Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

NASA's Space Launch Transitions: From Design to Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

NASA Engineering and Safety Center Lunar Rover Design Concepts Assessments

Mass is a significant risk to programs and projects as they transition from formulation to implementation, especially in larger human space systems where delivery mass or volume can be a constrained commodity. • Concepts developed without an adequate systems-engineering basis, including design and operations experience, may miss significant functionality and subsequent mass required for integration or operations. • Further uncertainty can be associated with not fully understanding design best practices and standards that drive mass, such as design for minimum risk or fault tolerance.1 • Finally, the appropriate systems engineering mass properties management rigor and technical discipline insight are required to set the mass baseline, including appropriate mass growth allowance (MGA) to ensure program success. Mass is a key quantity that should be constantly monitored by the systems engineer and the program/project management stakeholder to ensure mission compatibility throughout the project life cycle. In addition, mass is a key programmatic performance metric monitored by the NASA Chief Financial Officer for current and future program cost estimating. NASA Exploration Systems sought an assessment of reasonableness with respect to different potential rover concepts that balances mass needs and human-class cargo lander capabilities. Appropriate systems engineering mass properties management rigor and technical discipline insight were used, and are required to set the mass baseline, including appropriate MGA to ensure program success. Two independent Lunar rover concepts were evaluated, with a goal to understand concept credibility and the Lunar rover designs potential extensibility for Mars surface operations. A notional generic rover concept is shown in Figure 1.

Systems Engineering↗

Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary

The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.

Source record↗

Spiral model pilot project information model

The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

Source record↗

Testing Microshutter Arrays Using Commercial FPGA Hardware

NASA is developing micro-shutter arrays for the Near Infrared Spectrometer (NIRSpec) instrument on the James Webb Space Telescope (JWST). These micro-shutter arrays allow NIRspec to do Multi Object Spectroscopy, a key part of the mission. Each array consists of 62414 individual 100 x 200 micron shutters. These shutters are magnetically opened and held electrostatically. Individual shutters are then programmatically closed using a simple row/column addressing technique. A common approach to provide these data/clock patterns is to use a Field Programmable Gate Array (FPGA). Such devices require complex VHSIC Hardware Description Language (VHDL) programming and custom electronic hardware. Due to JWST's rapid schedule on the development of the micro-shutters, rapid changes were required to the FPGA code to facilitate new approaches being discovered to optimize the array performance. Such rapid changes simply could not be made using conventional VHDL programming. Subsequently, National Instruments introduced an FPGA product that could be programmed through a Labview interface. Because Labview programming is considerably easier than VHDL programming, this method was adopted and brought success. The software/hardware allowed the rapid change the FPGA code and timely results of new micro-shutter array performance data. As a result, numerous labor hours and money to the project were conserved.

Rapchun, David↗

Human Factors Interface with Systems Engineering for NASA Human Spaceflights

This paper summarizes the past and present successes of the Habitability and Human Factors Branch (HHFB) at NASA Johnson Space Center s Space Life Sciences Directorate (SLSD) in including the Human-As-A-System (HAAS) model in many NASA programs and what steps to be taken to integrate the Human-Centered Design Philosophy (HCDP) into NASA s Systems Engineering (SE) process. The HAAS model stresses systems are ultimately designed for the humans; the humans should therefore be considered as a system within the systems. Therefore, the model places strong emphasis on human factors engineering. Since 1987, the HHFB has been engaging with many major NASA programs with much success. The HHFB helped create the NASA Standard 3000 (a human factors engineering practice guide) and the Human Systems Integration Requirements document. These efforts resulted in the HAAS model being included in many NASA programs. As an example, the HAAS model has been successfully introduced into the programmatic and systems engineering structures of the International Space Station Program (ISSP). Success in the ISSP caused other NASA programs to recognize the importance of the HAAS concept. Also due to this success, the HHFB helped update NASA s Systems Engineering Handbook in December 2007 to include HAAS as a recommended practice. Nonetheless, the HAAS model has yet to become an integral part of the NASA SE process. Besides continuing in integrating HAAS into current and future NASA programs, the HHFB will investigate incorporating the Human-Centered Design Philosophy (HCDP) into the NASA SE Handbook. The HCDP goes further than the HAAS model by emphasizing a holistic and iterative human-centered systems design concept.

Wong, Douglas T.↗

NASA Earth Observations Informing Energy Management Decision Making

The Energy Sector is experiencing increasing impacts from severe weather and shifting climatic trends, as well as facing a changing political climate, adding uncertainty for stakeholders as they make short- and long-term planning investments. Climate changes such as prolonged extreme heat and drought (leading to wildfire spread, for example), sea level rise, and extreme storms are changing the ways that utilities operate. Energy infrastructure located in coastal or flood-prone areas faces inundation risks, such as damage to energy facilities. The use of renewable energy resources is increasing, requiring more information about their intermittency and spatial patterns. In light of these challenges, public and private stakeholders have collaborated to identify potential data sources, tools, and programmatic ideas. For example, utilities across the country are using cutting-edge technology and data to plan for and adapt to these changes. In the Federal Government, NASA has invested in preliminary work to identify needs and opportunities for satellite data in energy sector application, and the Department of Energy has similarly brought together stakeholders to understand the landscape of climate vulnerability and resilience for utilities and others. However, have these efforts improved community-scale resilience and adaptation efforts? Further, some communities are more vulnerable to climate change and infrastructure impacts than others. This session has two goals. First, panelists seek to share existing and ongoing efforts related to energy management. Second, the session seeks to engage with attendees via group knowledge exchange to connect national energy management efforts to local practice for increased community resilience.

Eckman, Richard↗

NASA's Space Launch System Transitions From Design To Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce R.↗

NASA Spacecraft Fault Management Workshop Results

Fault Management is a critical aspect of deep-space missions. For the purposes of this paper, fault management is defined as the ability of a system to detect, isolate, and mitigate events that impact, or have the potential to impact, nominal mission operations. The fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, as well as opportunities identified for future investment in tools, processes, and products to facilitate the development of space flight fault management capabilities.

Newhouse, Marilyn↗

Results from the NASA Spacecraft Fault Management Workshop: Cost Drivers for Deep Space Missions

Fault Management, the detection of and response to in-flight anomalies, is a critical aspect of deep-space missions. Fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for five missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that four out of the five missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, and academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, particularly as fault management development issues affect operations and the development of operations capabilities.

Newhouse, Marilyn E.↗

Status of SAS4A/SASSYS-1 Software Development and Application (FY2024)

SAS4A/SASSYS-1 is a simulation tool used to perform deterministic analysis of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. With its origin as SAS1A in the late 1960s, the SAS series of codes has been under continuous use and development for over fifty years. It has been identified as a critical element of safety analysis capabilities for the U.S. Department of Energy and is utilized within industry to perform the transient safety analyses required to support the licensing of Liquid Metal-cooled Fast Reactors (LMFRs). This report summarizes the code development and update activities carried out during FY2024. In FY2024, programmatic activities focused on key improvements to software useability, such as enhanced user interfaces for reactivity feedback modeling, improvements in stability/useability of the Code Manual, and improvements to the acceptance testing infrastructure, including automation of acceptance testing and generation of the Acceptance Testing Report. To support end user applications, an open training was held, a semi-public forum was maintained, and a practical benchmarking and validation matrix was developed which allowed limitations of existing testing capabilities to be assessed. The existing fuel models were also enhanced with improved modeling capabilities and testing for the oxide and annular fuel models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coal gasification systems engineering and analysis, volume 2

The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

Source record↗

Building the RS-25 Engine for NASA’s Next Generation of Exploration.

NASA is aggressively pursuing a human lunar return to the Moon with the Artemis Program. The Space Launch System (SLS) is critical to the transportation architecture, providing both crew and cargo capability. To accelerate SLS development, NASA settled on space shuttle heritage propulsion technologies. Early missions will use repurposed RS-25 engines from the Shuttle Program adapted to SLS requirements. For future missions, however, NASA and engine contractor Aerojet Rocketdyne are restarting RS-25 production with a goal of using the latest manufacturing technologies to produce an RS-25 variant that will cost at least 30 percent less than the shuttle-era engines developed and flown for almost 30 years. The prospect of restarting the production line on these engines after many years and modifying the engine to reduce cost and better match the needs of the SLS vehicle presented unique challenges and opportunities for NASA and Aerojet Rocketdyne. NASA and AR are now deep into the process of adapting 16 RS-25 engines for the first four SLS Artemis flights and building the first RS-25 “Restart” engines for future Artemis missions. In addition to navigating programmatic, technical, and logistical challenges with the current RS-25 production work, NASA and AR have partnered to pursue new methods of building this engine through advanced manufacturing techniques to further reduce the cost and schedule required to build each RS-25 engine to contribute to the long-term affordability of the SLS vehicle. This presentation will discuss the goals for the restart program, the challenges, and results to date.

Jessica Jean Wood↗

Radiation: microbial evolution, ecology, and relevance to mars missions

Ultraviolet (UV) radiation has been an important environmental parameter during the evolution of life on Earth, both in its role as a mutagen and as a selective agent. This was probably especially true during the time from 3.8 to 2.5 billion years ago, when atmospheric ozone levels were less than 1% of present levels. Early Mars may not have had an "ozone shield" either, and it never developed a significant one. Even though Mars is farther away from the Sun than the Earth, a substantial surficial UV flux is present on Mars today. But organisms respond to dose rate, and on Mars, like on Earth, organisms would be exposed to diurnal variations in UV flux. Here we present data on the effect of diurnal patterns of UV flux on microbial ecosystems in nature, with an emphasis on photosynthesis and DNA synthesis effects. These results indicate that diurnal patterns of metabolism occur in nature with a dip in photosynthesis and DNA synthesis in the afternoon, in part regulated by UV flux. Thus, diurnal patterns must be studied in order to understand the effect of UV radiation in nature. The results of this work are significant to the success of human missions to Mars for several reasons. For example, human missions must include photosynthetic organisms for food production and likely oxygen production. An evolutionary approach suggests which organisms might be best suited for high UV fluxes. The diurnal aspect of these studies is critical. Terraforming is a potential goal of Mars exploration, and it will require studies of the effect of Martian UV fluxes, including their diurnal changes, on terrestrial organisms. Such studies may suggest that diurnal changes in UV only require mitigation at some times of day or year.

Review, Tutorial↗

Telescience Testbed Pilot Project - Evaluation environment for Space Station operations

The objectives of the Telescience Testbed Pilot Program (TTPP) are discussed. The purpose of the TTPP, which involves 15 universities in cooperation with various NASA centers, is to demonstrate the utility of a user-oriented rapid prototyping testbed approach to developing and refining science requirements and validation concepts and approaches for the information systems of the Space Station era and beyond. It is maintained that the TTPP provides an excellent environment, with low programmatic schedule and budget risk, for testing and evaluating new operations concepts and technologies.

Wiskerchen, Michael J.↗

Xenon Acquisition Strategies for High-Power Electric Propulsion NASA Missions

The benefits of high-power solar electric propulsion (SEP) for both NASA's human and science exploration missions combined with the technology investment from the Space Technology Mission Directorate have enabled the development of a 50kW-class SEP mission. NASA mission concepts developed, including the Asteroid Redirect Robotic Mission, and those proposed by contracted efforts for the 30kW-class demonstration have a range of xenon propellant loads from 100's of kg up to 10,000 kg. A xenon propellant load of 10 metric tons represents greater than 10% of the global annual production rate of xenon. A single procurement of this size with short-term delivery can disrupt the xenon market, driving up pricing, making the propellant costs for the mission prohibitive. This paper examines the status of the xenon industry worldwide, including historical xenon supply and pricing. The paper discusses approaches for acquiring on the order of 10 MT of xenon propellant considering realistic programmatic constraints to support potential near-term NASA missions. Finally, the paper will discuss acquisitions strategies for mission campaigns utilizing multiple high-power solar electric propulsion vehicles requiring 100's of metric tons of xenon over an extended period of time where a longer term acquisition approach could be implemented.

Electric Propulsion↗

Integral Channel Nozzles and Heat Exchangers using Additive Manufacturing Directed Energy Deposition NASA HR-1 Alloy

Heat exchangers for use in propulsion applications are very critical components because they must be efficient, compact and light and often operate with working fluids at extreme temperatures or pressures or both. Various components and systems use heat exchangers such as combustion chambers of gas turbines and internal combustion engines, fuel cells (air supply and thermal management), electric batteries (thermal management), evaporators and recuperators of waste-heat-to-power systems, and rocket engines. Even if the results are more generally applicable, the heat exchangers applications to which this study is more closely related are regeneratively cooled rocket nozzles and chambers, and repressurization systems for the launch vehicles. These components are often thin-walled and contain pressurized fluids, like propellants at cryogenic or elevated temperatures. Given that the environments that these propulsion components must endure are challenging, the manufacturing to meet these specifications often require long lead times due to specialty processes and unique tooling associated with the combined thin-wall integral channel and large-scale structures. Additive manufacturing (AM) offers programmatic advantages for reduction in processing time and cost in addition to various technical advantages, including the possibility to achieve enhanced hardware complexity targeted to superior performance, part consolidation, and the capability of processing of novel alloys. While AM is already being utilized for heat exchanger components in propulsion applications, almost all these AM components are made by means of Laser Powder Bed Fusion (L-PBF). L-PBF allows for fine features but is rather limited with respect to the overall size of the components that can be manufactured. Recent developments are maturing the Laser Powder Directed Energy Deposition (LP-DED) process which may be used, for example, to make integral channel thin-wall regeneratively-cooled rocket nozzles with diameters greater than 1 m. This paper highlights some integral channel heat exchanger demonstrator hardware applications of LP-DED, as well as the characterization of this process in combination with the use of the NASA HR-1 alloy. To properly utilize LP-DED for heat exchanger manufacturing, various aspects are being characterized such as geometry limitations, measurement of surface texture and geometric angled surfaces, surface enhancements for internal channels, and material evaluation. NASA HR-1 (FeNi-Cr) is a high strength hydrogen resistant superalloy developed for use in aerospace applications, such as heat exchangers. Some aspects and considerations about the design of heat exchangers are summarized together with data relevant to LP-DED manufacturing in combination with the NASA HR-1 alloy. Microchannels were successful deposited down to 2.54 mm and 1 mm wall thickness, wall angles of 30°, both with high reproducibility. It was also found that the areal surface roughness is highly dependent on the size of the powder feedstock used for deposition. The characterization of these LP-DED features is critical for fluid flow and heat transfer predictions as it can be exploited to enhance heat transfer at the cost of increased pressure drop.

Additive Manufacturing↗

Integral Channel Nozzles and Heat Exchangers using Additive Manufacturing Directed Energy Deposition NASA HR-1 Alloy

Heat exchangers for use in propulsion applications are very critical components because they must be efficient, compact and light and often operate with working fluids at extreme temperatures or pressures or both. Various components and systems use heat exchangers such as combustion chambers of gas turbines and internal combustion engines, fuel cells (air supply and thermal management), electric batteries (thermal management), evaporators and recuperators of waste-heat-to-power systems, and rocket engines. Even if the results are more generally applicable, the heat exchangers applications to which this study is more closely related are regeneratively cooled rocket nozzles and chambers, and repressurization systems for the launch vehicles. These components are often thin-walled and contain pressurized fluids, like propellants at cryogenic or elevated temperatures. Given that the environments that these propulsion components must endure are challenging, the manufacturing to meet these specifications often require long lead times due to specialty processes and unique tooling associated with the combined thin-wall integral channel and large-scale structures. Additive manufacturing (AM) offers programmatic advantages for reduction in processing time and cost in addition to various technical advantages, including the possibility to achieve enhanced hardware complexity targeted to superior performance, part consolidation, and the capability of processing of novel alloys. While AM is already being utilized for heat exchanger components in propulsion applications, almost all these AM components are made by means of Laser Powder Bed Fusion (L-PBF). L-PBF allows for fine features but is rather limited with respect to the overall size of the components that can be manufactured. Recent developments are maturing the Laser Powder Directed Energy Deposition (LP-DED) process which may be used, for example, to make integral channel thin-wall regeneratively-cooled rocket nozzles with diameters greater than 1 m. This paper highlights some integral channel heat exchanger demonstrator hardware applications of LP-DED, as well as the characterization of this process in combination with the use of the NASA HR-1 alloy. To properly utilize LP-DED for heat exchanger manufacturing, various aspects are being characterized such as geometry limitations, measurement of surface texture and geometric angled surfaces, surface enhancements for internal channels, and material evaluation. NASA HR-1 (FeNi-Cr) is a high strength hydrogen resistant superalloy developed for use in aerospace applications, such as heat exchangers. Some aspects and considerations about the design of heat exchangers are summarized together with data relevant to LP-DED manufacturing in combination with the NASA HR-1 alloy. Microchannels were successful deposited down to 2.54 mm and 1 mm wall thickness, wall angles of 30°, both with high reproducibility. It was also found that the areal surface roughness is highly dependent on the size of the powder feedstock used for deposition. The characterization of these LP-DED features is critical for fluid flow and heat transfer predictions as it can be exploited to enhance heat transfer at the cost of increased pressure drop.

additive manufacturing↗