Search NASA⌕ Search

SEARCH · Search NASA

Results for “scientific exploration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

In-Flight Operation of the Dawn Ion Propulsion System Through Orbit Capture at Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta -II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. Onboard the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the ?V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The first 80 days after launch were dedicated to the initial checkout of the spacecraft which was followed by about ten months of full-power thrusting leading to a Mars gravity assist in February 2009 that provided 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. Deterministic thrusting for heliocentric transfer to Vesta resumed in June 2009 and was concluded with orbit capture at Vesta in July 2011. IPS was operated for approximately 23,400 hours, consumed approximately 250 kg of xenon, and provided a delta-V of approximately 6.7 km/s to achieve orbit capture at Vesta. IPS performance characteristics are very close to the expected performance characteristics based on analysis performed pre-launch. The only significant problem to have occurred over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in DCIU-1, resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture indicates DCIU-1 is completely operational. After about three weeks of survey operations IPS will be used to maneuver the spacecraft as needed for science operations including orbit transfers. After approximately one year of science operations IPS will then be used for escape from Vesta and begin thrusting for cruise to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through orbit capture and the start of science operations at Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

The Icebreaker Mission to Search for Life on Mars

The search for evidence of life on Mars is the ultimate motivation for its scientific exploration. The results from the Phoenix mission indicate that the high N. latitude ice-rich regolith at low elevations is likely to be a recently habitable place on Mars [Stoker et al., 2010]. The near-surface ice likely provided adequate water activity during periods of high obliquity, 3 to 10 Myr ago. Carbon dioxide and nitrogen are present in the atmosphere, and nitrates may be present in the soil. Together with iron in basaltic rocks and perchlorate in the soil they provide carbon and energy sources, and oxidative power to drive metabolism. Furthermore, the presence of organics is possible, as thermally reactive perchlorate would have prevented their detection by Viking and Phoenix. The Mars Icebreaker Life mission [McKay et al., 2013] focuses on the following science goals: (1) Search for biomolecular evidence of life; (2) Search for organic matter from either exogeneous or endogeneous sources using methods that are not effected by the presence of perchlorate; (3) Characterize oxidative species that produced reactivity of soils seen by Viking; and 4) Assess the habitability of the ice bearing soils. The Icebreaker Life payload (Figure 1) includes a 1-m rotary percussive drill that brings cuttings samples to the surface where they are delivered to three instruments (Fig. 1), the Signs of Life Detector (SOLID) [Parro et al., 2011] for biomolecular analysis, Laser Desorption Mass Spectrometer (LDMS) [??? 2015]) for broad spectrum organic analysis, and Wet Chemistry Laboratory (WCL) [Hecht et al., 2009] for detecting soluble species of nutrients and reactive oxidants. The Icebreaker payload fits on the Phoenix spacecraft and can land at the well-characterized Phoe-nix landing site in 2020 in a Discovery-class mission.

Carbon dioxide and nitrogen↗

T-38 Primary Flight Display Prototyping and HIVE Support Abstract & Summary

This fall I worked in EV3 within NASA's Johnson Space Center in The HIVE (Human Integrated Vehicles & Environments). The HIVE is responsible for human in the loop testing, getting new technologies in front of astronauts, operators, and users early in the development cycle to make the interfaces more human friendly. Some projects the HIVE is working on includes user interfaces for future spacecraft, wearables to alert astronauts about important information, and test beds to simulate mock missions. During my internship I created a prototype for T-38 aircraft displays using LabVIEW, learned how to use microcontrollers, and helped out with other small tasks in the HIVE. The purpose of developing a prototype for T-38 Displays in LabVIEW is to analyze functions of the display such as navigation in a cost and time effective manner. The LabVIEW prototypes allow Ellington Field AOD to easily make adjustments to the display before hardcoding the final product. LabVIEW was used to create a user interface for simulation almost identical to the real aircraft display. Goals to begin the T-38 PFD (Primary Flight Display) prototype included creating a T-38 PFD hardware display in a software environment, designing navigation for the menu's, incorporating vertical and horizontal navigation bars, and to add a heading bug for compass controls connected to the HSI (Horizontal Situation Indicator). To get started with the project, measurements of the entire display were taken. This enabled an accurate model of the hardware display to be created. Navigation of menu's required some exploration of different buttons on the display. The T-38 simulator and aircraft were used for examining the display. After one piece of the prototype was finished, another trip of to the simulator took place. This was done until all goals for the prototype were complete. Some possible integration ideas for displays in the near future are autopilot selection, touch screen displays, and crew member preferences. Complete navigation, control, and function customization will be achievable once a display is fully developed. Other than the T-38 prototyping, I spent time learning how to design small circuits and write code for them to function. This was done by adding electronic circuit components to breadboard and microcontroller then writing code to speak to those components through the microcontroller. I went through an Arduino starter kit to build circuits and code software that allowed the hardware to act. This work was planned to assist in a lighting project this fall but another solution was discovered for the lighting project. Other tasks that I assisted with, included hands on work such as mock-up construction/removal, logic analyzer repairs, and soldering with circuits. The unique opportunity to be involved work with NASA has significantly changed my educational and career goals. This opportunity has only opened the door to my career with engineering. I have learned over the span of this internship that I am fascinated by the type of work that NASA does. My desire to work in the aerospace industry has increased immensely. I hope to return to NASA to be more involved in the advancement of science, engineering, and spaceflight. My interests for my future education and career lie in NASA’s work - pioneering the future in space exploration, scientific discovery and aeronautics research.

Boniface, Andrew↗

In-Flight Operation of the Dawn Ion Propulsion System Through Year Two of Cruise to Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total (Delta)V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits.

Garner, Charles E.↗

Automation of Flight Software Regression Testing

NASA is developing the Space Launch System (SLS) to be a heavy lift launch vehicle supporting human and scientific exploration beyond earth orbit. SLS will have a common core stage, an upper stage, and different permutations of boosters and fairings to perform various crewed or cargo missions. Marshall Space Flight Center (MSFC) is writing the Flight Software (FSW) that will operate the SLS launch vehicle. The FSW is developed in an incremental manner based on "Agile" software techniques. As the FSW is incrementally developed, testing the functionality of the code needs to be performed continually to ensure that the integrity of the software is maintained. Manually testing the functionality on an ever-growing set of requirements and features is not an efficient solution and therefore needs to be done automatically to ensure testing is comprehensive. To support test automation, a framework for a regression test harness has been developed and used on SLS FSW. The test harness provides a modular design approach that can compile or read in the required information specified by the developer of the test. The modularity provides independence between groups of tests and the ability to add and remove tests without disturbing others. This provides the SLS FSW team a time saving feature that is essential to meeting SLS Program technical and programmatic requirements. During development of SLS FSW, this technique has proved to be a useful tool to ensure all requirements have been tested, and that desired functionality is maintained, as changes occur. It also provides a mechanism for developers to check functionality of the code that they have developed. With this system, automation of regression testing is accomplished through a scheduling tool and/or commit hooks. Key advantages of this test harness capability includes execution support for multiple independent test cases, the ability for developers to specify precisely what they are testing and how, the ability to add automation, and the ability of the harness and cases to be executed continually. This test concept is an approach that can be adapted to support other projects.

Tashakkor, Scott B.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

Giovanni - The Bridge Between Data and Science

This article describes new features in the Geospatial Interactive Online Visualization ANd aNalysis Infrastructure (Giovanni), a user-friendly online tool that enables visualization, analysis, and assessment of NASA Earth science data sets without downloading data and software. Since the satellite era began, data collected from Earth-observing satellites have been widely used in research and applications; however, using satellite-based data sets can still be a challenge to many. To facilitate data access and evaluation, as well as scientific exploration and discovery, the NASA Goddard Earth Sciences (GES) Data and Information Services Center (DISC) has developed Giovanni for a wide range of users around the world. This article describes the latest capabilities of Giovanni with examples, and discusses future plans for this innovative system.

GPM↗

NASA GES DISC Earth Science Data Support

It is the NASA Goddard Earth Sciences (GES) Data and Information Services Center (DISC) mission statement to facilitate data access and evaluation, as well as scientific exploration and discovery. Recently, GES DISC has been evolving and improving our data management and services in order to promote GES DISC data to be easily discovered, improve usage and made more interoperable with common tools. As a result, we will present a brief review of our recent data services at the GES DISC including our new science-data driven website, subsetting and resampling services across multitude of satellite processing levels, visualization services, and how we utilize social media tools to interact with user communities.

data support↗

The O/OREOS Mission - Astrobiology in Low Earth Orbit

The O/OREOS (Organism/Organic Exposure to Orbital Stresses) nanosatellite is the first science demonstration spacecraft and flight mission of the NASA Astrobiology Small- Payloads Program (ASP). O/OREOS was launched successfully on November 19, 2010, to a high-inclination (72°), 650-km Earth orbit aboard a US Air Force Minotaur IV rocket from Kodiak, Alaska. O/OREOS consists of 3 conjoined cubesat (each 1000 cu.cm) modules: (i) a control bus, (ii) the Space Environment Survivability of Living Organisms (SESLO) experiment, and (iii) the Space Environment Viability of Organics (SEVO) experiment. Among the innovative aspects of the O/OREOS mission are a real-time analysis of the photostability of organics and biomarkers and the collection of data on the survival and metabolic activity for micro-organisms at 3 times during the 6-month mission. We will report on the spacecraft characteristics, payload capabilities and first operational phase of the O/OREOS mission. The science and technology rationale of O/OREOS supports NASA’s scientific exploration program by investigating the local space environment as well as space biology relevant to Moon and Mars missions. It also serves as precursor for experiments on small satellites, the International Space Station (ISS), future free-flyers and lunar surface exposure facilities.

Ehrenfreund, P.↗

The O/OREOS Mission - Astrobiology in Low Earth Orbit

The O/OREOS (Organism/Organic Exposure to Orbital Stresses) nanosatellite is the first science demonstration spacecraft and flight mission of the NASA Astrobiology Small- Payloads Program (ASP). O/OREOS was launched successfully on November 19, 2010, to a high-inclination (72°), 650-km Earth orbit aboard a US Air Force Minotaur IV rocket from Kodiak, Alaska. O/OREOS consists of 3 conjoined cubesat (each 1000 cu.cm) modules: (i) a control bus, (ii) the Space Environment Survivability of Living Organisms (SESLO) experiment, and (iii) the Space Environment Viability of Organics (SEVO) experiment. Among the innovative aspects of the O/OREOS mission are a real-time analysis of the photostability of organics and biomarkers and the collection of data on the survival and metabolic activity for micro-organisms at 3 times during the 6-month mission. We will report on the spacecraft characteristics, payload capabilities and first operational phase of the O/OREOS mission. The science and technology rationale of O/OREOS supports NASA’s scientific exploration program by investigating the local space environment as well as space biology relevant to Moon and Mars missions. It also serves as precursor for experiments on small satellites, the International Space Station (ISS), future free-flyers and lunar surface exposure facilities.

Ehrenfreund, P.↗

Milli-Arcsecond (MAS) Imaging with SmallSat Enabled Super-resolution

The objective of this project is to demonstrate a new imaging technology with unprecedented capabilities for scientific exploration. This technology innovation will enable extremely high-resolution imaging capability, otherwise unattainable with conventional approaches. It is based on a unique combination of novel diffractive optical sensing (photon sieve), advanced image processing, and small satellite formation flying. The spatial resolution of current solar instruments are more than 100 times coarser than the size of energy dissipation features in coronal heating (<100 km) since conventional optics cannot be figured to near diffraction-limited accuracy at extreme ultraviolet (EUV) wavelengths. This project will demonstrate the feasibility of imaging of a few milli-arcseconds (MAS) to study the structure and development of these dissipation regions.

Farzad Kamalabadi↗

New Technologies for Cost-Effective High-Performance Remote Sensing from Space

Scientific exploration of the Solar System, astrophysics discoveries, and earth observations for weather and environment have had a profound effect on our understanding of the Universe. Modern sensors, propulsion, materials technology, planetary and astrophysics missions are briefly discussed, tracing the history of the applications of technology to space science missions in a few areas.

Technology↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Progress Towards Prolonged Deployment of SiC JFET-R ICs Into Previously Inaccessible Hostile Environments

This invited presentation describes demonstration of semiconductor integrated circuits (ICs) and ceramic packaging that are arguably the most environmentally durable transistor electronics ever demonstrated. SiC junction field effect transistor-resistor (JFET-R) ICs with two-level interconnect have successfully operated for over 1 year in 500 °C air-ambient [1], 60 days in 460 °C and 9.3 MPa pressure caustic Venus surface environment test chamber [2], and radiation exposure through 7 Mrad(Si) total ionizing dose (TID) and 86 MeV-cm2/mg heavy ion strikes [3]. Furthermore, these ICs have also demonstrated operation from -190 °C to +812 °C (over 1000 °C T-span) without significant change in signal (input /output) or power supply voltages [4]. With modest adjustments, the SiC JFET-R fabrication process is compatible with semiconductor mass-production tools and materials. As an initial step towards this end, the processing that forms the SiC JFETs and resistors (without interconnect) for the NASA Glenn “Generation 12” design prototype JFET-R ICs was conducted at GE Research. Once the COVID-delayed IC interconnect and bond pad fabrication processing on these wafers is completed at NASA Glenn, the resulting chips will be packaged and oven-tested [5]. It is expected that further technology transfer to complete commercial production will lower investment and risk barriers to useful application deployment. For NASA, an initial high-value deployment is opening the Venus surface to extended missions for robotic scientific exploration.

Silicon Carbide↗

Towards Erecting Straighter Lightweight Towers on the Moon Using Deployable Guy Wires

This paper reports our static stability test findings for a simple guy wire system to correct the natural lateral deflections of an 8.5m tall, compact deployable composite tower intended to support exploration of lunar permanently shadowed regions by nearby robotic assets. Deployable composite booms with microgravity flight heritage are currently being investigated at NASA Langley Research Center (LaRC) and Massachusetts Institute of Technology(MIT)’s Space Resources Workshop for their potential to be vertically deployed in the lunar gravity field, in support of NASA’s Artemis campaign. These applications include vertical solar arrays and the provision of elevated lines-of-sight to science or engineering payloads on landers and rovers, in support of nearby or distant crewed or robotic assets exploring scientifically interesting and hard to reach areas. Useful elevated payloads include radio repeaters, remote sensing and imaging, navigation and power beaming systems. However, while these lightweight booms have an excellent height to mass ratio, they typically exhibit slight axial curvature upon deployment resulting in appreciable lateral dead-load deflection of the tip mass relative to the tower base. This static deflection increases with tower height and tip mass, not only constraining the value delivered by the tower but also endangering its integrity. To develop a competitive, lightweight deployable composite boom tower, a capability to correct static deflections during and after deployment may be required. This paper presents a pathfinder deployable guy wire stability system for the MIT / LaRC self-erecting composite boom lunar tower that provides real time measurements, maintains tension passively, and can serve as a reconfigurable platform to test new guy wire components, configurations and control algorithms. Using a validated, calibrated photogrammetry system, the natural lateral deflection of the boom tip relative to the boom base at different deployed heights in Earth’s gravity field was recorded. With real-time tension measurements it was found that guy wires can significantly reduce the tip deflection of a deployable composite boom under dead load. Specifically, we found that (1) control capability is greatest where it is needed most, i.e. for the lever arm closest to being opposite the direction of deflection, and (2) for a tower height of at least 8.5 m and arm length of at least 60 cm, a solution of differential tension in all three arms exists and, in principle, provides sufficient control capability to correct or significantly reduce boom deflections. We also found that natural deflections occur almost entirely out-of-plane of the seams of the boom cross-section, which was expected, and that the natural boom tip lateral deflection under dead load upon deployment was ~5% of boom deployed length, unexpectedly exceeding the manufacturing acceptance specification of 1%.Ongoing and future collaborative work between LaRC and MIT includes the further investigation of the unexpected lateral deflection, testing of alternative guy wire system designs at higher tensions and higher deployed heights, as well as trade studies of costs and benefits of an optimized integrated guywire system compared to other types of static stability solutions.

lunar towers↗