Methodology for Evaluating Raw Material Changes to RSRM Elastomeric Insulation Materials

The Reusable Solid Rocket Motor (RSRM) uses asbestos and silicon dioxide filled acrylonitrile butadiene rubber (AS-NBR) as the primary internal insulation to protect the case from heat. During the course of the RSRM Program, several changes have been made to the raw materials and processing of the AS-NBR elastomeric insulation material. These changes have been primarily caused by raw materials becoming obsolete. In addition, some process changes have been implemented that were deemed necessary to improve the quality and consistency of the AS-NBR insulation material. Each change has been evaluated using unique test efforts customized to determine the potential impacts of the specific raw material or process change. Following the evaluations, the various raw material and process changes were successfully implemented with no detectable effect on the performance of the AS-NBR insulation. This paper will discuss some of the raw material and process changes evaluated, the methodology used in designing the unique test plans, and the general evaluation results. A summary of the change history of RSRM AS-NBR internal insulation is also presented.

Mildenhall, Scott D.↗

Plasma Heating: An Advanced Technology

The Mercury and Apollo spacecraft shields were designed to protect astronauts from high friction temperatures (well over 2,000 degrees Fahrenheit) when re-entering the Earth's atmosphere. It was necessary to test and verify the heat shield materials on Earth before space flight. After exhaustive research and testing, NASA decided to use plasma heating as a heat source. This technique involves passing a strong electric current through a rarefied gas to create a plasma (ionized gas) that produces an intensely hot flame. Although NASA did not invent the concept, its work expanded the market for commercial plasma heating systems. One company, Plasma Technology Corporation (PTC), was founded by a member of the team that developed the Re-entry Heating Simulator at Ames Research Center (ARC). Dr. Camacho, President of PTC, believes the technology has significant environmental applications. These include toxic waste disposal, hydrocarbon, decomposition, medical waste disposal, asbestos waste destruction, and chemical and radioactive waste disposal.

Source record↗

Jewelry Design

A jeweler's torch generates temperatures of 1,400 - 1,800 degrees. Asbestos blocks were used as soldering bases but they were disintegrating at high temperatures. Space Shuttle tiles, manufactured by Lockheed Missiles & Space Co., offered a base with temperature resistance far beyond his requirements.

Source record↗

Fireblocking Fibers

PBI was originally developed for space suits. In 1980, the need for an alternative to asbestos and stricter government anti-pollution standards led to commercialization of the fire blocking fiber. PBI is used for auto racing driver suits and aircraft seat covers. The fiber does not burn in air, is durable and easily maintained. It has been specified by a number of airliners and is manufactured by Hoechst-Celanese Corporation.

Source record↗

Insulation Material

Manufactured by Hitco Materials Division of Armco, Inc. a ceramic fiber insulation material known as Refrasil has been used extensively as a heat-absorbing ablative reinforcement for such space systems as rocket motor nozzles, combustion chambers, and re-entry shields. Refrasil fibers are highly porous and do not melt or vaporize until fibers exceed 3,100 degrees Fahrenheit. Due to these and other properties, Refrasil has found utility in a number of industrial high temperature applications where glass, asbestos and other materials fail. Hitco used this insulation to assist Richardson Co., Inc. in the manufacturing of hard rubber and plastic molded battery cases.

Source record↗

NASA Lewis' Icing Research Tunnel Works With Small Local Company to Test Coatings

Dynamic Coatings, Inc., wanted to test coating products that would enable the company to approach new markets. A Space Act Agreement with NASA Lewis Research Center afforded them this opportunity. They used Lewis' Icing Research Tunnel to test coating products for reduced ice adhesion, industrial and aerospace lubrication applications, a tiremold release coating now used in the production of tires for the Boeing 777, and a product that solidifies asbestos fibers (which is being tested as an insulator in a power plant in Iowa). Not only was the testing a success, but during these activities, Dynamic Coatings met another coating company with whom they now have a joint venture offering a barnacle-repellent coating for marine applications, now on the market in Florida.

Source record↗

Evaluation of the Effect of Silicone Contamination on Various Bond Systems and the Feasibility of Removing the Contamination

Silicone is a contaminant that can cause catastrophic failure of a bond system depending on the materials and processes used to fabricate the bond system. Unfortunately, more and more materials are fabricated using silicone. The purpose of this testing was to evaluate which bond systems are sensitive to silicone contamination and whether or not a cleaning process could be utilized to remove the silicone to bring the bond system performance back to baseline. Due to the extensive nature of the testing, attempts will be made to generalize the understanding within classes of substrates, bond systems, and surface preparation and cleaning methods. This study was done by contaminating various metal (steel, Inconel, and aluminum), phenolic (carbon-cloth phenolic [CCP] and glass-cloth phenolic [GCP]), and rubber (natural rubber, asbestos-silicone dioxide filled natural butyldiene rubber [ASNBR]; silica-filled ethylene propylenediene monomer [SFEPDM], and carbon-filled ethylene propylenediene monomer [CFEPDM]) substrates which were then bonded using various adhesives and coatings (epoxy-based adhesives, paints, ablative compounds, and Chemlok adhesives) to determine the effect silicone contamination has on a given bond system's performance. The test configurations depended on the bond system being evaluated. The study also evaluated the feasibility of removing the silicone contamination by cleaning the contaminated substrate prior to bonding. The cleaning processes also varied depending on bond system.

Stanley, Stephanie D.↗

Evaluation of the Effect of Silicone Contamination on Various Bond Systems and the Feasibility of Removing the Contamination

Silicone is a contaminant that can cause catastrophic failure of a bond system depending on the materials and processes used to fabricate the bond system, Unfortunately, more and more materials are fabricated using silicone. The purpose of this testing was to evaluate which bond systems are sensitive to silicone contamination and whether or not a cleaning process could be utilized to remove the silicone to bring the bond system performance back to baseline. Due to the extensive nature of the testing attempts will be made to generalize the understanding within classes of substrates, bond systems, and surface preparation and cleaning methods. This study was done by contaminating various meta! (steel, inconel, and aluminum), phenolic (carbon cloth phenolic and glass cloth phenolic), and rubber (natural rubber, asbestos-silicone dioxide filled natural butyldiene rubber, silica-filled ethylene propylenediene monomer, and carbon-filled ethylene propylenediene monomer) substrates which were then bonded using various adhesives and coatings (epoxy-based adhesives, paints, ablative compounds, and Chemlok adhesives) to determine the effect silicone contamination has on a given bond system's performance. The test configurations depended on the bond system being evaluated. The study also evaluated the feasibility of removing the silicone contamination by cleaning the contaminated substrate prior to bonding. The cleaning processes also varied depending on bond system.

Stanley, Stephanie D.↗

Reusable Solid Rocket Motor - Accomplishments, Lessons, and a Culture of Success

The Reusable Solid Rocket Motor represents the largest solid rocket motor ever flown and the only human rated solid motor. Each Reusable Solid Rocket Motor (RSRM) provides approximately 3-million lb of thrust to lift the integrated Space Shuttle vehicle from the launch pad. The motors burn out approximately 2 minutes later, separate from the vehicle and are recovered and refurbished. The size of the motor and the need for high reliability were challenges. Thrust shaping, via shaping of the propellant grain, was needed to limit structural loads during ascent. The motor design evolved through several block upgrades to increase performance and to increase safety and reliability. A major redesign occurred after STS-51L with the Redesigned Solid Rocket Motor. Significant improvements in the joint sealing systems were added. Design improvements continued throughout the Program via block changes with a number of innovations including development of low temperature o-ring materials and incorporation of a unique carbon fiber rope thermal barrier material. Recovery of the motors and post flight inspection improved understanding of hardware performance, and led to key design improvements. Because of the multidecade program duration material obsolescence was addressed, and requalification of materials and vendors was sometimes needed. Thermal protection systems and ablatives were used to protect the motor cases and nozzle structures. Significant understanding of design and manufacturing features of the ablatives was developed during the program resulting in optimization of design features and processing parameters. The project advanced technology in eliminating ozone-depleting materials in manufacturing processes and the development of an asbestos-free case insulation. Manufacturing processes for the large motor components were unique and safety in the manufacturing environment was a special concern. Transportation and handling approaches were also needed for the large hardware segments. The reusable solid rocket motor achieved significant reliability via process control, ground test programs, and postflight assessment. Process control is mandatory for a solid rocket motor as an acceptance test of the delivered product is not feasible. Process control included process failure modes and effects analysis, statistical process control, witness panels, and process product integrity audits. Material controls and inspections were maintained throughout the sub tier vendors. Material fingerprinting was employed to assess any drift in delivered material properties. The RSRM maintained both full scale and sub-scale test articles. These enabled continuous improvement of design and evaluation of process control and material behavior. Additionally RSRM reliability was achieved through attention to detail in post flight assessment to observe any shift in performance. The postflight analysis and inspections provided invaluable reliability data as it enables observation of actual flight performance, most of which would not be available if the motors were not recovered. These unique challenges, features of the reusable solid rocket motor, materials and manufacturing issues, and design improvements will be discussed in the paper.

Moore, Dennis R.↗

Real-Time X-ray Radiography Diagnostics of Components in Solid Rocket Motors

Solid rocket motors (SRMs) typically use nozzle materials which are required to maintain their shape as well as insulate the underlying support structure during the motor operation. In addition, SRMs need internal insulation materials to protect the motor case from the harsh environment resulting from the combustion of solid propellant. In the nozzle, typical materials consist of high density graphite, carbon-carbon composites and carbon phenolic composites. Internal insulation of the motor cases is typically a composite material with carbon, asbestos, Kevlar, or silica fibers in an ablative matrix such as EPDM or NBR. For both nozzle and internal insulation materials, the charring process occurs when the hot combustion products heat the material intensely. The pyrolysis of the matrix material takes away a portion of the thermal energy near the wall surface and leaves behind a char layer. The fiber reinforcement retains the porous char layer which provides continued thermal protection from the hot combustion products. It is of great interest to characterize both the total erosion rates of the material and the char layer thickness. By better understanding of the erosion process for a particular ablative material in a specific flow environment, the required insulation material thickness can be properly selected. The recession rates of internal insulation and nozzle materials of SRMs are typically determined by testing in some sort of simulated environment; either arc-jet testing, flame torch testing, or subscale SRMs of different size. Material recession rates are deduced by comparison of pre- and post-test measurements and then averaging over the duration of the test. However, these averaging techniques cannot be used to determine the instantaneous recession rates of the material. Knowledge of the variation in recession rates in response to the instantaneous flow conditions during the motor operation is of great importance. For example, in many SRM configurations the recession of the solid propellant grain can drastically alter the flow-field and effect the recession of internal insulation and nozzle materials. Simultaneous measurement of the overall erosion rate, the development of the char layer, and the recession of the char-virgin interface during the motor operation can be rather difficult. While invasive techniques have been used with limited success, they have serious drawbacks. Break wires or make wire sensors can be installed into a sufficient number of locations in the charring material from which a time history of the charring surface can be deduced. These sensors fundamentally alter the local structure of the material in which they are imbedded. Also, the location of these sensors within the material is not known precisely without the use of an X-ray. To determine instantaneous recession rates, real-time X-ray radiography (X-ray RTR) has been utilized in several SRM experiments at PSU. The X-ray RTR system discussed in this paper consists of an X-ray source, X-ray image intensifier, and CCD camera connected to a capture computer. The system has been used to examine the ablation process of internal insulation as well as nozzle material erosion in a subscale SRM. The X-ray source is rated to 320 kV at 10 mA and has both a large (5.5 mm) and small (3.0 mm) focal spot. The lead-lined cesium iodide X-ray image intensifier produces an image which is captured by a CCD camera with a 1,000 x 1,000 pixel resolution. To produce accurate imagery of the object of interest, the alignment of the X-ray source to the X-ray image intensifier is crucial. The image sequences captured during the operation of an SRM are then processed to enhance the quality of the images. This procedure allows for computer software to extract data on the total erosion rate and the char layer thickness. Figure 1 Error! Reference source not found.shows a sequence of images captured during the operation the subscale SRM with the X-ray RTR system. The X-rayTR system, alignment procedure, uncertainty determination, and image analysis process will be discussed in detail in the full manuscript.

Cortopassi, A. C.↗

Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are underway with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex S.↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗

Insulation Reformulation Development

The current Space Launch System (SLS) internal solid rocket motor insulation, polybenzimidazole acrylonitrile butadiene rubber (PBI-NBR), is a new insulation that replaced asbestos-based insulations found in Space Shuttle heritage solid rocket boosters. PBI-NBR has some outstanding characteristics such as an excellent thermal erosion resistance, low thermal conductivity, and low density. PBI-NBR also has some significant challenges associated with its use: Air entrainment/entrapment during manufacture and lay-up/cure and low mechanical properties such as tensile strength, modulus, and fracture toughness. This technology development attempted to overcome these challenges by testing various reformulated versions of booster insulation. The results suggest the SLS program should continue to investigate material alternatives for potential block upgrades or use an entirely new, more advanced booster. The experimental design was composed of a logic path that performs iterative formulation and testing in order to maximize the effort. A lab mixing baseline was developed and documented for the Rubber Laboratory in Bldg. 4602/Room 1178.

Chapman, Cynthia↗

Test and Analysis of Solid Rocket Motor Nozzle Ablative Materials

Asbestos free solid motor internal insulation samples were tested at the MSFC Hyperthermal Facility. Objectives of the test were to gather data for analog characterization of ablative and in-depth thermal performance of rubber materials subject to high enthalpy/pressure flow conditions. Tests were conducted over a range of convective heat fluxes for both inert and chemically reactive sub-sonic free stream gas flow. Instrumentation included use of total calorimeters, thermocouples, and a surface pyrometer for surface temperature measurement. Post-test sample forensics involved measurement of eroded depth, charred depth, total sample weight loss, and documentation of the general condition of the eroded profile. A complete Charring Material Ablator (CMA) style aero-thermal analysis was conducted for the test matrix and results compared to the measured data. In general, comparisons were possible for a number of the cases and the results show a limited predictive ability to model accurately both the ablative response and the in-depth temperature profiles. Lessons learned and modeling recommendations are made regarding future testing and modeling improvements that will increase understanding of the basic chemistry/physics associated with the complicated material ablation process of rubber materials.

Clayton, J. Louie↗

Incorporating Non-energy Benefits into Energy Savings Performance Contracts

This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers use to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Existing Whole-House Solutions Case Study: Retrofit of 1915 Home, Dayton, Washington

This case study lists project information, cost and energy efficiency performance data, energy efficiency measures and lessons learned for a 1915 home in eastern Washington audited by Pacific Northwest National Laboratory for an energy retrofit. The asbestos covered diesel boiler was left in place in the basement and a new SEER 16, HSPF 9.4 ductless heat pump with four inside heads was added to cut energy costs over $2,000/year.

Building America↗

Electronic Medical Business Operations System

Electronic Management of medical records has taken a back seat both in private industry and in the government. Record volumes continue to rise every day and management of these paper records is inefficient and very expensive. In 2005, the White House announced support for the development of electronic medical records across the federal government. In 2006, the DOE issued 10 CFR 851 requiring all medical records be electronically available by 2015. The Y-12 National Security Complex is currently investing funds to develop a comprehensive EMR to incorporate the requirements of an occupational health facility which are common across the Nuclear Weapons Complex (NWC). Scheduling, workflow, and data capture from medical surveillance, certification, and qualification examinations are core pieces of the system. The Electronic Medical Business Operations System (EMBOS) will provide a comprehensive health tool solution to 10 CFR 851 for Y-12 and can be leveraged to the Nuclear Weapon Complex (NWC); all site in the NWC must meet the requirements of 10 CFR 851 which states that all medical records must be electronically available by 2015. There is also potential to leverage EMBOS to the private4 sector. EMBOS is being developed and deployed in phases. When fully deployed the EMBOS will be a state-of-the-art web-enabled integrated electronic solution providing a complete electronic medical record (EMR). EMBOS has been deployed and provides a dynamic electronic medical history and surveillance program (e.g., Asbestos, Hearing Conservation, and Respirator Wearer) questionnaire. Table 1 below lists EMBOS capabilities and data to be tracked. Data to be tracked: Patient Demographics – Current/Historical; Physical Examination Data; Employee Medical Health History; Medical Surveillance Programs; Patient and Provider Schedules; Medical Qualification/Certifications; Laboratory Data; Standardized Abnormal Lab Notifications; Prescription Medication Tracking and Dispensing; Allergies; Non-Occupational Illness and Injury Visits; Occupational Recommendations/Restrictions; Diagnosis/Vital Signs/Blood Pressures; Immunizations; Return to Work Visits Capabilities: Targeted Health Assessments; Patient Input Capabilities for Questionnaires; Medical Health History; Surveillance Programs; Human Reliability Program; Scheduling; Automated Patient Check-in/Check-out; Provider & Patient Workflow; Laboratory Interface & Device Integration; Human Reliability Program Processing; Interoperability with SAP, IH, IS, RADCON; Coding: ICED-9/10; Desktop Integration; Interface/Storage of Digital X-Rays (PACS)

Cannon, D. T.↗

Y-12 National Security Complex's Sustainable Recovery and Transformation - 12420

American Recovery and Reinvestment Act (ARRA) funds were used at the Y-12 National Security Complex (Y-12) to remove legacy materials from large contaminated excess facilities in order to prepare the facilities for demolition, demolish five excess buildings, and clean up sources of environmental contamination. The legacy materials and buildings presented many challenges and the potential hazards included depleted uranium and other radiological contaminants, lead, polychlorinated biphenyls, Freon, mold, mildew, asbestos, beryllium and mercury. Y-12 project teams have integrated sustainable waste management practices into each of the seven ARRA projects. The ARRA clean up efforts have resulted in the reduction of potential environmental, health, and safety risks posed by the excess facilities and sources of environmental contamination. Y-12's ARRA project teams focused on completing the activities in a sustainable, timely and safe manner. The site utilized a systematic material disposition evaluation process to ensure that materials were not automatically dis-positioned as waste. ARRA projects have recycled or reused over 1.3 million pounds of materials while preventing over 3 million vehicle miles traveled for waste disposal. Y-12 ARRA projects have worked over 2 million safe work hours without a lost time injury. The site has already begun to beneficially reuse land cleared by ARRA project activities to support sustainable transformation efforts. The Y-12 ARRA project activities have demonstrated that large complex projects can be completed sustainably and safely while maintaining an aggressive schedule. Through careful planning and execution, ARRA projects at the site have sustainably reduced the potential environmental, health, and safety risks posed to site employees and the community by the excess facilities and sources of environmental contamination. Y-12's systematic material disposition process ensured that materials were not automatically assumed to be wastes and facilitated the evaluation of all unneeded materials for reuse or recycling. The site's pervasive pollution prevention culture is reflected in the recycling or reuse of over 1.3 million pounds of materials by the ARRA project teams. While the disposal of a large volume of ARRA wastes could not be avoided, the projects were able to reduce the local and national impacts of waste transportation and disposal through careful planning and efficient execution. The site has conserved natural resources through the preservation and beneficial reuse of materials and land cleared by ARRA activities. Y-12 has taken steps to preserve its history as the site undergoes a sustainable and safe transformation for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗