Ranking problems in multivariate normal /statistical/ populations Final report, 1 Jul. 1966 - 30 Jun. 1967
Theory and solutions for ranking problems in multivariate normal statistical populations
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Theory and solutions for ranking problems in multivariate normal statistical populations
Progress is reported in the following areas: remote sensing applications to land use planning Lowndes County, applications of LANDSAT data to strip mine inventory and reclamation, white tailed deer habitat evaluation using LANDSAT data, remote sensing data analysis support system, and discrimination of unique forest habitats in potential lignite areas of Mississippi. Other projects discussed include LANDSAT change discrimination in gravel operations, environmental impact modeling for highway corridors, and discrimination of fresh water wetlands for inventory and monitoring.
A general research program to explore the technical problem of rotating manned spacecraft has been underway at the Langley Research Center for some time. A report summarizing progress on some of the more significant aspects of the work accomplished thus far was recently presented to a group of NASA personnel sharing interest in this work at a symposium held at the Langley Research Center from July 31 to August 1, 1962. The collection of papers contained in this report is a summary of the material presented. It is published in this form for the convenience of other organizations and individuals who may engaged in similar studies. It is emphasized that the investigations reported herein are exploratory in nature. There is no approved NASA program for the construction and operation of any such spacecraft.
A study was conducted to provide NASA management with an 'initial' look at the production and use of scientific and technical information (STI) at five NASA centers (Ames, Goddard, Langley, Lewis, and Marshall). The 550 respondents who were interviewed by telephone held favorable views regarding the NASA STI system. About 65 percent of the respondents stated that it is either very or somewhat important for them to publish their work through the NASA STI system. About 10 percent of those respondents encountered problems using the NASA STI system services for publication. The most frequently reported problem was 'the process is too time consuming' (8.6 percent). Overall, those respondents using the NASA STI system to publish their work rated the system as excellent (24.6 percent) or good (37.6 percent). About 79 percent of the respondents stated that it is either very or somewhat important for them to use the NASA STI system to access information. The most frequently reported problems were 'the time and effort it takes to locate and obtain information through the system' (14.4 percent). Overall, about 83 percent of the respondents stated that the NASA STI system is important to performing their work. Overall, about 73 percent of the respondents stated that the NASA STI system meets their information needs.
Many existing complex space systems have a significant amount of historical maintenance and problem data bases that are stored in unstructured text forms. For some platforms, these reports may be encoded as scanned images rather than even searchable text. The problem that we address in this paper is the discovery of recurring anomalies and relationships between different problem reports that may indicate larger systemic problems. We will illustrate our techniques on data from discrepancy reports regarding software anomalies in the Space Shuttle. These free text reports are written by a number of different penp!e, thus the emphasis and wording varies considerably.
This report provides: (1) a discussion of the origination of decision analysis problems (well-structured problems) from ill-structured problems; (2) a review of the various methodologies and software packages for decision analysis and related problem areas; (3) a discussion of how the characteristics of a decision analysis problem affect the choice of modeling methodologies, thus providing a guide as to when to choose a particular methodology; and (4) examples of applications of decision analysis to particular problems encountered by the IE Group at KSC. With respect to the specific applications at KSC, particular emphasis is placed on the use of the Demos software package (Lumina Decision Systems, 1993).
This report presents two fundamental properties of lunar trajectories and makes use of these properties to solve various lunar landing site problems. Not only are various problems treated and solved but the properties and methods are established for use in the solution of other problems. This report presents an analysis of lunar landing site problems utilizing the direct mission mode as well as the orbital mission mode. A particular landing site is then specified and different flight profiles are analyzed for getting an exploration vehicle to that landing site. Rendezvous compatible lunar orbits for various stay-times at the landing site are treated. Launch opportunities are discussed for establishing rendezvous compatible lunar orbits without powered plane changes. Then, the minimum required plane changes for rendezvous in the lunar orbit are discussed for launching from earth on any day. On days that afford rendezvous compatible opportunities, there are no powered plane change requirements in the operations from launch at AMR through the rendezvous in lunar orbit, after the stay at the lunar site.
Cooling systems for liquid propellant rocket engines operating at high chamber pressures
A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed. Actual applications and coverage data are tabulated for seven cities whose police departments actively cooperated in the study.
The results are reported of work on an appropriate approach to the solution of the optimum two-impulse transfer problem between orbits of specified inclination. The task included a literature search to identify the current state of the art and a definition of the suggested approach for the specific application of a lunar orbit trim. The applications of the results to the problem are included. The formulation for a computer program developed under this task following a more conventional approach is also included.
Linsely (1983) has proposed a technique for the detection and analysis of air showers at large distances from the shower axis based on a measurement of the shower front thickness and the assumption that this thickness is closely related to the core distance. Some of the problems involved with realizing such a technique were investigated, and some related observations are reported. The practical problems of how consistent the measurements of the shower front would be, how one would use the measurement, and how the rate of triggered events would depend on the minimum pulse width required are studied.
In displaying computer-generated graphics, it is advantageous to have the facility to render any subset of polygons as a silhouette with respect to itself. While the silhouette problem has been addressed before, there has been no completely general solution. In this report, the silhouette problem for calligraphic drawings is solved for the most general case. This solution offers all possible combinations of silhouette and non-silhouette specifications for an arbitrary solid. It allows the flexibility to enhance the clarity of any three-dimensional scene presented in two dimensions.
Seven studies have been conducted on research in the existence and nature of solutions of the restricted problems of three and four bodies. The details and results of five of these research investigations have already been published, and the latest two studies will be published shortly. A complete bibliography of publications is included in this report. This research has been primarily qualitative and has yielded new information on the behavior of trajectories near the libration points in the Earth-Moon-Sun and Sun-Jupiter-Saturn systems, and on the existence of periodic trajectories about the libration points of the circular and elliptical restricted four-body models. We have also implemented Birkhoff's normalization process for conservative and nonconservative Hamiltonian systems with equilibrium points. This makes available a technique for analyzing stability properties of certain nonlinear dynamical systems, and we have applied this technique to the circular and elliptical restricted three-body models. A related study was also conducted to determine the feasibility of using cislunar periodic trajectories for various space missions. Preliminary results suggest that this concept is attractive for space flight safety operations in cislunar space. Results of this research will be of interest to mathematicians, particularly those working in ordinary differential equations, dynamical systems and celestial mechanics; to astronomers; and to space guidance and mission analysts.
In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.
Teaching technical writing to Native Americans contending with a second language and culture is addressed. Learning difficulties arising from differences between native and acquired language and cultural systems are examined. Compartmentalized teaching, which presents the ideals of technical writing in minimal units, and skills development are considered. Rhetorical problems treated include logic of arrangement, selection of support and scope of detail, and time and space. Specific problems selected include the concept of promptness, the contextualization of purpose, interpersonal relationships, wordiness, mixture of registers, and the problem of abstracting. Four inductive procedures for students having writing and perception problems are included. Four sample exercises and a bibliography of 13 references are also included.
The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. This tape presents a pre-launch briefing for the press held on Feb 8, 2000. Statements were given by Doug Lyons, Shuttle Test Director; Scott Higginbotham, STS-99 Payload Director and Ed Priselac, Shuttle Weather Officer. Mr. Lyons reported on the replacement of the Master Control Unit on board Endeavour, the part that had caused a delay in the launch. He reviewed the work that had to be done and the timeline for completion. Scott Higginbotham reported that there were no problems with the SRTM. Ed Priselac reported on favorable weather conditions for the launch. Discussion after the statements concerned a possible problem with a cable, and the possibility of a further delay to the launch.
This report is intended as a technical introduction to the series of reports on aeronautic instruments. It presents a discussion of those subjects which are common to all instruments. First, a general classification is given, embracing all types of instruments used in aeronautics. Finally, a classification is given of the various problems confronted by the instrument expert and investigator. In this way the following groups of problems are brought up for consideration: problems of mechanical design, human factor, manufacturing problems, supply and selection of instruments, problems concerning the technique of testing, problems of installation, problems concerning the use of instruments, problems of maintenance, and physical research problems. This enumeration of problems which are common to instruments in general serves to indicate the different points of view which should be kept in mind in approaching the study of any particular instrument.
The Final Report on psychophysiological investigations of the biomedical problems of manned spaceflight is presented. In the first project, statistical analyses of human autonomic data were performed. The objectives were the following: to establish a relational data base containing human psychophysiological data obtained from Shuttle flight experiments and ground-based research over a 20 year period; to enable multi-user access and retrieval of these data for subsequent analyses and for possible inclusion in the proposed Life Sciences Data Archive; and to enable/conduct statistical analyses across several experiments on large subject populations which can thereby provide definitive answers to questions on human autonomic and behavioral responses and adaptation to environmental stressors on Earth and in space. The second project studied motion sickness. The objectives were: to test/develop hardware and procedures to be incorporated into preflight training of crewmembers of Spacelab-J; and to examine spin-off applications of AFT. The third project studied orthostatic intolerance. The objective was to test the feasibility of applying autogenic-feedback training as a potential treatment for postflight orthostatic intolerance.