Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Development of PFLOTRAN Transport Capability for Use in the Waste Isolation Pilot Plant Performance Assessment - 20545

Waste Isolation Pilot Plant (WIPP) performance assessment (PA) calculations estimate the probability of radionuclide release from the repository to the land surface and across the land withdrawal boundary for a regulatory period of 10,000 years after facility closure. Simulations of flow and transport in the repository and the surrounding Salado Formation are foundational to the PA. Because proposed additional waste emplacement panels would result in an asymmetric repository layout, the US Department of Energy (DOE) is preparing to transition to use of a three-dimensional (3-D) model domain for simulation of flow and transport instead of the two-dimensional (2-D) flared grid domain currently used. DOE has charged Sandia National Laboratories with developing the capability necessary to simulate processes affecting flow and transport in the WIPP in PFLOTRAN, an open-source massively parallel multi-phase flow and reactive transport code. The new flow and transport capabilities developed in PFLOTRAN incorporate WIPP-specific process models and will replace the 2-D simulators (BRAGFLO and NUTS) that are currently utilized for Salado flow and transport calculations in WIPP PA. The focus of this paper is on the development of a new Nuclear Waste Transport (NWT) mode in PFLOTRAN that has all of the capabilities necessary for Salado transport simulations, including the ability to handle complete dry-out (100% gas saturation) of arbitrary cells in the model domain, radionuclide mass conservation at step changes in porosity associated with borehole intrusion, and the ability to calculate fluxes on a flared grid. The new PFLOTRAN transport capability and a suite of verification tests were designed around a list of functional requirements for WIPP PA calculations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental Investigation of Polymer Induced Fouling of Heater Tubes in the First-Ever Polymer Flood Pilot on Alaska North Slope

Mineral fouling in heat exchangers has been extensively investigated by researchers in recent times. The oil and gas industry has a long history of fouling issues in production systems as a result of produced fluids treatment. Due to decline in production rates in oilfields new technologies are being developed and field tested in pilots. Polymer flooding is one such technology that involves addition of polymers to injection fluids to enhance oil production. A polymer flood pilot has been set up in the Schrader Bluff viscous oil reservoir at Milne Point field on the Alaska North Slope (ANS). The results from the pilot are encouraging, however a major concern of the operator is the influence of polymer on the production system after breakthrough, especially the fouling in heat exchangers. This study investigates the propensity of polymer fouling on the heater tubes as a function of different variables, with the ultimate goal of determining safe and efficient operating conditions. This work applies a multi-experimental approach to study the severity of polymer-induced fouling in both dynamic and static states of produced fluids as well as studying the stability of polymer solutions at different temperatures. A unique experimental setup was designed and developed in-house to simulate the fouling process on the heating tube. The influence of heating tube skin temperature, tube material, and polymer concentration on fouling tendency was investigated. Each test was run five times with the same tube, and in each run, the freshly prepared synthetic brine and polymer solution was heated from 77°F to 122°F to mimic field-operating conditions. The heating time and fouling amount were recorded for each run. Dynamic Scale Loop (DSL) tests were conducted to study fouling due to polymer at different temperatures (165°F to 350°F) in a dynamic state of fluid flow where the fluids mimic the residence time of fluids in the heat exchanger on the field pilot. Cloud point measurement has also been conducted to find the critical temperature at which the polymer in solution becomes unstable and precipitates out. The morphology and composition of the deposit samples were analyzed by environmental scanning electron microscopy (ESEM) and X-ray diffraction (XRD), respectively. It was found that the presence of polymer in produced fluids would aggravate the fouling issues on both carbon steel and stainless-steel surfaces at all tested skin temperatures. Only higher skin temperatures of 250°F and 350°F could cause polymer-induced fouling issues on the copper tube surface, and the fouling tendency increased with polymer concentration. At the lower skin temperatures of 165°F, no polymer-induced fouling was identified on the copper tube. A critical temperature that is related to the cloud point of the polymer solution was believed to exist, below which polymer-induced fouling would not occur, and only mineral scale was deposited but above which the polymer would aggravate the fouling issue. The cloud point of the tested polymer solution was determined to be between 220°F and 230°F. In the DSL tests it was found that at higher skin temperatures of 250°F and 350°F tube blocking was observed in the DSL tests whereas the tests at 165°F and 200°F did not show any tube blocking in the same time period. These experiments also manifested the influence of cloud point of the solution as deposit rate increased significantly in both carbon steel and stainless-steel tubes when the skin temperature was higher than the solution cloud point. The results of this study have provided guidance to the operator for the field-operations.

Dhaliwal, Anshul↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Supporting Bioproducts Industry Growth with a System Dynamics Decision-Support Tool

A bio-based economy requires chemical products as well as fuels to be produced from biomass. Although a variety of universities, government agencies, start-ups and established firms have engaged in bioproduct development, many projects have failed to reach the point of commercialization and commercialized bioproducts struggle to capture and maintain market share. To date, there has been no general research into the factors that contribute to bioproduct failure or success. This work presents the Bioproduct Transition Dynamics (BTD) system dynamics model, a decision-support tool that simulates the bioproduct development process from pre-piloting research through construction of the first commercial-scale plant, as well as the processes of obtaining funding from investors and government agencies. The core of the BTD is a feedback loop between bioproduct developers and funders, which relates development progress measured with indicators such as net present value to funders’ decisions to continue investing. External factors such as feedstock prices, market size and growth, and the existence of bioproduct consumers also influence a development project’s chances of receiving follow-on funding. Virtually any bioproduct can be represented with the BTD: direct replacements, performance-advantaged products, niche and commodity markets can all be modeled. The goal of the BTD project is to inform decisions made by developers in both established firms and start-ups, investors, government agencies, and other stakeholders interested in growing the nascent U.S. bioproducts industry. This talk will cover the general structure and functionality of the BTD, and present results from an analysis performed with the BTD to demonstrate its use as a decision-support tool and the insights it can provide. The goal of the analysis is to identify the most critical factors that lead to direct replacement and performance-advantaged bioproduct projects emerging successfully from the “Valley of Death”, and to determine if these factors differ between the two bioproduct types.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of CO2 plume behavior for a large-scale pilot test of geologic carbon storage in a saline formation

The hydrodynamic behavior of carbon dioxide (CO{sub 2}) injected into a deep saline formation is investigated, focusing on trapping mechanisms that lead to CO{sub 2} plume stabilization. A numerical model of the subsurface at a proposed power plant with CO{sub 2} capture is developed to simulate a planned pilot test, in which 1,000,000 metric tons of CO{sub 2} is injected over a four-year period, and the subsequent evolution of the CO{sub 2} plume for hundreds of years. Key measures are plume migration distance and the time evolution of the partitioning of CO{sub 2} between dissolved, immobile free-phase, and mobile free-phase forms. Model results indicate that the injected CO{sub 2} plume is effectively immobilized at 25 years. At that time, 38% of the CO{sub 2} is in dissolved form, 59% is immobile free phase, and 3% is mobile free phase. The plume footprint is roughly elliptical, and extends much farther up-dip of the injection well than down-dip. The pressure increase extends far beyond the plume footprint, but the pressure response decreases rapidly with distance from the injection well, and decays rapidly in time once injection ceases. Sensitivity studies that were carried out to investigate the effect of poorly constrained model parameters permeability, permeability anisotropy, and residual CO{sub 2} saturation indicate that small changes in properties can have a large impact on plume evolution, causing significant trade-offs between different trapping mechanisms.

54 ENVIRONMENTAL SCIENCES↗

Techno Economic Analysis for Production of Renewable Natural Gas and Value-Added Chemicals from Forest Biomass Residues (CRADA Final Report)

West Biofuels - in collaboration with the University of California San Diego, the University of California Davis, the National Laboratory of the Rockies (NLR), the Colorado School of Mines’ Center for Hydrate Research, Placer County Air Pollution Control District, the Sierra Business Council, and the Southern California Gas Company (SoCalGas)-will demonstrate an innovative pathway to convert forest biomass to renewable gas (RG). The project, Production of Pipeline Grade Renewable Natural Gas and Value-Added Chemicals from Forest Biomass Residues, will utilize an existing pilot-scale gasification system and data and lessons learned from a lab-scale catalytic reactor design, develop, and demonstrate an integrated pilot-scale RG process with a scaled-up catalytic reactor and hydrate-based gas separation process. This robust and simple process uses a commercial proven gasifier, a commercially available catalyst that can tolerate gas contaminants, and a gas separation process that simplifies the downstream processing. Current testing has shown that the process can yield a large amount of methane rich renewable gas in addition to a mixture of propanol, ethanol and other higher alcohols and the relative amounts can be controlled by shifting the process conditions. This process is novel and groundbreaking because the product mixture of RG and valuable alcohols byproducts makes RG production economically feasible at $\$$12 per million British thermal units (MMBtu) or less using forest biomass from high hazard zones.

09 BIOMASS FUELS↗

Buried Anode Device Development: Cooperative Research and Development Final Report, CRADA Number CRD-11-451

The possibility of a reflecting electrochromic device is very attractive, and the 'Buried Anode' architecture developed at NREL could yield such a device. The subject of this cooperative agreement will be the development and refinement of a Buried Anode device process. This development will require the active involvement of NREL and US e-Chromic personnel, and will require the use of NREL equipment as much as possible. When this effort is concluded, US e-Chromic will have enough information to construct a pilot production line, where further development can continue.

14 SOLAR ENERGY↗

Building a Credible and Updated WIPP Performance Assessment - New Knowledge Versus Conservative Assumptions and FEP Analysis, A Balancing Act - 16299

Conservative assumptions are important components in conceptual model development where limited data is available. And, as appropriate, during the early 1990's Department of Energy (DOE) adopted many conservative assumptions in the development of the Waste Isolation Pilot Plant's (WIPP's) 24 Conceptual Models incorporated in DOE's 1996 Compliance Certification Application (CCA) performance assessment (PA). Many of these assumptions were formulated and documented in the WIPP relevant features, events and processes (FEPs) analyses; others were adopted when developing input parameter values and their distributions that were used as inputs to computer models. The Agency accepted these conservative assumptions during their 1996 CCA assessment for several reasons; 1) at the time there was a scarcity of data related to long-term behavior of many parameters needed to be incorporated in the PA, 2) sensitivity studies performed during this time period determined that the affected 'conservative' assumptions adopted for some parameters had minimal to no impact on repository performance; and, 3) DOE could demonstrate compliance with EPA's radioactive waste disposal regulations while adopting conservative assumptions and data. Since the initial 1996 CCA DOE has modified the repository panel closure design, and the repository footprint in the experimental areas has expanded. These modifications were incorporated into DOE's 2014 Compliance Re-certification Application for WIPP. Additionally, there have been numerous investigations related to both the short- and long-term behavior of salt in a repository setting. As a result, the Agency is reassessing the use of these conservative assumptions and the continued applicability of the original FEP analyses, primarily developed during DOE's 1996 PA and carried forward to the current re-certification. This paper examines some of these analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compact steady-state tokamak performance dependence on magnet and core physics limits

Compact tokamak fusion reactors using advanced high-temperature superconducting magnets for the toroidal field coils have received considerable recent attention due to the promise of more compact devices and more economical fusion energy development. Facilities with combined fusion nuclear science and Pilot Plant missions to provide both the nuclear environment needed to develop fusion materials and components while also potentially achieving sufficient fusion performance to generate modest net electrical power are considered. The performance of the tokamak fusion system is assessed using a range of core physics and toroidal field magnet performance constraints to better understand which parameters most strongly influence the achievable fusion performance. This article is part of a discussion meeting issue ‘Fusion energy using tokamaks: can development be accelerated?’.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Real time PV manufacturing diagnostic system

The main obstacle Photovoltaic (PV) industry is facing at present is the higher cost of PV energy compared to that of fossil energy. While solar cell efficiencies continue to make incremental gains these improvements are so far insufficient to drive PV costs down to match that of fossil energy. Improved in-line diagnostics however, has the potential to significantly increase the productivity and reduce cost by improving the yield of the process. On this Phase I/Phase II SBIR project MicroXact developed and demonstrated at CIGS pilot manufacturing line a high-throughput in-line PV manufacturing diagnostic system, which was verified to provide fast and accurate data on the spatial uniformity of thickness, an composition of the thin films comprising the solar cell as the solar cell is processed reel-to-reel. In Phase II project MicroXact developed a stand-alone system prototype and demonstrated the following technical characteristics: 1) ability of real time defect/composition inconsistency detection over 60cm wide web at web speeds up to 3m/minute; 2) Better than 1mm spatial resolution on 60cm wide web; 3) an average better than 20nm spectral resolution resulting in more than sufficient sensitivity to composition imperfections (copper-rich and copper-poor regions were detected). The system was verified to be high vacuum compatible. Phase II results completely validated both technical and economic feasibility of the proposed concept. MicroXact’s solution is an enabling technique for in-line PV manufacturing diagnostics to increase the productivity of PV manufacturing lines and reduce the cost of solar energy, thus reducing the US dependency on foreign oil while simultaneously reducing emission of greenhouse gasses.

14 SOLAR ENERGY↗

Supervisory control of a pilot-scale cooling loop

We combine a previously developed strategy for Fault Detection and Identification (FDI) with a supervisory controller in closed loop. The combined method is applied to a model of a pilot-scale cooling loop of a nuclear plant, which includes Kalman filters and a model-based predictive controller as part of normal operation. The system has two valves available for flow control meaning that some redundancy is available. The FDI method is based on likelihood ratios for different fault scenarios which in turn are derived from the application of the Kalman filter. A previously introduced extension of the FDI method is used here to enable detection and identification of non-linear faults like stuck valve problems and proper accounting of the time of fault introduction. The supervisory control system is designed so to take different kinds of actions depending on the status of the fault diagnosis task and on the type of identified fault once diagnosis is complete. Some faults, like sensor bias and drift, are parametric in nature and can be adjusted without need for reconfiguration of the regulatory control system. Other faults, like a stuck valve problem, require reconfiguration of the regulatory control system. The whole strategy is demonstrated for several scenarios.

47 OTHER INSTRUMENTATION↗

Implementing Mixed Reality Tools to Support Mission Delivery at Hanford - 20520

Mission Support Alliance's (MSA) Public Works and Information Systems organizations have been working with Microsoft Corporation to develop and implement mixed reality operational solutions using their HoloLens technology. This collaborative effort is intended to drive innovative solutions and significantly improve MSA's efficiency in performing work at the Hanford Site. HoloLens, a mixed reality tool, is a commercial off-the-shelf technology that combines a head-mounted viewing screen with applications to help people and organizations learn, communicate, and collaborate more effectively through the use of mixed reality. https://microsoft.com/en-us/hololens MSA's initial pilot successfully demonstrated its ability to use mixed reality utilizing HoloLens' advanced features in a variety of ways, illustrating the potential efficiency gains previously stated as goals of this pilot. These achievements include the development of proprietary technology that allows synchronization between a HoloLens device and a mobile device or alternate global positioning system (GPS) device. This synchronization enables the HoloLens device to access real time GPS location data anywhere on the Hanford Site. This real time location data, combined with MSA's improved Hanford Geographical Information System (GIS) data, enables the mixed reality pilot application to identify underground utility systems as well as related utility attributes. This ability will aid utility workers in several areas, including excavation activities, the placement of large cranes, identifying interactions and conflicts with future underground utility placements and, eventually, recognizing and de-conflicting tank waste transfer system valve alignments. The HoloLens mixed reality application is also able to provide full or small scale holographic images of a facility's digital twin. This feature will allow MSA's Water and Sewer Utilities team to train and validate procedures associated with the new water treatment facility virtually, before it is constructed. This reduces the amount of time it takes to complete the training and procedure validation, and accelerates the overall construction schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗