Search NASA⌕ Search

SEARCH · Search NASA

Results for “observation planning operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Polarization Performance Simulation for the GeoXO Atmospheric Composition Instrument: NO2 Retrieval Impacts

NOAA's Geostationary Extended Observations (GeoXO) constellation will continue and expand on the capabilities of the current generation of geostationary satellite systems to support US weather, ocean, atmosphere, and climate operations. It is planned to consist of a dedicated atmospheric composition instrument (ACX) to support air quality forecasting and monitoring by providing capabilities similar to missions such as TEMPO (Tropospheric Emission: Monitoring Pollution), currently planned to launch in 2023, as well as OMI (Ozone Monitoring Instrument), TROPOMI (TROPOspheric Monitoring Instrument), and GEMS (Geostationary Environment Monitoring Spectrometer) currently in operation. As the early phases of ACX development are progressing, design trade-offs are being considered to understand the relationship between instrument design choices and trace gas retrieval impacts. Some of these choices will affect the instrument polarization sensitivity (PS), which can have radiometric impacts on environmental satellite observations. We conducted a study to investigate how such radiometric impacts can affect NO2 retrievals by exploring their sensitivities to time of day, location, and scene type with an ACX instrument model that incorporates PS. The study addresses the basic steps of operational NO2 retrievals: the spectral fitting step and the conversion of slant column to vertical column via the air mass factor (AMF). The spectral fitting step was performed by generating at-sensor radiance from a clear-sky scene with a known NO2 amount, the application of an instrument model including both instrument PS and noise, and a physical retrieval. The spectral fitting step was found to mitigate the impacts of instrument PS. The AMF-related step was considered for clear-sky and partially cloudy scenes, for which instrument PS can lead to errors in interpreting the cloud content, propagating to AMF errors and finally to NO2 retrieval errors. For this step, the NO2 retrieval impacts were small but non-negligible for high NO2 amounts; we estimated that a typical high NO2 amount can cause a maximum retrieval error of 0.25×1015 molec. cm−2 for a PS of 5 %. These simulation capabilities were designed to aid in the development of a GeoXO atmospheric composition instrument that will improve our ability to monitor and understand the Earth's atmosphere.

Aaron Pearlman↗

SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can generate flights enables humans to assess and analyze complex tradeoffs between fuel consumption, estimated science quality and the percentage of scheduled observations. Due to the changing nature of SOFIA scheduling problems, this functionality will play a crucial role in optimizing science and minimizing costs during operations. In the full paper, we will summarize the technical challenges that have been met in order to build this system. These include: design of the search algorithm, design of appropriate heuristics and approximations, and reduction in the size of the search space. We will also describe technical challenges that are currently being addressed, including the extension of the existing approach to handle new solution criteria. Finally, we will describe a variety of cultural challenges that the astronomical community must address in order to successfully use SOFIA, and describe how the AFT can be used to address some of these challenges. Specifically, many of the intended science users are accustomed to using ground-based or space-based observatories; we will identify some differences that arise due to the nature of airborne observatories, and how the AFT can be extended to provide useful services to ease these cultural differences.

Frank, Jeremy↗

Magellan project

The Magellan spacecraft was placed into orbit around Venus on 10 Aug. 1990 and started radar data acquisition on 15 Sep. 1990. Since then, Magellan has completed mapping over 2.75 rotations of the planet (as of mid-July 1992). Synthetic aperture radar (SAR), altimetry, and radiometry observations have covered 84 percent of the surface during the first mission cycle from mid-Sep. 1990 through mid-May 1991. Operations in the second mission cycle from mid-May 1991 through mid-Jan. 1992 emphasized filling the larger gaps (the south polar region and a superior conjunction) from that first cycle. Planned observations in the fourth mission cycle from mid-Sep. 1992 through mid-May 1993 will emphasize high-resolution gravity observations of the equatorial regions of Venus.

Scott, J. F.↗

The CERES S'COOL Project: Development and Operational Phases

As part of NASA's Mission to Planet Earth, the first Clouds and the Earth's Radiant Energy System (CERES) instrument will be launched on the Tropical Rainfall Measuring Mission (TRMM) spacecraft from the Tanegashima launch site in Japan in November 1997. The instrument will measure the radiation budget incoming and outgoing radiant energy - of the Earth. The major feature of interest is clouds, which play a very strong role in regulating our climate. CERES will identify clear and cloudy regions and determine cloud physical and microphysical properties using imager data from a companion instrument. Validation efforts for the remote sensing algorithms will be intensive. As one component of the validation, the S'COOL (Students' Cloud Observations On-Line) project will involve school children around the globe in making ground truth measurements at the time of a CERES overpass. They will report cloud type, height, fraction, and opacity, as well as the local surface conditions. Their observations will be collected at the NASA Langley Distributed Active Archive Center (DAAC) and made available over the Internet for educational purposes as well as for use by the CERES Science Team in validation efforts. Pilot testing of the S'COOL project began in January 1997 with two local schools in Southeastern Virginia and one remote site in Montana. National testing in April 1997 involved 8 schools (grades 3 to high school) across the United States. Global testing will be carried out in October 1997. Details of the S'COOL project, which is mainly Internet-based, are being developed in each of these phases according to feedback received from participants. In 1998, when the CERES instrument is operational, a global observer network should be in place providing useful information to the scientists and learning opportunities to the students. Broad participation in the S'COOL project is planned, both to obtain data from a wide range of geographic areas, and to involve as many students as possible in learning about clouds and atmospheric science. This paper reports on the development phase of the S'COOL project, including the reaction of the teachers and students who have been involved. It describes the operational state of the S'COOL network, and identifies opportunities for additional participants.

Chambers, Lin H.↗

Observing Halley from Venus

During the 3 mo of perihelion passage of Comet Halley in 1985 and 1986, the Pioneer Venus Orbiter was diverted from its normal role of collecting Venus science, and operated as a platform for ultraviolet and solar-wind observations of the comet. This paper describes the unusal features of the planning, and the special problems encountered in order to observe the comet.

Jackson, Robert W.↗

Final Environmental Impact Statement for the Ulysses Mission (Tier 2)

This Final (Tier 2) Environmental Impact Statement (FEIS) addresses the environmental impacts which may be caused by implementation of the Ulysses mission, a space flight mission to observe the polar regions of the Sun. The proposed action is completion of preparation and operation of the Ulysses spacecraft, including its planned launch at the earliest available launch opportunity on the Space Transportation System (STS) Shuttle in October 1990 or in the backup opportunity in November 1991. The alternative is canceling further work on the mission. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. This alternative was further evaluated and eliminated from consideration when, in November 1988, the U.S. Air Force, which procures the Titan 4, notified that it could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The Titan 4 launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) for the November 1991 launch opportunity. The only expected environment effects of the proposed action are associated with normal launch vehicle operation and are treated elsewhere. The environmental impacts of normal Shuttle launches were addressed in existing NEPA documentation and are briefly summarized. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects were judged insufficient to preclude Shuttle launches. There could also be environmental impacts associated with the accidental release of radiological material during launch, deployment, or interplanetary trajectory injection of the Ulysses spacecraft. Intensive analysis indicates that the probability of release is small. There are no environmental impacts in the no-action alternative; however, the U.S. Government and the European Space Agency would suffer adverse fiscal and programmatic impacts if this alternative were adopted. The scientific benefits of the mission would be delayed and possibly lost. There could be significant impacts on the ability of the U.S. to negotiate international agreements for cooperative space activities.

Source record↗

Calibration and operation of the Faint Object Spectrograph

The design and basic performance characteristics of the Faint Object Spectrograph (FOS), one of five instruments built for use on the Space Telescope observatory, is summarized briefly. The results of the recently completed instrument-level calibration are presented with special emphasis on issues affecting plans for FOS astronomical observations. Examples include such fundamental characteristics as: limiting magnitudes (system sensitivity and noise figures), spectral coverage and resolution, scattered light properties, and instrumental polarization and modulation efficiencies. Also gated toward intended users, a rather detailed description of FOS operating modes is given. The discussion begins with the difficulties anticipated during target acquisition and their hoped-for resolution. Both the 'normal' spectroscopic operating modes of the FOS and its 'exotic' features (e.g. spectropolarimetric, time-tagged, and time-resolved modes) are presented. The paper concludes with an overview of the activities to assure proper alignment and operation of the FOS within the entire Space Telescope system (orbital and ground-based).

Harms, R.↗

Application of State Analysis and Goal-Based Operations to a MER Mission Scenario

State Analysis is a model-based systems engineering methodology employing a rigorous discovery process which articulates operations concepts and operability needs as an integrated part of system design. The process produces requirements on system and software design in the form of explicit models which describe the behavior of states and the relationships among them. By applying State Analysis to an actual MER flight mission scenario, this study addresses the specific real world challenges of complex space operations and explores technologies that can be brought to bear on future missions. The paper describes the tools currently used on a daily basis for MER operations planning and provides an in-depth description of the planning process, in the context of a Martian day's worth of rover engineering activities, resource modeling, flight rules, science observations, and more. It then describes how State Analysis allows for the specification of a corresponding goal-based sequence that accomplishes the same objectives, with several important additional benefits.

mission planning↗

First Results from the Washington D.C. Metropolitan Area Lighting Map Demonstration Project

An experimental portable lightning mapping array (LMA) operating in the upper VHF TV band (Channels 7-13; 174-216 MHz) was deployed in the Washington DC Metropolitan area during the summer 2006 to locate and monitor the overall lightning activity. The LMA network provides total lightning data to support lightning research as well as proxy data to benefit the development of applications for planned observing systems such as the GOES-R Geostationary Lightning Mapper. The portable LMA hardware is a compactly-housed, easily deployed version of the LMA stations installed North Alabama, Oklahoma, and New Mexico, which operate in the lower VHF TV band (Channels 2-6,54-88 MHz). Real-time LMA data products are provided to the National Weather Service Weather Forecast Office (WFO) in Sterling, VA to aid in their forecast and warning operations. Forecasters at WFO Sterling have already found the lightning data from the Washington DC demonstration network to be very useful in assessing the development of storm systems. On July 4,2006, data from the LMA aided forecasters as they monitored an area of convection that later developed into a line of severe storms that moved southward through the Washington DC metropolitan area across the Washington Mall. Additional applications of lightning mapping data in the Baltimore-Washington DC urban environment will be discussed.

Goodman, Steven J.↗

SIM white light on-board processing algorithms

Interferometry in optical astronomy is an important and growing field of astronomical observation. A number of stellar interferometers have come online over the past several years, and several more are due to be operational in the near future. In addition, space based interferometers are also planned missions of NASA's Origins program, including the Space Interferometry Mission (SIM), the focus of the present paper. The fundamental measurement made by each of these interferometers is the white light fringe measurement to determine the optical pathlength delay between the two arms of the interferometer. SIM makes white light measurements with three independent interferometers observing three different objects. Two of these are the "guide" interferometers that observe bright objects (approximately 7th magnitude) to track the rigid body motion of the instrument. The third interferometer, the "science" interferometer, observes the science targets of interest.

interferometry↗

Assessment Report ASMT-1033: Department 635 FY2019 Evaluate Center 600 Assessment Process

This assessment reviewed the Center 600 assessment process; gathered knowledge from 17 assessment points of contact across the Center; piloted an annual assessment planning process; and compared Center 600 Administrative Operating Procedure (AOP) 04-04, Assessments, to current practices and corporate requirements. The assessment identified two observations, three noteworthy practices, and multiple opportunities for improvement beyond the scope of the assessment.

42 ENGINEERING↗

National Spherical Torus eXperiment - Upgrade NSTX-U: Structural Analysis of Passive Plates Support Brackets

The objective of this analysis is to estimate and assess the stresses in the passive plates caused by a limiting plasma disruption. The objective of this calculation is also to address observed damage to mounting hardware after completion of NSTX operation. These observations initiated diagnostic efforts during the Upgrade project to monitor the severity of the disruptions that were causing the damage, and planned instrumentation to trend the behavior of the mounting hardware. The Recovery Project mission for the passive plate hardware is to appropriately reinforce the passive plates with stainless steel ribs mounted on the back of the plate to reduce their flexure and stress and reinforcements of the “biscuit” components of the bracketry to transfer loads without damage to bolts, biscuits, and bracket plates and welds. Mid-plane disruptions and quenches were manageable with NSTX vintage hardware. The Vertical Displacement Event (VDE) disruptions position the plasma closer to the passive plates and are more severe than the centered plasma. Earlier work pointed to the P1-P5 VDE as limiting. This has been confirmed by A. Brooks work in support of the load generation effort in reference. During vertical displacement large counter currents are generated in the plate as the plasma approaches it. - as would be expected from passive plates. When the plasma disrupts the currents in the plates are reversed, which also reverses the loading on the plates. This report documents the methodology and results of transient structural analysis on the plasma, passive plates support brackets. The loads induced by eddy and halo currents have been considered, and were generated using a separate electromagnetic analysis (NSTXU_1_11_2_1_CALC_051). The structural model also incorporates the effects from preload. Calculation was performed with the assumption that existing biscuits are not participating in the load bearing except the biscuits connected to jumper bolts, which are fully engaged. Results show that with the planned reinforcements, Passive plates and mounting structures satisfy static and fatigue criteria in all areas except welds, where separate analysis was performed. Both symmetric and asymmetric (with locating block) designs were analyzed, and although stresses were higher without locating block they still satisfy NSTX design criteria.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Expert systems tools for Hubble Space Telescope observation scheduling

This paper discusses the utility of expert systems techniques for Hubble Space Telescope (HST) planning and scheduling and describes a plan for development of expert system tools which will augment the existing ground system. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

Miller, Glenn↗

Expert systems tools for Hubble Space Telescope observation scheduling

The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

Miller, Glenn↗

DSN support of Mars Observer

This article provides a summary of the DSN prelaunch, launch, and cruise support of the Mars Observer through Trajectory Correction Maneuver 2 (TCM-2) on 8 Feb. 1993. This summary includes planning, implementation, testing, DSN special configurations and DSN operational problems, and successes and challenges to date.

Traxler, M. R.↗

AGENDA: A task organizer and scheduler

AGENDA will be the main tool used in running the SPOT 4 Earth Observation Satellite's Operational Control Center. It will reduce the operator's work load and make the task easier. AGENDA sets up the work plan for a day of operations, automatically puts the day's tasks into sequence and monitors their progress in real time. Monitoring is centralized, and the tasks are run on different computers in the Center. Once informed of any problems, the operator can intervene at any time while an activity is taking place. To carry out the various functions, the operator has an advanced, efficient, ergonomic graphic interface based on X11 and OSF/MOTIF. Since AGENDA is the heart of the Center, it has to satisfy several constraints that have been taken into account during the various development phases. AGENDA is currently in its final development stages.

Fratter, Isabelle↗

Max 1991 and beyond

Max '91, a coordinated, broad based observational program, was designed to help maximize the scientific return of solar activity studies. Max '91 benefited from the support of the NOAA space environment laboratory. An important source that increases solar ground based support observations is the solar observing optical network (SOON) solar patrol on tape (SOONSPOT) solar image archival system which has started operations. The past means and the future plans for ground based coordination and communications of Max '91 are summarized. The current status and the future developments of SOONSPOT are presented.

Kiplinger, Alan L.↗

CEO Sites Mission Management System (SMMS)

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

Trenchard, Mike↗