System Engineering & Integration (SE&I) In-Situ Resource Utilization (ISRU) Modeling and Analysis (SIMA)
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
NASA developed a flexible system modeling framework of integrated ISRU and ISRU related subsystem models: MAIT (Mission Analysis & Integration Tool) that enables point solutions, optimization, and/or parametric studies at the system level to predict mission architecture mass, power, and volume and provides accessible consolidated database that categorizes specific ISRU and ISRU related subsystem variables common between NASA & industry. Directly and indirectly addresses multiple STMD shortfalls: - ISRU-581 - ‘ISRU System Modeling’: Establish a modular end-to-end ISRU system modeling & analysis capability by leveraging and evolving prior, on-going, and future investments - More than an ISRU system modeling tool, MAIT integrates power, excavation, Environmental Control & Life Support System (ECLSS), Cryogenic Fluid Management (CFM) liquification, & compares surface ops & environments, to assist in the closure of other related ISRU shortfalls Adheres to governing NASA procedures for Models & Simulations (NASA-HDBK-7009) & AIAA standards for Mass Properties Control for Space Systems.
Version 3.10.5 is a multi-year Decision Support tool for Distributed Generation (DG). DER-CAM was initially created as an exclusively economic energy model, able to find the cost minimizing combination and operation profile of a set of DER technologies that meet heat and electric loads of a single building or microgrid for a typical test year. Now, version 3.10.5.m solves for a multiple-year horizon the technology choice question, the appropriate capacity for each selected technology as well as the operational and investment schedule. Optimized investment decisions are based on techno-economic criteria, along with site information such as energy loads, economic forecast, and technology characterization. Version 3.10.5 contains: 1. a PV and battery degradation model and 2. variable performance for technologies. Efficiency, investment costs, etc. can vary over time and model technology breakthroughs and advancements.
DER-CAM+ v1.0.0 is internally referred to as DER-CAM v5.0.0. Due to fundamental changes from previous versions, a new name (DER-CAM+) will be used for DER-CAM version 5.0.0 and above. DER-CAM+ is a Decision Support Tool for Decentralized Energy Systems that has been tailored for microgrid applications, and now explicitly considers electrical and thermal networks within a microgrid, ancillary services, and operating reserve. DER-CAM was initially created as an exclusively economic energy model, able to find the cost minimizing combination and operation profile of a set of DER technologies that meet energy loads of a building or microgrid for a typical test year. The previous versions of DER-CAM were formulated without modeling the electrical/thermal networks within the microgrid, and hence, used aggregate single-node approaches. Furthermore, they were not able to consider operating reserve constraints, and microgrid revenue streams from participating in ancillary services markets. This new version DER-CAM+ considers these issues by including electrical power flow and thermal flow equations and constraints in the microgrid, revenues from various ancillary services markets, and operating reserve constraints.
The DER-CAM Graphical User Interface has been redesigned to consist of a dynamic tree structure on the left side of the application window to allow users to quickly navigate between different data categories and views. Views can either be tables with model parameters and input data, the optimization results, or a graphical interface to draw circuit topology and visualize investment results. The model parameters and input data consist of tables where values are assigned to specific keys. The aggregation of all model parameters and input data amounts to the data required to build a DER-CAM model, and is passed to the GAMS solver when users initiate the DER-CAM optimization process. Passing data to the GAMS solver relies on the use of a Java server that handles DER-CAM requests, queuing, and results delivery. This component of the DER-CAM GUI can be deployed either locally or remotely, and constitutes an intermediate step between the user data input and manipulation, and the execution of a DER-CAM optimization in the GAMS engine. The results view shows the results of the DER-CAM optimization and distinguishes between a single and a multi-objective process. The single optimization runs the DER-CAM optimization once and presents the results as a combination of summary charts and hourly dispatch profiles. The multi-objective optimization process consists of a sequence of runs initiated by the GUI, including: 1) CO2 minimization, 2) cost minimization, 3) a user defined number of points in-between objectives 1) and 2). The multi-objective results view includes both access to the detailed results of each point generated by the process as well as the generation of a Pareto Frontier graph to illustrate the trade-off between objectives. DER-CAM GUI 2.1.8 also introduces the ability to graphically generate circuit topologies, enabling support to DER-CAM 5.0.0. This feature consists of: 1) The drawing area, where users can manually create nodes and define their properties (e.g. point of common coupling, slack bus, load) and connect them through edges representing either power lines, transformers, or heat pipes, all with user defined characteristics (e.g., length, ampacity, inductance, or heat loss); 2) The tables, which display the user-defined topology in the final numerical form that will be passed to the DER-CAM optimization. Finally, the DER-CAM GUI is also deployed with a database schema that allows users to provide different energy load profiles, solar irradiance profiles, and tariff data, that can be stored locally and later used in any DER-CAM model. However, no real data will be delivered with this version.
Abstract not provided.
A wave model test bed is established to benchmark, test and evaluate spectral wave models and modeling methodologies (i.e., best practices) for predicting the wave energy resource parameters recommended by the International Electrotechnical Commission, IEC TS 62600-101Ed. 1.0 ©2015. Among other benefits, the model test bed can be used to investigate the suitability of different models, specifically what source terms should be included in spectral wave models under different wave climate conditions and for different classes of resource assessment. The overarching goal is to use these investigations to provide industry guidance for model selection and modeling best practices depending on the wave site conditions and desired class of resource assessment. Modeling best practices are reviewed, and limitations and knowledge gaps in predicting wave energy resource parameters are identified.
The Resource Planning Model co-optimizes dispatch and capacity expansion using a simplified, chronological dispatch period representation and high-resolution resource, load and infrastructure data. The computational tractability of capacity expansion models depends on model simplifications. We demonstrate the effects of various dispatch period representations on model results using the Resource Planning Model.
This Core Model Proposal adds fugitive CO2 emissions from coal, crude oil, and natural gas resources to the data system. It also includes an improved method to replace outlier emissions factors for fossil resources. Lastly, it makes some minor changes to the data system and Model Interface headers to fix some inconsistencies in how resource technologies are named in the XMLs.
As managers of agricultural and natural resources are confronted with uncertainties in global change impacts, the complexities associated with the interconnected cycling of nitrogen, carbon, and water present daunting management challenges. Existing models provide detailed information on specific sub-systems (land, air, water, economics, etc). An increasing awareness of the unintended consequences of management decisions resulting from interconnectedness of these sub-systems, however, necessitates coupled regional earth system models (EaSMs). Decision makers’ needs and priorities can be integrated into the model design and development processes to enhance decision-making relevance and "usability" of EaSMs. BioEarth is a current research initiative with a focus on the U.S. Pacific Northwest region that explores the coupling of multiple stand-alone EaSMs to generate usable information for resource decision-making. Direct engagement between model developers and non-academic stakeholders involved in resource and environmental management decisions throughout the model development process is a critical component of this effort. BioEarth utilizes a "bottom-up" approach, upscaling a catchment-scale model to basin and regional scales, as opposed to the "top-down" approach of downscaling global models utilized by most other EaSM efforts. This paper describes the BioEarth initiative and highlights opportunities and challenges associated with coupling multiple stand-alone models to generate usable information for agricultural and natural resource decision-making.
This project seeks to carry out a multifaceted analysis combining buoy observations, machine learning, turbulence, satellite data and high-resolution modeling. Our analyses will investigate air–sea interaction physics governing the variation of the winds with height and influence of clouds, uncertainty in coupled ocean-wave-atmosphere mesoscale models to capture certain key atmospheric phenomenon observed over the U.S. West Coast, impact of climate change, and the fidelity with which resource characterization models describe the range of observed offshore wind conditions. This project will focus its efforts on characterizing and assessing the atmospheric and oceanographic conditions along the U.S. West Coast.
Computer subprogram set permitting use of radiosonde data to provide model atmosphere data for earth resources application
The Resource Planning Model (RPM) is a capacity expansion model designed for regional power systems and high levels of renewable generation. Recent extensions capture value-stacking for storage technologies, including batteries and concentrating solar power with storage. After estimating per-unit capacity value and curtailment reduction potential, RPM co-optimizes investment decisions and reduced-form dispatch, accounting for planning reserves; energy value, including arbitrage and curtailment reduction; and three types of operating reserves. Multiple technology cost scenarios are analyzed to determine level of deployment in the Western Interconnection under various conditions.
As the offshore wind energy industry begins to emerge on the U.S. northeast coast, there is an urgent need for an accurate characterization of the offshore wind resource. The offshore regime features various resource characteristics not seen onshore, including frequent coastal low-level jets, non-steady surface conditions (e.g. waves), complex air-sea and land-sea interactions, and coastal mesoscale circulations (e.g. sea breeze). An accurate characterization of these phenomena in mesoscale models is critical to support accurate energy production estimates and forecasting for future offshore wind farms. However, a robust validation of mesoscale model performance in the offshore U.S. has been limited due to sparse data and difficulty obtaining offshore measurements. Consequently, it is unclear how mesoscale models perform offshore and which suite of parameterizations and input data are best suited for accurate resource characterization. To begin addressing this knowledge gap, the National Renewable Energy Laboratory, in collaboration with the Rutgers Center for Ocean Observing Leadership, conducted a mesoscale model validation campaign in the offshore environment. The Weather Research and Forecasting (WRF) model was assessed and the New Jersey offshore coastal area served as the validation domain. An ensemble of WRF simulations conducted over a one-year period sampled from a range of model setups, including different reanalysis and forecast data inputs, sea surface temperature data inputs, planetary boundary layer parameterizations, and WRF versions. The performance of each ensemble member was validated against a network of observations including offshore floating lidars, coastal met towers, offshore platform measurements, and offshore buoys. Model performance was assessed on annual, seasonal, and diurnal scales with particular emphasis on the vertical wind speed profile and temperature stratification. Preliminary results from this validation work will be presented here. The key WRF inputs and parameters driving changes in the modeled wind resource will be discussed and preliminary recommendations on WRF setups for offshore wind resource modeling will be proposed. The application of this validation exercise to other proposed offshore wind energy areas in the U.S. will also be discussed. mesoscale circulations (e.g. sea breeze). An accurate characterization of these phenomena in mesoscale models is critical to support accurate energy production estimates and forecasting for future offshore wind farms. However, a robust validation of mesoscale model performance in the offshore U.S. has been limited due to sparse data and difficulty obtaining offshore measurements. Consequently, it is unclear how mesoscale models perform offshore and which suite of parameterizations and input data are best suited for accurate resource characterization. To begin addressing this knowledge gap, the National Renewable Energy Laboratory, in collaboration with the Rutgers Center for Ocean Observing Leadership, conducted a mesoscale model validation campaign in the offshore environment. The Weather Research and Forecasting (WRF) model was assessed and the New Jersey offshore coastal area served as the validation domain. An ensemble of WRF simulations conducted over a one-year period sampled from a range of model setups, including different reanalysis and forecast data inputs, sea surface temperature data inputs, planetary boundary layer parameterizations, and WRF versions. The performance of each ensemble member was validated against a network of observations including offshore floating lidars, coastal met towers, offshore platform measurements, and offshore buoys. Model performance was assessed on annual, seasonal, and diurnal scales with particular emphasis on the vertical wind speed profile and temperature stratification. Preliminary results from this validation work will be presented here. The key WRF inputs and parameters driving changes in the modeled wind resource will be discussed and preliminary recommendations on WRF setups for offshore wind resource modeling will be proposed. The application of this validation exercise to other proposed offshore wind energy areas in the U.S. will also be discussed.
Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.
Functional fault models (FFMs) are a directed graph representation of the failure effect propagation paths within a system's physical architecture and are used to support development and real-time diagnostics of complex systems. Verification of these models is required to confirm that the FFMs are correctly built and accurately represent the underlying physical system. However, a manual, comprehensive verification process applied to the FFMs was found to be error prone due to the intensive and customized process necessary to verify each individual component model and to require a burdensome level of resources. To address this problem, automated verification tools have been developed and utilized to mitigate these key pitfalls. This paper discusses the verification of the FFMs and presents the tools that were developed to make the verification process more efficient and effective.
Not Available