Search NASA⌕ Search

SEARCH · Search NASA

Results for “service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Mission Design Strategies for Rendezvous and Servicing of Sun-Earth Libration Point Missions

With the launch of the James Webb Space Telescope (JWST) and future launches of the Roman Space Telescope (RST) and larger telescopes such as the proposed Habitable Worlds Observatory (HWO), the questions of where and how to rendezvous to enable servicing of these telescope missions arise. To aid in determining the allowable locations to rendezvous for servicing from a trajectory design approach, our previous research and analysis has shown feasible transfer trajectories between the Sun-Earth Libration L2 region (Quasi-Halo orbit) and the Earth Moon vicinity (Distant Retrograde Orbit (DRO), Quasi-Halo Orbit, Halo Orbit, and Near Rectilinear Halo Orbit (NRHO)), along with the related transfer constraints and the corresponding total fuel mass costs. We now focus on operational-like optimal scenarios for these transfers to complete a rendezvous to permit servicing at various Libration orbit locations. In this paper, we address how operational navigation and maneuver execution uncertainties impact the rendezvous timing and fuel mass (via ΔV). While optimization techniques are applied to ensure minimal ΔVs, we also analyze various transfer trajectory durations and rendezvous arrival geometries. The analysis presented includes dynamical system approaches and applies optimization through several tools including the Adaptive Trajectory Design (ATD) module as an initial guess, numerical computation using the General Mission Analysis Tool (GMAT) and Systems Tool Kit (STK) with higher fidelity perturbation modeling, and recently developed optimization tools that incorporate dynamical systems directly into the optimization process. Transfer trajectory options examined include a direct transfer from Earth versus departures from the previously examined Earth-Moon regime orbits, e.g. NRHOs and DROs. A return from Sun-Earth to lunar vicinity for a complete servicing after a rendezvous in Sun-Earth orbit is also considered. The resultant ΔV’s for each scenario is provided with discussions on various transfer trades, rendezvous considerations, and orbital limitations from the dynamical systems. A Poincare-like mapping of trajectory and rendezvous conditions categorize feasible and optimum transfer approaches, dependent on Sun-Earth orbit mission parameters. The focus of this research addresses questions for upcoming trades regarding servicing options for current and future Sun-Earth L1 and L2 missions. By doing a comprehensive analysis approach (dynamical systems + high fidelity optimization with true operational constraints), this paper will serve as a guide for mission architecture and operational trade considerations.

Maneuver Design↗

Challenges to Rural Service Transformers on Increased Electric Vehicle Charging Infrastructure

As Electric Vehicle (EV) electric charging demand increases so to does the corresponding load requirements for charging the vehicles. The expansion of power distribution assets is therefore a critical issue to address on whether rural service transformers can handle the increase in EV load demand. Large-scale EV deployment is likely to cause problems in the localized distributions systems bringing challenges such as increased load demand, increased system losses, and additional voltage drops. This paper investigates how rural service transformer resiliency plays an important role in these challenges. EV charging can create new load peaks exceeding the service transformer's rated capacity, thereby accelerating equipment aging. EV charging can also both positively and negatively affect transformer aging. The core purpose of this paper is to investigate that change in service life of rural service transformers.

Mukherjee, Srijib↗

Temporal mismatches in flight activity patterns between Pipistrellus kuhlii and Prays oleae in olive farms: Implications for biocontrol services potential

Abstract Biocontrol services are widely recognized to provide key incentives for bat conservation. However, we have virtually no information on whether and how disruptions in bat‐mediated biocontrol services are driven by mismatches between the temporal activity patterns of insectivorous bats and insect pests. We investigated the temporal relationship between the nightly activity patterns of the common pipistrelle bat ( Pipistrellus kuhlii ) and the olive fruit moth ( Prays oleae ). Temporal mismatches between species pairs were estimated as the time difference (expressed as a percentage of the night) at which P. kuhlii and P. oleae reached 50% of their abundance. The study was carried out during spring, summer, and fall between 2017 and 2019 in 60 olive farms representing increasing levels of structural simplification (as a surrogate of agricultural intensification). Olive farms were classified as exhibiting high (i.e. HIGH olive farms; n = 27), intermediate (MID; n = 18), and low (LOW; n = 15) structural complexity. Temporal mismatches between the activity levels of P. kuhlii and P. oleae varied between seasons and types of olive farms, being comparatively lower in summer than in spring and fall. Furthermore, summer was the only season in which temporal mismatches between species pairs differed between types of olive farms, with higher temporal mismatches found in LOW than in HIGH and MID olive farms. Overall, our work demonstrates the existence of temporal mismatches between the nightly activity patterns of P. kuhlii and P. oleae . Furthermore, it demonstrates that the structural simplification of olive farms increases temporal mismatches between species pairs, particularly in summer when bat‐mediated biocontrol services are most needed. Synthesis and applications . Future research should consider mismatches between the temporal activity patterns of insectivorous bats and insect pests. Otherwise, the actual impact of agricultural intensification on bat‐mediated biocontrol services as well as the economic impact of their loss on the agriculture industry might be underestimated. To enhance biocontrol services, we propose increasing the availability of suitable roosting and foraging sites as well as conserving areas of remnant native woodland and scattered hollow‐bearing trees.

Herrera, José M.↗

The effectiveness of flower strips and hedgerows on pest control, pollination services and crop yield: a quantitative synthesis

Floral plantings are promoted to foster ecological intensification of agriculture through provisioning of ecosystem services. However, a comprehensive assessment of the effectiveness of different floral plantings, their characteristics and consequences for crop yield is lacking. Here we quantified the impacts of flower strips and hedgerows on pest control (18 studies) and pollination services (17 studies) in adjacent crops in North America, Europe and New Zealand. Flower strips, but not hedgerows, enhanced pest control services in adjacent fields by 16% on average. However, effects on crop pollination and yield were more variable. Our synthesis identifies several important drivers of variability in effectiveness of plantings: pollination services declined exponentially with distance from plantings, and perennial and older flower strips with higher flowering plant diversity enhanced pollination more effectively. These findings provide promising pathways to optimise floral plantings to more effectively contribute to ecosystem service delivery and ecological intensification of agriculture in the future.

54 ENVIRONMENTAL SCIENCES↗

Supervised extraction of near-complete genomes from metagenomic samples: A new service in PATRIC

Large amounts of metagenomically-derived data are submitted to PATRIC for analysis. In the future, we expect even more jobs submitted to PATRIC will use metagenomic data. One in-demand use case is the extraction of near-complete draft genomes from assembled contigs of metagenomic origin. The PATRIC metagenome binning service utilizes the PATRIC database to furnish a large, diverse set of reference genomes. We provide a new service for supervised extraction and annotation of high-quality, near-complete genomes from metagenomically-derived contigs. Reference genomes are assigned to putative draft genome bins based on the presence of single-copy universal marker roles in the sample, and contigs are sorted into these bins by their similarity to reference genomes in PATRIC. Each set of binned contigs represents a draft genome that will be annotated by RASTtk in PATRIC. A structured-language binning report is provided containing quality measurements and taxonomic information about the contig bins. The PATRIC metagenome binning service emphasizes extraction of high-quality genomes for downstream analysis using other PATRIC tools and services. Due to its supervised nature, the binning service is not appropriate for mining novel or extremely low-coverage genomes from metagenomic samples.

59 BASIC BIOLOGICAL SCIENCES↗

Hierarchical Model-Free Transactive Control of Building Loads to Support Grid Services

Residential buildings consume 4.4 quads of electricity annually, approximately 37% of the total electricity consumption in the United States. This represents a vast resource that can be used for demand management and other ancillary services. This project aims to develop a robust, scalable hierarchical transactional control mechanism incorporating elements of model-free control (MFC) and game theory to harness buildings to provide ancillary services to the grid. This approach is being taken to address the challenges of incorporating traditional transactional control schemes into existing buildings. The challenges include small individual building sizes requiring aggregation of many buildings, unpredictable energy usage that makes model identification difficult, and satisfying the sensitive occupant comfort constraints. In the proposed approach, by separating the control mechanism into two layers above and below the load aggregator, MFC can be used below the aggregator to modulate flexible building loads in response to pricing signals with guaranteed performance. This allows the burden of identifying an accurate model of the system to be shifted to the above-aggregator layer, where fluctuations in individual building usage have less impact on predicted building system behavior. Game theory concepts can then be used to determine pricing curves and control signals among regional aggregators. Managing this control in a game-theoretic approach will allow us to build in financial incentives that increase customer engagement. Additionally, the usage of MFC necessitates less burdensome computational and communication requirements, thus, it is easily deployable on small, embedded devices. In a broader sense, developing a strategy capable of effectively incorporating residential and small commercial buildings will allow greater throughput of existing and emerging grid services in addition to future transactive energy grid management methods. Using MFC within a hierarchical control architecture will allow the shifting of existing forecasting challenges to an aggregate level, where dynamics are slower and more predictable. This will enable a smooth interface between the grid services requests of utilities and the reliable control required by participating buildings. MFC, which supports distributed control architecture, permits a scalable solution that can be deployed to neighborhood-size systems as well as individual buildings. This project focuses on three objectives: (1) developing the mathematical framework, algorithm toolkit, and software toolset of the two-layer transactive control testbed; (2) developing a scalable solution for application over many residential and small-size commercial buildings with sparse distributed communication; and (3) field testing and implementation on hardware of the control strategies developed in the previous two objectives. The research and development activities are focused and designed to be impactful within the relevant 2025 targets timeframe. An open-source control framework for exploiting variability and dispatchability of building loads will be delivered as the outcome of the project. This capability enables greater participation of loads in electricity markets and ancillary services that are both useful for the utility and financially beneficial for building owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Early Warning Signs of a Mental Health Tsunami: A Coordinated Response to Gather Initial Data Insights From Multiple Digital Services Providers

The immediate impact of coronavirus 2019 (COVID-19) on morbidity and mortality has raised the need for accurate and real-time data monitoring and communication. The aim of this study is to document the initial observations from multiple digital services providers during the COVID-19 crisis, especially those related to mental health and well-being. We used email and social media to announce an urgent call for support. Digital mental health services providers (N = 46), financial services providers (N = 4), and other relevant digital data source providers (N = 3) responded with quantitative and/or qualitative data insights. People with lived experience of distress, as service users/consumers, and carers are included as co-authors. This study provides proof-of-concept of the viability for researchers and private companies to work collaboratively toward a common good. Digital services providers reported a diverse range of mental health concerns. A recurring observation is that demand for digital mental health support has risen, and that the nature of this demand has also changed since COVID-19, with an apparent increased presentation of anxiety and loneliness. Following this study, we will continue to work with providers in more in-depth ways to capture follow-up insights at regular time points. We will also onboard new providers to address data representativeness. Looking ahead, we anticipate the need for a rigorous process to interpret insights from an even wider variety of sources in order to monitor and respond to mental health needs.

60 APPLIED LIFE SCIENCES↗

Manned Systems Utilization Analysis. Study 2.1: Space Servicing Pilot Program Study

Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.

Wolfe, R. R.↗

Joint aircraft loading/structure response statistics of time to service crack initiation

A reliability analysis for predicting the statistical distribution of time to fatigue crack initiation for aircraft structures in service is presented. The present analysis utilizes the statistical data of the specimen fatigue tests, the full-scale structure tests, and the statistical dispersion of aircraft service loads. The statistical distribution of the time to fatigue crack initiation of the full-scale structure under laboratory loading spectrum is assumed to be Weibull. The service loads for gust turbulences are modeled as Poisson processes for transport-type aircraft, while the maneuver loads are modeled as compound Poisson processes for fighter and training aircraft. It is found that the statistical distribution of time to fatigue crack initiation for aircraft structures in service is not Weibull and that the prediction on the basis of the Weibull distribution is unconservative, in particular in the early service time.

Yang, J.-N.↗

Flight service evaluation of Kevlar-49/epoxy composite panels in wide-bodied commercial transport aircraft

Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after three years' service, and found to be performing satisfactorily. There are six Kevlar-49 panels on each aircraft, including sandwich and solid laminate wing-body panels, and 150 C service aft engine fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.

Stone, R. H.↗

Communication satellite services for special purpose users

The present study identifies potential satellite services, examines the technology necessary for efficient implementation of these services, and determines minimum service cost versus user network size. The generic satellite services evaluated comprise TV and radio distribution (for retransmission), video teleconferencing (interactive), audio/facsimile teleconferencing (interactive), multiplexed data/voice (point-to-point), and satellite-supported land mobile. Satellite costs are based on extrapolations from ongoing commercial satellite programs. Production methods, new technology, and effect of production quantities on present and future production costs are examined to provide information on earth station equipment cost versus the variable 'buy'. Six different launch vehicles from a Delta 2914 to a dedicated Shuttle and three frequency bands and both broadcast (no eclipse capability) and fixed service satellites are considered to assess the effect of satellite size on cost and performance. It is assumed that the user pays only for his prorata share of the space segment costs.

Wright, D. L.↗

Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after five years' service. There are six Kevlar-49 panels on each aircraft: a left-hand and right-hand set of a wing-body sandwich fairing; a solid laminate under-wing fillet panel; and a 150 C (300 F) service aft engine fairing. The fairings have accumulated a total of 40,534 hours, with one ship set having 16,091 hours service as of Feb. 11, 1979. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.

Stone, R. H.↗

The value of improved telecommunications service to hospitals: A preliminary assessment

In view of the rapid rate of development of domestic telecommunication services and the emphasis on private networks, it was sought to determine if hospitals had major requirements which could be aggregated and served by such networks. The value of the information transfer services judged to be most promising over the next twenty years was evaluated, based on expenditures and activity levels in five hospitals and one management services firm and the judgement of their senior staff. An implicit assumption is that services will become affordable once the hospital industry aggregates its requirements. A methodology to evaluate the value of telecommunication services in a hospital was developed and tested.

Potter, J. G.↗

Computer control of a robotic satellite servicer

The advantages that will accrue from the in-orbit servicing of satellites are listed. It is noted that in a concept in satellite servicing which holds promise as a compromise between the high flexibility and adaptability of manned vehicles and the lower cost of an unmanned vehicle involves an unmanned servicer carrying a remotely supervised robotic manipulator arm. Because of deficiencies in sensor technology, robot servicing would require that satellites be designed according to a modular concept. A description is given of the servicer simulation hardware, the computer and interface hardware, and the software. It is noted that several areas require further development; these include automated docking, modularization of satellite design, reliable connector and latching mechanisms, development of manipulators for space environments, and development of automated diagnostic techniques.

Fernandez, K. R.↗

The 737 graphite composite flight spoiler flight service evaluation

A flight service report was prepared which covers the flight service experience of 111 graphite epoxy spoilers on 737 transport aircraft and related ground based environmental exposure of graphite epoxy material specimens. Spoilers were installed on 28 aircraft representing seven major airlines operating throughout the world. Tests of removed spoilers after the seventh year of service continue to indicate modest changes in composite strength properties. Two spoilers were tested, one with 6 and one with 7 years of service, and both had residual strengths that fall within the original static strength scatter band. Both these units had typical service included discrepancies when tested. Based on visual, ultrasonic, and destructive inspection there continues to be no evidence of moisture migration into the honeycomb core and no core corrosion in the deployed units.

Coggeshall, R. L.↗

Space operations center applications of satellite service equipment

Satellite servicing requirements for a continuously manned Space Operations Center (SOC) are discussed. Applications for Orbiter developed service equipment are described, together with representative satellite servicing operations for use on SOC. These services cover the full mission cycle from orbital deployment to on-orbit maintenance/repair and, eventually, removal from orbit. An orbiting base, such as the SOC, can provide many of the same services at less cost than the Space Shuttle transportation system.

Mccaffrey, R. W.↗