The Voyager program.
Voyager project goals, orbital operations, capsule descent, navigational systems, etc
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Voyager project goals, orbital operations, capsule descent, navigational systems, etc
Voyager project goals, orbital operations, capsule descent, navigational systems, etc
Two level system checkout in which first level satisfies continuous monitoring requirements and second level provides fault isolation to satisfy maintenance requirements, provides self-checking capability for monitoring system and enables recovery from unexpected error or failure interruptions. System must perform operational duties of navigation, control, and experimentation.
Conference on technology utilization in spacecraft guidance, ground operations, communications and navigation systems, and sensor development
The author has identified the following significant results. Attempts to correlate optical aircraft remote sensing of water quality with the optical data from the ERTS-1 satellite using calibrated imagery of Charlotte Amalie harbor, St. Thomas, Virgin Islands are reported. The harbor at Charlotte Amalie has a concentration of a number of factors affecting water quality: untreated sewage, land runoff, and sediment from navigation and dredging operations. Calibration procedures have been originated and applied to ERTS-1 and I2S camera imagery. The results indicate that the ERTS-1 and I2S imagery are correlated with optical in situ measurements of the harbor water. The aircraft green photographic and ERTS-1 MSS-4 bands have been found most suitable for monitoring the scattered light levels under the conditions of the investigation. The chemical parameters of the harbor water were found to be correlated to the optical properties for two stations investigated in detail. The biological properties of the harbor water (chlorophyll and carotenoids), correlate inversely with the optical data near the pollution sources compared to further away. Calibration procedures developed in this investigation were essential to the interpretation of the photographic and ERTS-1 photometric responses.
This study establishes that configurations satisfying the aeromaneuvering orbit-to-orbit shuttle (AMOOS) requirements can be designed with performance capabilities in excess of the purely propulsive space tug. In view of this improved potential of the AMOOS vehicle over the propulsive space tug concept it is recommended that the AMOOS studies be advanced to a stage comparable to those performed for the space tug. This advancement is needed in particular in areas that are either peculiar to AMOOS or not addressed in sufficient detail in these studies to date. These areas include the thermodynamics problems, navigation and guidance, operations and economics analyses, subsystems and interfaces. The aeromaneuvering orbit-to-orbit shuttle (AMOOS) is evaluated as a candidate reusable third stage to the two-stage earth-to-orbit shuttle (EOS). AMOOS has the potential for increased payload capability over the purely propulsive space tug by trading a savings in consumables for an increase in structural and thermal protection system (TPS) mass.
The proceedings of a symposium on significant accomplishments in science and technology are presented. The symposium was held at the Goddard Space Flight Center in December 1973. The subjects discussed are as follows: (1) cometary physics, (2) X-ray and gamma ray astronomy, (3) solar and terrestrial physics, (4) spacecraft technology, (5) Earth Resources Technology Satellite, (6) earth and ocean physics, (6) communications and navigation, (7) mission operations and data systems, and (8) networks systems and operations.
A comprehensive model of vestibular organ function is presented. The model is based on an analogy with the inertial guidance systems used in navigation. Three distinct operations are investigated: angular motion sensing, linear motion sensing, and computation. These operations correspond to the semicircular canals, the otoliths, and central processing respectively. It is especially important for both an inertial guidance system and the vestibular organs to distinguish between attitude with respect to the vertical on the one hand, and linear velocity and displacement on the other. The model is applied to various experimental situations and found to be corroborated by them.
A simple and low cost method of fabricating an active antenna preamplifier system covering the range of 10 KHz to 10 MHz for use with tunable communications receivers is described. The same type of system can be used with airborne VLF navigation receivers. By operating a high impedance preamplifier as a wide band device directly at the base of a short vertical antenna, the signal can be driven back to the receiver on a length of coaxial cable. The antenna can be as short as I meter and still give excellent results when the capacity to ground at the antenna is low.
Faraday-rotation data from the linearly polarized 137-MHz beacons of the ATS-1, SIRIO, and Kiku-2 geosynchronous satellites are used to determine the ionospheric corrections to the range and Doppler data for interplanetary spacecraft navigation. The JPL operates the Deep Space Network of tracking stations for NASA; these stations monitor Faraday rotation with dual orthogonal, linearly polarized antennas, Teledyne polarization tracking receivers, analog-to-digital converter/scanners, and other support equipment. Computer software examines the Faraday data, resolves the pi ambiguities, constructs a continuous Faraday-rotation profile and converts the profile to columnar zenith total electron content at the ionospheric reference point; a second program computes the line-of-sight ionospheric correction for each pass of the spacecraft over each tracking complex. Line-of-sight ionospheric electron content using mapped Faraday-rotation data is compared with that using dispersive Doppler data from the Voyager spacecraft; a difference of about 0.4 meters, or 5 x 10 to the 16th electrons/sq m is obtained. The technique of determining the electron content of interplanetary plasma by subtraction of the ionospheric contribution is demonstrated on the plasma torus surrounding the orbit of Io.
Operation of a navigation system, centered around image correction, was simulated and the system performance was analyzed. Onboard utilization of ground control points for image correction is summarized. Simulation results, and recommendations for future mission requirements are presented.
Paper summarizes the status of personal air transportation with emphasis upon VTOL and converticar capability. The former obviates the need for airport operations for personal aircraft whereas the latter provides both ground and air capability in the same vehicle. Fully automatic operation, ATC and navigation is stressed along with consideration of acoustic, environmental and cost issues.
This paper evaluates several navigation approaches for the first phase of the Magnetospheric Multiscale (MMS) mission, which consists of a tetrahedral formation of four satellites in highly eccentric Earth orbits of approximately 1.2 by 12 Earth radii at an inclination of 10 degrees. The inter-satellite separation is approximately 10 kilometers near apogees. Navigation approaches were studied using ground station m g e =d two-way Doppler measurements, Global Positioning System (GPS) pseudorange measurements, crosslink range measurements among the members flying in formation, and various combinations of these measurement types. An absolute position accuracy of 10 kilometers or better can be achieved with most of the approaches studied and a relative position accuracy of 100 meters or better can be achieved at apogee in some cases. Among the various approaches studied, the approaches that use a combination of GPS and crosslink measurements were found to be more reliable in terms of absolute and relative navigation accuracies and operational flexibility.
Softc has been used operationally for spacecraft navigation at JPL for over 2 years and will be JPL's Mark 5 correlator next year. Softc was written to be as close to an ideal correlator as possible, making approximations only below 10(exp -13) seconds. The program can correlate real USB, real LSB, or complex I/Q data sampled with 1, 2, 4. or 8-bit resolution, and was developed with strong debugging tools that made final debugging relatively quick. Softc's algorithms and program structure are fully documented. Timing tests on a recent Intel CPU show Softc processes 8 lags of 1-bit sampled data at 10 MSamples/sec, independent of sample rate.
Of the eight Saturnian icy satellites. all but Mimas and Tethys had low altitude targeted flybys during the 4-year primary Cassini spacecraft tour. In November 2004, the existence of a potential low-altitude Tethys flyby was discovered; this low-altitude flyby, added to the nominal tour in March 2005, corresponded to a 1500 km non-targeted periapsis altitude on September 24, 2005 with an associated (delta)v cost of approximately 8 mis. This memo details the methods used to determine the Rev-15 non-targeted Tethys flyby altitude, driven by navigational requirements and operational constraints, in addition to several trajectory modifications implemented to reduce total (delta)v costs, and in some cases. render simultaneous increases in scientific return.
Of the eight Saturnian icy satellites, all but Mimas and Tethys have low altitude targeted flybys during the 4-year nominal Cassini spacecraft tour. In November 2004, the existence of a potential low-altitude Tethys flyby was discovered; this low-altitude Tethys flyby, added to the nominal tour in March 2005, corresponds to a 1500 km nontargeted periapsis altitude on September 24, 2005 and requires a Av cost of 8 mls. This paper details the methods used to determine the Tethys non-targeted flyby altitude, driven by navigational requirements and operational constraints, in addition to several trajectory modifications implemented to reduce total Av costs, and in some cases, simultaneous increases in scientific return.
The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.
The figure shows the LEMUR IIb, which is a modified version of the LEMUR II the second generation of the Limbed Excursion Mechanical Utility Robot (LEMUR). Except as described below, the LEMUR IIb hardware is mostly the same as that of the LEMUR II. The IIb and II versions differ in their kinematic configurations and characteristics associated with their kinematic configurations. The differences are such that relative to the LEMUR II, the LEMUR IIb is simpler and is better suited to climbing on inclined surfaces. The first-generation LEMUR, now denoted the LEMUR I, was described in Six-Legged Experimental Robot (NPO-20897), NASA Tech Briefs, Vol. 25, No. 12 (December 2001), page 58. The LEMUR II was described in Second-Generation Six-Limbed Experimental Robot (NPO-35140) NASA Tech Briefs, Vol. 28, No. 11 (November 2004), page 55. To recapitulate: the LEMUR I and LEMUR II were six-legged or sixlimbed robots for demonstrating robotic capabilities for assembly, maintenance, and inspection. They were designed to be capable of walking autonomously along a truss structure toward a mechanical assembly at a prescribed location. They were equipped with stereoscopic video cameras and image-data-processing circuitry for navigation and mechanical operations. They were also equipped with wireless modems, through which they could be commanded remotely. Upon arrival at a mechanical assembly, the LEMUR I would perform simple mechanical operations by use of one or both of its front legs (or in the case of the LEMUR II, any of its limbs could be used to perform mechanical operations). Either LEMUR could also transmit images to a host computer. The differences between the LEMUR IIb and the LEMUR II are the following: Whereas the LEMUR II had six limbs, the LEMUR IIb has four limbs. This change has reduced both the complexity and mass of the legs and of the overall robot. Whereas each limb of the LEMUR II had four degrees of freedom (DOFs), each limb of the LEMUR IIb has three DOFs. This change has also reduced both complexity and mass. Notwithstanding the decrease in the number of DOFs, the three remaining DOFs are configured to provide greater dexterity for motion along a surface. To extend reach, the limbs of the LEMUR IIb are 25 percent longer than those of the LEMUR II. Additional benefits stemming from the modifications are that the robot body supported by the limbs is now less massive and its center of gravity is now closer to the surface along which the robot is to move. These benefits have been obtained without sacrificing load-carrying capacity. Hence, overall, the LEMUR IIb is a more adept climber.