Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Affordability Engineering: Bridging the Gap Between Design and Cost

Affordability is a commonly used term that takes on numerous meanings depending on the context used. Within conceptual design of complex systems, the term generally implies comparisons between expected costs and expected resources. This characterization is largely correct, but does not convey the many nuances and considerations that are frequently misunderstood and underappreciated. In the most fundamental sense, affordability and cost directly relate to engineering and programmatic decisions made throughout development programs. Systems engineering texts point out that there is a temporal aspect to this relationship, for decisions made earlier in a program dictate design implications much more so than those made during latter phases. This paper explores affordability engineering and its many sub-disciplines by discussing how it can be considered an additional engineering discipline to be balanced throughout the systems engineering and systems analysis processes. Example methods of multidisciplinary design analysis with affordability as a key driver will be discussed, as will example methods of data visualization, probabilistic analysis, and other ways of relating design decisions to affordability results.

Reeves, J. D.↗

PyApprox: A software package for sensitivity analysis, Bayesian inference, optimal experimental design, and multi-fidelity uncertainty quantification and surrogate modeling

PyApprox is a Python-based one-stop-shop for probabilistic analysis of numerical models such as those used in the earth, environmental and engineering sciences. Easy to use and extendable tools are provided for constructing surrogates, sensitivity analysis, Bayesian inference, experimental design, and forward uncertainty quantification. The algorithms implemented represent a wide range of methods for model analysis developed over the past two decades, including recent advances in multi-fidelity approaches that use multiple model discretizations and/or simplified physics to significantly reduce the computational cost of various types of analyses. An extensive set of Benchmarks from the literature is also provided to facilitate the easy comparison of new or existing algorithms for a wide range of model analyses. Here, this paper introduces PyApprox and its various features, and presents results demonstrating the utility of PyApprox on a benchmark problem modeling the advection of a tracer in groundwater.

54 ENVIRONMENTAL SCIENCES↗

Storing syngas lowers the carbon price for profitable coal gasification

Integrated gasification combined cycle (IGCC) electric power generation systems with carbon capture and sequestration have desirable environmental qualities but are not profitable when the carbon dioxide price is less than approximately $50 per metric ton. We examine whether an IGCC facility that operates its gasifier continuously but stores the syngas and produces electricity only when daily prices are high may be profitable at significantly lower CO{sub 2} prices. Using a probabilistic analysis, we have calculated the plant-level return on investment (ROI) and the value of syngas storage for IGCC facilities located in the U.S. Midwest using a range of storage configurations. Adding a second turbine to use the stored syngas to generate electricity at peak hours and implementing 12 h of above-ground high-pressure syngas storage significantly increases the ROI and net present value. Storage lowers the carbon price at which IGCC enters the U.S. generation mix by approximately 25%. 36 refs., 7 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Analysis of Logistics in Support of a Human Lunar Outpost

Strategic level analysis of the integrated behavior of lunar transportation system and lunar surface system architecture options is performed to inform NASA Constellation Program senior management on the benefit, viability, affordability, and robustness of system design choices. This paper presents an overview of the approach used to perform the campaign (strategic) analysis, with an emphasis on the logistics modeling and the impacts of logistics resupply on campaign behavior. An overview of deterministic and probabilistic analysis approaches is provided, with a discussion of the importance of each approach to understanding the integrated system behavior. The logistics required to support lunar surface habitation are analyzed from both 'macro-logistics' and 'micro-logistics' perspectives, where macro-logistics focuses on the delivery of goods to a destination and micro-logistics focuses on local handling of re-supply goods at a destination. An example campaign is provided to tie the theories of campaign analysis to results generation capabilities.

Cirillo, William↗

Hazard function theory for nonstationary natural hazards

Impact from natural hazards is a shared global problem that causes tremendous loss of life and property, economic cost, and damage to the environment. Increasingly, many natural processes show evidence of nonstationary behavior including wind speeds, landslides, wildfires, precipitation, streamflow, sea levels, and earthquakes. Traditional probabilistic analysis of natural hazards based on peaks over threshold (POT) generally assumes stationarity in the magnitudes and arrivals of events, i.e., that the probability of exceedance of some critical event is constant through time. Given increasing evidence of trends in natural hazards, new methods are needed to characterize their probabilistic behavior. The well-developed field of hazard function analysis (HFA) is ideally suited to this problem because its primary goal is to describe changes in the exceedance probability of an event over time. HFA is widely used in medicine, manufacturing, actuarial statistics, reliability engineering, economics, and elsewhere. HFA provides a rich theory to relate the natural hazard event series ( X ) with its failure time series ( T ), enabling computation of corresponding average return periods, risk, and reliabilities associated with nonstationary event series. This work investigates the suitability of HFA to characterize nonstationary natural hazards whose POT magnitudes are assumed to follow the widely applied generalized Pareto model. We derive the hazard function for this case and demonstrate how metrics such as reliability and average return period are impacted by nonstationarity and discuss the implications for planning and design. As a result, our theoretical analysis linking hazard random variable X with corresponding failure time series T should have application to a wide class of natural hazards with opportunities for future extensions.

54 ENVIRONMENTAL SCIENCES↗

Probabilistic safety assessment of the design of a tall buildings under the extreme load

The paper describes some experiences from the deterministic and probabilistic analysis of the safety of the tall building structure. There are presented the methods and requirements of Eurocode EN 1990, standard ISO 2394 and JCSS. The uncertainties of the model and resistance of the structures are considered using the simulation methods. The MONTE CARLO, LHS and RSM probabilistic methods are compared with the deterministic results. On the example of the probability analysis of the safety of the tall buildings is demonstrated the effectiveness of the probability design of structures using Finite Element Methods.

97 MATHEMATICS AND COMPUTING↗

Time Dependent Data Mining in RAVEN

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The goal of this type of analyses is to understand the response of such systems in particular with respect their probabilistic behavior, to understand their predictability and drivers or lack of thereof. Data mining capabilities are the cornerstones to perform such deep learning of system responses. For this reason static data mining capabilities were added last fiscal year (FY 15). In real applications, when dealing with complex multi-scale, multi-physics systems it seems natural that, during transients, the relevance of the different scales, and physics, would evolve over time. For these reasons the data mining capabilities have been extended allowing their application over time. In this writing it is reported a description of the new RAVEN capabilities implemented with several simple analytical tests to explain their application and highlight the proper implementation. The report concludes with the application of those newly implemented capabilities to the analysis of a simulation performed with the Bison code.

97 MATHEMATICS AND COMPUTING↗

Design for Reliability and Safety Approach for the NASA New Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new crew launch vehicle called ARES I. The ARES I is being developed by NASA Marshall Space Flight Center (MSFC) in support of the Constellation program. The ARES I consists of three major Elements: A solid First Stage (FS), an Upper Stage (US), and liquid Upper Stage Engine (USE). Stacked on top of the ARES I is the Crew exploration vehicle (CEV). The CEV consists of a Launch Abort System (LAS), Crew Module (CM), Service Module (SM), and a Spacecraft Adapter (SA). The CEV development is being led by NASA Johnson Space Center (JSC). Designing for high reliability and safety require a good integrated working environment and a sound technical design approach. The "Design for Reliability and Safety" approach addressed in this paper discusses both the environment and the technical process put in place to support the ARES I design. To address the integrated working environment, the ARES I project office has established a risk based design group called "Operability Design and Analysis" (OD&A) group. This group is an integrated group intended to bring together the engineering, design, and safety organizations together to optimize the system design for safety, reliability, and cost. On the technical side, the ARES I project has, through the OD&A environment, implemented a probabilistic approach to analyze and evaluate design uncertainties and understand their impact on safety, reliability, and cost. This paper focuses on the use of the various probabilistic approaches that have been pursued by the ARES I project. Specifically, the paper discusses an integrated functional probabilistic analysis approach that addresses upffont some key areas to support the ARES I Design Analysis Cycle (DAC) pre Preliminary Design (PD) Phase. This functional approach is a probabilistic physics based approach that combines failure probabilities with system dynamics and engineering failure impact models to identify key system risk drivers and potential system design requirements. The paper also discusses other probabilistic risk assessment approaches planned by the ARES I project to support the PD phase and beyond.

Safie, Fayssal, M.↗

Analysis of the stochastic excitability in the flow chemical reactor

A dynamic model of the thermochemical process in the flow reactor is considered. We study an influence of the random disturbances on the stationary regime of this model. A phenomenon of noise-induced excitability is demonstrated. For the analysis of this phenomenon, a constructive technique based on the stochastic sensitivity functions and confidence domains is applied. It is shown how elaborated technique can be used for the probabilistic analysis of the generation of mixed-mode stochastic oscillations in the flow chemical reactor.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Evaluate the impact of sensor accuracy on model performance in data-driven building fault detection and diagnostics using Monte Carlo simulation

The performance of data-driven fault detection and diagnostics (FDD) is heavily dependent on sensors. However, sensor inaccuracy and sensor faults are pervasive in building operation: inaccurate and missing sensor readings deteriorate FDD performance; sensor inaccuracy will also affect the selection of sensor for data-driven FDD in the model training process, which is another key factor of data-driven FDD performance. Sensor accuracy and sensor selection individually are well-studied research topics in this field, but the impact of sensor accuracy on sensor selection and its further impact on FDD performance has not been evaluated and quantified. In this paper, we developed a novel analysis methodology that comprehensively evaluates sensor fault on sensor selection and FDD accuracy. Monte Carlo simulation is applied to deal with multiple stochastic sensor inaccuracy and provide probabilistic analysis results of the impact of sensor inaccuracy on sensor selection and FDD accuracy. This methodology focuses on the net impact of fault states across a full sensor set. The developed methodology can be used for the early-stage sensor design and operation-stage sensor maintenance. Furthermore, a case study is conducted to demonstrate the analysis methodology using a commercial building model crated to Flexible Research Platform located at Oak Ridge National Laboratory, USA.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Probabilistic nonlinear finite element analysis of composite structures

A probabilistic finite element analysis procedure for laminated composite shells is developed. A total Lagrangian finite element formulation, employing a degenerated three-dimensional laminated composite shell element with the full Green-Lagrange strains and first-order shear deformable kinematics, is used. The first-order second-moment technique for probabilistic finite element analysis of random fields is employed, and results are presented in the form of mean and variance of the structural response. Reliability calculations are made by using the first-order reliability method combined with sensitivity derivatives from the finite element analysis. Both ply-level and micromechanics-level random variables are incorporated, the latter by means of the Aboudi micromechanics model. Two sample problems are solved to verify the accuracy of the procedures developed and to quantify the variability of certain material type/structure combinations. In general, the procedure is quite effective in determining the response statistics and reliability for linear and geometric nonlinear behavior of laminated composite shells.

Engelstad, S. P.↗

An Ensemble Optimization Framework for Coupled Design of Hydropower Contracts and Real-Time Reservoir Operating Rules

Often, revenues from hydropower generation depend on the operator's ability to provide firm power in the presence of uncertain inflows. The primary options available for optimizing revenue are negotiation of a firm power contract before operations begin and adjustment of the reservoir release during operations. Contract and release strategy optimization are closely coupled and most appropriately analyzed with stochastic real-time control methods. Here we use an ensemble-based approach to stochastic optimization that provides a convenient way to construct nonparametric revenue probability distributions to explore the implications of uncertainty. The firm power contract is a simplified bilateral fixed price agreement that partially insulates operator and buyer from price fluctuations. The release control laws and firm energy target are jointly optimized to maximize the operator's expected revenue. Revenue probability distributions and related spill performance statistics indicate that predictive operating strategies such as stochastic dynamic programming and model predictive control can give significantly better performance than standard deterministic operating rules. The performance obtained from batch optimization with perfect inflow information establishes a convenient upper bound on potential revenue and provides a baseline for assessing the significance of differences between real-time operating strategies. Sensitivity analysis indicates that the benefits of predictive operational strategies are greatest for reservoirs with medium nondimensional residence times and less important for reservoirs with large residence times. Overall, probabilistic analysis of the coupled hydropower contract-operations problem provides a realistic way to assess revenue and risk for reservoirs that must provide firm power when inflows are uncertain.

13 HYDRO ENERGY↗

A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

Putcha, Chandra S.↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y Zhu↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y. Zhu↗

Minimally Invasive Treatment for Benign Prostatic Hyperplasia: Economic Evaluation from a Standardized Hospital Case Costing System

Purpose: Minimally invasive alternatives to transurethral resection of the prostate (TURP) such as prostate arterial embolization (PAE) and photoselective vaporization of the prostate (PVP) are being explored as adjuncts in the care of patients with benign prostatic hyperplasia. However, there are conflicting reports of the costs of these procedures. The purpose of this study was to compare the direct and indirect hospital costs of TURP, PAE and PVP. Materials and Methods: A chart review was performed in patients who underwent TURP, PVP and PAE from April 2015 to March 2017. All hospital costs were collected in accordance with the Ontario Case Costing Initiative, a standardized medical case costing system. Costs were characterized as direct or indirect and fixed or variable. Probabilistic sensitivity analysis was conducted to study cost uncertainty. Results: During the study period, a total of 209 men underwent TURP, 28 PVP and 21 PAE. Mean age (years) was as follows: TURP 71.43; PVP 73.66; PAE 70.77 (p = 0.366). Mean length of stay (days) was as follows: TURP 1.63; PVP 1.55; PAE 1 (p = 0.076). Total costs of the PAE group ($3829, SD $1582) were less than both PVP ($5719, SD $1515) and TURP groups ($5034, SD $1997, p < 0.001). There was no significant difference in direct costs between the groups. Monte Carlo simulation demonstrated that PAE was the least costly alternative majority of the time. Conclusions: The total hospital costs of PAE at our institution are significantly lower than those of PVP and TURP.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

RAVEN and Dynamic Probabilistic Risk Assessment: Software overview

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7 [], currently under development at the Idaho National Laboratory. Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism has been employed by providing Application Programming Interfaces (APIs). These interfaces are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable to investigate the system response, investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The paper presents an overview of the software capabilities and their implementation schemes followed by some application examples.

99 GENERAL AND MISCELLANEOUS↗