Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimized infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗

A novel large-scale EV charging scheduling algorithm considering V2G and reactive power management based on ADMM

Electric vehicle aggregators (EVAs) that utilize vehicle-to-grid (V2G) technologies can function as both controllable loads and virtual power plants, providing key energy management services to the distribution system operator (DSO). EVAs can also balance the grid’s reactive power as a virtual static VAR compensator (SVC) and provide voltage stability by utilizing advanced electric vehicle (EV) chargers that are capable of four-quadrant operations to provide reactive power management. Finally, managed charging can benefit EVAs themselves by minimizing power factor penalties in their electricity bills. In this paper, we propose a novel EV charging scheduling algorithm based on a hierarchical distributed optimization framework that minimizes peak load and provides reactive power compensation for the DSO by collaboration with EVAs that manage both the active and the reactive charging and discharging power of participating EVs. Utilizing the alternative direction method of multipliers (ADMM), the proposed distributed optimization approach scales well with increased EV charging infrastructure by balancing active and reactive power while decreasing computational burden. In our proposed hierarchical approach, each EVA schedules the active and reactive EV charging and discharging power for 1) reactive power compensation in order to minimize power factor penalty and electricity cost accrued by the EVA, 2) satisfaction of each EV’s energy demand at minimal charging cost, and 3) peak shaving and load management for the DSO. When compared with an uncoordinated charging model, the efficacy of this proposed model is successfully demonstrated through a 300% decreased peak EV load for the DSO, 28% lower electricity costs for EV users, and 98.55% smaller power factor penalty, along with 17.58% lower overall electricity costs, for EVAs. The performance of our approach is validated in a case study with 50 EVs at multiple EVAs in an IEEE 13-bus test case and compared the results with uncoordinated EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Selling Demand Response Using Options

Wholesale electricity markets in many jurisdictions use a two-settlement structure: a day-ahead market for bulk power transactions and a real-time market for fine-grain supply-demand balancing. This paper explores trading demand response assets within this two-settlement market structure. Here, we consider two approaches for trading demand response assets: (a) an intermediate spot market with contingent pricing, and (b) an over-the-counter options contract. In the first case, we characterize the competitive equilibrium of the spot market, and show that it is socially optimal. Economic orthodoxy advocates spot markets, but these require expensive infrastructure and regulatory blessing. In the second case, we characterize competitive equilibria and compare its efficiency with the idealized spot market. Options contract are private bilateral over-the-counter transactions and do not require regulatory approval. We show that the optimal social welfare is, in general, not supported. We then design optimal option prices that minimize the social welfare gap. This optimal design serves to approximate the ideal spot market for demand response using options with modest loss of efficiency. Our results are validated through numerical simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Securing Infrastructure from High Explosive Threats

Lawrence Livermore National Laboratory (LLNL) is working with the Department of Homeland Security's Science and Technology Directorate, the Transportation Security Administration, and several infrastructure partners to characterize and help mitigate principal structural vulnerabilities to explosive threats. Given the importance of infrastructure to the nation's security and economy, there is a clear need for applied research and analyses (1) to improve understanding of the vulnerabilities of these systems to explosive threats and (2) to provide decision makers with time-critical technical assistance concerning countermeasure and mitigation options. Fully-coupled high performance calculations of structural response to ideal and non-ideal explosives help bound and quantify specific critical vulnerabilities, and help identify possible corrective schemes. Experimental validation of modeling approaches and methodologies builds confidence in the prediction, while advanced stochastic techniques allow for optimal use of scarce computational resources to efficiently provide infrastructure owners and decision makers with timely analyses.

42 ENGINEERING↗

Audi e-tron Green Light Optimized Speed Advisory On-Road Data

To aid researchers in studying the capabilities and benefits of vehicle-to-infrastructure communication, Argonne National Laboratory collected a robust set of on-road driving data of the Audi Green Light Optimized Speed Advisory (GLOSA) system implemented in the e-tron battery electric vehicle. This dataset includes 33 tests, each roughly 27 miles in length and roughly 45 to 75 minutes in duration. The team selected Kane County Highway Route 34 from Main Street in Batavia, Illinois to Middlecreek Lane in St. Charles, Illinois as the route do to its high density of GLOSA-active lights and the most opportunities to observe the system per hour of test time. The data include parameters from the following sources: GLOSA system driving the dash indicators, multiple powertrain parameters including real-time battery power/energy consumption, GPS, front radar gap, and rear radar gap. ![audio-e-tron image](audi-e-tron.jpg)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantitative approaches for including equity in risk and resilience infrastructure planning analyses

Risk and resilience assessments for critical infrastructure focus on myriad objectives, from natural hazard evaluations to optimizing investments. Although research has started to characterize externalities associated with current or possible future states, incorporation of equity priorities at project inception is increasingly being recognized as critical for planning related activities. However, there is no standard methodology that guides development of equity-informed quantitative approaches for infrastructure planning activities. Here, to address this gap, we introduce a logic model that can be tailored to capture nuances about specific geographies and community priorities, effectively incorporating them into different mathematical approaches for quantitative risk assessments. Specifically, the logic model uses a graded, iterative approach to clarify specific equity objectives as well as inform the development of equations being used to support analysis. We demonstrate the utility of this framework using case studies spanning aviation fuel, produced water, and microgrid electricity infrastructures. For each case study, the use of the logic model helps clarify the ways that local priorities and infrastructure needs are used to drive the types of data and quantitative methodologies used in the respective analyses. The explicit consideration of methodological limitations (e.g., data mismatches) and stakeholder engagements serves to increase the transparency of the associated findings as well as effectively integrate community nuances (e.g., ownership of assets) into infrastructure assessments. Such integration will become increasingly important to ensure that planning activities (which occur throughout the lifecycle of the infrastructure projects) lead to long-lasting solutions to meet both energy and sustainable development goals for communities.

community-based↗

Optimum Planning for Inductively Charged On-Demand Automated Electric Shuttles at Greenville, South Carolina

Wireless charging technology presents perfect fits for autonomous electric vehicles for realizing a fully automated system (vehicle and charger). This paper presents a planning optimization analysis for a pilot project of in-route wireless charging infrastructure serving fixed-route on-demand shared automated electric shuttles (SAESs) at Greenville, South Carolina, USA. A single-objective non-linear integer planning optimization problem is formulated. A comprehensive cost function representing the inductively charged SAESs is developed, considering road construction, power electronics and materials, traction battery, and installation costs. The optimization problem is solved to determine the best combination of the system key design parameters (number and allocations of wireless chargers, charging power level, track length and on-board battery capacity) that show the most cost-effective solution and allow the SAESs realizing charge sustaining operation. The planning platform incorporates representative simulated traffic data (drive cycles and routes) for four SAESs at Greenville project using the Simulation of Urban Mobility (SUMO) tool. These data are fed to a vehicle powertrain model and a wireless charger power model to predict the battery power, energy and state-of-charge (SOC) profiles, which are provided to the search algorithm to assess the design objectives under specific constraints. The results indicated that implementing wireless charging at a few designated stops for fixed-route SAESs with proper design allows the vehicles realizing charge sustaining operation, infinite range and zero recharge downtime, with a significant reduction in the on-board battery (36 % ) and road coverage (69%), at minimum cost.

33 ADVANCED PROPULSION SYSTEMS↗

Optimal placement of data concentrators for expansion of the smart grid communications network

Evolving power systems with increasing renewables penetration, along with the development of the smart grid, calls for improved communication networks to support these distributed generation sources. Automatic and optimal placement of communication resources within the advanced metering infrastructure is critical to provide a high‐performing, reliable, and resilient power system. Three network design formulations based on mixed‐integer linear and non‐linear programming approaches are proposed to minimise network congestion by optimising residual buffer capacity through the placement of data concentrators and network routeing. Results on a case study show that the proposed models improve network connectivity and robustness, and increase average residual buffer capacity. Maximising average residual capacity alone, however, results in both oversaturated and underutilised nodes, while maximising either minimum residual capacity or total reciprocal residual capacity can yield much‐improved network load allocation. Consideration of connection redundancy improves network reliability further by ensuring quality‐of‐service in the event of an outage. Analysis of multi‐period network expansion shows that the models do not deviate significantly from optimal when used progressively (within 5% deviation), and are effective for utility planners to use for smart grid expansion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization and Control Theory for Smart (Power) Grids [Slides]

The national interest in a broad class of problems loosely characterized as the smart grid is rapidly growing. At its core, the smart grid is the modernization of our existing electric power systems through improvements in efficiency, increased robustness and resiliency, integration of time-variable renewable generation, and reduction of environmental impacts. To date, the focus of most commercial entities has been on development of hardware such as smart meters and green technologies. However, with the exception of a handful of academic researchers, there has been limited research on optimization, control and more broadly, the information science required to effectively utilize this hardware. Our proposal targets development of the basic information science that will effectively bridge this gap. Using our expertise in information theory, network analysis, infrastructure analysis and power engineering, we will develop new algorithms for optimal design of the nation's next generation power transmission and distribution system that address the realities and challenges of the future grid. We focus on three core information science challenges in Grid Design, Grid Control and Grid Stability by considering a set of challenging problems. First, we study efficient and robust integration of geographically widespread renewable generation by solving large, cutting-edge optimization problems that incorporate difficult constraints imposed by the transmission of electrical power. Second, we consider two load balancing problems in the low-voltage distribution grid: development of robust and efficient distributed control techniques and algorithms based on queuing theory. These tools will enable high penetration of small-scale distributed generation and plug-in hybrid vehicles with limited or no communications. We will also develop efficient control algorithms for maintaining an operational distribution grid via switching of redundant lines. Third, we will develop a preventive toolbox capable of detecting instabilities and failures prior to their occurrence. Damaging failures and cascading outages, which can result in billions of dollars worth of damage, have substantial economic consequences. We will focus on estimating the probability of these outages, identifying their signatures and precursors, and developing detection algorithms for alerting the transmission grid operator. The new challenges in IS&T for smart grids require coherent advances in analysis and control, stability and reliability metrics, state estimation, data aggregation and assimilation, and communication middleware for the grid as well as understanding consumer response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Planning Optimization for Inductively Charged On-demand Automated Electric Shuttles Project at Greenville, South Carolina

Wireless charging technology presents an ideal fit for autonomous electric vehicles for realizing a fully automated system (vehicle and charger). This paper presents a planning optimization analysis for a pilot project of in-route wireless charging infrastructure serving fixed-route on-demand shared automated electric shuttles (SAESs) at Greenville, South Carolina, USA. A single-objective non-linear mixed integer system planning optimization problem is formulated. A comprehensive cost model representing the overall inductively charged SAESs system is developed, considering road construction, power electronics and materials, traction battery, and installation costs. The optimization problem is solved to determine the best combination of the system key design parameters (number and allocations of wireless chargers, charging power level, track length and on-board battery capacity) that show the most cost-effective solution and allow the SAESs to achieve charge-sustaining operation. The planning platform incorporates representative simulated traffic data (driving speed and routes) for four SAESs in the Greenville using the Simulation of Urban Mobility tool. These data are fed to a vehicle powertrain model and a wireless charger power model to predict the battery power, energy and state-of-charge profiles, which are provided to the search algorithm to assess the design objectives under specific constraints. Finally, the results indicate that implementing high-power (100 kW) wireless charger at a few designated stops for fixed-route SAESs with the proper track length allows the vehicles to realize charge-sustaining operation, infinite range, and zero recharge downtime, with a significant reduction in the on-board battery (36%) and road coverage (69%), at minimum cost.

33 ADVANCED PROPULSION SYSTEMS↗

Perspective: Towards environmentally acceptable criteria for downstream fish passage through mini hydro and irrigation infrastructure in the Lower Mekong River Basin

Tropical rivers have high annual discharges optimal for hydropower and irrigation development. The Mekong River is one of the largest tropical river systems, supporting a unique mega-diverse fish community. Fish are an important commodity in the Mekong, contributing a large proportion of calcium, protein, and essential nutrients to the diet of the local people and providing a critical source of income for rural households. Many of these fish migrate not only upstream and downstream within main-channel habitats but also laterally into highly productive floodplain habitat to both feed and spawn. Most work to date has focused on providing for upstream fish passage, but downstream movement is an equally important process to protect. Expansion of hydropower and irrigation weirs can disrupt downstream migrations and it is important to ensure that passage through regulators or mini hydro systems is not harmful or fatal. Many new infrastructure projects (<6 m head) are proposed for the thousands of tributary streams throughout the Lower Mekong Basin and it is important that designs incorporate the best available science to protect downstream migrants. Recent advances in technology have provided new techniques which could be applied to Mekong fish species to obtain design criteria that can facilitate safe downstream passage. Obtaining and applying this knowledge to new infrastructure projects is essential in order to produce outcomes that are more favorable to local ecosystems and fisheries.

fish-friendly turbine↗

Optimal Siting of EV Fleet Charging Station Considering EV Mobility and Microgrid Formation for Enhanced Grid Resilience

Coordinating infrastructure planning for transportation and the power grid is essential for enhanced reliability and resilience during operation and disaster management. This paper presents a two-stage stochastic model to optimize the location of electric vehicle fleet charging stations (FEVCSs) to enhance the resilience of a distribution network. The first stage of this model deals with the decision to place an FEVCS at the most favorable and optimized location, whereas the second stage aims to minimize the weighted sum of the value of lost load in multiple potential scenarios with different faults. Indeed, the second stage is a joint grid restoration scheme with network reconfiguration and microgrid formation using available distributed generators and fleet electric vehicles. The proposed model is tested on a modified IEEE-33 node distribution network and a four-node transportation network. Case studies demonstrate the effectiveness of the proposed model.

25 ENERGY STORAGE↗

Energy Optimization of Light and Heavy-Duty Vehicle Cohorts of Mixed Connectivity, Automation and Propulsion System Capabilities via Meshed V2V-V2I and Expanded Data Sharing (Final Scientific and Technical Report)

Vehicle connectivity and automated driving technologies individually have the potential to decrease energy consumption and/or increase safety on light, medium or heavy duty vehicles to varying degrees depending on the traffic infrastructure and specific driving scenarios. Due to advances in sensing, perception and computing power, research and development emphasis in the mobility sector has shifted away from connectivity. Prior research has shown that driving automation with the absence of connectivity can in certain circumstances increase energy consumption. The effectiveness of synergizing connectivity and driving automation technologies is the focus of this work, specifically applied to vehicle cohorts of mixed composition, light and heavy duty, and powertrains ranging from all electric to conventional internal combustion engine. The project team is led by Michigan Technological University (MTU) and partnered with AVL Mobility Technologies Inc. (AVL), Borg Warner (BW), Traffic Technology Services (TTS), American Center for Mobility (ACM) and Navistar (NAV). The main thrusts for the team are to develop a micro-traffic simulation environment with specific VD&PT system attributes and CAV capabilities, 2) field a vehicle test fleet of mixed classification, propulsion and CAV capacity, 3) develop artificial intelligence (AI) and machine learning (ML) based multi-agent optimization methods for various traffic infrastructures, 4) integrate the virtual environment and the optimization methods then deploy the system as a CAV hardware in the loop (HiL) for the vehicle test fleet and 5) conduct closed track and public road testing to validate simulation and demonstrated energy and mobility improvements at multiple scales. For a cohort of mixed vehicles, the team will demonstrate a reduction of energy consumption of 10-50% at intersection, arterial roadway and limited access highway scenarios through connectivity and automation in simulation and at a closed test track. The energy reduction objectives of the project are summarized in Table 1, indicating the infrastructure and over what distances are relevant considered. Single scenario energy reductions are not relevant and thus, the research team took the approach to vary parameters associated with the infrastructure, vehicle cohort composition and dynamic behavior to generate energy consumption distributions for both unconnected and connected scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Threats to a Colorado river provisioning basin under coupled future climate and societal scenarios

Clean, reliable supplies of water are critical to the sustainability and resilience of communities, including water needed for energy and food production, industry, drinking water, and other human and ecological needs. However, water infrastructure and management in the United States are largely optimized for historic conditions—designed and operated to respond to social needs, and past mean and extreme streamflow, which may no longer apply in the future. Temperature, precipitation, ecosystem dynamics, energy and food production, and social systems are all experiencing changes, which cumulatively affect the security of water supply. Here, we examine the impact of these changes in a provisioning basin in the arid Southwest, the San Juan River, which supplies water, food, and energy to the Colorado River and the Rio Grande. Our analysis applies a multi-model framework to examine future climate and water use scenarios. Results demonstrate that the San Juan River basin could experience significant disruptions to water deliveries (-12% to -48% for the drier models) and shortages that exceed manageable thresholds (53% to 73% of water in shorted years), potentially affecting both the local basin as well as other regions that receive water and energy from the San Juan. While water stress metrics vary across the scenarios, results indicate the need for government, industry, and communities to consider options for adapting to water supply shifts. These results raise important questions regarding the resilience of water resources in basins across the West under future scenarios and implications for energy, food, and other water supply needs.

54 ENVIRONMENTAL SCIENCES↗

To Derive or Not to Derive: I/O Libraries Take Charge of Derived Quantities Computation

The ever-increasing volume of data produced by HPC simulations necessitates scalable methods for data exploration and knowledge extraction. Scientific data analysis often involves complex queries across distributed datasets, requiring manipulation of multiple primary variables and generating derived data that needs to be handled efficiently, creating challenges for applications that need to parse many large datasets. Relying on individual applications to handle all intermediate data generally leads to redundant computations across studies and unnecessary data transfers. In this paper, we investigate the performance of different approaches where applications define derived variables as quantities of interest (QoIs) and offload the computation and transfer of these QoIs to the I/O library. This significantly reduces redundancy and optimizes data movement across the distributed storage and processing infrastructure by allowing control over when and where derived variables are computed. We present a detailed analysis of the performance-storage trade-offs associated with different solutions and showcase results for our study on two large-scale datasets created from climate and combustion simulations.

Gainaru, Ana↗

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

Plant security during decommissioning; challenges and lessons learned from German phase out decision

Purpose of this paper is to point out the security challenges that may occur during the decommissioning, based on the issues and lessons learned from the German phase out decision. Though national regulations may be different in other countries the basic problems and issues will be the same. Therefore presented solutions will be applicable in other countries as well. The radioactive material remaining at the NPP during decommissioning has the most influence on how the security measures have to be designed. The radioactive material defines the risk potential of the plant and this determines the needed security level. The following aspects have been challenging in Germany: - Scenarios varying from those, used for plants in operation, due to changed operating conditions - Spent fuel will stay in the spent fuel pool for a quite long period before it can be removed from the plant. Risk potential of the plant stays high and requires a high level of security measures - Security measures according to the existing operating license have to stay in place as they are, unless the first license for decommissioning is given respective the spent fuel is removed from the plant site. This even led to the question if improvements of security measures, planned and announced with focus on a plant remaining in operation for another couple of years, need to be done although they will not be required after removing the spent fuel from the plant. A further important aspect for the security design is the fact that a plant under decommissioning has completely different and strongly varying operating procedures, compared to the stable ones of an operating plant. This leads to different needs concerning workspace, infrastructure on plant site, access to buildings etc. An optimized and highly flexible security concept is needed to ensure an adequate level of security as well as an efficient decommissioning. A deep analysis of the vital plant functions, depending on the different decommissioning stages, is required to determine the vital equipment, its location and its need for protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mastering HPC Runtime Prediction: From Observing Patterns to a Methodological Approach

The continual expansion of high-performance computing (HPC) brings with it an increasing need for efficiency. Heavy investment in energy, hardware, and software infrastructure to support peta- and exascale computing requires the optimization of existing systems and, wherever possible, the discernment and adoption of best-practices towards these goals. Such is the case for runtime prediction. When a job is submitted to an HPC system, an estimate of its runtime is provided by the user in the form of "requested wallclock". Error in this user-provided estimate can lead to jobs being prematurely killed by the scheduler, increased wait time on the queue, and decreased system utilization. More than fifteen years of research has been directed at mitigating these effects by using data-driven runtime predictions. Codified here is a set of commonalities and insights emerging from this body of work, which we present as recommendations and best practices. These practices are combined into a methodological approach described and evaluated on an 11-million-job dataset from the National Renewable Energy Laboratory's petascale HPC system, Eagle. This dataset and the accompanying codebase have been released to the public domain for the benefit of the wider HPC research community.

high performance computing↗