Search NASA⌕ Search

SEARCH · Search NASA

Results for “regulatory framework”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Utilization of Common Automotive Three-Way NO{sub x} Reduction Catalyst for Managing Off- Gas from Thermal Treatment of High-Nitrate Waste - 13094

Studsvik's Thermal Organic Reduction (THOR) steam reforming process has been tested and proven to effectively treat radioactive and hazardous wastes streams with high nitrate contents to produce dry, stable mineral products, while providing high conversion (>98%) of nitrates and nitrites directly to nitrogen gas. However, increased NO{sub x} reduction may be desired for some waste streams under certain regulatory frameworks. In order to enhance the NO{sub x} reduction performance of the THOR process, a common Three-Way catalytic NO{sub x} reduction unit was installed in the process gas piping of a recently completed Engineering Scale Technology Demonstration (ESTD). The catalytic DeNO{sub x} unit was located downstream of the main THOR process vessel, and it was designed to catalyze the reduction of residual NO{sub x} to nitrogen gas via the oxidation of the hydrogen, carbon monoxide, and volatile organic compounds that are inherent to the THOR process gas. There was no need for auxiliary injection of a reducing gas, such as ammonia. The unit consisted of four monolith type catalyst sections positioned in series with a gas mixing section located between each catalyst section. The process gas was monitored for NO{sub x} concentration upstream and downstream of the catalytic DeNO{sub x} unit. Conversion efficiencies ranged from 91% to 97% across the catalytic unit, depending on the composition of the inlet gas. Higher concentrations of hydrogen and carbon monoxide in the THOR process gas increased the NO{sub x} reduction capability of the catalytic DeNO{sub x} unit. The NO{sub x} destruction performance of THOR process in combination with the Three-Way catalytic unit resulted in overall system NO{sub x} reduction efficiencies of greater than 99.9% with an average NO{sub x} reduction efficiency of 99.94% for the entire demonstration program. This allowed the NO{sub x} concentration in the ESTD exhaust gas to be maintained at less than 40 parts per million (ppm), dry basis with an average concentration of approximately 17 ppm, dry basis. There were no signs of catalyst deactivation throughout the 6 day demonstration program, even under the high steam (>50%) content and chemically reducing conditions inherent to the THOR process. Utilization of the common Three-Way automotive catalyst may prove to be a cost effective method for improving NO{sub x} emissions from thermal treatment processes that utilize similar processing conditions. This paper will discuss the details of the implementation and performance of the Three-Way catalytic DeNO{sub x} unit at the THOR ESTD, as well as a discussion of future work to determine the long-term durability of the catalyst in the THOR process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completion of the Operational Closure of Tank 18F and Tank 19F at the Savannah River Site by Grouting - 13236

Radioactive waste is stored in underground waste tanks at the Savannah River Site (SRS). The low-level fraction of the waste is immobilized in a grout waste form, and the high level fraction is disposed of in a glass waste form. Once the waste is removed, the tanks are prepared for closure. Operational closure of the tanks consists of filling with grout for the purpose of chemically stabilizing residual material, filling the tank void space for long-term structural stability, and discouraging future intrusion. Two of the old-style single-shell tanks at the SRS have received regulatory approval confirming waste removal had been completed, and have been stabilized with grout as part of completing operational closure and removal from service. Consistent with the regulatory framework, two types of grout were used for the filling of Tanks 18F and 19F. Reducing grout was used to fill the entire volume of Tanks 18F and 19F (bulk fill grout) and a more flowable grout was used to fill equipment that was left in the tank (equipment fill grout). The reducing grout was added to the tanks using portable grout pumps filled from concrete trucks, and delivered the grout through slick lines to the center riser of each tank. Filling of the two tanks has been completed, and all equipment has been filled. The final capping of riser penetrations brings the operation closure of Tanks 18F and 19F to completion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Approach for Long-Term Management of Disused Sealed Radioactive Sources - 13630

Radioactive sources are used widely throughout the world in a variety of medical, industrial, research and military applications. When such radioactive sources are no longer used and are not intended to be used for the practice for which an authorization was granted, they are designated as 'disused sources'. Whether appropriate controls are in place during the useful life of a source or not, the end of this useful life is often a turning point after which it is more difficult to ensure the safety and security of the source over time. For various reasons, many disused sources cannot be returned to the manufacturer or the supplier for reuse or recycling. When these attempts fail, disused sources should be declared as radioactive waste and should be managed as such, in compliance with relevant international legal instruments and safety standards. However, disposal remains an unresolved issue in many counties, due to in part to limited public acceptance, insufficient funding, and a lack of practical examples of strategies for determining suitable disposal options. As a result, disused sources are often stored indefinitely at the facilities where they were once used. In order to prevent disused sources from becoming orphan sources, each country must develop and implement a comprehensive waste management strategy that includes disposal of disused sources. The International Atomic Energy Agency (IAEA) fosters international cooperation between countries and encourages the development of a harmonized 'cradle to grave' approach to managing sources consistent with international legal instruments, IAEA safety standards, and international good practices. This 'cradle to grave' approach requires the development of a national policy and implementing strategy, an adequate legal and regulatory framework, and adequate resources and infrastructure that cover the entire life cycle, from production and use of radioactive sources to disposal. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

French Atomic Energy Commission Decommissioning Programme and Feedback Experience - 12230

Since the French Atomic and Alternatives Energy Commission (CEA) was founded in 1945 to carry out research programmes on use of nuclear, and its application France has set up and run various types of installations: research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. Since the 1960's and 1970's in all its centres, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing now from two dedicated funds, close to euro 15,000 M for the next thirty years, for current or projected dismantling operations, the CEA's Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2016, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD and R (Decontamination Decommissioning and Remediation) strategy, programme and feedback experience inside the CEA's Nuclear Energy Division. A special feature of dismantling operations at the CEA comes from the diversity of facilities to be dismantled, which are predominantly research facilities and therefore have no series advantage. There is tremendous operating feedback, however. For more than twenty years in all its centres, the CEA has acquired experience and know-how through dismantling research reactors or critical models and laboratories or plants. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing from two dedicated funds, close to euro 15,000 Millions for the next thirty years, for current or projected dismantling operations, the Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2020, the dismantling of the UP1 plant at Marcoule, one of the largest dismantling works in the world, will be well advanced, with all the process equipment dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prospective implementation of a software application for pre-disposal L/ILW waste management activities in Romania

Romania is actively engaged to update the Medium and Long Term National Strategy for Safe Management of Radioactive Waste and to approve the Road Map for Geological Repository Development. Considering relevant documents to be further updated, about 122,000 m{sup 3} SL-LILW are to be disposed in a near surface facility that will have room, also, for quantities of VLLW. Planned date for commissioning is under revision. Taking into account that in this moment there are initiated several actions for the improvement of the technical capability for LILW treatment and conditioning, several steps for the possible use of SAFRAN software were considered. In view of specific data for Romanian radioactive waste inventory, authors are trying to highlight the expected limitations and unknown data related with the implementation of SAFRAN software for the foreseen pre-disposal waste management activities. There are challenges that have to be faced in the near future related with clear definition of the properties of each room, area and waste management activity. This work has the aim to address several LILW management issues in accordance with national and international regulatory framework for the assurance of nuclear safety. Also, authors intend to develop their institutional capability for the safety demonstration of the existent and future radioactive waste management facilities and activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of treatment as an alternative WM pathway: examples of I-graphite and metallic components such as steam generators - 15212

EDF is working continuously to optimize and secure its waste management pathways, leading in some case to develop appropriate treatment solutions that could be implemented parallel to reference solutions, complementary or as alternative solutions to already existing paths. This approach is illustrated by the examples of steam generators replaced during the operation of French PWR power plants, and of irradiated graphite (stacks and sleeves), coming from the decommissioning of UNGG reactors, which have been shut down. Concerning graphite wastes, the near surface disposal facility intended for this waste does not exist yet, and is currently giving rise to the research of a suitable site, and an evaluation of its performances. While accompanying ANDRA (French national agency for nuclear waste management), in charge of the development of the facility, and while waiting for more data to be available, EDF is continuing the consolidation of graphite wastes radiological inventory, and is working on the development of an alternative management solution, based on a thermal treatment process. Depending on the nature of the treatment, and on the choice of operating parameters, this treatment may contribute to reduce graphite wastes volume and/or promote its acceptance in a disposal facility. Reducing the radiological inventory by decontamination is one of the means to achieve these objectives. Concerning replaced steam generators, nearly 200 of them will have been removed by 2030, and stored on site waiting for their treatment, which represents about 65 000 tons of metal. Initially intended to be cut and packed on NPPs' sites during their dismantling, EDF is studying the economic value of having the steam generators treated in a centralized facility, which allows reducing the volume of final wastes by optimizing cutting operations, while considering recycling after melting. However, this studied pathway implies a number of difficulties to be overcome. In particular, the shipment of such large components to a centralized facility may be complex. Moreover, French regulatory framework does not allow recycling outside nuclear industry, therefore limiting recycling opportunities to storage containers for radioactive wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of mine remediation programmes in developing countries - a life cycle perspective - 15371

This paper analyses some challenges of environmental rehabilitation (ER) projects in developing countries that the authors have encountered over the past two decades in many parts of the world, discusses the reasons and proposes ways to mitigate them. In the life cycle of an ER project, some stages that are particularly decisive for the lasting rehabilitation success are considered here: (1) site characterisation/baseline studies, (2) justification and development of remediation objectives, site end states and a remediation strategy, and (3) the after-care phase. This paper argues that the time available in many ER projects in developing countries using international funding is very often insufficient, and discusses the reasons for some of the most important bottlenecks: (1) time realistically required to produce thorough baseline data and obtain historic site information that are indispensable to develop a robust remediation design, (2) lack of an adequate legal and regulatory framework, overlapping and/or conflicting provisions of national standards and discrepancies with international best practice, (3) unmanaged stakeholder expectations regarding the actual health and environmental risks, justification and prioritisation of remedial actions, and the achievable remediation end state. Insufficient resources for after-care, monitoring and, if required, corrective action is another major issue that, in the experience of the authors, jeopardises the sustainability of remediation success. Consequently by applying the lessons learnt from previous ER projects in developing (and developed) countries and taking them on board during the programming phase of new ER projects, international funding agencies could greatly help to avoid these obstacles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Immediate Dismantling of a Large Fleet of LWR NPPs: Consequences for Spent Fuel and Waste Management - 16027

The experience feedback shows that the complete dismantling of one Light Water Reactor (LWR) unit is an activity now globally well under control (reactor pressure vessel and its internals removal and cutting included). However some specific industrial difficulties may arise in view of the dismantling of numerous LWR units simultaneously. Indeed more than 300 LWR units are currently operated worldwide, which have been commissioned these last 50 years. So in some countries, many units may be permanently shut down over a period of few years in the next decades. Such a situation addresses the issue of the overall management of large quantities of spent nuclear fuel (SNF) and decommissioning waste for the concerned units. For example, in France, the legislative and regulatory framework for the nuclear facilities favors their dismantling 'as soon as possible' after their permanent shutdown which implies as well to limit the duration of the transition period from operation to decommissioning. Furthermore 58 LWR units have been commissioned between 1977 and 1999 in France - on average more than 2 units per year. In this context, the operator (Electricite de France - EDF) plans to remove quickly the SNF then to perform dismantling actions immediately after the permanent shutdown of the LWR units. One issue is to remove the SNF from all the relevant units, even if this removal is simultaneous in many units (permanently shut down or still under operation). Similar issue has to be taken into account regarding the management of the radioactive waste (RW) produced by the dismantling and clean-up actions, notably the RW that cannot be disposed of in a near surface repository. One method followed by the French technical support organization (Institut de Radioprotection et de Surete Nucleaire - IRSN) to analyze these issues is the use of estimates of flows of SNF and RW. These estimates are based notably on a phasing-scenario and a planning template defined for the decommissioning of the units of one nuclear power plant (NPP) and coupled to an overall schedule for phase out all the units of the fleet. The estimates relative to the next decades can be compared to the current experience feedback of flows of SNF and RW for units under operation, in order to identify risks when facing decommissioning. The risks highlighted are driven by key parameters (as duration of the main dismantling actions) of the estimates which can be adapted to minimize their impact. On this basis, it is possible to identify the key-factors to dismantle each unit of NPPs and phase out the fleet regarding SNF and RW management. It is noteworthy that this work needs to be done in any case upstream the studies and the implementation of dismantling actions. Finally it can be underlined that another issue is the human resources (staff, skills and knowledge) necessary to perform all the decommissioning actions, but this aspect is not addressed in the present paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Importance of Experience Based Decommissioning Planning - 16242

Decommissioning of a nuclear facility is an extensive and multidisciplinary task which involves the management and technical actions associated with ceasing operation and thereafter the step by step transfer of the facility from an operating plant to an object under decommissioning. The decommissioning phase includes dismantling of systems and components, decontamination and clearance, demolition of buildings, remediation of any contaminated ground and finally a survey of the site. Several of these activities generate radioactive or potentially radioactive waste which has to be managed properly prior to clearance or disposal. What makes decommissioning of nuclear installations unique is to a large extent the radioactive waste management. No other industries have that complex regulatory frameworks for waste management. If a decommissioning project in the nuclear industry does not consider the waste aspects to the extent required, there is a large risk of failure causing a reduced trust by the regulators and other stakeholders as well as cost and schedule overruns. This paper will give an overview of important aspects and findings gathered during decades of planning and conducting decommissioning and nuclear facility modernization projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low- and Intermediate-Active Waste Management in the Federal Republic of Germany - 16567

Waste with negligible heat generation (low- and intermediate-active waste) generated in Germany is to be emplaced in the Konrad repository. As the start of operation of the Konrad repository is expected in 2022, regulations have been developed that allow a longer storage period while keeping the same high level of safety. The guidelines for the storage of radioactive waste with negligible heat-generation have become part of the regulatory framework and its enforcement is thoroughly guided by the responsible Federal Ministry. Radioactive waste generated during the operation or the decommissioning of nuclear power plants and nuclear fuel cycle facilities has to be stored by the operator until the Konrad repository is available. In contrast, radioactive waste generated from other industrial, medical and research applications including spent nuclear sources, initially has to be delivered to a Land collecting facility and has to be registered, treated and stored there. The Land collecting facilities will deliver the resulting waste packages to the disposal facility as of 2022. While the operation of the Land Collecting Facilities is a task of the responsible Laender authorities, the operation of the repository Konrad is a federal task. The interaction of the involved different parties will be described. This paper will focus on the management of low- and intermediate-active waste. It will give an insight to the expected amounts and different kinds of waste streams. The different concepts for collecting and qualification procedures for waste packages depending on the origin of the waste will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of criticality safety validation guidance for NRC-regulated activities

Some guidance documents support validation of criticality safety evaluations for many system types, and some accommodate different regulators or regulatory requirements. While these reports address specific applications, no single document applies to all systems and incorporates both traditional and sensitivity/uncertainty-based validation techniques. Oak Ridge National Laboratory will develop a single reference report for the US Nuclear Regulatory Commission (NRC) that provides modern examples and suggested recommendations for a uniform approach for performing and documenting k{sub eff} calculation validations applicable to any system containing fissile material. The project will include a literature review and development of a new, comprehensive NUREG/CR document on nuclear criticality safety validation. The NUREG will address the following experiences from recent reviews: 1) Inappropriate critical experiment selection; 2) Insufficient trending analysis; 3) Incorrectly calculated 95/95 uncertainties; 4) Failure to address how validation applies to safety analysis; 5) Lack of goodness-of-fit testing in trending analyses; 6) Incorrect use of commercial reactor critical data; 7) Failure to meet bias determination methodology prerequisites; 8) Inappropriate extrapolation of bias and uncertainty; 9) Failure to identify validation analysis gaps and weaknesses; and 10) Inadequate validation analysis documentation. The final report will provide guidance on use of trending analysis results, acceptable confidence levels for normality testing and trending analysis, management of validation analysis gaps and weaknesses, use of sensitivity and uncertainty analysis in validation analysis, and potential impact of correlations among critical experiments used in validation. It will also consolidate existing guidance documents using both traditional and sensitivity/uncertainty-based approaches. This document will support NRC-regulated activities, as well as validation used in criticality safety within other regulatory frameworks. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Post-Fukushima Safety Enhancement Activities in Canada

In the immediate aftermath of the common-cause seismic and tsunami events that triggered the Fukushima Daiichi nuclear accident on March 11, 2011, the nuclear regulator, the Canadian Nuclear Safety Commission (CNSC), requested that all Cass I nuclear facilities re-examine the safety cases for their nuclear facilities. Lessons-learned task forces were established by the CNSC, and the nuclear utilities, Ontario Power Generation (OPG), Bruce Power (BP), and New Brunswick Power (NBP). The purposes of these independent task forces was to develop relevant lessons learned issues for the Candu nuclear power plants operating in Canada and to identify actions that could enhance safety. Subsequently, a CNSC Integrated Action Plan was developed to address the recommendations arising from the CNSC Task Force Report, and the licensees aligned their actions with this plan. The actions were grouped into four categories, as follows. 1. Strengthening defence in depth; Actions included re-assessment of a site-specific external hazards using PSA; physical plant changes to add further cooling water make-up capability to heat sinks; development of new Canadian standards and updated regulatory documents that address requirements for Beyond Design Basis Accidents (BDBA), Probabilistic Safety Assessment (PSA) and Period Safety Review (PSR); development of a new and novel methodology for assessing multi-unit risk that is consistent with the IAEA construct of defence-in-depth (including a safety goal hierarchy and complementary risk analysis methods that address 'Black Swan' events); enhanced management of hydrogen combustion challenges; and enhanced Severe Accident Management Guidelines (SAMG). 2. Enhancing emergency response; Actions included provision of Emergency Mitigation Equipment (EME) such as transportable diesel-driven pumps or fire engines, transportable diesel generators for AC and instrument power; pre-installed connections to in-plant equipment via easily accessible and protected quick-connect points for water and electrical power; upgraded emergency response centres; enhanced communication systems and protocols; and enhanced emergency response programs, training and exercises. 3. Improving the regulatory framework and processes; 4. Enhancing international collaboration. Actions assigned under categories 3 and 4 were placed upon the regulator. This presentation will focus on the assigned actions in categories 1 and 2. The underlying motivation, objectives, and safety benefits associated with the actions will be described within the context of broader aspects of severe accident mitigation in water-cooled reactors. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Advances for Sustainable Remediation: In Situ Monitoring and Climate Resiliency - 18436

Recent advances in sustainable remediation techniques show promise as solutions for contaminant removal in soil and groundwater media. Although passive remediation (or natural attenuation) has gained momentum as an acceptable technique, there are still challenges in regulatory frameworks as well as in public acceptance. Leaving contaminants in subsurface requires increased burden of proof to show that plumes are stable and residual contaminants do not pose a significant health risk. Climate changes and frequent extreme climate events contribute another level of complexity and make it difficult to demonstrate system stability and predict future plume conditions. In this study, we show two coupled approaches to tackle this challenge: (1) in situ groundwater monitoring based on advanced sensor and data analytics technologies (i.e., Big Data), and (2) state-of-art modeling for optimizing monitoring and site closure strategies. In the new monitoring approach, in situ sensors are used to continuously measure the key variables that control contaminant plume mobility and its spatial and temporal distribution (such as pH, redox potential, electrical conductivity, and groundwater level). Coupled with a limited number of groundwater sampling, the data analytics methods - data mining and machine learning - allow us to estimate contaminant concentrations, and also to detect any significant changes associated with the plume mobility. In parallel, the state-of-art numerical flow and reactive transport model - ASCEM software under DOE Office of Environmental Management - provides a physical and mechanistic understanding of the system behavior, and predicts the long-term plume migration for optimizing the monitoring and closure strategies. In particular, we focus on the effects of extreme precipitation or drought on the site closure as well as monitoring strategies. We demonstrate this approach at the Savannah River Site (SRS) F-Area, where groundwater is contaminated by various radionuclides, including uranium, tritium and technetium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evidence-Based Critique of U.S. Nuclear Waste Policy Using Data from Reactor and Cyclotron Sites - 18568

Concrete at nuclear facilities becomes radioactive when it is exposed to a neutron flux, and when such facilities are vacated, decommissioning activities are enacted to make the site safe for reuse. These activities generate wastes that the public expects to be managed in their best interest. This paper provides side-by-side comparisons of concrete bio-shielding encountered at typical reactor and cyclotron decommissioning projects. Three sites are considered, and results from characterization samples are used to demonstrate that the wastes generated by such sites are similar in terms of content and risk. First, the dose potential represented by each waste is determined from mass-based radioactivity concentration with the RESRAD-BUILD computer code. The resulting doses are translated into population-risk estimates by applying dose-response predictions from the National Academy of Sciences' 2006 BEIR VII report. In terms of possible adverse health outcomes, the risk of solid cancer or leukemia associated with the wastes this paper examines is 8 to 50 extra cases per 100,000 persons. The regulatory framework applicable to each site is also reviewed, and the waste management strategies used at each site are contrasted. This paper demonstrates that the wastes it examines are virtually indistinguishable. Contrary to this finding, the wastes are regulated, managed, and disposed in very different manners according to current U.S. nuclear waste policy. The value of this paper is that the side-by-side comparisons it presents provides an opportunity to examine the risk-benefit of existing policies in terms of the benefits or disparities they represent. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small Modular Reactors in Canada: Planning for Waste from the Outset - 19254

Canada is exploring the potential for on- and off-grid applications for small modular reactors (SMRs). SMRs are at an early stage of development and a road-mapping process was launched in Canada in February 2018 to better understand the views on priorities and challenges related to the possible development and deployment of SMRs. In addition to engaging partners, stakeholders and Indigenous representatives through workshops, a number of working groups were formed to advise the Road-map Secretariat on topics such as understanding the value proposition of different SMR technologies, matters associated with regulatory readiness, and issues related to waste management and transportation. The Waste Working Group (Waste WG) brought together experts from current nuclear waste generators, the organization responsible for managing Canada's nuclear fuel waste, government, and the regulator to identify waste disposal and storage considerations for Canadian SMR applications, including an analysis of waste streams, waste transportation, short and long-term disposal and storage requirements, and decommissioning considerations. Radioactive waste has been safely managed within a regulatory framework in Canada for decades. Technologies for waste storage and transport exist and also have been in use for decades, and therefore provide a technical basis to explore any specific differences that would apply to waste streams resulting from the construction, operation and decommissioning of SMRs. The Waste WG concluded that a disposal path for SMR used fuel exists through the Nuclear Waste Management Organisation's (NWMO) Adaptive Phased Management (APM) approach, but that R and D work is needed to demonstrate that SMR waste can meet the acceptance criteria. The Waste WG noted that although projects are progressing to realize disposal facilities for the two largest producers of low and intermediate level waste, small producers including potential SMR operators currently have no defined path to disposal for low and intermediate level waste. The Waste WG also highlighted that there could be potential logistical challenges with the transportation of irradiated reactor cores, in particular for remote locations, which will need to be explored. The Waste WG recognized that some uncertainties remain, and early and open communication and coordination between the SMR developers and the NWMO, and potential waste receivers will be key to ensuring a robust framework for SMR waste management from the outset in Canada. This paper explores the results of the analysis and the key findings, high-level recommendations and actions of the Waste WG. It presents the results of the Waste WG's analysis of waste categories against Canadian SMR technologies that best align to end-user requirements; identification of key gaps in research and development for waste categories; and identification of potential work that could address the key gaps. The Waste WG undertook its work between February and August 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sampling and Analysis Plan for Investigation of Undeclared Nuclear Activities - 20104

The nuclear-centered energy policy in South Korea is moving towards a nuclear-free era. It also facilitates an action or progress on the denuclearization of the Korean peninsula. The Nuclear Safety and Security Commission (NSSC) launched a new R and D project which attempts to verify nuclear activities via analyzing environmental samples. Environmental samples possibly contain significant radiological information relevant to past undeclared activities. In order to precisely verify them, it is essential to provide 1) the concrete information of target facilities, 2) appropriate methodologies and procedures, and 3) well-suited instrumentation and equipment corresponding to sample signatures. It is also important to provide scientific reliability or validity in any process such as sample collection, handling, transportation and laboratory analysis. Therefore, the information of nuclear facilities (fuel fabrication plant, graphite moderated reactor, reprocessing plant) in North Korea are reviewed in order to determine parameters for appropriate sampling methods representing a facility's characteristics. Secondly, a sampling procedure for radioactive elements is being developed based on international and domestic standards such as ASTM (American Society for Testing and Materials), KS (Korean industrial Standards), and International Atomic Energy Agency (IAEA) manuals. The procedure contains some specific information including sampling process, sampling tools, amount of sample, sample identification, and other related information. Developing the qualified national guidelines is most important since sampling and analyzing results can be used as evidences of nuclear activities. The guideline developed through this work will clearly define various methodologies such as document verification, sampling procedures, collection methods, sample storage criteria, chain of custody, and transportation conditions. The final objective of this work is to establish the infrastructure and regulatory framework for assessment of nuclear activities, and provide a national guideline for sampling and analysis. This will bring confidence in the results and play a critical role in complete denuclearization progress in South Korea. (authors)

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Review of the Safety Analyses of the Konrad Repository - 20530

The Bundesgesellschaft fuer Endlagerung (BGE) is the license holder of all geological repository sites in Germany since 2017. Besides the construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository, BGE is responsible to carry out the operative tasks of selecting a site for a high-level waste (HLW) repository. The Konrad repository is Germany's first repository for radioactive waste with negligible heat generation, which was fully licensed under atomic law within the scope of a plan approval procedure from the original application in 1982 until the license was granted in 2002 and finally confirmed by the Federal Administrative Court in 2007. The emplacement of LILW was licensed up to a volume of 303,000 m{sup 3} with a total β/γ-activity of 5 x 10{sup 18} Bq and a total α-activity of 1.5 x 10{sup 17} Bq. Currently, the former iron ore mine Konrad is being converted to a repository and is expected to come into operation in 2027. But what if there is no safety case in place nor a regulatory framework tailored for a change of documents in order to ensure the safety according to the state-of-the-art of science and technology during the evolution of a long-term project such as a geological repository? In this presentation, a review procedure of the safety analyses, that have been the basis of the plan approval decision for the Konrad repository at that time, will be described. Furthermore, the first results of this graduated review procedure for updating the safety analyses will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗