Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design Technology, and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Advances of the FRIB project

The Facility for Rare Isotope Beams (FRIB) Project has entered the phase of beam commissioning starting from the room-temperature front end and the superconducting linac segment of first 15 cryomodules. With the newly commissioned helium refrigeration system supplying 4.5K liquid helium to the quarter-wave resonators and solenoids, the FRIB accelerator team achieved the sectional key performance parameters as designed ahead of schedule accelerating heavy ion beams above 20MeV/u energy. Thus, FRIB accelerator becomes world’s highest-energy heavy ion linear accelerator. We also validated machine protection and personnel protection systems that will be crucial to the next phase of commissioning. FRIB is on track towards a national user facility at the power frontier with a beam power two orders of magnitude higher than operating heavy ion facilities. Here, this paper summarizes the status of accelerator design, technology development, construction, commissioning as well as path to operations and upgrades.

43 PARTICLE ACCELERATORS↗

IR Camera Report for the 7 Day Production Test

The following report gives a summary of the IR camera performance results and data for the 7 day production run that occurred from 10 Sep 2015 thru 16 Sep 2015. During this production run our goal was to see how well the camera performed its task of monitoring the target window temperature with our improved alignment procedure and emissivity measurements. We also wanted to see if the increased shielding would be effective in protecting the camera from damage and failure.

43 PARTICLE ACCELERATORS↗

High power ring methods and accelerator driven subcritical reactor application

High power proton accelerators allow providing, by spallation reaction, the neutron fluxes necessary in the synthesis of fissile material, starting from Uranium 238 or Thorium 232. This is the basis of the concept of sub-critical operation of a reactor, for energy production or nuclear waste transmutation, with the objective of achieving cleaner, safer and more efficient process than today’s technologies allow. Designing, building and operating a proton accelerator in the 500-1000 MeV energy range, CW regime, MW power class still remains a challenge nowadays. There is a limited number of installations at present achieving beam characteristics in that class, e.g., PSI in Villigen, 590 MeV CW beam from a cyclotron, SNS in Oakland, 1 GeV pulsed beam from a linear accelerator, in addition to projects as the ESS in Europe, a 5 MW beam from a linear accelerator. Furthermore, coupling an accelerator to a sub-critical nuclear reactor is a challenging proposition: some of the key issues/requirements are the design of a spallation target to withstand high power densities as well as ensure the safety of the installation. These two domains are the grounds of the PhD work: the focus is on the high power ring methods in the frame of the KURRI FFAG collaboration in Japan: upgrade of the installation towards high intensity is crucial to demonstrate the high beam power capability of FFAG. Thus, modeling of the beam dynamics and benchmarking of different codes was undertaken to validate the simulation results. Experimental results revealed some major losses that need to be understood and eventually overcome. By developing analytical models that account for the field defects, one identified major sources of imperfection in the design of scaling FFAG that explain the important tune variations resulting in the crossing of several betatron resonances. A new formula is derived to compute the tunes and properties established that characterize the effect of the field imperfections on the transverse beam dynamics. The results obtained allow to develop a correction scheme to minimize the tune variations of the FFAG. This is the cornerstone of a new fixed tune non-scaling FFAG that represents a potential candidate for high power applications. As part of the developments towards high power at the KURRI FFAG, beam dynamics studies have to account for space charge effects. In that framework, models have been installed in the tracking code ZGOUBI to account for the self-interaction of the particles in the accelerator. Application to the FFAG studies is shown. Finally, one focused on the ADSR concept as a candidate to solve the problem of nuclear waste. In order to establish the accelerator requirements, one compared the performance of ADSR with other conventional critical reactors by means of the levelized cost of energy. A general comparison between the different accelerator technologies that can satisfy these requirements is finally presented. In summary, the main drawback of the ADSR technology is the high Levelized Cost Of Energy compared to other advanced reactor concepts that do not employ an accelerator. Nowadays, this is a show-stopper for any industrial application aiming at producing energy (without dealing with the waste problem). Besides, the reactor is not intrinsically safer than critical reactor concepts, given the complexity of managing the target interface between the accelerator and the reactor core.

43 PARTICLE ACCELERATORS↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

FCC-ee: The Lepton Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. On the other hand, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the domination of matter over antimatter, the evidence for dark matter and the non-zero neutrino masses. Theoretical issues that need to be addressed include the hierarchy problem, the neutrality of the Universe, the stability of the Higgs boson mass upon quantum corrections and the strong CP problem. This report contains the description of a novel research infrastructure based on a highest-luminosity energy frontier electron-positron collider (FCC-ee) to address the open questions of modern physics. It will be a general precision instrument for the continued in-depth exploration of nature at the smallest scales, optimised to measure precisely the properties of the Higgs boson at the per-cent level, the Z and W bosons, the top quark and the Higgs coupling to the Z at the per-mil level. FCC-ee will provide unprecedented sensitivity to signs of new physics appearing either in the form of small deviations from the Standard Model or as rare decay processes. This collider will be implemented in stages, successively spanning the entire energy range from the Z pole over the WW threshold and H production peak to the t"t" ̅ threshold. Most of the infrastructure (e.g. underground structures, surface sites, electrical distribution, cooling & ventilation, RF systems) can be directly re-used for a subsequent highest-energy hadron collider (described in the FCC conceptual design report volume 3), serving the world-wide particle-physics community in a highly synergetic and cost-effective manner throughout the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular lepton collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy, highest-luminosity circular lepton collider exists today. The FCC-ee concept comprises a power-saving twin-aperture magnet system, a continuous top-up injection scheme for stable operation and maximum integrated luminosity. Combined with an energy staging scheme, the FCC-ee represents the most efficient and most sustainable route for executing the research required to discover signs of new physics beyond the Standard Model. The step-wise energy increase of the FCC-ee does not require any additional civil engineering activities. Strategic R&D for FCC-ee aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate residual technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, building the international machine and experiment consortia, developing a territorial implementation plan in agreement with the host-states’ requirements, optimising the disposal of land and underground volumes and preparing the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

FCC-hh: The Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a highest-energy hadron collider with a centre-of-mass collision energy of 100 TeV and an integrated luminosity of at least a factor of 5 larger than the HL-LHC. It will extend the current energy frontier by almost an order of magnitude. The mass reach for direct discovery will reach several tens of TeV, and allow, for example, to produce new particles whose existence could be indirectly exposed by precision measurements during the earlier preceding e+e– collider phase. This collider will also precisely measure the Higgs self-coupling and thoroughly explore the dynamics of electroweak symmetry breaking at the TeV scale, to elucidate the nature of the electroweak phase transition. WIMPs as thermal dark matter candidates will be discovered, or ruled out. As a single project, this particle collider infrastructure will serve the world-wide physics community for about 25 years and, in combination with a lepton collider (see FCC conceptual design report volume 2), will provide a research tool until the end of the 21st century. Collision energies beyond 100 TeV can be considered when using high-temperature superconductors. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular energy frontier collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy circular hadron collider can be brought to the technology readiness level required for constructing within the coming ten years through a focused R&D programme. The FCC-hh concept comprises in the baseline scenario a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. On a longer timescale, high-temperature superconductors can be developed together with industrial partners to achieve an even more energy efficient particle collider or to reach even higher collision energies.The re-use of the LHC and its injector chain, which also serve for a concurrently running physics programme, is an essential lever to come to an overall sustainable research infrastructure at the energy frontier. Strategic R&D for FCC-hh aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate technology-related risks and ensure that industry can benefit from an acceptable utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan in agreement with the host-states’ requirements, to optimise the disposal of land and underground volumes, and to prepare the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

HE-LHC: The High-Energy Large Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a high-energy hadron collider, which extends the current energy frontier by almost a factor 2 (27 TeV collision energy) and an integrated luminosity of at least a factor of 3 larger than the HL-LHC. In connection with four experimental detectors, this infrastructure will deepen our understanding of the origin of the electroweak symmetry breaking, allow a first measurement of the Higgs self-coupling, double the HL-LHC discovery reach and allow for in-depth studies of new physics signals arising from future LHC measurements. This collider would directly produce particles at significant rates at scales up to 12 TeV. The project re-uses the existing LHC underground infrastructure and large parts of the injector chain at CERN. This particle collider would succeed the HL-LHC directly and serve the world-wide physics community for about 20 years beyond the middle of the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular high-energy hadron collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a High-Energy LHC can be brought to the technology readiness level required for construction within the coming ten years through a committed and focused R&D programme. The concept comprises a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. Re-use of the LHC underground civil infrastructure worth about 500 million CHF at the time of its construction, extension of the surface sites and use of the existing injector chain that also serve for a concurrently running physics programme are levers to come to a sustainable research infrastructure at the energy frontier. Strategic R&D for HE-LHC aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It needs to mitigate technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan considering the constraints emerging from using the existing infrastructure and the host states’ requirements, optimising the use of land, resources and preparing the construction project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Beam optics design of a prototype 20 kW conduction-cooled SRF accelerator for medical sterilization

Superconducting technology has significantly advanced the capabilities of particle accelerators, facilitating higher beam-power operations for fundamental research at a comparatively lower cost. However, the conventional implementation of superconducting technology introduces complexities in the form of cryogenic plants, cryogenic distribution systems and substantial construction and operational cost. In response to these challenges, recent research efforts at Fermilab have been dedicated to the development of a cryogen-free, conduction-cooled Nb3Sn-based superconducting technology. This paper outlines the beam optics design of a 20-kW conduction-cooled compact superconducting accelerator for medical sterilization. The paper reviews both the physics and practical constraints associated with high beam-power operation within the context of industrial applications. The focus is on providing insights into the potential of this innovative technology to overcome existing challenges and pave the way for more accessible and efficient industrial particle accelerators.

Saini, A. [Fermilab]↗

Beam Optics Design of A Prototype 20 kW Conduction-Cooled SRF Accelerator for Medical Sterilization

Superconducting technology has significantly advanced the capabilities of particle accelerators, facilitating higher beam-power operations for fundamental research at a comparatively lower cost. However, the conventional implementation of superconducting technology introduces complexities in the form of cryogenic plants, cryogenic distribution systems and substantial construction and operational cost. In response to these challenges, recent research efforts at Fermilab have been dedicated to the development of a cryogen-free, conduction-cooled Nb3Sn-based superconducting technology. This paper outlines the beam optics design of a 20-kW conduction-cooled compact superconducting accelerator for medical sterilization. The paper reviews both the physics and practical constraints associated with high beam-power operation within the context of industrial applications. The focus is on providing insights into the potential of this innovative technology to overcome existing challenges and pave the way for more accessible and efficient industrial particle accelerators.

43 PARTICLE ACCELERATORS↗

Beam Optics Design of a Prototype 20 KW Conduction-cooled SRF Accelerator for Medical Sterilization

Superconducting technology has significantly advanced the capabilities of particle accelerators, facilitating higher beam-power operations for fundamental research at a comparatively lower cost. However, the conventional implementation of superconducting technology introduces complexities in the form of cryogenic plants, cryogenic distribution systems and substantial construction and operational cost. In response to these challenges, recent research efforts at Fermilab have been dedicated to the development of a cryogen-free, conduction-cooled Nb3Sn-based superconducting technology. This paper outlines the beam optics design of a 20-kW conduction-cooled compact superconducting accelerator for medical sterilization. The paper reviews both the physics and practical constraints associated with high beam-power operation within the context of industrial applications. The focus is on providing insights into the potential of this innovative technology to overcome existing challenges and pave the way for more accessible and efficient industrial particle accelerators.

43 PARTICLE ACCELERATORS↗

FRIB Project Status and Beam Instrumentation Challenges

With an average beam power two orders of magnitude higher than operating heavy-ion facilities, the Facility for Rare Isotope Beams (FRIB) stands at the power frontier of the accelerator family. This report summarizes the status of design, technology development, construction, commissioning, as well as path to operations and upgrades. We also highlight beam instrumentation challenges including machine protection of high-power heavy-ion beams and complications of multi-charge-state and multi-ion-species accelerations.

43 PARTICLE ACCELERATORS↗

FEgen (v.1): Field Emission Distribution Generator Freeware Based on Fowler–Nordheim Equation

This work presents an open-source code, FEgen, that generates initial field emission distributions based on the time-dependent Fowler–Nordheim equation. Current in-demand and open-source beam tracking software—such as ASTRA, IMPACT-T, and GPT—do not contain native distribution generator functions suitable for field emitted electron tracking and phase space analysis. Furthermore, the intuitive graphical user interface of FEgen generates input files shown to be fully compatible with both ASTRA and GPT. Here, detailed application examples demonstrating a subset of FEgen’s capabilities are given by creating a customized emitter pattern with application to transverse beam shaping and longitudinal beam dynamic experiments.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗