Search NASA⌕ Search

SEARCH · Search NASA

Results for “monitoring, personnel”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Applications of remote-sensing data in Alaska

Public and private agencies were introduced to the use of remotely sensed data obtained by both satellite and aircraft, and benefitted from facilities for data processing enhancement and interpretation as well as from the institute's data library. Cooperative ventures involving the performance of operational activities included assistance to the Bureau of Land Management in the suppression of wildfires; the selection of sites for power line right-of-way; the mapping of leads in sea ice; determination of portions of public lands to be allocated for small scale farming; the identification of areas for large scale farming of barley; the observation of coastal processes and sediment transport near Prudhoe Bay; the establishment of a colar infrared file of the entire state; and photomapping for geological surveys. Monitoring of the outer continental shelf environment and reindeer herds was also conducted. Institutional constraints to full utilization of satellite remote sensing in the state are explored and plans for future activites include the generation of awareness by government agencies, the training of state personnel, and improving coordination and communication with users.

Miller, J. M.↗

Shared mission operations concept

Historically, new JPL flight projects have developed a Mission Operations System (MOS) as unique as their spacecraft, and have utilized a mission-dedicated staff to monitor and control the spacecraft through the MOS. NASA budgetary pressures to reduce mission operations costs have led to the development and reliance on multimission ground system capabilities. The use of these multimission capabilities has not eliminated an ongoing requirement for a nucleus of personnel familiar with a given spacecraft and its mission to perform mission-dedicated operations. The high cost of skilled personnel required to support projects with diverse mission objectives has the potential for significant reduction through shared mission operations among mission-compatible projects. Shared mission operations are feasible if: (1) the missions do not conflict with one another in terms of peak activity periods, (2) a unique MOS is not required, and (3) there is sufficient similarity in the mission profiles so that greatly different skills would not be required to support each mission. This paper will further develop this shared mission operations concept. We will illustrate how a Discovery-class mission would enter a 'partner' relationship with the Voyager Project, and can minimize MOS development and operations costs by early and careful consideration of mission operations requirements.

Spradlin, Gary L.↗

Aerospace Safety Advisory Panel

During 1997, the Aerospace Safety Advisory Panel (ASAP) continued its safety reviews of NASA's human space flight and aeronautics programs. Efforts were focused on those areas that the Panel believed held the greatest potential to impact safety. Continuing safe Space Shuttle operations and progress in the manufacture and testing of primary components for the International Space Station (ISS) were noteworthy. The Panel has continued to monitor the safety implications of the transition of Space Shuttle operations to the United Space Alliance (USA). One area being watched closely relates to the staffing levels and skill mix in both NASA and USA. Therefore, a section of this report is devoted to personnel and other related issues that are a result of this change in NASA's way of doing business for the Space Shuttle. Attention will continue to be paid to this important topic in subsequent reports. Even though the Panel's activities for 1997 were extensive, fewer specific recommendations were formulated than has been the case in recent years. This is indicative of the current generally good state of safety of NASA programs. The Panel does, however, have several longer term concerns that have yet to develop to the level of a specific recommendation. These are covered in the introductory material for each topic area in Section 11. In another departure from past submissions, this report does not contain individual findings and recommendations for the aeronautics programs. While the Panel devoted its usual efforts to examining NASA's aeronautic centers and programs, no specific recommendations were identified for inclusion in this report. In lieu of recommendations, a summary of the Panel's observations of NASA's safety efforts in aeronautics and future Panel areas of emphasis is provided. With profound sadness the Panel notes the passing of our Chairman, Paul M. Johnstone, on December 17, 1997, and our Staff Assistant, Ms. Patricia M. Harman, on October 5, 1997. Other changes to the Panel composition during the past year were: the resignation of Mr. Dennis E. Fitch as a Consultant; the appointment of Mr. Roger D. Schaufele as a Consultant; and the assignment of Ms. Susan M. Smith as Staff Assistant.

Source record↗

Autonomous Assessment and Predictive Capabilities for Low-Altitude Urban Flight Operations

The integration of unmanned aerial vehicles in the national airspace will introduce new vehicle types, technologies, and operational paradigms for which safety must be maintained and hazards mitigated. One approach is to attempt to design for possible hazards and unsafe incidents that can occur at different phases of flight (pre-flight, in-flight, and post-flight) and during ground operations. Another is to mitigate safety incidents by implementing changes to policies, procedures, regulations, and design to cover personnel, equipment, and aircraft during operations. These and other techniques, not described herein, are typically conservative or adhoc in that they reduce the likelihood of risk after safety incidents have occurred. In this work, the goal is to develop a more predictive capability to monitor and mitigate risk and hazards to safety “in-time” enough for decisions to be made. In line with NASA’s Aeronautics Mission Directorate Strategic Thrust 5 [1] (In-Time System-Wide Safety Assurance), the System-Wide Safety (SWS) project under which this work falls, is developing and demonstrating innovative and safety-oriented solutions that enable modernization and aviation transformation. To that effect, this work will detail data-driven efforts on the SWS project to develop a number of safety-critical services for in-time monitoring and mitigation of hazards to low-altitude flight operations. First, hazards to these operations are identified based on previous work by NASA [2,3] and others in the aerospace industry. These hazards include (i) unsafe proximity to other vehicles, property, and people on the ground, (ii) critical system failures such as communication signal/GPS loss, unexpected propulsion system degradation, engine/power failure, and (iii) operational/environmental issues such as severe weather and gusty winds. For these hazards, safety metrics, which can be quantified and assessed are defined, models to monitor and predict them are developed, and flight test data is generated to develop, validate, and test these models, considering the complex interplay of the different hazards that define them [4-6]. In addition, the uncertainty in the non-deterministic effects that cannot be modeled nor predicted and unknown unknowns that arise after design/testing and during operations must be handled in rigorous manner. As a result, for each of the developed safety metrics, their dependencies on one another are characterized and a framework for handling the uncertainties inherent in the modeling, algorithms, and measurements required for prediction is also developed [7]. To that effect, this presentation will describe the safety metrics and services already developed and underway under the System-Wide Safety project that utilize data-driven techniques for the identification of anomalies, precursors, and trends (APTs) to monitor and mitigate hazards to safety, in-time, for urban flight operations in low-altitude airspace.

Okolo, Wendy A.↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Otowi Well No. 4 Analytical Results

Los Alamos National Laboratory (LANL or the Laboratory) collected soil samples near Otowi Well No. 4 on behalf of Los Alamos County (LAC) to address health and safety concerns related to potential radioactive contamination in Los Alamos canyon. Oil had spilled from Otowi Well No. 4 and sampling was to determine if radiological contamination in the soils to be excavated in response to that spill presented a health or safety risk to LAC personnel who would be involved in the cleanup. Results of the sampling event are attached to this memo.

54 ENVIRONMENTAL SCIENCES↗

Development of a digital control system for a spacecraft propulsion test facility.

A digital computer control and abort system which is used at NASA-Lewis Research Center's Plum Brook Test Facilities is described. The system was designed by NASA personnel to control test operations such as rocket engine testing, structure testing, and wind tunnel tests. Because of the nature of spacecraft system testing, particularly rocket engine testing, the unique features of the system are, control function updating at a 20 millisecond rate, continuous abort monitoring and a software system designed for short duration tests rather than continuous on-line control. To accomplish these system requirements, special hardware was designed. The presentation will include a description of the computer system including special interface hardware as well as a general description of the software used.

Smalley, R. R.↗

Development of a digital control system for a spacecraft propulsion test facility.

Description of a digital computer control and abort system designed by NASA personnel to control test operations such as rocket engine testing, structure testing, and wind tunnel tests. Because of the nature of spacecraft system testing, particularly rocket engine testing, the unique features of the system are, control function updating at a 20 millisecond rate, continuous abort monitoring, and a software system designed for short duration tests rather than continuous on-line control. The presentation includes a description of the computer system and special interface hardware as well as a general description of the software used.

Smalley, R. R.↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Portable Gas Analyzer

The Michromonitor M500 universal gas analyzer contains a series of miniature modules, each of which is a complete gas chromatograph, an instrument which separates a gaseous mixture into its components and measures the concentrations of each gas in the mixture. The system is manufactured by Microsensor Technology, and is used for environmental analysis, monitoring for gas leaks and chemical spills, compliance with pollution laws, etc. The technology is based on a Viking attempt to detect life on Mars. Ames/Stanford miniaturized the system and NIOSH funded further development. Three Stanford researchers commercialized the technology, which can be operated by unskilled personnel.

Source record↗

Roles of the ground and flight crew in Apollo operations.

The functions performed by ground personnel and flight crews of Apollo missions are reviewed, covering vehicle systems operation and management, Saturn launch vehicle, command-service and lunar modules, lunar rover, communication relay unit and ground-commanded TV assembly. Details of the flight path, scientific experiments, photographic equipment and crew health monitoring are also discussed in terms of these functions. The coordinated combination of large numbers of experts and data processing equipment on the ground with the crew's capabilities to operate the spacecraft and exercise on-the-spot judgements is viewed as the backbone of the successful fulfillment of Apollo missions.

Wolfer, B. M.↗

Pan and Tilt Platform for a Thermal Vacuum Video Camera

The purpose of the Space Simulation Test Engineering (SSTE) Section at NASA Goddard Space Flight Center is "to provide full service test support, engineering expertise, and state-of-the-art facilities to perform simulated space and thermal cycle testing of Earth orbit and deep space flight hardware"(ref. 1). During the Integration & Testing phase of space flight projects, flight hardware must successfully demonstrate its functionality under conditions similar to the actual environment experienced in space. When testing hardware with mechanical components, such as antenna extensions, door openings, or solar panel deployments, visual observation would allow test personnel to verify mechanical operations in real-time. A video camera can supply data that the usual sensors inside a TV chamber cannot provide. Since mechanical functional testing could affect multiple regions of a test item, a camera with a fixed position may not be able to monitor and record the performance of different components of a mechanism, especially for large test items. By mounting the camera to a Pan and Tilt Platform, the camera can cover a larger area and its field-of-view (FOV) will increase significantly. This paper details the design process for the Pan and Tilt Platform.

Lui, Yan↗

Raising the Bar in High Performance Laboratory Design

Laboratory facilities are expensive to build and operate, they consume energy at high rates compared to other types of buildings, and modifications are frequently required to accommodate ever-changing research activities. PNNL sought ways to address these issues in the design and construction of a 14,700 sq. ft. new laboratory building. To improve adaptability to change a high roof structure was used that allows raising the ceiling when needed with minimal disruption to installed HVAC and electrical utilities. Also, HVAC equipment was located on a mezzanine above the central corridor rather than above ceilings. This eliminates the need for maintenance personnel to routinely access lab spaces, reducing disruption to research staff and improving maintenance access. To improve the reliability of operations while reducing energy consumption, heat pipe heat recovery with evaporative cooling, zoned heating/cooling coils, high-efficiency condensing boilers, district cooling, VAV fume hoods, DDC controls, energy use monitoring, and implementation of the US Department of Energy’s Guiding Principles for Federal Leadership in Sustainable Buildings were all used. The energy model developed during design projected energy use at 2,840 MBtu/yr, a 13.5% savings over ASHRAE Standard 90.1-2010. The first full year of operation resulted in actual energy use of 2,661 MBtu, a savings of 19% over Standard 90.1. As a result of the project design’s demonstrated success, these strategies will be incorporated into a significantly larger (125,000 sq ft), $65 million lab facility to be constructed on the PNNL campus in 2020.

Scott, Jeffery M.↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

Heart Monitoring By Satellite

The ambulance antenna shown is a specially designed system that allows satellite-relayed two-way communications between a moving emergency vehicle and a hospital emergency room. It is a key component of a demonstration program aimed at showing how emergency medical service can be provided to people in remote rural areas. Satellite communication permits immediate, hospital- guided treatment of heart attacks or other emergencies by ambulance personnel, saving vital time when the scene of the emergency is remote from the hospital. If widely adopted, the system could save tens of thousands of lives annually in the U.S. alone, medical experts say. The problem in conventional communication with rural areas is the fact that radio signals travel in line of sight. They may be blocked by tall buildings, hills and mountains, or even by the curvature of the Earth, so signal range is sharply limited. Microwave relay towers could solve the problem, but a complete network of repeater towers would be extremely expensive. The satellite provides an obstruction-free relay station in space.

Source record↗

Research and development for Onboard Navigation (ONAV) ground based expert/trainer system: Final user's guide

The purpose is to present procedures for preparation, operation, monitoring, and recovery of the Shuttle Onboard Navigation (ONAV) Entry phase expert system. This user's guide is primarily intended for functional users of the system. It includes procedures for system operation in support of training activities as well as operational tasks. In addition, information is provided which enables maintenance personnel to handle updates, modifications, etc. to the system.

Bochsler, Daniel C.↗

Fatigue‐Related Countermeasures for Long‐Duration Exploration Missions

The NASA Human Research Program's (HRP) Behavioral Health and Performance Element (BHP) supports and conducts research to mitigate deleterious outcomes related to fatigue, sleep loss, circadian desynchronization, and work overload. Objective evidence indicates that within the context of the International Space Station (ISS), sleep is reduced and there is circadian misalignment. Despite chronic sleep loss and high workloads; however, astronauts successfully complete their missions. Contributing to their success is not only the tremendous skills and capabilities of each astronaut, but also the collaborative team efforts amongst the crew, between flight and ground crews, and through real‐time care provided by medical personnel. It is anticipated that risks to human health and performance will increase in the context of exploration missions, where crewmembers will venture to deep space for extended durations and in small vehicles with limited communication with home. Hence, fatigue‐related countermeasures are being developed and/or validated that include unobtrusive monitoring technologies to detect fatigue‐related performance decrements, environmental countermeasures, and sleep education and training for flight and ground crews. Given that fatigue is an issue in current ISS missions, the BHP works collaboratively with Space Medicine operations to collect data in the operational environment, to validate fatigue-related countermeasures, and provide evidence‐based mitigations. Our presentation will summarize fatigue‐related operational research that is underway through NASA's BHP in partnership with its operational counterparts. Efforts include studies evaluating the effects of hypnotics, lighting protocols as countermeasures for circadian entrainment, and investigations involving education and training. This presentation will further identify, based on flight and terrestrial evidence, additional sleep and circadian countermeasures that may still be needed to support exploration missions. Lessons learned from transitioning research deliverables into ISS operations will also be discussed.

Whitmire, A.↗

Risk-informed Graded Approach for Reliability and Performance Assessment of Machine Learning and Artificial Intelligence for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

97 - MATHEMATICS AND COMPUTING↗