Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Initialization of Formation Flying Using Primer Vector Theory

In this paper, we extend primer vector analysis to formation flying. Optimization of the classical rendezvous or free-time transfer problem between two orbits using primer vector theory has been extensively studied for one spacecraft. However, an increasing number of missions are now considering flying a set of spacecraft in close formation. Missions such as the Magnetospheric MultiScale (MMS) and Leonardo-BRDF (Bidirectional Reflectance Distribution Function) need to determine strategies to transfer each spacecraft from the common launch orbit to their respective operational orbit. In addition, all the spacecraft must synchronize their states so that they achieve the same desired formation geometry over each orbit. This periodicity requirement imposes constraints on the boundary conditions that can be used for the primer vector algorithm. In this work we explore the impact of the periodicity requirement in optimizing each spacecraft transfer trajectory using primer vector theory. We first present our adaptation of primer vector theory to formation flying. Using this method, we then compute the AV budget for each spacecraft subject to different formation endpoint constraints.

Mailhe, Laurie↗

Initial Jupiter Orbit Insertion and Period Reduction Maneuver Plans for Juno

This paper describes the initial plans for the New Frontiers Juno mission at Jupiter. It includes the considerable contingency planning for mission recovery if the Jupiter Orbit Insertion (JOI) burn to place Juno into a large capture orbit were interrupted or terminated on a burn timer setting, and the options for the mission if the Period Reduction Maneuver (PRM) burn to achieve the final orbit period were terminated early. The analyses were based on the assumption that 14-day orbits were the desired operational orbit period.

Bordi, John J.↗

Space Shuttle Orbiter status - April 1980

The Orbiter is in the final stages of preparation, proceeding toward mating with the other Shuttle flight hardware elements, preparatory to its maiden voyage. The first orbital vehicle, Columbia, has been undergoing manufacturing, modifications, and testing at KSC, and integrated vehicle processing is planned to continue prior to the planned STS-1 launch. In order to establish a national fleet of operational Orbiters, Space Shuttle production includes fabrication of two additional Orbiters, refurbishment of the Columbia after its use in the orbital flight test program and early operations, and conversion of the Orbiter structural test article to a flight operational Orbiter.

Jones, S. C., Jr.↗

The Extension of ISS Resources for Multi-Discipline Subrack Payloads

The EXpedite the processing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette M.↗

EXPRESS Rack: The Extension of International Space Station Resources for Multi-Discipline Subrack Payloads

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette↗

System Requirements and Operations Panel Workshop summary

The low Earth orbit (LEO) versus the geosynchronous Earth orbit (GEO) deployment systems were discussed. The following items are emphasized: (1) large area systems, such as deployment, altitude, orbit transfer, and on orbit operation; (2) propulsion oriented issues such as the orbit transfer vehicle and the auxiliary propulsion systems; (3) programmatic issues. The LEO versus GEO deployment is a significant driver on propulsion requirements for an orbit transfer vehicle. It is suggested that early systems will be deployed at LEO. The Shuttle remote manipulator system (RMS) will not be involved in early demonstration activities. It is concluded that an integrated large space system/propulsion approach is essential and that propulsion development requirements need to be established.

Schwarzberg, F. R.↗

GEOSTAR - a microwave sounder for GOES-R

The National Oceanic and Atmospheric Administration (NOAA) has for many years operated two weather satellite systems, the Polar-orbiting Operational Environmental Satellite system (POES), using low-earth orbiting (LEO) satellites, and the Geostationary Operational Environmental Satellite system (GOES), using geostationary earth orbiting (GEO) satellites. Similar systems are also operated by other nations. The POES satellites have been equipped with both infrared (IR) and microwave (MW) atmospheric sounders, which together make it possible to determine the vertical distribution of temperature and humidity in the troposphere even under cloudy conditions.

microwave↗

GEO/SAMS - The Geostationary Synthetic Aperture Microwave Sounder

The National Oceanic and Atmospheric Administration (NOAA) has for many years operated two weather satellite systems, the Polar-orbiting Operational Environmental Satellite system (POES), using low-earth orbiting (LEO) satellites, and the Geostationary Operational Environmental Satellite system (GOES), using geostationary earth orbiting (GEO) satellites. (Similar systems are also operated by other nations.) The POES satellites have been equipped with both infrared (IR) and microwave (MW) atmospheric sounders, which makes it possible to determine the vertical distribution of temperature and humidity in the troposphere even under cloudy conditions. Such satellite observations have had a significant impact on weather forecasting accuracy, especially in regions where in situ observations are sparse. In contrast, the GOES satellites have only been equipped with IR sounders, since it has not been feasible to build a large enough antenna to achieve sufficient spatial resolution for a MW sounder in GEO. As a result, GOES soundings can only be obtained in cloud free areas and in the less important upper atmosphere, above the cloud tops. This has hindered the effective use of GOES data in numerical weather prediction. Full sounding capabilities with the GOES system is highly desirable because of the advantageous spatial and temporal coverage that is possible from GEO. While POES satellites provide coverage in relatively narrow swaths, and with a revisit time of 12-24 hours or more, GOES satellites can provide continuous hemispheric coverage, making it possible to monitor highly dynamic phenomena such as hurricanes.

Lambrigtsen, Bjorn H.↗

International Space Station Cathode Life Testing

Four hollow cathode assembly (HCA) life tests were initiated at operating conditions simulating on-orbit operation of the International Space Station plasma contactor. The objective of these tests is to demonstrate the mission-required 18,000 hour lifetime with high-fidelity development model HCAS. HCAs are operated with a continuous 6 sccm xenon flow rate and 3 A anode current. On-orbit emission current requirements are simulated with a square waveform consisting of 50 minutes at a 2.5 A emission current and 40 minutes with no emission current. One HCA test was terminated after approximately 8,000 hours so that a destructive analysis could be performed. The analysis revealed no life-limiting processes and the ultimate lifetime was projected to be greater than the mission requirement. Testing continues for the remaining three HCAs which have accumulated approximately 8,000 hours, 10,000 hours, and 11,000 hours, respectively, as of June 1997. Anode and bias voltages, strong indicators of cathode electron emitter condition, are within acceptable ranges and have exhibited no life- or performance-limiting phenomena to date.

Soulas, George C.↗

Advanced service equipment

Orbiter-based service equipment needs/usage are identified by considering a broad spectrum of on-orbit operational scenarios associated with three primary mission events: initial launch, revisits, and Earth return. Nominal and alternate modes of operation, contingency situations (as remote manipulator system inoperative), and Orbiter close proximity operations are included. Satellite classes considered are direct delivery and servicing of the orbiter, low Earth orbiter/propulsion, sorties and DOD, geosatellites, and planetary and other satellites.

Mockovciak, J., Jr.↗

PC-402 Pioneer Venus orbiter spacecraft mission operational characteristics document

The operational characteristics of the Orbiter spacecraft and its subsystems are described. In extensive detail. Description of the nominal phases, system interfaces, and the capabilities and limitations of system level performance are included along with functional and operational descriptions at the subsystem and unit level the subtleties of nominal operation as well as detailed capabilities and limitations beyond nominal performance are discussed. A command and telemetry logic flow diagram for each subsystem is included. Each diagram encountered along each command signal path into, and each telemetry signal path out of the subsystem. Normal operating modes that correspond to the performance of specific functions at the time of specific events in the mission are also discussed. Principal backup means of performing the normal Orbiter operating modes are included.

Barker, F. C.↗

GEO/SAMS - The Geostationary Synthetic Aperture Microwave Sounder

The National Oceanic and Atmospheric Administration (NOAA) has for many years operated two weather satellite systems, the Polar-orbiting Operational Environment Satellite system (POES), using low-earth orbiting (LEO) satellites, and the Geostationary Operational Satellite system (GOES), using geostationary earth orbiting (GEO) satellites.

microwave↗

EVA-SCRAM operations

This paper wrestles with the on-orbit operational challenges introduced by the proposed Space Construction, Repair, and Maintenance (SCRAM) tool kit for Extra-Vehicular Activity (EVA). SCRAM undertakes a new challenging series of on-orbit tasks in support of the near-term Hubble Space Telescope, Extended Duration Orbiter, Long Duration Orbiter, Space Station Freedom, other orbital platforms, and even the future manned Lunar/Mars missions. These new EVA tasks involve welding, brazing, cutting, coating, heat-treating, and cleaning operations. Anticipated near-term EVA-SCRAM applications include construction of fluid lines and structural members, repair of punctures by orbital debris, refurbishment of surfaces eroded by atomic oxygen, and cleaning of optical, solar panel, and high emissivity radiator surfaces which have been degraded by contaminants. Future EVA-SCRAM applications are also examined, involving mass production tasks automated with robotics and artificial intelligence, for construction of large truss, aerobrake, and reactor shadow shield structures. Realistically achieving EVA-SCRAM is examined by addressing manual, teleoperated, semi-automated, and fully-automated operation modes. The operational challenges posed by EVA-SCRAM tasks are reviewed with respect to capabilities of existing and upcoming EVA systems, such as the Extravehicular Mobility Unit, the Shuttle Remote Manipulating System, the Dexterous End Effector, and the Servicing Aid Tool.

Flanigan, Lee A.↗

The Use of Human Factors Simulation to Conserve Operations Expense

In preparation for on-orbit operations, NASA performs experiments aboard a KC-135 which performs parabolic maneuvers, resulting in short periods of microgravity. While considerably less expensive than space operations, the use of this aircraft is costly. Simulation of tasks to be performed during the flight can allow the participants to optimize hardware configuration and crew interaction prior to flight. This presentation will demonstrate the utility of such simulation. The experiment simulated is the fluid dynamics of epoxy components which may be used in a patch kit in the event of meteoroid damage to the International Space Station. Improved configuration and operational efficiencies were reflected in early and increased data collection.

Hamilton, George S.↗