Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Introduction of Virtualization Technology to Multi-Process Model Checking

Model checkers find failures in software by exploring every possible execution schedule. Java PathFinder (JPF), a Java model checker, has been extended recently to cover networked applications by caching data transferred in a communication channel. A target process is executed by JPF, whereas its peer process runs on a regular virtual machine outside. However, non-deterministic target programs may produce different output data in each schedule, causing the cache to restart the peer process to handle the different set of data. Virtualization tools could help us restore previous states of peers, eliminating peer restart. This paper proposes the application of virtualization technology to networked model checking, concentrating on JPF.

Leungwattanakit, Watcharin↗

ATS-F millimeter wave propagation experiment data processing.

Review of the data processing program for the Applications Technology Satellite (ATS-F) scheduled for launch in 1973. The program consists of: (1) short term processing, which utilizes analog data recording and produces amplitude scintillation and time-frequency correlation studies; and (2) long term processing, which utilizes digitally recorded data to provide hourly and daily statistical output functions. The data acquisition and processing program planned for the ATS-F experiment provides a highly automated environment which emphasizes the unique requirements for the characterization of the propagation medium in the frequency bands required for the next generation of space communication systems.

Ippolito, L. J.↗

Managing Capital Investments and Resources for Large, Complex Satellite Development Efforts

Once the schedule was baselined and the primary, secondary, and tertiary critical paths (at least) were established: Identified what entity control which portion of the schedule reserve Dollarized the time associated with the schedule reserve and segregated it off from other budget reserves authorization to spend only came when authorization to utilize the time was given Created a process to manage the control of these resources This process was above and beyond the typical schedule controls used to monitor and maintain the day-to-day schedules Webb telescope will be the premier space observatory for astronomers worldwide,extending the tantalizing discoveries of the Hubble Space telescope• An international collaboration among NASA, the European Space Agency, and theCanadian Space Agency• The largest telescope ever placed in space, Webb will be ~100 times more powerful thanHubble• It is so big it has to fold origami-style to fit in the rocket and will unfold like a transformeronce in space• The 5-layer sunshield protects the telescope from the Sun, Earth, and Moon’s infraredradiation. It’s like having sun protection of SPF 1 million• Unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see thefirst galaxies born after the Big Bang• Hubble orbits ~350 miles above the Earth; Webb will orbit the sun ~1 million miles fromEarth• Launch from French Guiana in 2018

Ryan, Richard M.↗

Computational dynamics for robotics systems using a non-strict computational approach

A Non-Strict computational approach for real-time robotics control computations is proposed. In contrast to the traditional approach to scheduling such computations, based strictly on task dependence relations, the proposed approach relaxes precedence constraints and scheduling is guided instead by the relative sensitivity of the outputs with respect to the various paths in the task graph. An example of the computation of the Inverse Dynamics of a simple inverted pendulum is used to demonstrate the reduction in effective computational latency through use of the Non-Strict approach. A speedup of 5 has been obtained when the processes of the task graph are scheduled to reduce the latency along the crucial path of the computation. While error is introduced by the relaxation of precedence constraints, the Non-Strict approach has a smaller error than the conventional Strict approach for a wide range of input conditions.

Orin, David E.↗

Tracking the Short Term Planning (STP) Development Process

Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

Price, Melanie↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

Intelligent Observation Strategies for Geosynchronous Remote Sensing for Natural Hazards

Geosynchronous satellites offer a unique perspective for monitoring environmental factors important to understanding natural hazards and supporting the disasters management life cycle, namely forecast, detection, response, recovery and mitigation. In the NASA decadal survey for Earth science, the GEO-CAPE mission was proposed to address coastal and air pollution events in geosynchronous orbit, complementing similar initiatives in Asia by the South Koreans and by ESA in Europe, thereby covering the northern hemisphere. In addition to analyzing the challenges of identifying instrument capabilities to meet the science requirements, and the implications of hosting the instrument payloads on commercial geosynchronous satellites, the GEO-CAPE mission design team conducted a short study to explore strategies to optimize the science return for the coastal imaging instrument. The study focused on intelligent scheduling strategies that took into account cloud avoidance techniques as well as onboard processing methods to reduce the data storage and transmission loads. This paper expands the findings of that study to address the use of intelligent scheduling techniques and near-real time data product acquisition of both the coastal water and air pollution events. The topics include the use of onboard processing to refine and execute schedules, to detect cloud contamination in observations, and to reduce data handling operations. Analysis of state of the art flight computing capabilities will be presented, along with an assessment of cloud detection algorithms and their performance characteristics. Tools developed to illustrate operational concepts will be described, including their applicability to environmental monitoring domains with an eye to the future. In the geostationary configuration, the payload becomes a networked thing with enough connectivity to exchange data seamlessly with users. This allows the full field of view to be sensed at very high rate under the control of ground infrastructure, resulting in improved efficiencies, accuracy and science benefits. Hence a remote sensing payload and its data may become one of millions of connected objects in the emerging Internet of Things (IoT), and be as easily accessible by a users smart phone as any other smart appliance.

SatCORPS Global Cloud Composite (GCC): the Design and Delivery of A High Quality, High Resolution, Global Cloud Product Available in Near-Real Time

The NASA Satellite ClOud and Radiation Property retrieval System (SatCORPS) supports the development of an analysis ready and cloud-optimized data transformation pipeline and geospatial service enablement of a global cloud composite (GCC) product derived from global geostationary satellite imagery. This geospatial service will be available at high temporal and spatial resolution via the SatCORPS web mapping application for visualization and analysis as well as direct ingestion to common geospatial software and custom programming. The resulting global cloud composite products from the processing pipeline can then be geospatially-service enabled as ArcGIS Image Services and Open Geospatial Consortium (OGC) Web Mapping/Coverage Services for visualization and analysis via a web mapping application and common geospatial software. Near real time global observations are created through the composition of five geostationary satellites that provides modelling and forecasting communities with the capability to provide high quality and timely information to start the projection process. The Global Cloud Composite product combines information from geostationary satellites, GOES-16, GOES-17, Himawari-8, Meteosat-11 and Meteosat-9 to create a single global composite netcdf file and images using the different products within the netcdf file. The SatCORPS team, though our Global Cloud Composite (GCC) product and web-based visualization tools including Geographical Information System (GIS) services provide near real time global cloud product information to both automated processes and traditional web users that is timely and high quality derived from geostationary satellites. The Global Cloud Composite product takes advantage of the scalable processing resources provided by the AWS batch service to provide new composites every thirty minutes. Because information from each of the low earth orbiting satellites is available on schedules tuned to the specific satellite, the processing algorithm temporally composites the final dataset as each satellite’s information becomes available. The SatCORPS team has leveraged our experience using Amazon Web Services (AWS) to build a low latency high availability tool that allows end users both human and automated to acquire high quality and high-resolution Geostationary Earth Orbiting (GEO) information at zero cost to the end user. This presentation will describe how we architected and implemented the service as well as lessons learned based on our experiences both developing and operating the system. The lessons learned include how we integrated multiple services including Amazon Batch, Amazon S3 and Amazon Lambda service to create a low cost but high-performance processing system that is capable of identifying and processing the most appropriate satellite overpass information into global cloud composites. We will also describe our web-based tools including our Geographic Information System that can be used for visualization and analysis. The products from the processing can be geospatially-service enabled as ArcGIS Image Services and Open Geospatial Consortium (OGC) Web Mapping/Coverage Services for visualization and analysis via a web mapping application and common geospatial software. The SatCORPS Global Composite Cloud product provides sophisticated global composited cloud research products with very low latency that we see that as filling a rapidly growing need in the research and modelling community with no up-front nor ongoing costs associated with downloading or using the information.

AWS AMCE SMCE GCC SATCORPS GLOBAL CLOUD COMPOSITE ↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability

A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.

Wilcox, Margaret↗

A Strategy for Autogeneration of Space Shuttle Ground Processing Simulation Models for Project Makespan Estimations

Space Shuttle Processing is a complicated and highly variable project. The planning and scheduling problem, categorized as a Resource Constrained - Stochastic Project Scheduling Problem (RC-SPSP), has a great deal of variability in the Orbiter Processing Facility (OPF) process flow from one flight to the next. Simulation Modeling is a useful tool in estimation of the makespan of the overall process. However, simulation requires a model to be developed, which itself is a labor and time consuming effort. With such a dynamic process, often the model would potentially be out of synchronization with the actual process, limiting the applicability of the simulation answers in solving the actual estimation problem. Integration of TEAMS model enabling software with our existing schedule program software is the basis of our solution. This paper explains the approach used to develop an auto-generated simulation model from planning and schedule efforts and available data.

Madden, Michael G.↗

Ares I-X Roll Control System Development

Project Managers often face challenging technical, schedule and budget issues. This presentation will explore how the Ares I-X Roll Control System Integrated Product Team (IPT) mitigated challenges such as concurrent engineering requirements and environments and evolving program processes, while successfully managing an aggressive project schedule and tight budget. IPT challenges also included communications and negotiations among inter- and intra-government agencies, including the US Air Force, NASA/MSFC Propulsion Engineering, LaRC, GRC, KSC, WSTF, and the Constellation Program. In order to successfully meet these challenges it was essential that the IPT define those items that most affected the schedule critical path, define early mitigation strategies to reduce technical, schedule, and budget risks, and maintain the end-product focus of an "unmanned test flight" context for the flight hardware. The makeup of the IPT and how it would function were also important considerations. The IPT consisted of NASA/MSFC (project management, engineering, and safety/quality) and contractors (Teledyne Brown Engineering and Pratt and Whitney Rocketdyne, who supplied heritage hardware experience). The early decision to have a small focused IPT working "badgelessly" across functional lines to eliminate functional stove-piping allowed for many more tasks to be done by fewer people. It also enhanced a sense of ownership of the products, while still being able to revert back to traditional roles in order to provide the required technical independence in design reviews and verification closures. This presentation will highlight several prominent issues and discuss how they were mitigated and the resulting Lessons Learned that might benefit other projects.

Unger, Ronald J.↗

NASA Agency Overview Briefing

The briefing opened with Dean Acosta (NASA Press Secretary) introducing Michael Griffin (NASA Administrator) and Bill Gerstenmaier (Associate Administrator for Space Operations). Bill Griffin stated that they would resume the Shuttle Fight to Return process, that the vehicle was remarkably clean and if the weather was good, the Shuttle would be ready to launch as scheduled. Bill Gerstenmaier stated that the preparations and processing of the vehicle went extremely well and they are looking forward to increasing the crew size to three. Then the floor was open to questions from the press.

Source record↗

Design for Review - Applying Lessons Learned to Improve the FPGA Review Process

Flight Field Programmable Gate Array (FPGA) designs are required to be independently reviewed. This paper provides recommendations to Flight FPGA designers to properly prepare their designs for review in order to facilitate the review process, and reduce the impact of the review time in the overall project schedule.

Process Improvement↗

The California Cooperative Remote Sensing Project

The USDA, the California Department of Water Resources (CDWR), the Remote Sensing Research Program of the University of California (UCB) and NASA have completed a 4-yr cooperative project on the use of remote sensing in monitoring California agriculture. This report is a summary of the project and the final report of NASA's contribution to it. The cooperators developed procedures that combined the use of LANDSAT Multispectral Scanner imagery and digital data with good ground survey data for area estimation and mapping of the major crops in California. An inventory of the Central Valley was conducted as an operational test of the procedures. The satellite and survey data were acquired by USDA and UCB and processed by CDWR and NASA. The inventory was completed on schedule, thus demonstrating the plausibility of the approach, although further development of the data processing system is necessary before it can be used efficiently in an operational environment.

Hlavka, Christine A.↗

Reinventing the Design Process: Teams and Models

The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues.

Design↗

A planning language for activity scheduling

Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

Zoch, David R.↗

IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

Source record↗