Search NASA⌕ Search

SEARCH · Search NASA

Results for “production facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The partnership: Space shuttle, space science, and space station

An overview of the NASA Space Station Program functions, design, and planned implementation is presented. The discussed functions for the permanently manned space facility include: (1) development of new technologies and related commercial products; (2) observations of the Earth and the universe; (3) provision of service facilities for resupply, maintenance, upgrade and repair of payloads and spacecraft; (4) provision of a transportation node for stationing, processing and dispatching payloads and vehicles; (5) provision of manufacturing and assembly facilities; (6) provision of a storage depot for parts and payloads; and (7) provision of a staging base for future space endeavors. The fundamental concept for the Space Station, as given, is that it be designed, operated, and evolved in response to a broad variety of scientific, technological, and commercial user interests. The Space Shuttle's role as the principal transportation system for the construction and maintenance of the Space Station and the servicing and support of the station crew is also discussed.

Culbertson, Philip E.↗

Assimilation of Sentinel 1 and SMAP–based satellite soil moisture retrievals into SWAT hydrological model: the impact of satellite revisit time and product spatial resolution on flood simulations in small basins

In runoff generation process, soil moisture plays an important role as it controls the magnitude of the flood events in response to the rainfall inputs. In this study, we investigated the ability of a new era of satellite soil moisture retrievals to improve the Soil & Water Assessment Tool (SWAT) daily discharge simulations via soil moisture data assimilation for two small (< 500 km2) and hydrologically different catchments located in Central Italy. We ingested 1) the Soil Moisture Active and Passive (SMAP) Enhanced L3 Radiometer Global Daily 9 km EASE-Grid soil moisture, 2) the Advanced SCATterometer (ASCAT) H113 soil moisture product released within the EUMETSAT Satellite Application Facility on Support to Operational Hydrology and Water Management (HSAF) which has a nearly daily temporal resolution and sampling of 12.5 km, and 3) a fused ASCAT/Sentinel-1 (S1) satellite soil moisture product named SCATSAR-SWI with temporal and spatial sampling of 1 day and 1 km, respectively into SWAT hydrological model via the Ensemble Kalman Filter (EnKF). Different configurations were tested with the aim of exploring the effect of the hydrological regime, the land use conditions, the spatial sampling and the revisit time of the products (which controls the amount of available data to be potentially ingested). Results show a general improvement of SWAT discharge simulations for all products in terms of error and Nash Sutcliffe efficiency index. In particular, we found a relatively good behavior of both the active and the passive products in terms of low flows improvement especially for the catchment characterized by a higher baseflow component. The benefit of the higher spatial resolution of SCATSAR-SWI obtained via S1 over ASCAT was small, likely due to very challenging areas for the S1 retrieval. Eventually, better performances were obtained for the passive product in the more forested catchment. With the aim of exploring the benefit of having more frequent satellite soil moisture observations to be ingested, we tested the performance of the ASCAT product with a reduced temporal sampling obtained by temporally matching ASCAT observations to that of SMAP. The results show a significant reduction of the performance of ASCAT, suggesting that the correction frequency (due to the higher number of observations available) for small catchments is an important aspect for improving flood forecasting as it helps to adjust more frequently the pre-storm soil moisture conditions.

Shima Azimi↗

NASA Critical Facilities Maintenance Assessment

Critical Facilities Maintenance Assessment (CFMA) was first implemented by NASA following the March 2000 overtest of the High Energy Solar Spectroscopic Imager (HESSI) spacecraft. A sine burst dynamic test using a 40 year old shaker failed. Mechanical binding/slippage of the slip table imparted 10 times the planned force to the test article. There was major structural damage to HESSI. The mechanical "health" of the shaker had not been assessed and tracked to assure the test equipment was in good working order. Similar incidents have occurred at NASA facilities due to inadequate maintenance (e.g., rainwater from a leaky roof contaminated an assembly facility that housed a spacecraft). The HESSI incident alerted NASA to the urgent need to identify inadequacies in ground facility readiness and maintenance practices. The consequences of failures of ground facilities that service these NASA systems are severe due to the high unit value of NASA products.

maintenance↗

MEDLI2: MISP Measured Aftbody Aerothermal Environments

The Mars Entry, Descent, and Landing Instrumentation 2 (MEDLI2) sensor suite on the Mars 2020 mission included two total heat flux sensors and one radiometer on the backshell to directly measure the aftbody aerothermal environments during entry into the Martian atmosphere. All three sensors successfully returned aftbody entry heating measurements. Comparisons between the total heat flux sensor measurements and DPLR/NEQAIR predictions show excellent agreement and provide confidence in the models. The radiometer measured significant radiative heating but compared to the model predictions the signal was attenuated by 50% at the end of the entry heat pulse. The loss of signal is attributed to blockage by thermal protection system (TPS) ablation product deposits on the radiometer window. Ground-based testing in the NASA Ames arc jet facilities was conducted to understand the impact of ablation product deposits on the measured radiometer signal. A discussion of the test results, how flight-like the test conditions were, and future work to further characterize the effect of TPS ablation product deposits on the radiometer performance are presented. In addition to measuring the entry heat pulse all three sensors were sensitive enough to measure solar radiation during cruise, the radiometer measured solar flux during the entry heat pulse, and the leeside total heat flux sensor picked up the descent reaction control system firings.

Ruth A Miller↗

Assimilation of Sentinel 1 and SMAP – Based Satellite Soil Moisture Retrievals into SWAT Hydrological Model: the Impact of Satellite Revisit Time and Product Spatial Resolution on Flood Simulations in Small Basins

In runoff generation process, soil moisture plays an important role as it controls the magnitude of the flood events to the rainfall inputs. In this study, we investigated the ability of a new era of satellite soil moisture retrievals to improve the Soil & Water Assessment Tool (SWAT) daily discharge simulations via soil moisture data assimilation for two small (< 500 km2) and hydrologically different catchments located in Central Italy. We ingested 1) the Soil Moisture Active and Passive (SMAP) Enhanced L3 Radiometer Global Daily 9 km EASE-Grid soil moisture, 2) the Advanced SCATterometer (ASCAT) H113 soil moisture product released within the EUMETSAT Satellite Application Facility on Support to Operational Hydrology and Water Management (H-SAF) which has a nearly daily temporal resolution and sampling of 12.5 km, and 3) a fused ASCAT/Sentinel-1 (S1) satellite soil moisture product named SCATSAR-SWI with temporal and spatial sampling of 1 day and 1 km, respectively into SWAT hydrological model via Ensemble Kalman Filter (EnKF). Different configurations were tested with the aim of exploring the effect of the hydrological regime, the land use conditions, the spatial sampling and the revisit time of the products (which controls the amount of available data to be potentially ingested). Results show a general improvement of SWAT discharge simulations for all products in terms of error and Nash Sutcliffe efficiency index. In particular, we found a relatively good behavior of both the active and the passive products in terms of low flows improvement especially for the catchment characterized by a higher baseflow component. The benefit of the higher spatial resolution of SCATSAR obtained via S1 over ASCAT was small likely due to very challenging areas for S1 retrieval. Eventually, better performances were obtained for the passive product in the more forested catchment. With the aim of exploring the benefit of having more frequent satellite soil moisture observations to be ingested, we tested the performance of the ASCAT product with a reduced temporal sampling obtained by temporally matching ASCAT observations to that of SMAP. The results show a significant reduction of the performance of ASCAT, suggesting that the correction frequency (due to the higher number of observations available) for small catchments is an important aspect for improving flood forecasting as it helps to adjust more frequently the soil moisture pre-storm conditions.

Small basins↗

NASA's Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) In-Field Demonstration at Desert RATS 2010

This paper describes the construction, assembly, subsystem integration, transportation, and field testing operations associated with the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) and discusses lessons learned. In a one-year period beginning summer 2009, a tightly scheduled design-develop-build process was utilized by a small NASA "tiger team" to produce the functional HDU-PEM prototype in time to participate in the 2010 Desert Research and Technology Studies (Desert RATS) field campaign. The process required the coordination of multiple teams, subcontractors, facility management and safety staff. It also required a well-choreographed material handling and transportation process to deliver the finished product from the NASA-Johnson Space Center facilities to the remote Arizona desert locations of the field test. Significant findings of this paper include the team s greater understanding of the HDU-PEM s many integration issues and the in-field training the team acquired which will enable the implementation of the next-generation of improvements and development of high-fidelity field operations in a harsh environment. The Desert RATS analog environment is being promoted by NASA as an efficient means to design, build, and integrate multiple technologies in a mission architecture context, with the eventual goal of evolving the technologies into robust flight hardware systems. The HDU-PEM in-field demonstration at Desert RATS 2010 provided a validation process for the integration team, which has already begun to retool for the 2011 field tests that require an adapted architecture.

Tri, Terry O.↗

Wind-Tunnel Capability at Ames Research Center

Report describes $700 million wind-tunnel complex at Ames Research Center, including auxiliary support systems, test instrumentation, and special test rigs. Planned near-term facility improvement aimed at providing new test capabilities and increased productivity, as well as some potential longer-term improvements, also discussed. Aerodynamic test facilities range from subsonic wind tunnels to highenthalpy arc jets.

Snyder, C. T.↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Automation of Space Processing Applications Shuttle payloads

The Space Processing Applications Program is examining the effect of weightlessness on key industrial materials processes, such as crystal growth, fine-grain casting of metals, and production of unique and ultra-pure glasses. Because of safety and in order to obtain optimum performance, some of these processes lend themselves to automation. Automation can increase the number of potential Space Shuttle flight opportunities and increase the overall productivity of the program. Five automated facility design concepts and overall payload combinations incorporating these facilities are presented.

Crosmer, W. E.↗

Status of the ERDA/NASA photovoltaic tests and applications project

The Tests and Applications Project of the ERDA Photovoltaic Program is concerned with the testing of photovoltaic systems and the growth of their use in real terrestrial applications. This activity is an important complement to the development of low cost solar arrays by providing requirements based on application needs and stimulating markets to create demand to absorb increasing production capacity. A photovoltaic system test facility is now operational, market stimulation has been initiated through applications, and standards for terrestrial cell measurements established.

Deyo, J. N.↗

Alternative approaches to space-based power generation

Satellite Power Stations (SPS) would generate electrical power in space for terrestrial use. Their geosynchronous orbit location permits continuous microwave power transmission to ground receiving antenna farms. Eight approaches to the generation of the electrical power to be transmitted were investigated. Configurations implementing these approaches were developed through an optimization process intended to yield the lowest cost for each. A complete program was baselined for each approach, identifying required production rates, quantities of launches, required facilities, etc. Each program was costed, including the associated launches, orbital assembly, and maintenance operations. The required electric power charges to amortize these costs were calculated. They range from 26 to 82 mills/kWh (ground busbar).

Gregory, D. L.↗

Systems definition space based power conversion systems: Executive summary

Potential space-located systems for the generation of electrical power for use on earth were investigated. These systems were of three basic types: (1) systems producing electrical power from solar energy; (2) systems producing electrical power from nuclear reactors; (3) systems for augmenting ground-based solar power plants by orbital sunlight reflectors. Configurations implementing these concepts were developed through an optimization process intended to yield the lowest cost for each. A complete program was developed for each concept, identifying required production rates, quantities of launches, required facilities, etc. Each program was costed in order to provide the electric power cost appropriate to each concept.

Source record↗

Systems definition space-based power conversion systems

Potential space-located systems for the generation of electrical power for use on Earth are discussed and include: (1) systems producing electrical power from solar energy; (2) systems producing electrical power from nuclear reactors; and (3) systems for augmenting ground-based solar power plants by orbital sunlight reflectors. Systems (1) and (2) would utilize a microwave beam system to transmit their output to Earth. Configurations implementing these concepts were developed through an optimization process intended to yield the lowest cost for each. A complete program was developed for each concept, identifying required production rates, quantities of launches, required facilities, etc. Each program was costed in order to provide the electric power cost appropriate to each concept.

Source record↗

Digital SAR processing using a fast polynomial transform

A new digital processing algorithm based on the fast polynomial transform is developed for producing images from Synthetic Aperture Radar data. This algorithm enables the computation of the two dimensional cyclic correlation of the raw echo data with the impulse response of a point target, thereby reducing distortions inherent in one dimensional transforms. This SAR processing technique was evaluated on a general-purpose computer and an actual Seasat SAR image was produced. However, regular production runs will require a dedicated facility. It is expected that such a new SAR processing algorithm could provide the basis for a real-time SAR correlator implementation in the Deep Space Network.

Butman, S.↗

Digital SAR processing using a fast polynomial transform

A new digital processing algorithm based on the fast polynomial transform is developed for producing images from Synthetic Aperture Radar data. This algorithm enables the computation of the two dimensional cyclic correlation of the raw echo data with the impulse response of a point target, thereby reducing distortions inherent in one dimensional transforms. This SAR processing technique was evaluated on a general-purpose computer and an actual Seasat SAR image was produced. However, regular production runs will require a dedicated facility. It is expected that such a new SAR processing algorithm could provide the basis for a real-time SAR correlator implementation in the Deep Space Network. Previously announced in STAR as N82-11295

Truong, T. K.↗

Specification for IBM/IBM compatible 3480 tape cartridge

This document establishes the same kinds of standards and controls that are currently in use for the procurement on new analog and digital magnetic tapes. The Magnetic Tape Certification Facility (MTCF) currently maintains a Quality Products List (QPL) for all new analog and digital magnetic tapes purchased by NASA-GSFC. Extensive tests are conducted in the MTCF on an annual basis to determine the manufacturer's tape types to be added to or deleted from the current QPL. The MTCF currently maintains two specifications for magnetic tapes: NASA TM-79724 is used for the QPL and acceptance testing of new analog tapes; and NASA TM-80599 is used for the QPL and acceptance testing of new digital tapes. This specification will be used for the QPL and acceptance testing of new 3480 cartridges. The magnetic tapes used by GSFC, LaRC, ARC/Dryden, WFF, and the Network Tracking Stations are covered by the NASA-GSFC specifications. The 3480 cartridge was introduced approximately 3.5 years ago and is becoming an increasingly attractive alternative to digital magnetic tapes. Many users have already converted to the 3480 system and have more tape drives on order.

Perry, Jimmy L.↗

Identifying atmospheric monitoring needs for Space Station Freedom

The atmospheric monitoring needs for Space Station Freedom were identified by examining the following from an industrial hygiene perspective: the experiences of past missions; ground based tests of proposed life support systems; the unique experimental and manufacturing facilities; the contaminant load model; metabolic production; and a fire. A target list of compounds to be monitored is presented and information is provided relative to the frequency of analysis, concentration ranges, and locations for monitoring probes.

Casserly, Dennis M.↗