Technology Estimating 2: A Process to Determine the Cost and Schedule of Space Technology Research and Development

As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.

Cole, Stuart K.↗

Toward a North American Standard for Mobile Data Services

The rapid introduction of digital mobile communications systems is an important part of the emerging digital communications scene. These developments pose both a potential problem and a challenge. On one hand, these separate market driven developments can result in an uncontrolled mixture of analog and digital links which inhibit data modem services across the mobile/Public Switched network (PSTN). On the other hand, the near coincidence of schedules for development of some of these systems, i.e., Digital Cellular, Mobile Satellite, Land Mobile Radio, and ISDN, provides an opportunity to address interoperability problems by defining interfaces, control, and service standards that are compatible among these new services. In this paper we address the problem of providing data services interoperation between mobile terminals and data devices on the PSTN. The expected data services include G3 Fax, asynchronous data, and the government's STU-3 secure voice system, and future data services such as ISDN. We address a common architecture and a limited set of issues that are key to interoperable mobile data services. We believe that common mobile data standards will both improve the quality of data service and simplify the systems for manufacturers, data users, and service providers.

Dean, Richard A.↗

Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications scheduling.

Short, Nick, Jr.↗

Potential Fifty Percent Reduction in Saturation Diving Decompression Time Using a Combination of Intermittent Recompression and Exercise

Conventional saturation decompression protocols use linear decompression rates that become progressively slower at shallower depths, consistent with free gas phase control vs. dissolved gas elimination kinetics. If decompression is limited by control of free gas phase, linear decompression is an inefficient strategy. The NASA prebreathe reduction program demonstrated that exercise during O2 prebreathe resulted in a 50% reduction (2 h vs. 4 h) in the saturation decompression time from 14.7 to 4.3 psi and a significant reduction in decompression sickness (DCS: 0 vs. 23.7%). Combining exercise with intermittent recompression, which controls gas phase growth and eliminates supersaturation before exercising, may enable more efficient saturation decompression schedules. A tissue bubble dynamics model (TBDM) was used in conjunction with a NASA exercise prebreathe model (NEPM) that relates tissue inert gas exchange rate constants to exercise (ml O2/kg-min), to develop a schedule for decompression from helium saturation at 400 fsw. The models provide significant prediction (p < 0.001) and goodness of fit with 430 cases of DCS in 6437 laboratory dives for TBDM (p = 0.77) and with 22 cases of DCS in 159 altitude exposures for NEPM (p = 0.70). The models have also been used operationally in over 25,000 dives (TBDM) and 40 spacewalks (NEPM). The standard U.S. Navy (USN) linear saturation decompression schedule from saturation at 400 fsw required 114.5 h with a maximum Bubble Growth Index (BGI(sub max)) of 17.5. Decompression using intermittent recompression combined with two 10 min exercise periods (75% VO2 (sub peak)) per day required 54.25 h (BGI(sub max): 14.7). Combined intermittent recompression and exercise resulted in a theoretical 53% (2.5 day) reduction in decompression time and theoretically lower DCS risk compared to the standard USN decompression schedule. These results warrant future decompression trials to evaluate the efficacy of this approach.

Gernhardt, Michael I.↗

Artificial intelligence approaches to astronomical observation scheduling

Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

Johnston, Mark D.↗

RS-25 for the NASA Cargo Launch Vehicle: The Evolution of SSME for Space Exploration

A key element of the National Vision for Space Exploration is the development of a heavy-lift Cargo Launch Vehicle (CaLV). Missions to the Moon, Mars, and beyond are only possible with the logistical capacity of putting large payloads in low-earth orbit. However, beyond simple logistics, there exists the need for this capability to be as cost effective as possible to ensure mission sustainability. An element of the CaLV project is, therefore, the development of the RS-25, which represents the evolution of the proven Space Shuttle Main Engine (SSME) into a high-performance, cost-effective expendable rocket engine. The development of the RS-25 will be built upon the foundation of over one million seconds of accumulated hot-fire time on the SSME. Yet in order to transform the reusable SSME into the more cost-effective, expendable RS-25 changes will have to be made. Thus the project will inevitably strive to maintain a balance between demonstrated heritage products and processes and the utilization of newer technology developments. Towards that end, the Core Stage Engine Office has been established at the NASA Marshall Space Flight Center to initiate the design and development of the RS-25 engine. This paper is being written very early in the formulation phase of the RS-25 project. Therefore the focus of this paper will be to present the scope, challenges, and opportunities for the RS-25 project. Early schedules and development decisions and plans will be explained. For not only must the RS-25 project achieve cost effectiveness through the development of new, evolved components such as a channel-wall nozzle, a new HIP-bonded main combustion chamber, and several others, it must simultaneously develop the means whereby this engine can be manufactured on a scale never envisioned for the SSME. Thus, while the overall project will span the next eight to ten years, there is little doubt that even this schedule is aggressive with a great deal of work to accomplish.

Kynard, Michael H.↗

An Assessment of Alternate Thermal Protection Systems for the Space Shuttle Orbiter: Executive Summary - Volume 1

Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.

Hays, D.↗

NASA activities and plans

An overview is provided of the NASA tracking, data acquisition, communications, and mission control systems and capabilities. These systems include the NASA Spaceflight Tracking and Data Network (STDN) which supports earth-orbital spacecraft, the Deep Space Network (DSN) which supports the planetary exploration and deep space missions, and the Tracking and Data Relay Satellite System (TDRSS) currently under development and scheduled to come into service in 1983. TDRSS will then displace STDN for support of low earth orbital spacecraft. A description is presented of the current status of the considered systems, and plans are discussed for future developments and new capabilities.

Smylie, R. E.↗

A Decision-Theoretic Approach to Autonomous Planetary Rover Control

The report discusses the: Decentralized Control of Markov Decision Processes. Study the complexity of decentralized control of Markov decision processes, and develop algorithms for finding optimal control policies. Scheduling Contract Algorithms. Develop an optimal method for scheduling runs of a contract anytime algorithm (one that takes the deadline as input) in situations where the deadline is unknown, multiple problem instances must be solved, and a multi-processor machine is available. Planetary Rover Control as a Markov Decision Process.Use the Markov decision process framework to formalize and solve problems in planetary rover control. Adaptive Peer Selection. Use reinforcement learning to maximize the expected down-load speed for a client in a peer-to-peer file sharing system.

Zilberstein, Shlomo↗

Timeline-Based Space Operations Scheduling with External Constraints

We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.

Chien, Steve↗

Control means for a gas turbine engine

A means is provided for developing a signal representative of the actual compressor casing temperature, a second signal representative of compressor inlet gas temperature, and a third signal representative of compressor speed. Another means is provided for receiving the gas temperature and compressor speed signals and developing a schedule output signal which is a representative of a reference casing temperature at which a predetermined compressor blade stabilized clearance is provided. A means is also provided for comparing the actual compressor casing temperature signal and the reference casing temperature signal and developing a clearance control system representative of the difference. The clearance control signal is coupled to a control valve which controls a flow of air to the compressor casing to control the clearance between the compressor blades and the compressor casing. The clearance control signal can be modified to accommodate transient characteristics. Other embodiments are disclosed.

Beitler, R. S.↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

A Scheduling Algorithm Compatible with a Distributed Management of Arrivals in the National Airspace System

The current system used by the FAA to schedule arrivals is the Traffic Based Flow Manager (TBFM). It is a centralized system that gives an operator (airline) no influence over scheduled times of arrival assigned to its flights. Future systems for managing arrival scheduling are proposed as distributed systems. Such a system is called upon to give operators influence to schedule and negotiate resources for their flights, and to resolve other technical challenges, such as eliminating a single point of failure. A distributed system for managing diverse air traffic will need the capability of computing a schedule for the given arriving flights in a way that complies with the operational constraints. This paper contributes an algorithm that computes such a schedule. Although developed as part of an effort toward a distributed system, the algorithm itself is neither inherently distributed nor inherently centralized and can be used in either type of system.

negotiation↗

Scheduling and Operations of the Orbiting Carbon Observatory-3 Mission

This paper describes the development and use of an automated scheduling system for the National Aeronautics and Space Administration’s (NASA) Orbiting Carbon Observatory-3 (OCO-3) Mission. OCO-3 measures atmospheric carbon dioxide from space. Made from the spare instrument built as a backup to the Orbiting Carbon Observatory-2 (OCO-2), OCO-3 extends the rich set of data collected by OCO-2. OCO-3 is outfitted with an agile Pointing Mirror Assembly (PMA) that allows for more detailed types of observations and rapid mode transitions. The mission uses an adaptation of the Compressed Large-scale Activity Scheduling and Planning (CLASP) system for scheduling nominal operations, as well as a separate automated scheduling system developed for scheduling observations for the calibration of the PMA. CLASP is used to schedule the four types of observational modes: Nadir, Glint, Target, and Snapshot Area Map. OCO-3 has a variety of complex mission-specific geometric constraints that were incorporated into CLASP to produce schedules that ensure instrument safety.

Moy, Alan↗

Coal gasification systems engineering and analysis, volume 2

The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

Source record↗

Flight Control Development for the ARH-70 Armed Reconnaissance Helicopter Program

In July 2005, Bell Helicopter won the U.S. Army's Armed Reconnaissance Helicopter competition to produce a replacement for the OH-58 Kiowa Warrior capable of performing the armed reconnaissance mission. To meet the U.S. Army requirement that the ARH-70A have Level 1 handling qualities for the scout rotorcraft mission task elements defined by ADS-33E-PRF, Bell equipped the aircraft with their generic automatic flight control system (AFCS). Under the constraints of the tight ARH-70A schedule, the development team used modem parameter identification and control law optimization techniques to optimize the AFCS gains to simultaneously meet multiple handling qualities design criteria. This paper will show how linear modeling, control law optimization, and simulation have been used to produce a Level 1 scout rotorcraft for the U.S. Army, while minimizing the amount of flight testing required for AFCS development and handling qualities evaluation of the ARH-70A.

Christensen, Kevin T.↗