and industry consultants, as well as various data sources. Each of these resources enabled the determination of total market size and illuminated area, typical lighting configuration, lighting power density for LED and incumbent technologies, operating hours, and the installed lighting technology mix. Among the major findings: 1. If all indoor horticultural lighting today was converted to LED technology, annual horticultural lighting consumption would be reduced to 6.3 TWh of site electricity, or 60 tBtu of source energy, which represents lighting energy savings of 34% or $350 million. 2. If all animal lighting today was converted to LED technology, annual lighting energy consumption for animal production would be reduced to 2.8 TWh site electricity, or 26 tBtu of source energy, which represents lighting energy savings of 25% or $96 million.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Comparison of DER Voltage Regulation Technologies Using Real-Time Simulations

Grid operators are now considering using distributed energy resources (DERs) to provide distribution voltage regulation rather than installing costly voltage regulation hardware. DER devices include multiple adjustable reactive power control functions, so grid operators have the difficult decision of selecting the best operating mode and settings for the DER. In this work, we develop a novel state estimation-based particle swarm optimization (PSO) for distribution voltage regulation using DER-reactive power setpoints and establish a methodology to validate and compare it against alternative DER control technologies (volt–VAR (VV), extremum seeking control (ESC)) in increasingly higher fidelity environments. Distribution system real-time simulations with virtualized and power hardware-in-the-loop (PHIL)-interfaced DER equipment were run to evaluate the implementations and select the best voltage regulation technique. Each method improved the distribution system voltage profile; VV did not reach the global optimum but the PSO and ESC methods optimized the reactive power contributions of multiple DER devices to approach the optimal solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Climate Change on the Generation Potential of Solar and Wind Energy Systems in India

Low-carbon energy sources like wind and solar are essential for decarbonizing the electricity sector. In addition, the cost of electricity generated from these sources has plummeted over the last decade. Therefore, these energy sources are poised to take a significant share of the total installed capacity soon. However, they are susceptible to the impacts of climate change as their generation potential depends on the weather conditions. Estimating the installed capacity requirements of solar and wind energy to decarbonize the power sector without accounting for these possible changes in generation potential could lead to missing out on the set climate goals and meeting future electricity demand. This study evaluates the effect of climate change on the generation potential of wind and solar energy systems in India for two future periods, 2050 and 2070, under two climate scenarios or Shared Socioeconomic Pathway (SSP): SSP245 and SSP585. Almost all regions show a decrease, and most regions show a significant decline (>5%) in the generation potential of solar Photovoltaic (PV) as compared to 2010 levels under both climate scenarios and future periods. The changes in the generation potential of wind energy are more significant (>10%), and the majority of regions show a decline in generation potential. Southwestern and central regions show an increase in wind generation potential for 2070 as compared to 2050 levels under the SSP245 scenario and the SSP585 scenario, respectively.

climate change↗

Virtual Metering for Monitoring Building Energy Consumption

The United States Department of Energy (DOE) has standard metering requirements of commercial buildings for optimizing energy performance. The guiding principles are to continuously track and optimize energy performance and install building-level meters for electricity, natural gas, and steam. Some buildings at Los Alamos National Laboratory (LANL) have physical submeters monitoring their energy consumption, but these meters have proven to be unreliable. And, in most cases, replacing them has proven to be a slow process. Installing new submeters also requires a temporary lockout of the circuit on which they are being installed. Many buildings at LANL contain laboratories with ongoing experiments or data centers, which makes an equipment power outage nearly impossible to plan. This inability to plan power outages results in long-term submeter failures. Although most submeters are eventually replaced, failures lead to missing consumption data for some unpredictable, extended time. A building automation system (BAS) is a system that provides control and monitoring on a building to maintain the operational performance of the building and occupancy comfort. Many buildings at LANL currently have a BAS, and all new renovations and installs will include installing a BAS if one does not already exist. The intended purpose for a BAS is primarily to monitor the health and efficiency of a building; however, it is also possible to calculate equipment power and energy consumption using BAS information. This project aims to use virtual meters to monitor building energy consumption as a cost-effective and minimally labor-intensive alternative to installing physical submeters. The fault detection and diagnostics tool, SkySpark, provides a centralized database for all the data from the various BAS that are active at LANL. This data includes the information that is needed to create virtual meters for heating, ventilating, and air conditioning (HVAC) systems in most buildings, including heating and cooling loads. 9 This report begins with a detailed summary of the project, including the reasoning, procedure, and results. The specific processes of creating the various virtual meters are then identified. Then the limitations are discussed. And, lastly, the results and future potential are presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Verdant Power TriFrame, Gen5 KHPS Turbine, and BOP System Content Models

This submission includes System Content Models with data following manufacture for the Verdant Power TriFrame, Gen5 Kinetic Hydropower System (KHPS) Turbines, and Balance of Plant (BOP). The TriFrame installs 3 Gen5 KHPS Turbines. The BOP system controls the turbines and interconnects the TriFrame to shoreline with supervisory control and data acquisition (SCADA).

16 TIDAL AND WAVE POWER↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Evaluating indoor thermal resilience of passive and low-power cooling shelters for outdoor workers in India

India’s 231 million outdoor workers are exposed to deadly heat during heat waves. We report results from a simulation-based study that focuses on passive design of cooling shelters for the hot and dry climate zone of India. The goal is to design a cooler-than-outdoor shelter for outdoor workers’ intermittent rest and recovery from heat stress during their arduous outdoor work, to avoid heat-related morbidities and mortality. Expected indoor thermal conditions in low-cost cooling shelters deploying a range of passive designs and low-power active measures are investigated, consistent with the current Indian standards and practices, located in the city of Jodhpur in western India. Heat resilience of the shelter was measured with the predicted reduction of hazardous hours inside the shelter based on the wet-bulb globe temperature (WBGT) and extended heat index. These measures include improving the building envelope, installing cool roofs, using internal thermal mass, and natural ventilation. Additionally, a low-power active measure of using ventilation fans and ceiling fans is explored. EnergyPlus-based simulation results show that simple, commonly available measures, particularly natural ventilation and ceiling fans, achieve the most significant reductions in overheating danger hours, by 22% and 21%, respectively, while more complex or costly passive strategies yield only marginal additional benefits. Moreover, combined measure packages are identified that can reduce the indoor WBGT by 8 to 10 °C, eliminating overheating danger hours. These findings highlight the critical importance of scalable, low-cost, and easily deployable cooling solutions for developing resilient cooling shelters for vulnerable outdoor workers during heat waves in India.

building performance↗