Search NASA⌕ Search

SEARCH · Search NASA

Results for “uplink”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Multi-Beam Laser Beacon Propagation Over Lunar Distance: Comparison of Predictions and Measurements

A multi-beam beacon was transmitted from the Optical Communication Telescope Laboratory (OCTL) located at Table Mountain, CA to the Lunar Laser Space Terminal (LLST), on-board the Lunar Atmospheric Dust and Environment Explorer (LADEE) spacecraft, during NASA’s recent Lunar Laser Communication Demonstration (LLCD). The laser beacon (1568?0.1 nm) was square wave modulated and sensed by a LLST quadrant sensor to enable link acquisition and tracking. LLST computed the mean received beacon power and returned 5 kHz sampled power time series over the downlink. Post-processing of the decoded downlink received at OCTL retrieved the uplink power recorded at LLST. The predicted mean irradiance delivered to LLST consistently agreed with the variable beam divergence transmitted from OCTL to within < 1 decibel (dB). Irradiance fluctuations detected at LLST were reconciled with an uplink wave-propagation model derived using independently monitored atmospheric parameters. We report good agreement of the scintillation index and atmospheric coherence time.

Biswas, A↗

Status of NASA’s Deep Space Optical Communication Technology Demonstration

With NASA funding, the Deep Space Optical Communication (DSOC) Project at JPL is planning a system level technology demonstration of optical communications from deep space. A 22 cm diameter flight laser transceiver (FLT) is being developed for space flight. The FLT will be designed to transmit an average laser power of 4W at 1550 nm and receive a weak 1064 nm laser signal (> 100 femtowatts). Use of the Hale telescope at Palomar Mountain, CA, retrofitted with a photoncounting receiver to detect the downlink from space, is planned. The Optical Communication Telescope Laboratory (OCTL) at Table Mountain, CA will transmit a 1064 nm laser beacon to serve as a pointing reference for the FLT and support low-rate uplink data-rates. The DSOC FLT is part of the baseline payload for the Psyche mission spacecraft recently selected for flight by NASA, providing link demonstration opportunities during the mission cruise phase. Link demonstration opportunities at distances of approximately 0.1 to 2 astronomical units (AU) are expected. The DSOC system is being designed to support downlink data-rates of 0.2 to > 200 Mb/s and uplink data rates of approximately 1.6 kb/s. A status update of DSOC Project activities on flight and ground development will be summarized in this paper.

Biswas, Abhijit↗

The Adaptive Optics and Transmit System for NASA's Laser Communications Relay Demonstration Project

The Laser Communication Relay Demonstration is NASA’s multi-year demonstration of laser communication to a geosynchronous satellite. We are currently assembling the optical system for the first of the two baseline ground stations. The optical system consists of an adaptive optics system, the transmit system and a camera for target acquisition. The adaptive optics system is responsible for compensating the downlink beam for atmospheric turbulence and coupling it into the modem’s single mode fiber. The adaptive optics system is a woofer/tweeter design, with one deformable mirror correcting for low spatial frequencies with large amplitude and a second deformable mirror correcting for high spatial frequencies with small amplitude. The system uses a Shack-Hartmann wavefront sensor. The transmit system relays four beacon beams and one communication laser to the telescope for propagation to the space terminal. Both the uplink and downlink beams are centered at 1.55 microns. We present an overview of the design of the system as well as performance predictions including time series of coupling efficiency and expected uplink beam quality.

Laser Communication↗

Juno Gravity Science: Preparing for Data Collection at Jupiter

One of the primary goals of the Juno mission is to investigate Jupiter’s interior by mapping its gravitational field with the gravity science instrument. The Juno spacecraft has two radio science components that comprise the gravity science instrument: the X-band telecommunications system for a X-up/X-down link and a Ka-band Translator for a Ka-up/Ka-down link. The Deep Space Network’s DSS-25 beam waveguide antenna at the Goldstone Deep Space Communications Complex in California provides the X- and Ka-band uplink alongside an Advanced Water Vapor Radiometer to calibrate tropospheric effects. X-band and Ka-band downlink data are collected with both open-loop and closed-loop receivers located at the complex. Utilization of Ka-band provides scientific benefit to the Doppler measurements, but also adds operational challenges. Pointing of the uplink and downlink Ka-band signals requires additional systems to be calibrated and operated by the Deep Space Network; and the higher frequency of Ka-band means the signal dynamics are increased by a factor of four over X-band signals. Due to the spacecraft’s elliptical orbit and 4000 kilometer perijove altitude, it accelerates at an extreme rate as it approaches Jupiter, inducing large dynamic ranges in Doppler range of approximately 6 MHz over 3 hours at Ka-band. After the installation of a new Ka-band transmitter at DSS-25 for Juno was completed in 2015, end-to-end testing was conducted to ensure readiness for operations at Jupiter and provide an initial assessment of the performance. Cruise testing was conducted in the same operational configuration that the system will be used in during perijove passes. Processed open-loop data yielded uncalibrated Doppler residuals of 1.9 mHz at X-band and 6.0 mHz at Ka-band with 5-second compression time. Conduction of these tests has prepared the instrument and the operations team for science data collection during the science phase of the mission.

Buccino, Dustin↗

Semi-Autonomous Spacecraft On-Board Ephemeris Propagation

Two strategies are presented for semi-autonomous on-board trajectory propagation. One implements a semi-analytic method and rectifies, when needed, a simple on-board (on-line) ephemeris. The method is called rectification in which only several parameters are uplinked to the spacecraft infrequently. The other strategy uses TOPEX/POSEIDON experience to build a data compression device for a wide range of orbits. A trade-off study is conducted to relate accuracy requirements with semi-major axis and eccentricity to minimize the frequency of uplinking.

spacecraft↗

Telecommand/Telemetry Ranging for Deep-Space Applications

Conventional two-way pseudonoise (PN) ranging relies on measuring the time delay between a PN signal transmitted to the spacecraft, and a corresponding synchronized PN signal transmitted from the spacecraft and received on the ground. Recently, we introduced a two-way ranging method ([1], [2], [3]) which eliminates the need for the downlink PN ranging signal. In this telemetry ranging scheme, the requisite timing measurements are obtained from a databearing downlink telemetry signal. In the present paper, we extend the telemetry ranging concept by also eliminating the uplink PN signal, which is replaced by a data-bearing telecommand signal. We describe the architecture and concept of such a system, and describe the fundamental limitations of tracking the timing of such uplink telecommand signals when tracking loops or demod-remod correlation techniques are employed. An end-to-end performance analysis shows that in typical scenarios, ranging performance comparable to conventional PN ranging is possible.

Hamkins, Jon↗

Iris Deep-Space Transponder for SLS EM-1 CubeSat Missions

Several key design upgrades have been recently made to the Iris Deep-Space Transponder baselined to be used on secondary payload missions of the upcoming Space Launch System Exploration Mission One (SLS EM-1). The Iris Transponder is a reconfigurable software-defined radio (SDR) designed for missions requiring interoperability with NASA's Deep Space Network (DSN) on X-band frequencies (7.2 GHz uplink, 8.4 GHz downlink). The transponder provides radiometric tracking support with the DSN to provide navigational products for precise orbit determination while performing standard uplink and downlink communications in a CubeSat/SmallSat-applicable package size. The recent hardware changes include a volume reduction of 30% from previous models, with the main transponder unit weighing less than 1.0 kg, while maintaining total ionizing dose (TID) radiation tolerance of >23 krads (Si) for deep-space missions. Lab tests indicate maximum downlink rates of up to 6.25 Msps can be supported by the transponder in conventional BPSK modulation, but most SLS EM-1 CubeSat missions are link-performance limited to less than 256 kbps. A prototype unit of the flight production units has been assembled and various performance and characterization tests are underway. This talk discusses the key design aspects and specifications of the Iris Transponder and presents preliminary results from early testing of the assembled transponder.

Kobayashi, M. Michael↗

Calibration and Performance Measurements for the NASA Deep Space Network Aperture Enhancement Project (DAEP)

The NASA Deep Space Network (DSN) has recently constructed two new 34-meter antennas at the Canberra Deep Space Communications Complex (CDSCC). These new antennas are part of the larger DAEP project to add six new 34-meter antennas to the DSN, including two in Madrid, three in Canberra and one in Goldstone (California). The DAEP project included development and implementation of several new technologies for the S, X, Ka (26 GHz) and Ka (32 GHz) -band uplink and downlink electronics, as previously reported. The electronics upgrades were driven by several different considerations, including parts obsolescence, cost reduction, improved reliability and maintainability, and capability to meet future performance requirements. The new antennas are required to support TT&C links for all of the NASA deep-space spacecraft, as well as for several international partners. Some of these missions, such as Voyager 1 and 2, have very limited link budgets, which results in demanding requirements for system G/T performance. These antennas are also required to support radio science missions with several spacecraft, which dictate some demanding requirements for spectral purity, amplitude stability and phase stability for both the uplink and downlink electronics. After completion of these upgrades, a comprehensive campaign of tests and measurements took place to characterize the electronics and calibrate the antennas. Radiometric measurement techniques were applied to characterize, calibrate, and optimize the performance of the antenna parameters. These included optical and RF high-resolution holographic and total power radiometry techniques. These techniques, which are described in the article, resulted in the highest antenna aperture efficiency in the DSN, of 66% achieved, at the highest operating frequency of the antenna, which is Ka-Band (32-GHz). The other measurements and results described include antenna noise temperature, photogrammetry and holography alignment of antenna panels, beam-waveguide mirrors, and subreflector, antenna aperture efficiencies and G/T versus frequency, and antenna pointing models. The first antenna (DSS-35) was entered into operations in October, 2014 and the 2nd antenna (DSS-36) in October, 2016. This paper describes the measurement techniques and results of the testing and calibration for both antennas, along with the driving requirements.

Rochblatt, David J.↗

Recommendations Emerging from an Analysis of NASA's Deep Space Communications Capacity

During 2016-2017, NASA’s Space Communications and Navigation (SCaN) Office chartered a study of Deep Space Network (DSN) communications capacity relative to projected future-mission demand over the next 30 years. In this paper, we briefly describe the methodology used to analyze capacity vs. demand over such a broad timeframe, summarize key findings emerging from the analysis, and discuss the associated recommendations. Performing the analysis entailed: identifying key factors shaping the anticipated future mission set, identifying several alternative future mission set scenarios consistent with these factors, and then analyzing each mission set scenario in terms of required antenna capacity, downlink and uplink capabilities, and spectrum as a function of time. On the basis of these aggregate requirements, DSN loading simulations were then conducted that examined how well each of the postulated mission sets could load up onto the the DSN’s “in-plan” architecture. To the extent that capacity shortfalls emerged during these baseline simulations, architectural solutions to the shortfalls were then postulated and tested via additional simulations. In general, the trend analyses and baseline loading simulations indicated a significant progression in challenges over the next three decades. In the current decade, the DSN appeared to be operating very close to capacity. The first human exploration mission and its secondary payload launch opportunities for cubesats traveling beyond GEO contributed to this loading. As a consequence, the main challenge appeared to be managing peak assetcontention periods. In the next decade, the DSN continued to operate close to capacity but also began transitioning to more frequent human mission support. Upgrading for, and operating, a human-rated system while continuing to meet robotic mission customer requirements emerged as the key challenge. In the 2030’s and beyond, simulations suggested a need for fundamentally new capability and capacity. The high data rates and long link distances characteristic of human Mars exploration drove requirements far beyond what is currently “in plan.” The key challenge then became determining the most cost-effective combination of RF and optical assets for communicating with the postulated human Mars assets while still providing for the needs of all the other missions across the solar system. Various link budget, visibility, and loading analyses ultimately suggested that the human Mars exploration demands of the 2030’s could best be addressed with two cross-linked RF-optical areostationary relays (or an areostationary relay and deep space habitat) providing a dual “trunk link” to an array of 2-to-3 additional 34m beam waveguide antennas and an ~8.5m optical antenna at each DSN Complex. The dual “trunk link” would enable the same amount of total data return to Earth as a single trunk link at twice the data rate, but with only half the required array size on the ground, assuming use of Multiple Spacecraft Per Antenna (MSPA) techniques. MSPA techniques, including a Multiple Uplink Per Antenna (MUPA) technique currently under investigation, also showed promise for reducing asset contention in the decades prior to human Mars exploration.

Lee, Carlyn-Ann↗

X/Ka-band one-meter deployable mesh reflector for Deep Space Network telecommunication

A deployable one meter mesh reflector compatible with 12U-class CubeSat is introduced for telecommunication. It is compatible with NASA’s deep-space network (DSN) at X-band (i.e., uplink: 7.145-7.19 GHz; downlink: 8.4-8.45 GHz) and Ka-band frequencies (i.e., uplink: 34.2–34.7 GHz; downlink: 31.8–32.3 GHz). Three right-handed circularly polarized (RHCP) antennas, both transmit and receive, are introduced here: X-band only, Ka-band only, and X/Ka-band.

Freebury, Gregg↗

Communications with Curiosity during solar conjunction

This study examines the methodology for operating and communicating with NASA's Curiosity Rover (MSL) during the 2019 solar conjunction. For MSL, solar conjunction occurs when the viewing angle between the Sun and Mars from Earth's perspective falls below 3 degrees, which occurs roughly every two Earth years and lasts for about two weeks. This presents a challenge for engineers operating a vehicle on Mars because the degraded signal to noise ratio disrupts data flow between Earth and the spacecraft. As a result, operators designate a command moratorium in which no commands are sent to the rover and instead design long-term plans that are uplinked weeks in advance (rather than the nominal case of daily uplinks). Coordinating communications with the rover leading up to and following conjunction requires negotiations with several orbiters, another lander, and the Deep Space Network (DSN) each with their own set of constraints. It is the Strategic Comm Planning T coordination, which acts as a baseline for the conjunction Comm team faced additional complications such as the arrival of two new spacecraft at Mars - Roscosmos ExoMars Trace Gas Orbiter (TGO).

Laubach, Sharon↗

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗

Benefits and Challenges of CCSDS File Delivery Protocol as Applied to Europa Clipper

—This paper describes the use of the Consultative Committee for Space Data Systems (CCSDS) File Delivery Protocol (CFDP) on the Europa Clipper mission for both uplink and downlink of files. It includes an overview of CFDP, the history of why CFDP was chosen, how it benefits mission operations, some of the mission scenarios that stress CFDP, operability aspects, the best practices that Clipper adopted from other missions and some of the technical challenges with implementation, and verification and validation. The benefits to mission operations accrue because CFDP reduces the need for manual management of file transfer, including retransmission of missing data, and deletion of files only after confirmation of receipt by the ground. The challenges occur because CFDP is a round-trip protocol – it requires messages in both directions to complete a file transfer, and because it uses timers to ensure that control messages are resent if needed to prevent transactions from going stale. Any situations where communication is restricted to a single direction, interrupted, reordered, or backlogged can pose a challenge. There are also implementation challenges. Europa Clipper is the first mission at the Jet Propulsion Laboratory (JPL) to adopt class 2, fully acknowledged, CFDP for both uplink and downlink. The implementation needed new software, requirements and operational procedures. The experience of the Applied Physics Laboratory (APL) with CFDP from their previous missions was crucial to success for Europa Clipper. Because CFDP relies on timers and messages travel in both directions, verification and validation (V&V) requires new approaches. For certain scenarios, a live ground system talking to a live flight system with realistic simulated one-way light times, data rates and data outages must be used.

Albers, Joshua↗

The Psyche Planning Software Subsystem: Creating a Robust Toolset for a Discovery-class Mission

Psyche is a Discovery-class mission to the small metal-rich asteroid (16) Psyche, and is slated to launch in 2022. Psyche, like many missions, requires low-cost activity planning and sequence generation that serves as the backbone to overall uplink design. Such tools must be maintainable over long periods of operations, and powerful enough to solve complex issues that deep-space one-off missions encounter. In this paper we introduce cost-effective solutions that leverage inner- and open-source principles to meet a variety of common and novel use cases.The uplink process that was designed to meet these challenges is presented, as well as the data-flow through the high-level architecture of the planning software subsystem. The user-facing planning tools are described, particularly the Science Opportunity Analyzer, the Plan Editor, Psyche’s planning automation in the Blackbird framework, and Psyche Simulation Reports. All these applications are either new or have been substantially revamped to meet Psyche’s concept of operations. In particular, ensuring the entire toolchain can correctly process epoch-relative activities is discussed. Underlying the main applications are a common set of dependencies developed and maintained by a new cross-mission association of planning developers. In this way, Psyche can inherit well-tested functionality which saves effort and ensures its developers can focus on solving domain challenges. Quality control of the applications and libraries is ensured with a code-review and unit-test based novel ‘CM lite’ process. Collaboration with international industry and academia using the open-source modules is already occurring.The planning and scheduling software is designed to maximize operator awareness of the integrated plan at every step of the process and use common interfaces and file formats to easily transfer information. Design choices plus the team’s test-driven development process enables more expansive capabilities compared to the decentralized planning and sequence generation functions typical of Discovery-class orbiters without significant development cost increases. Benefits and drawbacks of Psyche’s approach are discussed, including comparison to other missions and tools where appropriate.

Ramanathan, Keshav↗

Data Analysis Results From the GOLD Experiments

Analyses of uplink and downlink data from recent free-space optical communications experiments carried out between Table Mountain Facility (near Pasadena, CA) and the Japanese ETS-VI satellite are presented.

Free-space↗

Apollo checkout equipment.

Schematic and flow diagrams showing uplink and downlink of Apollo spacecraft automatic checkout equipment

APOLLO SPACECRAFT↗