Search NASA⌕ Search

SEARCH · Search NASA

Results for “BOLTS - STRESSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Complement to thermodynamics of dyonic Taub-NUT-AdS spacetime

We examine the thermodynamics of Euclidean dyonic Taub-Nut/Bolt-AdS 4 black holes for a variety of horizon geometries to understand how gauge field regularity conditions influence the thermodynamic relations. We find several distinct features that distinguish the NUT-charged case from its dyonic Reissner-Nordstrom counterpart. For the Nut solution, the gauge field vanishes at the horizon and so regularity is ensured. For the Bolt solution we find that the norm of the gauge field is required to vanish at the horizon in order to satisfy both regularity and the first law of thermodynamics. This regularity condition yields a constraint on the electric and magnetic charges and so reduces cohomogeneity of the system; for spherical horizons, the regularity condition removing the Misner string singularity further reduces cohomogeneity. We observe that bolt solutions with increasing electric charge have positive heat capacity, but upon turning on the magnetic charge to make the solution dyonic, we find that the properties of the uncharged one are retained, having both positive and negative heat capacity. We also study the extremal Bolt solution, finding that Misner string disappears at the horizon in the zero temperature limit. We find that the extremal solution has finite-temperature-like behaviour, with the electric potential playing a role similar to temperature.

79 ASTRONOMY AND ASTROPHYSICS↗

Supplemental Structural Analyses Used in Support of Certification of the Defense Programs Package 3

The Defense Programs Package (DPP)-3 is to be certified by the National Nuclear Security Administration (NNSA) Packaging and Transportation Division (PTD). Certification is based on successful physical testing of the package, and six certification test units (CTUs) have been subjected to the normal conditions of transport (NCT) and hypothetical accident conditions (HAC) outlined in Title 10 of the Code of Federal Regulations Part 71 (10 CFR 71). During regulatory testing of one of the CTUs, the drum lid closure bolt closest to the impact surface failed during the HAC 30-ft side drop. One of the testing goals for this CTU was to minimize the thermal pathway from the drum exterior shell to the containment vessel (CV) flange and O-rings, leading to the maximum damage scenario in preparation for thermal testing at 1475 °F. Therefore, the puncture bar impact proceeded as originally planned by striking the side wall of the package exterior closest to the location of the CV flange. This puncture bar impact did not attempt to exploit the region of the failed drum lid closure bolt to potentially cause more damage to the package. After the conclusion of regulatory testing, the DPP-3 package finite element model was used to numerically evaluate the effects of puncture bar impacts to the drum exterior in the vicinity of the failed drum lid closure bolt to further demonstrate the robustness of the DPP-3 design. Three alternate puncture bar impact locations and orientations were evaluated to demonstrate that these puncture bar impacts would not substantially reduce the effectiveness of the DPP-3 packaging. This paper describes the supplemental finite element models performed and structural analysis results that demonstrate the alternate HAC 40-in. puncture bar impact tests would have no deleterious effect on the performance of the DPP-3.

Sakalaukus Jr., Peter J.↗

TRUST Testing Procedure Documentation

The TRUST testbed was designed and fabricated to conduct vibration testing and validate the behavior of hyper-elastic foams in a pre-loaded condition. The main goals of this testbed design were to ensure symmetry, proper instrumentation alignment and mounting, simplified geometry to make the data analysis validation process more straightforward, and to apply and monitor the applied pre-load. Based off of the test parameters, a shaker system was purchased. The baseplate was designed to mount directly to the bolt holes provided on the top of the shaker table. It was determined that the specimens will be cylindrical and vary in thickness from 2-10mm. The baseplate riser, center-mass, and testbed cap were designed to be cylindrical to make alignment about the center axis more straightforward. It was determined to fabricate the parts previously mentioned using Aluminum 6061-T6 due to its stiffness in order to reduce the likelihood of the stiff material impacting the data being collected for the foam specimens. The design concept used to apply the pre-load to the testbed was a through bolt/nut configuration. A through hole was included in each piece of the testbed, specimens, and instrumentation large enough to allow for 1/8” clearance between the through bolt and each of these pieces. This was imperative to avoid causing friction and complicating the validation model. A load cell was then purchased and used to measure the pre-load being applied to the testbed. It was also required to collect data for 3 axes at 3 different locations 120° apart on the center-mass. This configuration was required to be placed on the cylindrical face and toward the top and bottom of the center-mass. Slots were milled out in the middle of each sensor block with tight tolerances for mounting each of the accelerometers at 120° apart. This same approach was taken to mount 2 accelerometers on the baseplate at 180° apart. Holes were milled out of the corners of each accelerometer mounting slot to relieve the corner and allow for a flat edge at the back of each slot. Sensor blocks were mounted into the center-mass using 6-32 bolts at the required locations. This initial testbed design was fabricated at the TA53 machine shop.

42 ENGINEERING↗

Pilot cryo tunnel: Attachments, seals, and insulation

Several different tests are described which simulated the actual configuration of a cryogenic wind tunnel operating at pressures up to 5 atmospheres (507 kPa) and temperatures from -320 F (78K) to 120 F (322K) in order to determine compatible bolting, adequate sealing, and effective insulating materials. The evaluation of flange attachments (continuous threaded studs) considered bolting based on compatible flanges, attachment materials, and prescribed bolt elongations. Various types of seals and seal configurations were studied to determine suitability and reusability under the imposed pressure and temperature loadings. The temperature profile was established for several materials used for structural supports.

Wilson, J. F.↗

Electrical servo actuator bracket

An electrical servo actuator is mounted on a support arm which is allowed to pivot on a bolt through a fixed mounting bracket. The actuator is pivotally connected to the end of the support arm by a bolt which has an extension allowed to pass through a slot in the fixed mounting bracket. An actuator rod extends from the servo actuator to a crank arm which turns a control shaft. A short linear thrust of the rod pivots the crank arm through about 90 for full-on control with the rod contracted into the servo actuator, and full-off control when the rod is extended from the actuator. A spring moves the servo actuator and actuator rod toward the control crank arm once the actuator rod is fully extended in the full-off position. This assures the turning of the control shaft to a full-off position. A stop bolt and slot are provided to limit pivot motion. Once fully extended, the spring pivots the motion.

Sawyer, R. V.↗

Economical Joint for Truss Structures

Mass-produced flat parts easily assembled. Joint for three-dimensional truss made of simple die-cutplates and inexpensive fasteners. Each truss joint consists of two identical interlocking plates bolted, welded, or glued together. Truss struts bolted to joint through holes in plate. Alternatively, ends of struts forked so that they slip over plates and fastened to them by bolts or pins.

Moore, Carleton J.↗

Hidden Fastening-And-Unfastening Mechanism

Proposed mechanism placed behind panel fastens panel to, or unfastens it from, underlying structure. Electric motor and gearbox drives bolt to engage or disengage captive floating nut. Used where head at outer end of bolt or other fastener covered with protective outer layer on panel and inner end of bolt inaccessible.

Macconochie, Ian O.↗

Saddle Clamp With Captive Components

Saddle clamp modified to prevent parts from falling off when installed or removed. Allows easy access for tightening or loosening bolts, and retains alignment with tube mounted in it when opened. All parts are held captive - bolts by retaining washers, floating nuts by pressing and swaging, and upper clamp band by tether. Upper and lower bolt flanges offset from each other to ensure access.

Belrose, Charles R.↗

Spline screw payload fastening system

A system for coupling an orbital replacement unit (ORU) to a space station structure via the actions of a robot and/or astronaut is described. This system provides mechanical and electrical connections both between the ORU and the space station structure and between the ORU and the ORU and the robot/astronaut hand tool. Alignment and timing features ensure safe, sure handling and precision coupling. This includes a first female type spline connector selectively located on the space station structure, a male type spline connector positioned on the orbital replacement unit so as to mate with and connect to the first female type spline connector, and a second female type spline connector located on the orbital replacement unit. A compliant drive rod interconnects the second female type spline connector and the male type spline connector. A robotic special end effector is used for mating with and driving the second female type spline connector. Also included are alignment tabs exteriorally located on the orbital replacement unit for berthing with the space station structure. The first and second female type spline connectors each include a threaded bolt member having a captured nut member located thereon which can translate up and down the bolt but are constrained from rotation thereabout, the nut member having a mounting surface with at least one first type electrical connector located on the mounting surface for translating with the nut member. At least one complementary second type electrical connector on the orbital replacement unit mates with at least one first type electrical connector on the mounting surface of the nut member. When the driver on the robotic end effector mates with the second female type spline connector and rotates, the male type spline connector and the first female type spline connector lock together, the driver and the second female type spline connector lock together, and the nut members translate up the threaded bolt members carrying the first type electrical connector up to the complementary second type connector for interconnection therewith.

Vranish, John M.↗

Saddle clamp assembly

A saddle clamp assembly is presented. The assembly is comprised of a hollow cylindrical body centered about a longitudinal axis and being diametrically split into semicircular top and bottom sections. Each section has a pair of connection flanges, at opposite ends, that project radially outward. A pair of bolts are retained on the top section flanges and are threadable into nuts retained on the bottom section flanges. A base member is anchored to a central underside portion of the bottom clamp body section and has a pair of connection tabs positioned beneath the bottom clamp body section connection flanges on opposite sides of the clamp axis. A pair of bolts are retained on the base member connection tabs and are threadable into a pair of nuts retainable on a support structure. The connection tab and connection flanges on each side of the clamp body are axially offset in a manner permitting downward installation/removable tool access to the lower bolts past the connection flanges. An elongated retention tether is used to connect the top clamp body section to the balance of the clamp assembly. This prevents loss of the top clamp body section when it is removed from the bottom clamp body section.

Belrose, Charles R.↗

Static Strength Characteristics of Mechanically Fastened Composite Joints

The analysis of mechanically fastened composite joints presents a great challenge to structural analysts because of the large number of parameters that influence strength. These parameters include edge distance, width, bolt diameter, laminate thickness, ply orientation, and bolt torque. The research presented in this report investigates the influence of some of these parameters through testing and analysis. A methodology is presented for estimating the strength of the bolt-hole based on classical lamination theory using the Tsai-Hill failure criteria and typical bolthole bearing analytical methods.

Fox, D. E.↗

Sensing the Tension

Spanning over 4 decades, NASA's bolt tension monitoring technology has benefited automakers, airplane builders, and other major manufacturers that rely on the devices to evaluate the performance of computerized torque wrenches and other assembly line mechanisms. In recent years, the advancement of ultrasonic sensors has drastically eased this process for users, ensuring that proper tension and torque are being applied to bolts and fasteners, with less time needed for data analysis. Langley Research Center s Nondestructive Evaluation Branch is one of the latest NASA programs to incorporate ultrasonic sensors within a bolt tension measurement instrument. As a multi-disciplined research group focused on spacecraft and aerospace transportation safety, one of the branch s many commitments includes transferring problem solutions to industry. In 1998, the branch carried out this obligation in a licensing agreement with Micro Control, Inc., of West Bloomfield, Michigan. Micro Control, an automotive inspection company, obtained the licenses to two Langley patents to provide an improved-but-inexpensive means of ultrasonic tension measurement.

Source record↗

Common Cause Case Study: An Estimated Probability of Four Solid Rocket Booster Hold-down Post Stud Hang-ups

Until Solid Rocket Motor ignition, the Space Shuttle is mated to the Mobil Launch Platform in part via eight (8) Solid Rocket Booster (SRB) hold-down bolts. The bolts are fractured using redundant pyrotechnics, and are designed to drop through a hold-down post on the Mobile Launch Platform before the Space Shuttle begins movement. The Space Shuttle program has experienced numerous failures where a bolt has "hung-up." That is, it did not clear the hold-down post before liftoff and was caught by the SRBs. This places an additional structural load on the vehicle that was not included in the original certification requirements. The Space Shuttle is currently being certified to withstand the loads induced by up to three (3) of eight (8) SRB hold-down post studs experiencing a "hang-up." The results af loads analyses performed for four (4) stud-hang ups indicate that the internal vehicle loads exceed current structural certification limits at several locations. To determine the risk to the vehicle from four (4) stud hang-ups, the likelihood of the scenario occurring must first be evaluated. Prior to the analysis discussed in this paper, the likelihood of occurrence had been estimated assuming that the stud hang-ups were completely independent events. That is, it was assumed that no common causes or factors existed between the individual stud hang-up events. A review of the data associated with the hang-up events, showed that a common factor (timing skew) was present. This paper summarizes a revised likelihood evaluation performed for the four (4) stud hang-ups case considering that there are common factors associated with the stud hang-ups. The results show that explicitly (i.e. not using standard common cause methodologies such as beta factor or Multiple Greek Letter modeling) taking into account the common factor of timing skew results in an increase in the estimated likelihood of four (4) stud hang-ups of an order of magnitude over the independent failure case.

Cross, Robert↗

Common Cause Case Study: An Estimated Probability of Four Solid Rocket Booster Hold-Down Post Stud Hang-ups

Until Solid Rocket Motor ignition, the Space Shuttle is mated to the Mobil Launch Platform in part via eight (8) Solid Rocket Booster (SRB) hold-down bolts. The bolts are fractured using redundant pyrotechnics, and are designed to drop through a hold-down post on the Mobile Launch Platform before the Space Shuttle begins movement. The Space Shuttle program has experienced numerous failures where a bolt has hung up. That is, it did not clear the hold-down post before liftoff and was caught by the SRBs. This places an additional structural load on the vehicle that was not included in the original certification requirements. The Space Shuttle is currently being certified to withstand the loads induced by up to three (3) of eight (8) SRB hold-down experiencing a "hang-up". The results of loads analyses performed for (4) stud hang-ups indicate that the internal vehicle loads exceed current structural certification limits at several locations. To determine the risk to the vehicle from four (4) stud hang-ups, the likelihood of the scenario occurring must first be evaluated. Prior to the analysis discussed in this paper, the likelihood of occurrence had been estimated assuming that the stud hang-ups were completely independent events. That is, it was assumed that no common causes or factors existed between the individual stud hang-up events. A review of the data associated with the hang-up events, showed that a common factor (timing skew) was present. This paper summarizes a revised likelihood evaluation performed for the four (4) stud hang-ups case considering that there are common factors associated with the stud hang-ups. The results show that explicitly (i.e. not using standard common cause methodologies such as beta factor or Multiple Greek Letter modeling) taking into account the common factor of timing skew results in an increase in the estimated likelihood of four (4) stud hang-ups of an order of magnitude over the independent failure case.

Cross, Robert↗

Threaded average temperature thermocouple

A threaded average temperature thermocouple 11 is provided to measure the average temperature of a test situs of a test material 30. A ceramic insulator rod 15 with two parallel holes 17 and 18 through the length thereof is securely fitted in a cylinder 16, which is bored along the longitudinal axis of symmetry of threaded bolt 12. Threaded bolt 12 is composed of material having thermal properties similar to those of test material 30. Leads of a thermocouple wire 20 leading from a remotely situated temperature sensing device 35 are each fed through one of the holes 17 or 18, secured at head end 13 of ceramic insulator rod 15, and exit at tip end 14. Each lead of thermocouple wire 20 is bent into and secured in an opposite radial groove 25 in tip end 14 of threaded bolt 12. Resulting threaded average temperature thermocouple 11 is ready to be inserted into cylindrical receptacle 32. The tip end 14 of the threaded average temperature thermocouple 11 is in intimate contact with receptacle 32. A jam nut 36 secures the threaded average temperature thermocouple 11 to test material 30.

Ward, Stanley W.↗

Helium-Cooled Black Shroud for Subscale Cryogenic Testing

This shroud provides a deep-space simulating environment for testing scaled-down models of passively cooling systems for spaceflight optics and instruments. It is used inside a liquid-nitrogen- cooled vacuum chamber, and it is cooled by liquid helium to 5 K. It has an inside geometry of approximately 1.6 m diameter by 0.45 m tall. The inside surfaces of its top and sidewalls have a thermal absorptivity greater than 0.96. The bottom wall has a large central opening that is easily customized to allow a specific test item to extend through it. This enables testing of scale models of realistic passive cooling configurations that feature a very large temperature drop between the deepspace-facing cooled side and the Sun/Earth-facing warm side. This shroud has an innovative thermal closeout of the bottom wall, so that a test sample can have a hot (room temperature) side outside of the shroud, and a cold side inside the shroud. The combination of this closeout and the very black walls keeps radiated heat from the sample s warm end from entering the shroud, reflecting off the walls and heating the sample s cold end. The shroud includes 12 vertical rectangular sheet-copper side panels that are oriented in a circular pattern. Using tabs bent off from their edges, these side panels are bolted to each other and to a steel support ring on which they rest. The removable shroud top is a large copper sheet that rests on, and is bolted to, the support ring when the shroud is closed. The support ring stands on four fiberglass tube legs, which isolate it thermally from the vacuum chamber bottom. The insides of the cooper top and side panels are completely covered with 25- mm-thick aluminum honeycomb panels. This honeycomb is painted black before it is epoxied to the copper surfaces. A spiral-shaped copper tube, clamped at many different locations to the outside of the top copper plate, serves as part of the liquid helium cooling loop. Another copper tube, plumbed in a series to the top plate s tube, is clamped to the sidewall tabs where they are bolted to the support ring. Flowing liquid helium through these tubes cools the entire shroud to 5 K. The entire shroud is wrapped loosely in a layer of double-aluminized Kapton. The support ring s inner diameter is the largest possible hole through which the test item can extend into the shroud. Twelve custom-sized trapezoidal copper sheets extend inward from the support ring to within a few millimeters of the test item. Attached to the inner edge of each of these sheets is a custom-shaped strip of Kapton, which is aluminum- coated on the warm-facing (outer) side, and has thin Dacron netting attached to its cold-facing side. This Kapton rests against the test item, but the Dacron keeps it from making significant thermal contact. The result is a non-contact, radiatively reflective thermal closeout with essentially no gap through which radiation can pass. In this way, the part of the test item outside the shroud can be heated to relatively high temperatures without any radiative heat leaking to the inside.

Tuttle, James↗

Hexavalent Chrome Free Coatings for Electronics Electromagnetic Interference (EMI) Shielding Effectiveness (SE) Interim Test Report

Test specimen configuration was provided by Parker Chomerics. The EMI gasket used in this project was Cho-Seal 6503E. Black oxide alloy steel socket head bolts were used to hold the plates together. Non-conductive spacers were used to control the amount of compression on the gaskets. The following test fixture specifications were provided by Parker Chomerics. The CHO‐TP09 test plate sets selected for this project consist of two aluminum plates manufactured to the specifications detailed in CHO­‐TP09. The first plate, referred to as the test frame, is illustrated in Figure 1. The test frame is designed with a cutout in the center and two alternating bolt patterns. One pattern is used to bolt the test frame to the corresponding test cover plate (Figure 2), forming a test plate set. The second pattern accepts the hardware used to mount the fully assembled test plate set to the main adapter plate (Figure 3).

trivalent chromium↗

Z-2 Threaded Insert Design and Testing

NASA's Z-2 prototype space suit contains several components fabricated from an advanced hybrid composite laminate consisting of IM10 carbon fiber and fiber glass. One requirement was to have removable, replaceable helicoil inserts to which other suit components would be fastened. An approach utilizing bonded in inserts with helicoils inside of them was implemented. During initial assembly, cracking sounds were heard followed by the lifting of one of the blind inserts out of its hole when the screws were torqued. A failure investigation was initiated to understand the mechanism of the failure. Ultimately, it was determined that the pre-tension caused by torqueing the fasteners is a much larger force than induced from the pressure loads of the suit which was not considered in the insert design. Bolt tension is determined by dividing the torque on the screw by a k value multiplied by the thread diameter of the bolt. The k value is a factor that accounts for friction in the system. A common value used for k for a non-lubricated screw is 0.2. The k value can go down by as much as 0.1 if the screw is lubricated which means for the same torque, a much larger tension could be placed on the bolt and insert. This paper summarizes the failure investigation that was performed to identify the root cause of the suit failure and details how the insert design was modified to resist a higher pull out tension.

Ross, Amy↗