Search NASA⌕ Search

SEARCH · Search NASA

Results for “umbilical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Global Response of the Space Shuttle External Tank with the Presence of Intertank Stringer Cracks and Radius Blocks

After propellant was loaded into the external tank (ET), the November 5, 2010 launch of Space Shuttle mission STS-133 was scrubbed due to a gaseous hydrogen leak located in a vent line near the ground umbilical and ET connection. Subsequent visual inspections identified cracks in the sprayed-on foam insulation in the forward end of the ET intertank segment, adjacent to the liquid oxygen (LOX) tank, as shown in Figure 1. These cracks necessitated repair of the foam due to debris concerns that violated launch constraints. As part of the repair process, the affected foam was removed to reveal cracks in the underlying external hat stiffeners on the intertank, as shown in Figure 2. Ultimately, five stiffeners were discovered to be cracked adjacent to the LOX tank. As the managing center for the ET Project, NASA Marshall Space Flight Center (MSFC) coordinated failure investigation and repair activities among multiple organizations, which included the ET prime contractor (Lockheed Martin Space Systems Michoud Operations), the Space Shuttle Program Office at the NASA Johnson Space Center (JSC), the NASA Kennedy Space Center (KSC), and the NASA Engineering and Safety Center (NESC). STS-133 utilized the external tank designated as ET-137. Many aspects of the investigation have been reported previously in Refs. 1-7, which focus on the root cause of the failures, the flight readiness rationale and the local analyses of the stringer failures and repair. This paper summarizes the global analyses that were conducted on ET-137 as part of the NESC effort during the investigation, which was conducted primarily to determine if the repairs that were introduced to the stringers would alter the global response of the ET. In the process of the investigation, a new STAGS tabular input capability was developed to more easily introduce the aerodynamic pressure loads using a method that could easily be extended to incorporate finite element property data such as skin and stiffener thicknesses and beam cross-sectional properties.

Lovejoy, Andrew E.↗

Robonaut 2 on the International Space Station: Status Update and Preparations for IVA Mobility

Robotics engineers, ground controllers and International Space Station (ISS) crew have been running successful experiments using Robonaut 2 (R2) on-board the ISS for more than a year. This humanoid upper body robot continues to expand its list of achievements and its capabilities to safely demonstrate maintenance and servicing tasks while working alongside human crewmembers. The next phase of the ISS R2 project will transition from a stationary Intra Vehicular Activity (IVA) upper body using a power/data umbilical, to an IVA mobile system with legs for repositioning, a battery backpack power supply, and wireless communications. These upgrades will enable the R2 team to evaluate hardware performance and to develop additional control algorithms and control verification techniques with R2 inside the ISS in preparation for the Extra Vehicular Activity (EVA) phase of R2 operations. As R2 becomes more capable in assisting with maintenance tasks, with minimal supervision, including repositioning itself to different work sites, the ISS crew will be burdened with fewer maintenance chores, leaving them more time to conduct other activities. R2's developers at the Johnson Space Center (JSC) are preparing the R2 IVA mobility hardware and software upgrades for delivery to the ISS in late 2013. This paper summarizes R2 ISS achievements to date, briefly describes the R2 IVA mobility upgrades, and discusses the R2 IVA mobility objectives and plans.

Ahlstrom, Thomas D.↗

Use MACES IVA Suit for EVA Mobility Evaluations

The use of an Intra-Vehicular Activity (IVA) suit for a spacewalk or Extra-Vehicular Activity (EVA) was evaluated for mobility and usability in the Neutral Buoyancy Lab (NBL) environment. The Space Shuttle Advanced Crew Escape Suit (ACES) has been modified (MACES) to integrate with the Orion spacecraft. The first several missions of the Orion MPCV spacecraft will not have mass available to carry an EVA specific suit so any EVA required will have to be performed by the MACES. Since the MACES was not designed with EVA in mind, it was unknown what mobility the suit would be able to provide for an EVA or if a person could perform useful tasks for an extended time inside the pressurized suit. The suit was evaluated in multiple NBL runs by a variety of subjects including crewmembers with significant EVA experience. Various functional mobility tasks performed included: translation, body positioning, carrying tools, body stabilization, equipment handling, and use of tools. Hardware configurations included with and without TMG, suit with IVA gloves and suit with EVA gloves. Most tasks were completed on ISS mockups with existing EVA tools. Some limited tasks were completed with prototype tools on a simulated rocky surface. Major findings include: demonstration of the ability to weigh-out the suit, understanding the need to have subjects perform multiple runs prior to getting feedback, determination of critical sizing factors, and need for adjustment of suit work envelop. The early testing has demonstrated the feasibility of EVA's limited duration and limited scope. Further testing is required with more flight like tasking and constraints to validate these early results. If the suit is used for EVA, it will require mission specific modifications for umbilical management or PLSS integration, safety tether attachment, and tool interfaces. These evaluations are continuing through calendar year 2014.

Watson, Richard D.↗

Spacesuit Water Membrane Evaporator Integration with the ISS Extravehicular Mobility Unit

NASA has developed a Solid Water Membrane Evaporation (SWME) to provide cooling for the next generation spacesuit. The current spacesuit team has looked at this technology from the standpoint of using the ISS EMU to demonstrate the SWME technology while EVA, and from the standpoint of augmenting EMU cooling in the case of a fouled EMU cooling system. One approach to increasing the TRL of the system is to incorporate this hardware with the existing EMU. Several integration issues were addressed to support a potential demonstration of the SWME with the existing EMU. Systems analysis was performed to assess the capability of the SWME to maintain crewmember cooling and comfort as a replacement for sublimation. The materials of the SWME were reviewed to address compatibility with the EMU. Conceptual system placement and integration with the EMU via an EVA umbilical system to ensure crew mobility and Airlock egress were performed. A concept of operation for EVA use was identified that is compatible with the existing system. This concept is extensible as a means to provide cooling for the existing EMU. The cooling system of one of the EMUs on orbit has degraded, with the root cause undetermined. Should there be a common cause resident on ISS, this integration could provide a means to recover cooling capability for EMUs on orbit.

Margiott, Victoria↗

Spacesuit Water Membrane Evaporator Integration with the ISS Extravehicular Mobility

NASA has developed a Solid Water Membrane Evaporation (SWME) to provide cooling for the next generation spacesuit. One approach to increasing the TRL of the system is to incorporate this hardware with the existing EMU. Several integration issues were addressed to support a potential demonstration of the SWME with the existing EMU. Systems analysis was performed to assess the capability of the SWME to maintain crewmember cooling and comfort as a replacement for sublimation. The materials of the SWME were reviewed to address compatibility with the EMU. Conceptual system placement and integration with the EMU via an EVA umbilical system to ensure crew mobility and Airlock egress were performed. A concept of operation for EVA use was identified that is compatible with the existing system. This concept is extensible as a means to provide cooling for the existing EMU. The cooling system of one of the EMUs on orbit has degraded, with the root cause undetermined. Should there be a common cause resident on ISS, this integration could provide a means to recover cooling capability for EMUs on orbit.

Margiott, Victoria↗

Development Testing and Subsequent Failure Investigation of a Spring Strut Mechanism

Commodities are transferred between the Multi-Purpose Crew Vehicle (MPCV) crew module (CM) and service module (SM) via an external umbilical that is driven apart with spring-loaded struts after the structural connection is severed. The spring struts must operate correctly for the modules to separate safely. There was no vibration testing of strut development units scoped in the MPCV Program Plan; therefore, any design problems discovered as a result of vibration testing would not have been found until the component qualification. The NASA Engineering and Safety Center (NESC) and Lockheed Martin (LM) performed random vibration testing on a single spring strut development unit to assess its ability to withstand qualification level random vibration environments. Failure of the strut while exposed to random vibration resulted in a follow-on failure investigation, design changes, and additional development tests. This paper focuses on the results of the failure investigations including identified lessons learned and best practices to aid in future design iterations of the spring strut and to help other mechanism developers avoid similar pitfalls.

Dervan, Jared↗

Modified Advanced Crew Escape Suit Intravehicular Activity Suit for Extravehicular Activity Mobility Evaluations

The use of an intravehicular activity (IVA) suit for a spacewalk or extravehicular activity (EVA) was evaluated for mobility and usability in the Neutral Buoyancy Laboratory (NBL) environment at the Sonny Carter Training Facility near NASA Johnson Space Center in Houston, Texas. The Space Shuttle Advanced Crew Escape Suit was modified to integrate with the Orion spacecraft. The first several missions of the Orion Multi-Purpose Crew Vehicle will not have mass available to carry an EVA-specific suit; therefore, any EVA required will have to be performed by the Modified Advanced Crew Escape Suit (MACES). Since the MACES was not designed with EVA in mind, it was unknown what mobility the suit would be able to provide for an EVA or whether a person could perform useful tasks for an extended time inside the pressurized suit. The suit was evaluated in multiple NBL runs by a variety of subjects, including crewmembers with significant EVA experience. Various functional mobility tasks performed included: translation, body positioning, tool carrying, body stabilization, equipment handling, and tool usage. Hardware configurations included with and without Thermal Micrometeoroid Garment, suit with IVA gloves and suit with EVA gloves. Most tasks were completed on International Space Station mock-ups with existing EVA tools. Some limited tasks were completed with prototype tools on a simulated rocky surface. Major findings include: demonstrating the ability to weigh-out the suit, understanding the need to have subjects perform multiple runs prior to getting feedback, determining critical sizing factors, and need for adjusting suit work envelope. Early testing demonstrated the feasibility of EVA's limited duration and limited scope. Further testing is required with more flight-like tasking and constraints to validate these early results. If the suit is used for EVA, it will require mission-specific modifications for umbilical management or Primary Life Support System integration, safety tether attachment, and tool interfaces. These evaluations are continuing through calendar year 2014.

Watson, Richard D.↗

Space Suit Portable Life Support System (PLSS) 2.0 Unmanned Vacuum Environment Testing

For the first time in more than 30 years, an advanced space suit Portable Life Support System (PLSS) design was operated inside a vacuum chamber representative of the flight operating environment. The test article, PLSS 2.0, was the second system-level integrated prototype of the advanced PLSS design, following the PLSS 1.0 Breadboard that was developed and tested throughout 2011. Whereas PLSS 1.0 included five technology development components with the balance the system simulated using commercial-off-the-shelf items, PLSS 2.0 featured first generation or later prototypes for all components less instrumentation, tubing and fittings. Developed throughout 2012, PLSS 2.0 was the first attempt to package the system into a flight-like representative volume. PLSS 2.0 testing included an extensive functional evaluation known as Pre-Installation Acceptance (PIA) testing, Human-in-the-Loop testing in which the PLSS 2.0 prototype was integrated via umbilicals to a manned prototype space suit for 19 two-hour simulated EVAs, and unmanned vacuum environment testing. Unmanned vacuum environment testing took place from 1/9/15-7/9/15 with PLSS 2.0 located inside a vacuum chamber. Test sequences included performance mapping of several components, carbon dioxide removal evaluations at simulated intravehicular activity (IVA) conditions, a regulator pressure schedule assessment, and culminated with 25 simulated extravehicular activities (EVAs). During the unmanned vacuum environment test series, PLSS 2.0 accumulated 378 hours of integrated testing including 291 hours of operation in a vacuum environment and 199 hours of simulated EVA time. The PLSS prototype performed nominally throughout the test series, with two notable exceptions including a pump failure and a Spacesuit Water Membrane Evaporator (SWME) leak, for which post-test failure investigations were performed. In addition to generating an extensive database of PLSS 2.0 performance data, achievements included requirements and operational concepts verification, as well as demonstration of vehicular interfaces, consumables sizing and recharge, and water quality control.

Watts, Carly↗

X-Band CubeSat Communication System Demonstration

Today's CubeSats mostly operate their communications at UHF- and S-band frequencies. UHF band is presently crowded, thus downlink communications are at lower data rates due to bandwidth limitations and are unreliable due to interference. This research presents an end-to-end robust, innovative, compact, efficient and low cost S-band uplink and X-band downlink CubeSat communication system demonstration between a balloon and a Near Earth Network (NEN) ground system. Since communication systems serve as umbilical cords for space missions, demonstration of this X-band communication system is critical for successfully supporting current and future CubeSat communication needs. This research has three main objectives. The first objective is to design, simulate, and test a CubeSat S- and X-band communication system. Satellite Tool Kit (STK) dynamic link budget calculations and HFSS Simulations and modeling results have been used to trade the merit of various designs for small satellite applications. S- and X-band antennas have been tested in the compact antenna test range at Goddard Space Flight Center (GSFC) to gather radiation pattern data. The second objective is simulate and test a CubeSat compatible X-band communication system at 12.5Mbps including S-band antennas, X-band antennas, Laboratory for Atmospheric and Space Physics (LASP) /GSFC transmitter and an S-band receiver from TRL-5 to TRL-8 by the end of this effort. Different X-band communication system components (antennas, diplexers, etc.) from GSFC, other NASA centers, universities, and private companies have been investigated and traded, and a complete component list for the communication system baseline has been developed by performing analytical and numerical analysis. This objective also includes running simulations and performing trades between different X-band antenna systems to optimize communication system performance. The final objective is to perform an end-to-end X-band CubeSat communication system demonstration between a balloon and/or a sounding rocket and a Near Earth Network (NEN) ground system. This paper presents CubeSat communication systems simulation results, analysis of X-band and S-band antennas and RF front-end components, transceiver design, analysis and optimization of space-to-ground communication performance, subsystem development, as well as the test results for an end-to-end X-band CubeSat communication system demonstration. The outcome of this work will be used to pave the way for next generation NEN-compatible X-band CubeSat communication systems to support higher data rates with more advanced modulation and forward error correction (FEC) coding schemes, and to support and attract new science missions at lower cost. It also includes an abbreviated concept of operations for CubeSat users to utilize the NEN, starting from first contact with NASA's communication network and continuing through on-orbit operations.

NEN↗

Investigation on Improvements in Lightning Retest Criteria for Spacecraft

Spacecraft are generally protected from a direct strike by launch the vehicle and ground structures, but protocols to evaluate the impact of nearby strikes are not consistent. Often spacecraft rely on the launch vehicle constraints to trigger a retest, but launch vehicles can typically evaluate the impact of a strike within minutes while spacecraft evaluation times can be on the order of hours or even days. For launches at the Kennedy Space Center where lightning activity is among the highest in the United States, this evaluation related delay could be costly with the possibility of missing the launch window altogether. This paper evaluated available data from local lightning measurements systems and computer simulations to predict the coupled effect from various nearby strikes onto a typical payload umbilical. Recommendations are provided to reduce the typical trigger criteria and costly delays.

Models↗

Materials Processes (MP) Engineering Internship Projects

This poster illustrates my major and minor projects worked on during my entire time interning at KSC in the Materials Science Branch. My major projects consist of three Failure Analyses, a research project on Magnesium Alloys, and the manufacturing and mechanical testing of the Advanced Plant Habitat. My three Failure Analyses are Umbilical Testing Ground Plates, Lithium Ion Battery Locking Spring Blade, and a Liquid Oxygen Poppet.

Tomsik, Elizabeth↗

Application of Machine-Learning Algorithms for On-Board Asteroid Shape Model Determination

The Application of Machine-learning Algorithms for On-board Asteroid Shape Model Determination project will develop an innovative system for spacecraft navigation to expand the capability of small spacecraft to meet the critical challenges associated with small-body exploration. Such challenges include accurate navigation in a microgravity environment and precision targeting of particular locations on an asteroid surface for sample collection. This on-board system will cut the computational "umbilical" back to Earth-currently necessary for the generation of a global shape model that requires thousands of images with sufficient resolution and adequate variation of incidence and emission angles, processed manually by a team of experts on Earth for several months. Small satellites have limited bandwidth and are unable to downlink the data volume required for this processing, restricting their ability to perform deep-space asteroid exploration.

Machine learning algorithms↗

TPSAS-NF1676L-31853-DND

Risk that Orion arrives later than Space Launch System (SLS). MSO mitigates this risk by using a mass simulator for SLS’ tests. An Orion simulator for the Integrated Modal Test (IMT) and Umbilical Release and Retraction Tests (URRT) mitigates schedule risk by significant timeframe. A clean sheet alternate being pursued - analysis shows matching modal characteristics unnecessary; rigid simulator is acceptable wrt existing SLS accelerometer locations and shaker placement/size. Key Simulator Requirements: Representative mass, CG, rigid modal characteristics, high fidelity interface at MSA. Pre-test analyses show that MSO vertical CG could be up to 40” low without affecting IMT.

Steve Cutright↗

Maternal provisioning gives young-of-the-year Hammerheads a head start in early life

For species that do not provide parental care after birth, excess maternal provisioning during development, beyond what is required for embryogenesis, provides offspring with resources to increase their chances of survival. Maternally derived resources are expected to be important for buffering offspring against limited food resources at birth or time needed to learn how to properly feed. Young-of-the-year (YOY) cryptic Scalloped Hammerheads (Sphyrna lewini) and Carolina Hammerheads (Sphyrna gilberti) were sampled from nurseries along the US Atlantic Coast and compared for a number of biological condition metrics across three developmental stages. Large declines in liver lipid content and hepatosomatic indices were found in neonatal sharks, using umbilical scar healing as a proxy for time since birth. Feeding commenced quickly as 96% of sharks had prey remnants in their stomachs. The combination of rapid exhaustion of maternally provided resources and high occurrence of stomachs with prey contents indicate that nursery quality, with respect to prey availability, may be important for YOY hammerhead survivorship. While externally the two species are morphologically similar, longer length-at-birth in S. lewini and higher hepatic condition in neonatal S. gilberti suggest that aspects of reproductive biology, including physiology, may differ between species. While more information is needed to distinguish life history differences between these two species, data collected from YOY may serve as a useful proxy to inform management when adult samples of cryptic species are difficult to collect.

none↗

Surface Systems Capability Gaps for Enabling NASA’s Sustainable Lunar Operations

This paper discusses the NASA Ground, Test, and Surface Systems Taxonomy (TX-13) related capability gaps, including details of architecture, technology, engineering, and policy gaps for enabling sustainable lunar surface operations and subsequent Mars missions. Architecture gaps include standardized architectures and interfaces, multi-element systems engineering and integration, design for supportability, and nuclear payload processing and launch approach. Technology gaps, primarily focused on uncrewed surface operations, include automated/autonomous cryogenic loading, transfer, servicing, and storage of commodities; health determination and fault management; automated/autonomous planning and scheduling; automated/autonomous inspection, maintenance and repair; logistics management and reliability; launch and landing site preparation; commodity management; and advanced umbilicals and dust tolerant interfaces. Engineering gaps include high-purity propellant production for ground and surface applications and large-scale xenon servicing capabilities. The policy gap includes nuclear propulsion acceptance testing and qualification approach. Strategically identifying human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle is essential for achieving the mission objectives for a sustainable human lunar presence, improving performance and mission effectiveness, reducing operations costs and reliance on humans to perform tasks, and accommodating ground communication delays.

Surface Systems↗

Comparison of Surface Pressure Fluctuations from Flight and Wind Tunnel Tests on the Orion Multi-Purpose Crew Vehicle

Transonic and supersonic wind-tunnel test of scaled-models are used to predict the surface pressure fluctuations on aerospace vehicles. An outstanding question is how good are such tests? The present paper attempts to answer this question for the Multi-Purpose Crew Vehicle by comparing data from the Ascent Abort-2 (AA2) flight test with those measured in two different scaled-model wind tunnel tests (WTT) 51AS and 134AS. A sensor by sensor and a Mach by Mach comparisons of spectra of surface pressure fluctuations are presented for nominal ascent part of flight. Spectra measured over a large part of the vehicle surface were found to be dominated by the wake vortices shed from the four Abort Motor nozzles situated on the upper part of the Launch Abort System. It was found that the shapes of the scaled-up spectra from WTTs were very close to those measured in the flight, but the levels, for the most part, were found to be lower than the flight data. The highest differences were from the regions of complex flows where wakes from the adjacent nozzles interacted with the free-stream flow. There the WTT predicted levels were consistently 2dB to 6dB lower than the flight data, across all spectral bands. Another region of significant under-prediction was the local separated flow region at the Fillet-Ogive junction. The accuracy of the sharp spectral peaks from regions along a nozzle axis was found to be dependent on the fidelity of the model. The model in the 51AS WTT used a simplified contour, which resulted in a large under prediction of the spectral peak by 1dB to 10dB. A limited number of data from 134AS, where the model accurately captured all features of the nozzles of the flight vehicle, however; showed that the under prediction was lower: 1-2dB. The fluctuation spectra on the large protuberance of the Umbilical Cover was found to be reasonably well-predicted by 134AS WTT, which meticulously reproduced a scaled-down shape of this protuberance. Such information will help to determine the margins to be applied to wind-tunnel data to create flight environments.

MPCV↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗