Search NASA⌕ Search

SEARCH · Search NASA

Results for “telescope assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Overview and Recent Accomplishments of Advanced Mirror Technology Development (AMTD) for Very Large Space Telescopes

AMTD uses a science-driven systems engineering approach to define & execute a long-term strategy to mature technologies necessary to enable future large aperture space telescopes. Because we cannot predict the future, we are pursuing multiple technology paths including monolithic & segmented mirrors. Assembled outstanding team from academia, industry & government; experts in science & space telescope engineering. Derived engineering specifications from science measurement needs & implementation constraints. Maturing 6 critical technologies required to enable 4 to 8 meter UVOIR space telescope mirror assemblies for both general astrophysics & ultra-high contrast exoplanet imaging. AMTD achieving all its goals & accomplishing all its milestones.

Stahl, H. Philip↗

Overview and Recent Accomplishments of Advanced Mirror Technology Development Phase 2 (AMTD-2)

AMTD uses a science-driven systems engineering approach to define & execute a long-term strategy to mature technologies necessary to enable future large aperture space telescopes. Because we cannot predict the future, we are pursuing multiple technology paths including monolithic & segmented mirrors. Assembled outstanding team from academia, industry & government; experts in science & space telescope engineering. Derived engineering specifications from science measurement needs & implementation constraints. Maturing 6 critical technologies required to enable 4 to 8 meter UVOIR space telescope mirror assemblies for both general astrophysics & ultra-high contrast exoplanet imaging. AMTD achieving all its goals & accomplishing all its milestones.

Mirror↗

Design and Analysis of the International X-Ray Observatory Mirror Modules

The Soft X-Ray Telescope (SXT) modules are the fundamental focusing assemblies on NASA's next major X-ray telescope mission, the International X-Ray Observatory (IXO). The preliminary design and analysis of these assemblies has been completed, addressing the major engineering challenges and leading to an understanding of the factors effecting module performance. Each of the 60 modules in the Flight Mirror Assembly (FMA) supports 200-300 densely packed 0.4 mm thick glass mirror segments in order to meet the unprecedented effective area required to achieve the scientific objectives of the mission. Detailed Finite Element Analysis (FEA), materials testing, and environmental testing have been completed to ensure the modules can be successfully launched. Resulting stress margins are positive based on detailed FEA, a large factor of safety, and a design strength determined by robust characterization of the glass properties. FEA correlates well with the results of the successful modal, vibration, and acoustic environmental tests. Deformation of the module due to on-orbit thermal conditions is also a major design driver. A preliminary thermal control system has been designed and the sensitivity of module optical performance to various thermal loads has been determined using optomechanical analysis methods developed for this unique assembly. This design and analysis furthers the goal of building a module that demonstrates the ability to meet IXO requirements, which is the current focus of the IXO FMA technology development team.

McClelland, Ryan S.↗

Spherical Primary Optical Telescope (SPOT): An Architecture Demonstration for Cost-effective Large Space Telescopes

This paper summarizes efforts underway at the Goddard Space Flight Center to demonstrate a new type of space telescope architecture that builds on the rigid, segmented telescope heritage of the James Webb Space Telescope but that solves several key challenges for future space telescopes. The architecture is based on a cost-effective segmented spherical primary mirror combined with a unique wavefront sensing and control system that allows for continuous phasing of the primary mirror. The segmented spherical primary allows for cost-effective 3-meter class (eg, Midex and Discovery) missions as well as enables 30-meter telescope solutions that can be manufactured in a reasonable amount of time and for a reasonable amount of money. The continuous wavefront sensing and control architecture enables missions in low-earth-orbit and missions that do not require expensive stable structures and thermal control systems. For the 30-meter class applications, the paper discusses considerations for assembling and testing the telescopes in space. The paper also summarizes the scientific and technological roadmap for the architecture and also gives an overview of technology development, design studies, and testbed activities underway to demonstrate it s feasibility.

Feinberg, Lee↗

Spherical Primary Optical Telescope (SPOT): An Architecture Demonstration for Cost-effective Large Space Telescopes

This paper summarizes efforts underway at the Goddard Space Flight Center to demonstrate a new type of space telescope architecture that builds on the rigid segmented telescope heritage of the James Webb Space Telescope but that solves several key challenges for future space telescopes. The architecture is based on a cost-effective segmented spherical primary mirror combined with a unique wavefront sensing and control system that allows for continuous phasing of the primary mirror. The segmented spherical primary allows for cost-effective 3-meter class (e.g., Midex and Discovery) missions as well as enables 30-meter telescope solutions that can be manufactured in a reasonable amount of time and for a reasonable amount of money. The continuous wavefront sensing and control architecture enables missions in low-earth-orbit and missions that do not require expensive stable structures and thermal control systems. For the 30-meter class applications, the paper discusses considerations for assembling and testing the telescopes in space. The paper also summarizes the scientific and technological roadmap for the architecture and also gives an overview of technology development, design studies, and testbed activities underway to demonstrate its feasibility.

Feinberg, Lee D.↗

Cryogenic performance of the SIRTF prototype secondary mirror assembly

Results are presented of the first liquid helium temperature testing of the Space Infrared Telescope Facility (SIRTF) prototype Secondary Mirror Assembly (PSMA). Attention is given to the key requirements of PSMA, its design, and the test instrumentation and procedures. Results of preliminary tests completed to date showed that the design of the PSMA forms a very strong basis for meeting the SIRTF requirements.

Stier, M. T.↗

Fabrication of the titanium transition ring of the Large Space Telescope (LST)

The fabrication of the titanium transition ring is summarized. The transition ring assembly was designed for the large space telescope and consists of two large titanium rings bolted together. The cross section dimensions of the assembly are 13-inches wide by 7-inches thick. The fabrication processes are discussed, and it is concluded that the work involved fabricating the largest titanium forging ever made.

Klein, L. A.↗

Predictive Thermal Control (PTC) Technology to Enable Thermally Stable Telescopes: First Two Year Status

Predictive Thermal Control Technology (PTCT) development project is a multiyear effort initiated in Fiscal Year (FY) 2017, to mature the Technology Readiness Level (TRL) of critical technologies required to enable ultra-thermally-stable ultraviolet/optical/infrared (UVOIR) space telescope primary-mirror assemblies for ultra-high-contrast observations of exoplanets. Key accomplishments of 2017 to 2019 include: creating a high-fidelity STOP (Structural, Thermal, and Optical Performance) model of the AMTD-2 (Advance Mirror Technology Development) 1.5-meter Ultra-Low Expansion (ULE®) mirror (manufactured by Harris Corp) by merging 3D X-Ray computed tomography data of the ‘as-built’ mirror and coefficient of thermal expansion (CTE) data maps for each of the 18 core elements; partially validating this model by measuring the mirror’s response to bulk temperature changes and lateral thermal gradients; designed and built (with PTC partner Harris Corp) a 1.5-meter enclosure with 26 actively-control thermal zones; and defined specifications for a potential 4-meter primary mirror thermal enclosure for the Habitable Exoplanet (HabEx) Imager mission.

Astrophysics↗

Precision Thermal Control Technology to Enable Thermally Stable Telescopes

Abstract. The precision thermal control (PTC) project was a multiyear effort initiated in fiscal year 2017 to mature the technology readiness level (TRL) of technologies required to enable ultra-thermally stable ultraviolet/optical/infrared space telescope primary-mirror assemblies for ultra-high-contrast observations of exoplanets. PTC had three objectives: (1) validate thermal optical performance models, (2) derive thermal system stability specifications, and (3) demonstrate multi-zonal active thermal control. PTC successfully achieved its objectives and matured active thermal control technology to at least TRL-5. PTC’s key accomplishments are a demonstration of better than 2-mK root-mean-square stable thermal control of the 1.5-m ultra-low expansion (ULE®) Advanced Mirror Technology Development-2 (AMTD-2) mirror when exposed to thermal disturbances in a relevant thermal/vacuum environment, and the ability to shape the 1.5-m AMTD-2 mirror to picometer precision. Additionally, an analysis approach is demonstrated for quantifying thermally induced mid-spatial frequency error which can cause speckle noise in the coronagraph dark hole.

thermal control↗

The IRAS telescope

The IRAS telescope is described in terms of its system configuration and physical characteristics, subsystem functions and descriptions, and performance characteristics. The mission and the configuration are reviewed briefly, and the major functional components of the telescope are described, including the focal plane assembly, the optics, the electronics, the cryogenics, and the thermal control. Exploded and cross-sectional views and block diagrams are presented for the telescope system configuration, focal plane assembly, infrared subarray module, optical subsystem, infrared channel data flow, and main cryogen dewar. The telescope physical characteristics are listed. The performance characteristics are listed and discussed, including the spectral response, sensitivity, optical quality, and photometric accuracy. Relative system spectral response curves for the infrared bands are shown.

Irace, W.↗

Improved multilayer insulation applications

Multilayer insulation blankets used for the attenuation of radiant heat transfer in spacecraft are addressed. Typically, blanket effectiveness is degraded by heat leaks in the joints between adjacent blankets and by heat leaks caused by the blanket fastener system. An approach to blanket design based upon modular sub-blankets with distributed seams and upon an associated fastener system that practically eliminates the through-the-blanket conductive path is described. Test results are discussed providing confirmation of the approach. The specific case of the thermal control system for the optical assembly of the Space Telescope is examined.

Mikk, G.↗

The Infrared Astronomical Satellite (IRAS) mission

The Infrared Astronomical Satellite (IRAS) consists of a spacecraft and a liquid helium cryostat that contains a cooled IR telescope. The telescope's focal plane assembly is cooled to less than 3 K, and contains 62 IR detectors in the survey array which are arranged so that every source crossing the field of view can be seen by at least two detectors in each of four wavelength bands. The satellite was launched into a 900 km-altitude near-polar orbit, and its cryogenic helium supply was exhausted on November 22, 1983. By mission's end, 72 percent of the sky had been observed with three or more hours-confirming scans, and 95 percent with two or more hours-confirming scans. About 2000 stars detected at 12 and 25 microns early in the mission, and identified in the SAO (1966) catalog, have a positional uncertainty ellipse whose axes are 45 x 9 arcsec for an hours-confirmed source.

Neugebauer, G.↗

Advanced Raman water vapor lidar

Water vapor and aerosols are important atmospheric constituents. Knowledge of the structure of water vapor is important in understanding convective development, atmospheric stability, the interaction of the atmosphere with the surface, and energy feedback mechanisms and how they relate to global warming calculations. The Raman Lidar group at the NASA Goddard Space Flight Center (GSFC) developed an advanced Raman Lidar for use in measuring water vapor and aerosols in the earth's atmosphere. Drawing on the experience gained through the development and use of our previous Nd:YAG based system, we have developed a completely new lidar system which uses a XeF excimer laser and a large scanning mirror. The additional power of the excimer and the considerably improved optical throughput of the system have resulted in approximately a factor of 25 improvement in system performance for nighttime measurements. Every component of the current system has new design concepts incorporated. The lidar system consists of two mobile trailers; the first (13m x 2.4m) houses the lidar instrument, the other (9.75m x 2.4m) is for system control, realtime data display, and analysis. The laser transmitter is a Lambda Physik LPX 240 iCC operating at 400 Hz with a XeF gas mixture (351 nm). The telescope is a .75m horizontally mounted Dall-Kirkham system which is bore sited with a .8m x 1.1m elliptical flat which has a full 180 degree scan capability - horizon to horizon within a plane perpendicular to the long axis of the trailer. The telescope and scan mirror assembly are mounted on a 3.65m x .9m optical table which deploys out the rear of the trailer through the use of a motor driven slide rail system. The Raman returns from water vapor (403 nm), nitrogen (383 nm) and oxygen (372 nm) are measured in addition to the direct Rayleigh/Mie backscatter (351). The signal from each of these is split at about a 5/95 ratio between two photomultiplier detectors. The 5 percent detector is used for measurements below about 4.0 km, while the 95 percent detector provides the information above this level.

Whiteman, David N.↗

A long-baseline method for HST gyro drift rate bias calibration

The routine on-orbit calibration of the Hubble Space Telescope (HST) rate gyro assemblies (RGA's) has depended on several related algorithms for drift rate bias calibration. The gyros have exhibited time-varying biases, which must be regularly corrected to maintain pointing stability. Currently, gyro drift parameters are uplinked to the spacecraft every 1-2 days for low rate mode and every 7 days for high rate mode. In order to minimize the impact of frequent calibrations on the HST science schedule, we have refined the gyro calibration algorithms and data collection schemes to reduce the amounts of telemetry data and processing time required for accurate bias calibration. We present a review of the evolution of the gyro calibration algorithms, with particular attention to what we have called the long-baseline bias (LBBIAS) technique, and describe the relative success of these methods in maintaining spacecraft stability.

Boia, John J.↗

James Webb Space Telescope (JWST) Project Status for the AIAA Working Group on Space Simulation

This brief presentation discusses developments in the design of the James Webb Space Telescope (JWST). The JWST master schedule is provided and its system architecture is described. Instruments include the Near Infrared Camaera, Near Infrared Spectrograph, Mid-Infrared Instrument, and the Fine Guidance Sensor. Compared to other telescopes the JWST has a 2.7 longer wavelength than the Hubble Telescope (HST), 38 times better sensitivity at K band that the HST NICMOS, and 8-24 times better angular resolution than the Spitzer Telescope. among other features. Engineering or verification models for all telescope instruments are being assembled and tested in the current year. Currently, good progress continues to be made on critical path items and the JWST is on track for a June 2013 launch.

Sabelhaus, Phil↗

Metrology of IXO Mirror Segments

For future x-ray astrophysics mission that demands optics with large throughput and excellent angular resolution, many telescope concepts build around assembling thin mirror segments in a Wolter I geometry, such as that originally proposed for the International X-ray Observatory. The arc-second resolution requirement posts unique challenges not just for fabrication, mounting but also for metrology of these mirror segments. In this paper, we shall discuss the metrology of these segments using normal incidence metrological method with interferometers and null lenses. We present results of the calibration of the metrology systems we are currently using, discuss their accuracy and address the precision in measuring near-cylindrical mirror segments and the stability of the measurements.

Chan, Kai-Wing↗

James Webb Space Telescope Optical Telescope Element Mirror Development History and Results

In a little under a decade, the James Webb Space Telescope (JWST) program has designed, manufactured, assembled and tested 21 flight beryllium mirrors for the James Webb Space Telescope Optical Telescope Element. This paper will summarize the mirror development history starting with the selection of beryllium as the mirror material and ending with the final test results. It will provide an overview of the technological roadmap and schedules and the key challenges that were overcome. It will also provide a summary or the key tests that were performed and the results of these tests.

Feinber, Lee D.↗

An Active Heater Control Concept to Meet IXO Type Mirror Module Thermal-Structural Distortion Requirement

Flight mirror assemblies (FMAs) of large telescopes, such as the International X-ray Observatory (IXO), have very stringent thermal-structural distortion requirements. The spatial temperature gradient requirement within a FMA could be as small as 0.05 C. Con ventionally, heaters and thermistors are attached to the stray light baffle (SLB), and centralized heater controllers (i.e., heater controller boards located in a large electronics box) are used. Due to the large number of heater harnesses, accommodating and routing them is extremely difficult. The total harness length/mass is very large. This innovation uses a thermally conductive pre-collimator to accommodate heaters and a distributed heater controller approach. It minimizes the harness length and mass, and reduces the problem of routing and accommodating them. Heaters and thermistors are attached to a short (4.67 cm) aluminum portion of the pre-collimator, which is thermally coupled to the SLB. Heaters, which have a very small heater power density, and thermistors are attached to the exterior of all the mirror module walls. The major portion (23.4 cm) of the pre-collimator for the middle and outer modules is made of thin, non-conductive material. It minimizes the view factors from the FMA and heated portion of the precollimator to space. It also minimizes heat conduction from one end of the FMA to the other. Small and multi-channel heater controllers, which have adjustable set points and internal redundancy, are used. They are mounted to the mechanical support structure members adjacent to each module. The IXO FMA, which is 3.3 m in diameter, is an example of a large telescope. If the heater controller boards are centralized, routing and accommodating heater harnesses is extremely difficult. This innovation has the following advantages. It minimizes the length/mass of the heater harness between the heater controllers and heater circuits. It reduces the problem of routing and accommodating the harness on the FMA. It reduces the risk of X-ray attenuation caused by the heater harness. Its adjustable set point capability eliminates the need for survival heater circuits. The operating mode heater circuits can also be used as survival heater circuits. In the non-operating mode, a lower set point is used.

Choi, Michael↗