Definition of the UMaine VolturnUS-S Reference Platform Developed for the IEA Wind 15-Megawatt Offshore Reference Wind Turbine

The following report defines the UMaine VolturnUS-S reference floating offshore wind turbine (FOWT) semi-submersible designed to support the IEA-15-240-RWT 15-megawatt (MW) reference turbine. The semi-submersible is a generic steel version of the UMaine patented concrete floating foundation technology developed by the US Department of Energy. This report serves as an addendum to the previously published report, NREL/TP-5000-75698 IEA Wind TCP Task 37: Definition of the IEA Wind 15-Megawatt Offshore Reference Wind Turbine, and provides details on a floating semi-submersible design developed to support the15MW reference wind turbine.

17 WIND ENERGY↗

Coupled Ocean Wave-Atmosphere Models for Offshore Wind Energy Applications

Coupling ocean wave models to mesoscale atmospheric models is necessary to represent the effect of waves on wind turbine hub-height winds. In this report we provide a review of the most widely used ocean waves models and the phased-averaged spectral wave modeling paradigm that they are based on. Methodologies used to couple these wave models to mesoscale atmospheric models are described along with details of existing coupled modeling systems. We summarize impacts on offshore wind resource assessments that have been investigated with such coupled modeling systems to-date. Specifically, coupling in the North and Baltic Seas was shown to have a small negative effect on the offshore wind energy resource at weak-to-moderate wind speeds, with little impact at higher wind speeds. Finally, limitations of these existing coupled modeling systems and impact assessments are discussed, including examples of and the potential for improved parameterizations of the air-sea fluxes, and the use of fine-scaled simulations using phased-resolved wave models.

17 WIND ENERGY↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

West Coast Offshore Wind Transmission Study

As a primary federal investigation of the utility of transmission to support offshore wind emergence in the Western Interconnect, the West Coast Offshore Wind Transmission study evaluates five distinct West Coast-wide transmission scenarios and trades the economic benefits and costs of six development pathways from 2035 to 2050. In this time, 33 GW of OSW generation and supporting transmission are explored within the context of 350 additional GW of generation to support 100% clean electricity. Geospatial analysis informed plausible transmission topologies and cost estimates. All pathways to intraregional or interregional coordination transmission builds showed more than $\$$14 billion in present value cost savings, with a maximum of $\$$25 billion of savings in the interregional case. These savings are primarily driven by fuel costs and increased availability of power flows enabled by new transmission networks. Key considerations of clean, dispatchable generation options, geographic disaggregation of costs, system reliability reinforcements, resilience, and community values are also presented and discussed.

17 WIND ENERGY↗

Offshore Wind Energy Validation Experiment Hierarchy

This paper provides a summary of planning work for experiments that will be necessary to address the long-term model validation needs required to meet offshore wind energy deployment goals. Conceptual experiments are identified and laid out in a validation hierarchy for both wind turbine and wind plant applications. Instrumentation needs that will be required for the offshore validation experiments to be impactful are then listed. The document concludes with a nominal vision for how these exp

Maniaci, David Charles↗

Regime Characterization of Offshore Wind Resource Using Unsupervised Learning

Predictability of wind resource conditions is critical for offshore wind design and operations. While many studies of extreme wind conditions focus on specific events such as low-level jets or ramps, these rely on threshold definitions that limit generality. Here we present a data-driven framework that combines principal component analysis (PCA), self-organizing maps (SOM), and k-means clustering to classify wind resource conditions as typical and anomalous from climatological data. Anomalies are defined not by fixed thresholds but by flagging samples located far from SOM node centers inside the baseline SOM structure. This reframes extremes as rare ebents and hence, likely difficult to anticipate by numerical weather prediction models. We applied this approach to 23 years (2000–2022) of hourly profiles from the NOW-23 hindcast model at the Humboldt Wind Energy Area. Classification is conducted on a feature space consisting of 10 m wind speed and direction, bulk shear and veer across 30–270 m, and a low-level jet index. Dimensionality reduction is achieved through PC. A 2 × 3 OM lattice trained on the PCA vectors identified six baseline regimes spanning weak to strong flow states. High quantization-error profiles are identified and re-clustered into four anomalous regimes. The baseline regimes exhibited clear seasonal and diurnal cycles. Meanwhile, the anomalous regimes represented <10 % of all hours but showed distinct combinations of speed, shear, and veer, when compared to the baseline regimes. Anomalous regimes are typically short-lived (~few hours), yet their transitions can lead to hub-height wind changes of −18 to +9 m s -1 . For a representative 15 MW turbine, these shifts imply rapid swings in capacity factor from near-full output to negligible generation. Validation with lidar buoy data showed 51% agreement in SOM labels across ~6,000 overlapping hours, with most mismatches confined to adjacent speed classes. HRRR comparisons further revealed that anomalous regimes were disproportionately associated with forecast biases exceeding 5 m s -1 . Together, these results reframe extremes in offshore wind from absolute maxima or minima to weather states that are difficult to anticipate from models.

17 WIND ENERGY↗

Southern Company Services: Project 2: Tall Tower Wind Technical Potential for the Southeast (Modifications 4, 5), Project 4: Offshore Wind Potential for Southern Company Services (Modifications 7, 8)

Project 2: The National Laboratory of the Rockies (NLR) and Southern Company Services (SCS) seek to establish an agreement to assess the technical potential for wind energy in the Southeastern U.S. SCS has requested that NLR conduct a detailed assessment of system performance, available capacity, transmission distance, and levelized cost of electricity (LCOE) at turbine hub heights of 100m to 160m within the SCS service territory. NLR will also provide an assessment of utility photovoltaic (PV) technical potential within the SCS service territory. NLR has unique modeling capabilities to assist SCS with high spatial and temporal resolution assessment of wind and PV technical potential, considering geospatial constraints. Project 4: NLR and SCS seek to develop a spatially explicit techno-economic assessment for offshore wind energy in the Southeastern U.S. The analysis aims to characterize the regional sensitivities of offshore wind plant costs and performance, underwater cabling, potential siting constraints, and landfall spur transmission costs.

17 WIND ENERGY↗

Cybersecurity Center for Offshore Wind Energy (Final Project Report)

This project establishes a Cybersecurity Center for Offshore Wind Energy with the objective of designing and operating a cyber-physical testbed for wind energy farms (WEFs) that enables comprehensive cybersecurity research. The testbed incorporates a Supervisory Control and Data Acquisition (SCADA) system connected to turbine models via industrial-grade programmable logic controllers (PLCs) and remote terminal units (RTUs). It supports side-channel data acquisition, implementation and analysis of various cyberattack scenarios, and development of attack detection, mitigation, and best-practice guidance tailored to wind energy systems. During the project, the team expanded the number and fidelity of mathematical turbine models (MTMs), integrated these models with SCADA infrastructure, and deployed a scaled physical turbine and associated sensors. High-resolution operational and side-channel data streams were collected and used to refine machine-learning (ML)-based attack detection systems and to extend the WindCRAFT framework to multi-turbine threat scenarios. The project demonstrated a realistic, scalable environment for evaluating cyber threats, validated attack detection approaches using enriched datasets, and identified new multi-turbine and inter-turbine communication attack vectors. The resulting testbed, models, and security mechanisms provide a foundation for ongoing R&D and deployment of cyber-resilient offshore wind energy systems.

17 WIND ENERGY↗

An Intermediate-Scale Version of the Volturnus + Floating Offshore Wind Turbine Platform Concept in a Real Ocean Environment with an Operating Turbine off the Coast of Maine (Final Scientific/Technical Report)

This project was undertaken to advance the technical readiness and commercial viability of a next-generation, industrialized concrete floating foundation for offshore wind turbines called VolturnUS +. The design objective is to deliver a platform that is lower cost, faster to manufacture, simpler to deploy, and optimized for domestic supply chains and local workforce participation. To enable project financing and commercial adoption, an at-sea demonstration under representative operating conditions was required and therefore this project aimed to deploy a ¼-scale VolturnUS+ prototype offshore the Coast of Maine.

17 WIND ENERGY↗

OC6 Project Phase IV: Validation of Numerical Models for Novel Floating Offshore Wind Support Structures

The fourth phase of the Offshore Code Comparison, Collaboration, Continued, with Correlation and unCertainty (OC6) aims to assess the ability of the tools to model a novel floating wind design. The design that was selected for this project is the TetraSpar designed by Stiesdal Offshore Technologies. The platform is a unique design that features a spar like stability with a very low center of gravity, but does not require deep-water ports. This combination is achieved with a system made of two separate steel structures, a hull at the water’s surface that supports the wind turbine tower, and a keel that is suspended below the main body. This lower keel has a very high density and drives the total platform’s low center of gravity. Scaled model tests of the TetraSpar design were performed in 2018-2019 by the University of Maine. The tests were performed with 1:43 Froude scaling. The data collected in the model tests provide a detailed description of the response of the platform in various controlled and relatively well understood conditions. Comparison with these data provides a good opportunity for validation of numerical models. The OC6 Phase IV work will focus on the specific parameters used in these scaled model tests. The load cases (LC) considered in this project are as follows: LC 1.X - Equilibrium and Static Offset Tests LC 2.X - Platform Free Decays LC 3.X - Turbine Thrust (Wind Only) LC 4.X - Regular and Irregular Waves (Wave only) LC 5.X - Combined Wind and Wave Loading

17 WIND ENERGY↗

Modeling Annual Electricity Production and Levelized Cost of Energy from the US East Coast Offshore Wind Energy Lease Areas

Offshore wind energy development along the East Coast of the US is proceeding quickly as a result of large areas with an excellent wind resource, low water depths and proximity to large electricity markets. Careful planning of wind turbine deployments in these offshore wind energy lease areas (LA) is required to maximize power output and to minimize wake losses between neighboring wind farms as well as those internal to each wind farm. Here, we used microscale wind modeling with two wake parameterizations to evaluate the potential annual energy production (AEP) and wake losses in the different LA areas, and we developed and applied a levelized cost of energy (LCoE) model to quantify the impact of different wind turbine layouts on LCoE. The modeling illustrated that if the current suite of LA is subject to deployment of 15 MW wind turbines at a spacing of 1.85 km, they will generate 4 to 4.6% of total national electricity demand. The LCoE ranged from $68 to $102/MWh depending on the precise layout selected, which is cost competitive with many other generation sources. The scale of the wind farms that will be deployed greatly exceed those currently operating and mean that wake-induced power losses are considerable but still relatively poorly constrained. AEP and LCoE exhibited significant dependence on the precise wake model applied. For the largest LA, the AEP differed by over 10% depending on the wake model used, leading to a $10/MWh difference in LCoE for the wind turbine layout with 1.85 km spacing.

58 GEOSCIENCES↗

Optimization of a Lightweight Floating Offshore Wind Turbine with Water Ballast Motion Mitigation Technology

Floating offshore wind turbines are a promising technology for addressing energy needs by utilizing wind resources offshore. The current state of the art is based on heavy, expensive platforms to survive the ocean environment. Typical design techniques do not involve optimization because of the computationally expensive time domain solvers used to model motions and loads in the ocean environment. However, this design uses an efficient frequency domain solver with a genetic algorithm to rapidly optimize the design of a novel floating wind turbine concept. The concept utilizes a liquid ballast mass to mitigate motions on a lightweight post-tensioned concrete platform. The simple cruciform-shaped design of the platform made of post-tensioned concrete is less expensive than steel, reducing the raw material and manufacturing cost. The use of ballast water to behave as a tuned mass damper allows a smaller platform to achieve the same motions as a much larger platform, thus reducing the mass and cost. The optimization techniques applied with these design innovations resulted in a design with a levelized cost of energy of USD 0.0753/kWh, roughly half the cost of the current state of the art.

Ramsay, William↗

Power at Sea: Use of Wave Energy Converters for Powering Offshore Oil and Gas Operations

New innovative services and goods based on artificial intelligence, next-generation robotics, autonomy, digitization, and electrification are taking root in the ocean economy. More typical competitive forces, such as value enhancement and safety improvement, are also present, as suppliers constantly strive to improve their competitive positioning. Concurrently, the Oil and Gas sector is experiencing mounting pressure to decrease its operational carbon emissions, forcing efforts to reduce or eliminate liquid fuel consumption offshore. Companies in the ocean economy are having to react to this combination of macro- and micro-level drivers and innovate at an ever more rapid pace. However, before many of these new capabilities can be implemented, new, clean, reliable power sources are needed, especially as liquid fuel grows increasingly out of favor. For many of these loads—both old and new and ranging from watts to megawatts—wave energy systems provide the best solution for remote power generation. As such, research, development and demonstration activities are underway to prove wave energy's ability to provide reliable, consistent energy supplies for certain offshore Oil and Gas activities, paving the way for near term commercialization. Furthermore, this paper outlines these drivers, competitive reaction to them, and why and how wave energy can be a preferable choice for power at sea.

16 TIDAL AND WAVE POWER↗

Comparison of wind-farm control strategies under realistic offshore wind conditions: wake quantities of interest

Wind-farm control strategies aim to increase the efficiency, and therefore lower the levelized cost of energy, of wind farms. This is done by using turbine settings such as the yaw angle, blade pitch angles, or generator torque to manipulate the wake that negatively affects downstream turbines in the farm. Two inherently different wind-farm control methods have been identified in the literature: wake steering (WS) and active wake mixing (AWM). As one of two companion papers focused on understanding practical aspects of these two wind-farm control strategies using large-eddy simulation (LES), we below analyze the wake quantities of interest for a single wind turbine performing WS and AWM, while the companion article (Frederik et al., 2025) focuses on turbine quantities of interest including power and structural loads for the same computational setup and also includes two-turbine arrays with full and partial wake overlap. The simulations, which are based in the LES solver AMR-Wind, are tailored to have inflow conditions representative of measurements from a site off the East Coast of the US, including with strong veer and low turbulence. The turbine, which is modeled in OpenFAST and coupled to the LES, is the IEA 15 MW, an open-source offshore design. After presenting an overview of the wake recovery for the different wake-control cases, the analysis probes the fluid-dynamic causes for the different performance of the arrays reported in the companion article by examining control volumes around the wakes and the budget of the mean-flow kinetic energy (MKE) within these volumes. In the high veer environment considered, the MKE recovery is dominated by mean convection, and this is shown to especially benefit the WS strategy when a neighboring turbine is directly downstream: there is ≈65 % more available power for a downstream turbine than in the baseline case, and this power is gained primarily through mean convection on the left-tip and top-tip faces of the control volume. However, the case with imperfect knowledge of the exact wind direction favors the pulse-type AWM strategy, largely because of ≈9 % increased turbulent entrainment from aloft versus the baseline that could be related to an apparent resistance to skewing in the pulsed wake. The general reduced effectiveness of helix-type and other individual-pitch-based AWM strategies for inflow with high veer and low turbulence as reported in the companion paper is due, in part, to low magnitudes of phase-averaged turbulent entrainment. Two main findings of this study are thus that veer has a significant impact on the effectiveness of different wake-control strategies and that pulse-type AWM may be a useful strategy when the objective is power maximization in realistic, offshore flow environments with imperfect knowledge of the exact wake overlap position on the downstream turbine.

17 WIND ENERGY↗

OC6 project Phase IV: validation of numerical models for novel floating offshore wind support structures

Abstract. This paper provides a summary of the work done within Phase IV of the Offshore Code Comparison Collaboration, Continued with Correlation and unCertainty (OC6) project, under International Energy Agency Wind Technology Collaboration Programme Task 30. This phase focused on validating the loading on and motion of a novel floating offshore wind system. Numerical models of a 3.6 MW horizontal-axis wind turbine atop the TetraSpar floating support structure were compared using measurement data from a 1:43-Froude-scale test performed in the University of Maine's Alfond Wind–Wave (W2) Ocean Engineering Laboratory. Participants in the project ran a series of simulations, including system equilibrium, surge offsets, free-decay tests, wind-only conditions, wave-only conditions, and a combination of wind and wave conditions. Validation of the models was performed by comparing the aerodynamic loading, floating support structure motion, tower base loading, mooring line tensions, and keel line tensions. The results show a relatively good estimation of the aerodynamic loading and a reasonable estimation of the platform motion and tower base fore–aft bending moment. However, there is a significant dispersion in the dynamic loading for the upwind mooring line. Very good agreement was observed between most of the numerical models and the experiment for the keel line tensions.

17 WIND ENERGY↗

Relative Permeability for Offshore Enhanced Oil Recovery

Relative permeability (k<sub>r</sub> ) is the description of <strong>multiphase transport through porous media </strong>that is most widely accepted and utilized to scale relationships up to the field scale through simulations. Previous research at NETL has shown a <strong>dependence of k</strong><sub><strong>r </strong></sub><strong>on the flow rates and porous media structure </strong>that is poorly captured in most descriptions of this process. Our project was originally scoped to be a 3-year project to (2019-2021): (1) determine if this poor literature description is true for offshore EOR; (2) collect data on the generation of relevant k<sub>r</sub> curves for offshore EOR; and (3) distribute this collected data, methodology and resultant curves.<br>

Crandall, Dustin↗

Recent Developments in Deployment of CCS Projects in the Offshore Gulf of Mexico

In the last year, since the passage of the IRA, there have been over 100 new CCUS project announcements in the U.S. This presentation provides an overview of the recent Offshore Gulf of Mexico (GoM) CCS project announcements attributable to 45Q and improvements in project economics. It also examines how the remaining regulatory hurdles to potentially broader CCUS deployment in the Offshore GoM, are being addressed.

Zaremsky, Connie↗

Equity Considerations for Renewable Energy Technologies in Alaska Offshore Waters

For many Alaskan communities, access to resilient, affordable, sustainable, and clean energy resources are top among the solutions they will need to help them navigate their changing landscape. The Bureau of Ocean Energy Management funded the National Renewable Energy Laboratory to conduct a feasibility study to examine the potential for renewable energy technologies in Alaska offshore waters (with a focus on waters that are under BOEM's purview, the Outer Continental Shelf). With unprecedented investments from the federal government in bolstering resiliency in rural, remote and disadvantaged communities, renewable energy development in Alaska offshore waters could very well become a reality within the next two decades.