Search NASA⌕ Search

SEARCH · Search NASA

Results for “CALENDARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Chemical Waste Landfill Annual Post-Closure Care Report, Calendar Year 2019

The Chemical Waste Landfill (CWL) at Sandia National Laboratories/New Mexico (SNL/NM) is a remediated hazardous waste landfill that underwent closure in accordance with Title 20, Chapter 4, Part 1 of the New Mexico Administrative Code (20.4.1.600 NMAC), incorporating Title 40, Code of Federal Regulations (CFR), Part 265, (40 CFR § 265) Subpart G, and the CWL Final Closure Plan (SNL/NM December 1992 and subsequent revisions). The CWL Post- Closure Care Permit (PCCP) (NMED October 2009), which became effective June 2, 2011 (Kieling June 2011) and as modified, defines all post-closure requirements. This ninth CWL Annual Post-Closure Care Report documents all activities and results as required by the PCCP Attachment 1, Section 1.12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site E-Tunnel Wastewater Disposal System Quarterly Monitoring Report, Water Pollution Control Permit NEV 96021 (First Quarter Calendar Year 2020)

This report includes the results of monthly inspections and monitoring for January, February, and March 2020. Monthly inspections and monitoring were conducted on January 15, February 12, and March 17, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System discharge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Waste Landfill Annual Post-Closure Report. Calendar Year 2020

The purpose of this CWL Annual Post-Closure Care Report is to document monitoring, inspection, maintenance, and repair activities conducted during CY 2020 as required by PCCP Attachment 1, Section 1.12 (NMED October 2009 and subsequent revisions). This annual report documents post-closure care activities conducted from January through December 2020 and fulfills the PCCP requirement for annual reporting to the NMED.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the First Quarter Calendar Year 2021 Tank 50 Salt Solution Sample

Tank 50 aqueous waste is analyzed on a quarterly basis and the results are compared to the Waste Acceptance Criteria (WAC) of the Z-Area Saltstone Production Facility (SPF). The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to SPF, where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF WAC Limits and Targets. A memorandum reporting the average Cs-137 value and comparison to WAC Limits has been previously issued.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the September Bimonthly Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2021 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2021 September bimonthly sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRR request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Monitoring Report, Calendar year 2020. Knolls Laboratory and Kesselring Site

The results of the effluent and environmental monitoring programs at the Knolls Laboratory and Kesselring Site are summarized and assessed in this report. Tables 1 - 4 summarize the major elements of the environmental monitoring programs at each site. Information regarding the U.S. Department of Energy – Office of Environmental Management (DOE-EM) Separations Process Research Unit (SPRU) Disposition Project (SPRU DP), is also included in this report; however, the project was completed in 2020 and will no longer be reported in subsequent reports. DOE-EM will be continuing to perform other Decontamination & Decommissioning (D&D) work at Knolls Laboratory and Kesselring Site, which may require environmental monitoring, and will be included in this report, as warranted. Operations at the Knolls Laboratory, which includes SPRU and other DOE-EM activities, and the Kesselring Site continue to have no adverse effect on human health and the quality of the environment.

54 ENVIRONMENTAL SCIENCES↗

Results for the March Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 March bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 March bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pantex Plant Calendar Year 2021 (Annual Site Environmental Report)

The 2021 Annual Site Environmental Report (ASER) summarizes the Pantex Plant’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOEa), and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOEb). These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, For Calendar Year 2021 (Revision 1)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site.

54 ENVIRONMENTAL SCIENCES↗

Results for the September Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 September bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request. The following facts pertaining to the WAC are drawn from the analytical results, including analytical uncertainty, provided in this report. 1) WAC LIMITS and TARGETS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC LIMITS and TARGETS; 2) Measured average concentrations of nitrate, nitrite and total mercury are approximately 24%, 9% and 12% of the WAC LIMITS, respectively; 3) Measured average concentrations of Tc-99 and I-129 are approximately 19% and 20% of the WAC LIMITS, respectively; 4) All other radionuclide average concentrations are at 4% or less of the WAC LIMITS and TARGETS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection (PCI) Letter Report for Closed Non-Resource Conservation and Recovery Act (RCRA) Corrective Action Units (CAUs) on the Nevada National Security Site (NNSS), for Calendar Year (CY) 2020

This letter report is for the following CAUs for CY 2020, including CAUs located on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. Use restriction (UR) issues that were identified in the 2019 inspections were addressed in 2020.

54 ENVIRONMENTAL SCIENCES↗

Calendar Year 2020 Underground Test Area Annual Sampling Report Nevada National Security Site, Nevada (Rev. 1)

This CY 2020 annual sampling report presents the background of the FFACO and Sampling Plan implementation, sampling and analysis methods, sampling results, quality assurance and quality control, regulatory requirements, and analytical data for the CY 2020. Appendix A presents data from samples collected in CY 2020 from the YF/CM CAU and the RM/SM CAU. This sampling was conducted in support of the Sampling Plan at these CAUs prior to approval of the final CRs. Appendix B presents the well completion diagrams for the wells sampled in CY 2020. Appendix C presents data from samples collected in CY 2019. These results were not reported in the previous sampling report because they were not available from the specialized laboratories at the time of the report’s publication.

54 ENVIRONMENTAL SCIENCES↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2018

This report documents radionuclide air emissions that result in the 2018 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2018 from PNNL Richland Campus sources is 1.6E-5 mrem (1.6E-7 mSv) EDE. The dose from all fugitive sources is 2.1E-6 mrem (2.1E-8 mSv) EDE. The dose from radon emissions is 5.6E-10 mrem (5.6E-12 mSv) EDE. No nonroutine emissions occurred in 2018. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

Marine Sciences Laboratory Radionuclide Air Emissions Report for Calendar Year 2018

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Marine Sciences Laboratory (MSL), located on Battelle Land-Sequim. The facility has two buildings with the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, Radiation Protection–Air Emissions. Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The MSL has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the MSL MEI due to routine operations in 2018 was 4.5E-04 mrem (4.5E-06 mSv). No non-routine emissions occurred in 2018. The MSL is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2019

This report documents radionuclide air emissions that result in the 2019 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2019 from PNNL Richland Campus sources is 1.4E-5 mrem (1.4E-7 mSv) EDE. The dose from all fugitive sources is 1.3E-6 mrem (1.3E-8 mSv) EDE. The dose from radon emissions is 1.5E-10 mrem (1.5E-12 mSv) EDE. No nonroutine emissions occurred in 2019. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.5E-5 mrem (1.5E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2020

This report documents radionuclide air emissions that result in the 2020 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2020 from PNNL Richland Campus sources is 1.5E-5 mrem (1.5E-7 mSv) EDE. The dose from all fugitive sources is 2.0E-6 mrem (2.0E-8 mSv) EDE. The dose from radon emissions is 9.3E-9 mrem (9.3E-11 mSv) EDE. No nonroutine emissions occurred in 2020. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.7E-5 mrem (1.7E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2021

This report documents radionuclide air emissions that result in the 2021 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2021 from PNNL Richland Campus sources is 1.7E-5 mrem (1.7E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 2.1E-9 mrem (2.1E-11 mSv) EDE. No nonroutine emissions occurred in 2021. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗