Search NASA⌕ Search

SEARCH · Search NASA

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

PIP-II High Beta 650 Prototype Cryomodule Assembly Experience and Related Design Optimization

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

Ozelis, J.↗

Ammonium Looping with Membrane Absorber and Distributed Stripper for Enhanced Algae Growth

The objective of this project is to conduct a comprehensive investigation to develop and demonstrate a practical, reliable, and cost-effective integrated carbon dioxide (CO 2 ) capture and biofixation process for algae production. This process utilizes a chemical hindered ammonium solution (NH 4 OH) as both a capture reagent and an algae nutrient. The membrane absorber employed in the system ensured minimal ammonia (NH 3 ) emissions in the treated flue gas. Additionally, distributed solar-energy powered strippers located near the bioreactor modules facilitate solvent regeneration and enable just-in-time delivery of CO 2 and NH 3 to the algae, thereby minimizing the pH swing for enhanced productivity. The proposed membrane CO 2 absorber and solar-powered stripper is designed and seamlessly integrated with the existing 0.1 MWth bench-scale CO 2 capture system (CCS) and open raceway ponds (ORPs) at the University of Kentucky Center for Applied Energy (UK CAER) campus. The entire integrated process has undergone construction, operation, testing, and analysis. Furthermore, technology has been evaluated with a techno-economic analysis (TEA), technology gap analysis (TGA), life-cycle analysis (LCA), and a technology maturation plan (TMP). This project was performed within two budget periods, 54 months in duration. There are fourteen Project Tasks, twelve Milestones and four Success Criteria.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only SMR technologies, but also Advanced Reactors design. An Electrical Penetration Assembly (EPA) is a component used to allow electrical power and signal conductors as well as optical fiber through the nuclear reactor’s containment structure while maintaining a pressure barrier. The EPA ensures the containment's integrity both during the normal operation and also accident conditions by providing a sealed passage for power and signals. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and also more severe normal operating conditions.This document describes cost effective approaches to qualify a unique EPA for Small Modular Reactor (SMR) technologies as legacy LWR EPA technologies will likely have inherent material performance insufficiencies. The DBA profiles for SMRs (and some Advanced Reactor Technologies) are more severe than the legacy qualification requirements making the design of the qualification testing system challenging as the temperatures and pressures can approach the limits permitted by ASME Pressure Vessel Code, as well as accident temperatures exceeding the capability of polymeric gaskets and dielectrics. Small Modular Reactors are designed to have, as the name suggests, modularity which implies sized for factory fabrication and subsequent assembly at the power plant site. SMR containment is much smaller than a legacy Light Water Reactor containment. The containment walls are likely to be comprised of stainless steel. Qualifying Electrical Penetration Assemblies (EPAs) through these steel vessels are of interest in this work. Methods are presented here that discuss critical safety and cost effectiveness for these SMR EPA’s test systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quarterly Research Performance Progress Report

The goal of this project is to develop a high temperature, high-pressure well integrity evaluation device that can operate in enhanced geothermal system (EGS) boreholes without active cooling or substantial mitigation of borehole conditions. The product must provide consistent high resolution data regarding the efficacy of wellbore casing and cement for long-term operation. This project aims to deliver a ruggedized tool that can withstand a corrosive geothermal environment with pressure ranges up to 15,000 psi and temperatures up to 250°C for a 24-hour operating period.

15 GEOTHERMAL ENERGY↗

The Simons Observatory: Design, Integration, and Testing of the Small Aperture Telescopes

The Simons Observatory (SO) is a cosmic microwave background survey experiment that includes small-aperture telescopes (SATs) observing from an altitude of 5200 m in the Atacama Desert in Chile. The SO SATs will cover six spectral bands between 27 and 280 GHz to search for primordial B-modes to a sensitivity of σ(r) = 0.002, with quantified systematic errors well below this value. Each SAT is a self-contained cryogenic telescope with a 35° field of view, 42 cm diameter optical aperture, 40 K half-wave plate, 1 K refractive optics, and <0.1 K focal plane that holds >12,000 transition edge sensor detectors. We describe the nominal design of the SATs and present details about the integration and testing for one operating at 93 and 145 GHz.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Summary of GFL Inverter Capability and Performance: Malawi [Slides]

This presentation provides a comprehensive comparison of inverter-based resource (IBR) technical requirements across multiple international grid codes - including IEEE 2800, ESO, EirGrid, and Malawi's evolving regulatory framework - to support capacity building for electricity-sector institutions in Malawi. It highlights key performance expectations for grid-following (GFL) inverters across critical domains such as primary and fast frequency response, ramping behavior, frequency and voltage ride-through capabilities, reactive power and voltage control, ROCOF withstand, phase jump tolerance, system strength considerations, protection schemes, and dynamic modeling requirements. Emphasizing a "Do no harm, do something, do more" philosophy, the document synthesizes best practices and operational benchmarks to guide the integration and stability of inverter-based resources within Malawi's power system. The presentation forms part of the SABESS Center of Excellence initiative supported by the Global Energy Alliance for People and the Planet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alternatives to MARVEL Power Conversion – Comparison of Stirling Engine Thermal Efficiency and Design to other Power Conversion Cycles

The Microreactor Applications, Research, Validation, and Evaluation (MARVEL) Reactor is a small liquid-metal thermal reactor that will be built at the Idaho National Laboratory to demonstrate design and operating processes for microreactors, microgrid integration, and process heat applications. Power conversion in the MARVEL design is provided by Stirling engines, which have disadvantages in nuclear environments. Compared to Stirling engine performance, some alternative power cycles can increase power production when coupled to a liquid-metal thermal reactor In this paper, the thermal efficiency of MARVEL’s power production with Stirling engines is compared to the thermal efficiency of power production with MARVEL and alternative power cycles. Those cycles include a superheated Rankine cycle, open and closed Brayton cycles, and a supercritical carbon dioxide cycle. All cycles (except the Stirling engines) were modeled with an intermediate helium loop to meet MARVEL’s principal design criteria. All models are simple designs with conservative assumptions for consistent comparison. Detailed optimization will depend largely on reactor location and application, and the relative merit of each cycle is discussed for different environmental conditions. The study informs significant early decisions on power cycle design and economic

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

An Approach to Automate tools for the Risk Assessment of Digital Instrumentation and Control Systems

Reliable digital instrumentation and control systems (DI&C) are integral for sustaining the continued operation of nuclear power plants. These systems ensure that nuclear reactors operate safely, efficiently, and within regulatory requirements. Yet, the cost of designing and licensing new nuclear DI&C can be prohibitively expensive. Under the U.S. Department of Energy Light Water Reactor Sustainability Program, Idaho National Laboratory has developed a framework for supporting the risk-informed design of DI&C systems by offering methods to support the identification, quantification, and evaluation of risks for various DI&C design architectures. The framework indicates potential software failure modes and provides pathways for quantifying the potential for these software failures, including common cause failures. Using the framework’s systematic approach, challenges for assessing risks within new and existing nuclear DI&C systems can be reduced. Nevertheless, the current framework can be further improved using the convenience of automation. This paper introduces the development of Software for the Hazard Identification and Evaluation of Digital Systems (SHIELDS). SHIELDS is an engineering software package that enables the identification, elimination, and mitigation of potential risks and reduces the burden of deploying reliable DI&C systems. This work introduces plans and techniques to digitize and improve the manual risk assessment modules of the framework. These improvements will save time and increase the repeatability and usability of the framework, making it more accessible to a wider range of users. Ultimately, this introduces SHIELDS and how its modules support efficient development of safe and reliable DI&C systems.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Exact evaluation of large-charge correlation functions in nonrelativistic conformal field theory

The large-charge master field which generates all n -point correlation functions with an insertion of large charge Q in nonrelativistic conformal field theory is obtained. This field is used to compute Schrödinger-invariant n -point correlation functions of large-charge operators via a direct evaluation of the path integral. Conformal dimensions are found to agree with calculations based on the state-operator correspondence. The master field solution exhibits an emergent harmonic trap whose frequency is a function of the Euclidean time. The large-charge effective action with operator insertions describes a droplet of superfluid matter whose spatial size scales with the time separation of sources. The solution is used to compute Schrödinger symmetry breaking corrections in the large-charge effective field theory (EFT) due to a finite scattering length in the fundamental theory of fermions near unitarity. The scaling of these effects in the large-charge power counting scheme is established, and the size of the effects is quantified using input from quantum Monte Carlo simulations of the near-unitary gas, as well as from the large- N expansion at large charge. Published by the American Physical Society 2024

Astronomy & Astrophysics↗

Balancing Charging Station Utilization and Throughput in Electric Vehicle Charging Stations with Queuing Theory

The rapid increase in electric vehicle (EV) adoption demands enhancements in the efficiency and adaptability of EV supply equipment (EVSE). Traditional EVSE systems often fail to optimize power delivery to meet the variable acceptance rates of EV batteries, resulting in significant energy wastage and reduced operational efficiency. This research addresses these challenges by integrating queuing theory with modular EVSE architectures, offering a dual strategy to optimize the operation of EV charging stations. A simulation model was developed to assess various configurations of charger capacities and outlet numbers. This model aimed to identify the optimal setup that maximizes station utilization while minimizing charging times and maximizing throughput. The model focused on charger capacities ranging from 50 to 250 kW and analyzed the different capacities’ effects on charging times and the number of vehicles served. The results indicate that a charger capacity of 125 kW is optimal, striking a balance between the charging time and the number of EVs served per hour, thus achieving the highest station utilization rate. This capacity allows for servicing a significant number of EVs with moderate increases in charging times. Lower capacities, although capable of serving more vehicles, lead to longer charging times and decreased throughput efficiency. The study underscores the effectiveness of combining queuing theory with flexible, modular charging systems that can dynamically adjust to EV charging demands.

Kumar, Praveen↗

The Technical, Economic, Risk, and Adoption Assessment for Evaluating Work Reduction Opportunities in the Nuclear Industry

Automation and cost-saving initiatives, such as process automation with advances in artificial intelligence, are gaining traction in modernization efforts across the nuclear industry. As these innovations are increasingly adopted, it becomes crucial to evaluate their impacts comprehensively. Various technical and economic attributes, along with risk and human readiness factors, must be achieved to ensure that innovative projects enabling automation and modernization are successful. However, no systematic or integrated framework exists that allows plants to evaluate these innovative projects. To address this gap, the Technical, Economic, Risk, and Adoption (TERA) assessment offers a structured method to evaluate innovative technologies, ensuring solutions meet both operational and safety standards. The TERA framework integrates the disparate perspectives to assess modernization opportunities in nuclear operations. It combines qualitative and quantitative models to evaluate the relationship between performance and business impacts, while also enabling continuous re-evaluation during project development. This approach helps plant owners identify high-priority opportunities, optimize cost savings, and minimize risks, ensuring projects remain on track to achieve desired returns. By providing a comprehensive, systematic methodology, TERA enables informed, data-driven decisions that support successful modernization efforts, enhancing efficiency, safety, and cost savings across nuclear operations. This paper explains the TERA framework and its benefits for the nuclear industry.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗

The NREL Sensor Laboratory Detection of Hydrogen Emissions

The development of a functional hydrogen detection system is a multifaceted process that integrates hardware, deployments strategies, and analytics which can be supported by the NREL Sensor Laboratory: 1. Support of the design, validation and optimization of sensing prototypes; 2. Guide optimized sensing element development, including control electronics; 3. Laboratory testing to validate/optimize metrological performance (measurement range, detection limit, etc.); 4. Provide test sites for field deployments representative of real-world scenarios with controlled hydrogen releases; 5. Develop sensor placement and operation guidance; 6. Provide guidance on electronics to accommodate facility integration; 7. Electrical safety designs to allow for operation within restricted zones; 8. Integration into facility monitoring and control systems; 9. Guide incorporation of cyber security elements to protect facilities from malicious attacks; 10. Modeling and application of advanced analytics to detect and quantify emissions; 11. Higher Order dispersion models to guide sensor placement for reliable detection; 12. Advanced analytics for improved metrological performances, and to inform inverse modeling; 13. Market support and commercialization (national and international markets); 14. Commercial deployments in H2@SCALE markets (e.g., HUBs and other large-scale hydrogen markets); and 15. Leverage off international collaborations/partnerships (e.g., NREL is on the advisory board for the European initiative "pre-Normative Research on Hydrogen Releases Assessment"-NHyRA).

08 HYDROGEN↗

Non-chiral vertex operator algebra associated to Lorentzian lattices and Narain CFTs

Frenkel, Lepowsky, and Meurman constructed a vertex operator algebra (VOA) associated to any even, integral, Euclidean lattice. In the language of physics, these are examples of chiral conformal field theories (CFT). In this paper, we define non-chiral vertex operator algebra and some associated notions. We then give a construction of a non-chiral VOA associated to an even, integral, Lorentzian lattice and construct their irreducible modules. We obtain the moduli space of such modular invariant non-chiral CFTs based on even, self-dual Lorentzian lattices of signature (m,n) ( m , n ) assuming the validity of a technical result about automorphisms of the lattice. We finally show that Narain conformal field theories in physics are examples of non-chiral VOA. Our formalism helps us to identify the chiral algebra of Narain CFTs in terms of a particular sublattice and give us the decomposition of its partition function into sum of characters.

Singh, Ranveer Kumar (ORCID:000000026385704X)↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparative Analysis of Model Predictive Control and MPC-Informed Rule-Based Control for Thermal Storage Operation in Ultra-Low Temperature 4th Generation District Heating Networks

The integration of thermal storage and heat pumps in district heating networks (DHNs) can significantly enhance operational flexibility and energy efficiency; however, the practical deployment of advanced control strategies is often hindered by forecasting requirements and computational complexity. This study presents a comparative analysis of thermal storage control strategies in an ultra-low-temperature fourth-generation DHN, focusing on the development of a simplified rule-based control (RBC) explicitly informed by Model Predictive Control (MPC) behavior. The proposed methodology systematically analyzes the charging and discharging decisions of an MPC-controlled system under ideal forecasting conditions and extracts recurrent control patterns as a function of key system variables, including outdoor temperature, thermal demand, and electricity price. These patterns are translated into a set of structured time- and condition-based rules, resulting in an MPC-informed RBC that embeds predictive insights while preserving implementation simplicity and operational transparency. The approach is validated on a realistic mixed-use urban district in Denver, Colorado, USA, equipped with a centralized air-source heat pump, distributed water-to-water heat pumps, and a central thermal storage unit. Results show that the tuned RBC attains approximately 96% of ideal MPC economic performance (-27% of costs), preserves values of technical and environmental indicators (reduction only of 2-3%), and substantially reduces complexity. Sensitivity analyses further demonstrate the robustness of the RBC under varying operational conditions (i.e., ambient temperature, electricity price). Overall, the study demonstrates that MPC-informed rule-based control represents an effective trade-off between control performance and real-world applicability, enabling the integration of additional system components while maintaining simplicity, robustness, and ease of implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗