Search NASA⌕ Search

SEARCH · Search NASA

Results for “polar orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity

NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.

Moon missions↗

Determination of the SNPP VIIRS SDSM Screen Relative Transmittance From Both Yaw Maneuver and Regular On-Orbit Data

The Visible Infrared Imaging Radiometer Suiteaboard the Suomi National Polar-orbiting Partnership (SNPP) satellite performs radiometric calibration of its reflective solar bands primarily through observing a sunlit onboard solar diffuser (SD). The SD bidirectional reflectance distribution function(BRDF) degradation factor is determined by an onboard SD stability monitor (SDSM), which observes the Sun through a pinhole screen and the sunlit SD. The transmittance of the SDSM pinhole screen over a range of solar angles was determined prelaunch and used initially to determine the BRDF degradation factor.The degradation-factor-versus-time curves were found to have a number of very large unphysical undulations likely due to the inaccuracy in the prelaunch determined SDSM screen transmittance.To refine the SDSM screen transmittance, satellite yaw maneuvers were carried out. With the SDSM screen relative transmittance determined from the yaw maneuver data, the computed BRDFdegradation factor curves still have large unphysical ripples, indicating that the projected solar horizontal angular step size in the yaw maneuver data is too large to resolve the transmittance at a fine angular scale. We develop a methodology to use both the yaw maneuver and a small portion of regular on-orbit data to determine the SDSM screen relative transmittance at a fine angular scale. We determine that the error standard deviation of the calculated relative transmittance ranges from 0.00030 (672 nm) to 0.00092 (926 nm). With the newly determined SDSM screen relative transmittance, the computed BRDF degradation factor behaves much more smoothly over time.

Lei, Ning↗

Satellite time synchronization of a NASA network.

A satellite time synchronization technique has been used for synchronization of remotely separated clocks during the past several years. The NASA network has been successfully synchronized to an accuracy of tens of microseconds via the NASA Geodetic Earth Orbiting Satellite GEOS-11. The results indicate that a polar orbit satellite having an onboard clock can effectively be used to synchronize clocks on a global basis.

Laios, S. C.↗

Low cost planetary science missions

The use of existing earth-orbiting satellite technology represents a potential way of fulfilling important planetary exploration goals at greatly reduced cost, at least within the region between Venus and the inner asteroid belt. The present paper reports three studies of options for such missions to near-earth asteroids, the moon and Mars. The asteroid mission projected would be that of a rendezvous with either Anteros or Eros for purposes of resource determination, using an adaptation of the Tiros-N weather satellite. Two parallel studies were done on geoscience orbiters intended to provide detailed composition mapping from low polar orbit of the moon and Mars based on the modification of the same spacecraft design: the FLTSATCOM spacecraft, and the Atmospheric Explorer/Dynamics Explorer (later changed to Tiros for combined moon-Mars missions). Studies have shown the major modifications required to involve the telecommunications, data handling, power, propulsion and attitude control subsystems, and have demonstrated concept feasibility.

French, J. R.↗

A science perspective of the Space Station

On-orbit scientific research involving the presence of humans has been hampered during Shuttle flights due to the brevity of the missions and the limited power supplies and data management facilities. The solutions to these limitations are the Space Station and extended duration Orbiter, the latter offering 2.5 weeks on-orbit operations. The Space Station configuration is to include polar orbiting and co-orbiting unmanned platforms serviced, initially, by the Shuttle. The longer duration operations on the Space Station will permit lowering the amount of on-the-ground training in favor of on-orbit experience, thereby enhancing the flexibility of experimental opportunities and expanding the breadth of investigations. The goal of all the developments is to furnish groundside experimenters access to space, along with minimized adaptation of experimental procedures to exploit the space environment.

Black, D. C.↗

Spaceflight optical disk recorder development

A NASA program to develop a high performance (high rate, high capacity) rewriteable optical disk recorder for spaceflight applications is presented. An expandable, adaptable system concept is proposed based on disk drive modules and a modular controller. Drive performance goals are 10 Gbyte capacity, 300 Mb transfer rate, 10 to the -12th corrected bit-error rate, and 150 msec access time. The preliminary design for an expandable controller is presented. System goals are up to 160 Gbyte capacity at up to 1.8 Gb/sec rate with concurrent I/O, asynchronous data transfer, and 2-5-year operating life in orbit. Projected system environment and operational scenarios based on Polar Orbiting Platform applications are discussed.

Shull, Thomas A.↗

User assembly and servicing system for Space Station, an evolving architecture approach

On-orbit assembly and servicing of a variety of scientific and applications hardware systems is expected to be one of the Space Station's primary functions. The hardware to be serviced will include the attached payloads resident on the Space Station, the free-flying satellites and co-orbiting platforms brought to the Space Station, and the polar orbiting platforms. The requirements for assembly and servicing such a broad spectrum of missions have led to the development of an Assembly and Servicing System Architecture that is composed of a complex array of support elements. This array is comprised of US elements, both Space Station and non-Space Station, and elements provided by Canada to the Space Station Program. For any given servicing or assembly mission, the necessary support elements will be employed in an integrated manner to satisfy the mission-specific needs. The structure of the User Assembly and Servicing System Architecture and the manner in which it will evolved throughout the duration of the phased Space Station Program are discussed. Particular emphasis will be placed upon the requirements to be accommodated in each phase, and the development of a logical progression of capabilities to meet these requirements.

Lavigna, Thomas A.↗

Spectroscopic method for Earth-satellite-Earth laser long-path absorption measurements using Retroreflector In Space (RIS)

The Retroreflector in Space (RIS) is a single element cube-corner retroreflector with a diameter of 0.5 m designed for earth-satellite-earth laser long-path absorption experiments. The RIS is to be loaded on the Advanced Earth Observing System (ADEOS) satellite which is scheduled for launch in Feb. 1996. The orbit for ADEOS is a sun synchronous subrecurrent polar-orbit with an inclination of 98.6 deg. It has a period of 101 minutes and an altitude of approximately 800 km. The local time at descending node is 10:15-10:45, and the recurrent period is 41 days. The velocity relative to the ground is approximately 7 km/s. In the RIS experiment, a laser beam transmitted from a ground station is reflected by RIS and received at the ground station. The absorption of the intervening atmosphere is measured in the round-trip optical path.

Sugimoto, Nobuo↗

Solar Array Disturbances to Spacecraft Pointing During the Lunar Reconnaissance Orbiter (LRO) Mission

The Lunar Reconnaissance Orbiter (LRO), the first spacecraft to support NASA s return to the Moon, launched on June 18, 2009 from the Cape Canaveral Air Force Station aboard an Atlas V launch vehicle. It was initially inserted into a direct trans-lunar trajectory to the Moon. After a five day transit to the Moon, LRO was inserted into the Lunar orbit and successfully lowered to a low altitude elliptical polar orbit for spacecraft commissioning. Successful commissioning was completed in October 2009 when LRO was placed in its near circular mission orbit with an approximate altitude of 50km. LRO will spend at least one year orbiting the Moon, collecting lunar environment science and mapping data, utilizing a suite of seven instruments to enable future human exploration. The objective is to provide key science data necessary to facilitate human return to the Moon as well as identification of opportunities for future science missions. LRO's instrument suite will provide the high resolution imaging data with sub-meter accuracy, highly accurate lunar cartographic maps, mineralogy mapping, amongst other science data of interest. LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing Mode", provides Lunar nadir, off-nadir, and inertial fine pointing for the science data collection and instrument calibration. This controller combines the capability of fine pointing with on-demand large angle full-sky attitude reorientation. It provides simplicity of spacecraft operation as well as additional flexibility for science data collection. A conventional suite of ACS components is employed in the Observing Mode to meet the pointing and control objectives. Actuation is provided by a set of four reaction wheels developed in-house at NASA Goddard Space Flight Center (GSFC). Attitude feedback is provided by a six state Kalman filter which utilizes two SELEX Galileo Star Trackers for attitude updates, and a single Honeywell Miniature Inertial Measurement Unit (MIMU) to provide body rates for attitude propagation. Rate is computed by differentiating accumulated angle provided by the MIMU. The Observing Mode controller is required to maintain fine pointing while a large fully-articulated solar array (SA) maintains its panel normal to the solar incidence. This paper describes the disturbances to the attitude control resulting from the SA articulation. Observing Mode performance in the presence of this disturbance was assessed while the spacecraft was in an initial elliptical low altitude orbit during the commissioning phase, which started about two weeks after launch and lasted for 90 days. LRO demonstrated excellent pointing performance during Observing Mode nadir and inertial attitude target operations during this phase. Transient LRO attitude errors observed during commissioning resulted primarily from three sources, Diviner instrument calibrations, RW zero crossings, and SA articulation. Even during times of considerable disturbance from SA articulation, the attitude errors were maintained below the statistical attitude error requirement level of 15 arc-sec (3 sigma).

Calhoun, Philip↗

JPSS-1 VIIRS Pre-Launch Response Versus Scan Angle Testing and Performance

The Visible Infrared Imaging Radiometer Suite (VIIRS) instruments on-board both the Suomi National Polar-orbiting Partnership (S-NPP) and the first Joint Polar Satellite System (JPSS-1) spacecraft, with launch dates of October 2011 and December 2016 respectively, are cross-track scanners with an angular swath of +/-56.06 deg. A four-mirror Rotating Telescope Assembly (RTA) is used for scanning combined with a Half Angle Mirror (HAM) that directs light exiting from the RTA into the aft-optics. It has 14 Reflective Solar Bands (RSBs), seven Thermal Emissive Bands (TEBs) and a panchromatic Day Night Band (DNB). There are three internal calibration targets, the Solar Diffuser, the BlackBody and the Space View, that have fixed scan angles within the internal cavity of VIIRS. VIIRS has calibration requirements of 2% on RSB reflectance and as tight as 0.4% on TEB radiance that requires the sensor's gain change across the scan or Response Versus Scan angle (RVS) to be well quantified. A flow down of the top level calibration requirements put constraints on the characterization of the RVS to 0.2%-0.3% but there are no specified limitations on the magnitude of response change across scan. The RVS change across scan angle can vary significantly between bands with the RSBs having smaller changes of approximately 2% and some TEBs having approximately 10% variation. Within aband, the RVS has both detector and HAM side dependencies that vary across scan. Errors in the RVS characterization will contribute to image banding and striping artifacts if their magnitudes are above the noise level of the detectors. The RVS was characterized pre-launch for both S-NPP and JPSS-1 VIIRS and a comparison of the RVS curves between these two sensors will be discussed.

Moyer, David↗

A Flexible Lunar Architecture for Exploration (FLARE) Supporting NASA’s Artemis Program

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for a minimum of seven days and then return them safely to Earth. FLARE can be implemented whenever the component vehicles are operational. FLARE was developed as an alternative to NASA’s Human Landing System (HLS) reference architecture from the Design Analysis Cycle (DAC) #2 created in 2019. The DAC2 guidelines required utilization of the Gateway vehicle in a Near- Rectilinear Halo Orbit (NRHO). Instead, FLARE chooses a Low Lunar Frozen Polar Orbit (LLFPO) for lunar rendezvous of components, and an optional Gateway vehicle. The LLFPO provides a stable orbit that overflies the south pole every 2 h, ensuring easy access to the lunar surface for surface aborts with a much lower propellant requirement than NRHO. The minimum FLARE concept uses one Space Launch System (SLS) launch, one Orion, one European Service Module (ESM), and one human lander (launched on commercial vehicle(s)). FLARE adds the SpaceTug, based upon the mature and successful ULA “Common” Centaur Upper Stage vehicle, with modifications to create an Earth-Moon transfer vehicle. In the FLARE baseline mission, the SpaceTug provides propulsion needed to return the Orion + ESM from LLFPO to Earth. The SpaceTug also provides propulsion to deliver the separate human lander components – the Descent Element (DE) and the Ascent Element (AE) - from Low Earth Orbit (LEO) to LLFPO. The SLS Block 1 then launches the Orion + ESM and completes a rendezvous with the mated DE + AE components in LLFPO. FLARE offers optional phases beyond the baseline mission. The SpaceTug can deliver components of the planned Gateway, including the Power and Propulsion Element (PPE) and the Habitable and Logistics Outpost (HALO), to LLFPO. FLARE provides an option to deliver precursor equipment to the lunar surface to enhance and extend the human mission. With these components, including an inflatable habitation module and airlock, individual crew mobility vehicle(s), an In-Situ Resource Utilization (ISRU) demonstration, and science and technology experiments, the crew can explore and conduct science on the lunar surface for up to 14 days.

Moon 2024↗

Simultaneous satellite and riometer studies

The expected 30 and 50 MHz riometer absorption was calculated for the 7 June, 25 September and 2 November 1969 solar events using data from the McDonnell Douglas charged particle experiment on the polar orbiting OGO-6 Satellite. Excellent agreement was found between measured polar cap riometer absorption during the events and absorption calculated from detailed particle data obtained on the satellite passing over the riometer. Electrons are found to contribute the greater part of the 30 MHz absorption before the peak of the 2 November 1969 event; at all other times protons produce most of the absorption. The alpha-particle contribution is negligible in all cases.

Baker, M. B.↗

Global view of the upper level outflow patterns associated with tropical cyclone intensity changes during FGGE

The characteristics of the upper tropospheric outflow patterns which occur with tropical cyclone intensification and weakening over all of the global tropical cyclone basins during the year long period of the First GARP Global Experiment (FGGE) are discussed. By intensification is meant the change in the tropical cyclone's maximum wind or central pressure, not the change of the cyclone's outer 1 to 3 deg radius mean wind which we classify as cyclone strength. All the 80 tropical cyclones which existed during the FGGE year are studied. Two-hundred mb wind fields are derived from the analysis of the European Center for Medium Range Weather Forecasting (ECMWF) which makes extensive use of upper tropospheric satellite and aircraft winds. Corresponding satellite cloud pictures from the polar orbiting U.S. Defense Meteorological Satellite Program (DMSP) and other supplementary polar and geostationary satellite data are also used.

Chen, L.↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

The design and performance estimates for the propulsion module for the booster of a TSTO vehicle

A NASA study of propulsion systems for possible low-risk replacements for the Space Shuttle is presented. Results of preliminary studies to define the USAF two-stage-to-orbit (TSTO) concept to deliver 10,000 pounds to low polar orbit are described. The booster engine module consists of an over/under turbine bypass engines/ramjet engine design for acceleration from takeoff to the staging point of Mach 6.5 and approximately 100,000 feet altitude. Propulsion system performance and weight are presented with preliminary mission study results of vehicle size.

Snyder, Christopher A.↗

The design and performance estimates for the propulsion module for the booster of a TSTO vehicle

A NASA study of the propulsion systems for possible low-risk replacements for the Space Shuttle is presented. Results of preliminary studies to define the USAF two-stage-to-orbit (TSTO) concept to deliver 10,000 pounds to low polar orbit are described. The booster engine module consists of an over/under turbine bypass engines/ramjet engine design for acceleration from takeoff to the staging point of Mach 6.5 and approximately 100,000 feet altitude. Propulsion system performance and weight are presented with preliminary mission study results of vehicle size.

Snyder, Christopher A.↗