Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACT MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

NASA Safety and Health (Short Form). Final rule

This final rule adopts with changes the interim rule published in the Federal Register on April 5, 2001 (65 FR 18051-18053), which amended the NASA FAR Supplement to implement a Safety and Health (Short Form) clause to address safety and occupational health in all NASA contracts above the micro-purchase threshold where the existing Safety and Health clause did not apply, and amended other safety and health clauses to be consistent with the new NASA Safety and Health (Short Form) clause.

Contract Services↗

Concept Designed and Developed for Distortion- Tolerant, High-Stability Engine Control

Engine Control Future aircraft turbine engines, both commercial and military, must be able to successfully accommodate expected increased levels of steady-state and dynamic engine-face distortion. Advanced tactical aircraft are likely to use thrust vectoring to enhance their maneuverability. As a result, the engines will see more extreme aircraft angles-of-attack and sideslip levels than are currently encountered with present-day aircraft. Also, the mixed-compression inlets needed for the High Speed Civil Transport will likely encounter disturbances similar to those seen by tactical aircraft, in addition to planar pulse, inlet buzz, and high distortion levels at low flight speed and off-design operation. The current approach of incorporating a sufficient component design stall margin to tolerate these increased levels of distortion would significantly reduce performance. The objective of the High Stability Engine Control (HISTEC) program is to design, develop, and flight demonstrate an advanced, high-stability, integrated engine-control system that uses measurement-based, real-time estimates of distortion to enhance engine stability. The resulting distortion-tolerant control reduces the required design stall margin, with a corresponding increase in performance and decrease in fuel burn. The HISTEC concept has been designed and developed, and the software implementing the concept has successfully accommodated time-varying distortion. The NASA Lewis Research Center is currently overseeing the development and validation of the hardware and software necessary to flight test the HISTEC concept. HISTEC is a contracted effort with Pratt & Whitney of West Palm Beach, Florida. The HISTEC approach includes two major systems: A Distortion Estimation System (DES) and Stability Management Control (SMC). DES is an aircraft-mounted, high-speed processor that estimates the amount and type of distortion present and its effect on the engine. It uses high-response pressure measurements at the engine face to calculate indicators of the type and extent of distortion in real time. From these indicators, DES determines the effects of distortion on the propulsion systems and the corresponding engine match point necessary to accommodate it. DES output consists of fan and compressor pressure ratio trim commands that are passed to the SMC. In addition, DES uses maneuver information, consisting of angle-of-attack and sideslip from the flight control, to anticipate high inlet distortion conditions. The SMC, which is contained in the engine-mounted, Improved Digital Electronic Engine Control (IDEEC), includes advanced control laws to directly control the fan and compressor transient operating line (pressure ratio). These advanced control laws, with a multivariable design, have the potential for higher bandwidth and the resulting more precise control of engine match. The ability to measure and assess the distortion effects in real time coupled with a high-response controller improves engine stability at high levels of distortion. The software algorithms implementing DES have been designed, developed, and demonstrated, and integration testing of the DES and SMC software has been completed. The results show that the HISTEC system will be able to sense inlet distortion, determine the effect on engine stability, and accommodate distortion by maintaining an adequate margin for engine surge. The Pratt &Whitney Comprehensive Engine Diagnostic Unit was chosen as the DES processor. An instrumented inlet case for sensing distortion was designed and fabricated. HISTEC is scheduled for flight test on the ACTIVE F-15 aircraft at the NASA Dryden Flight Research Center in Edwards, California, in late 1996.

Source record↗

Hybrid Modeling Improves Health and Performance Monitoring

Scientific Monitoring Inc. was awarded a Phase I Small Business Innovation Research (SBIR) project by NASA's Dryden Flight Research Center to create a new, simplified health-monitoring approach for flight vehicles and flight equipment. The project developed a hybrid physical model concept that provided a structured approach to simplifying complex design models for use in health monitoring, allowing the output or performance of the equipment to be compared to what the design models predicted, so that deterioration or impending failure could be detected before there would be an impact on the equipment's operational capability. Based on the original modeling technology, Scientific Monitoring released I-Trend, a commercial health- and performance-monitoring software product named for its intelligent trending, diagnostics, and prognostics capabilities, as part of the company's complete ICEMS (Intelligent Condition-based Equipment Management System) suite of monitoring and advanced alerting software. I-Trend uses the hybrid physical model to better characterize the nature of health or performance alarms that result in "no fault found" false alarms. Additionally, the use of physical principles helps I-Trend identify problems sooner. I-Trend technology is currently in use in several commercial aviation programs, and the U.S. Air Force recently tapped Scientific Monitoring to develop next-generation engine health-management software for monitoring its fleet of jet engines. Scientific Monitoring has continued the original NASA work, this time under a Phase III SBIR contract with a joint NASA-Pratt & Whitney aviation security program on propulsion-controlled aircraft under missile-damaged aircraft conditions.

Source record↗

A pilot demonstration project of technology application from the aerospace industry to city management (four cities program)

The Four Cities Program has completed the first year of the planned two-year program. At the beginning of the first year, a variety of program initiation activities were accomplished. Contracts were negotiated; science and technology advisors were interviewed, selected and assigned; general indoctrination and integration of the advisors into city affairs occurred; technical needs were identified and related projects pursued; pilot projects for the second year were identified; inter-city coordination on technical problems began to emerge; and the general soundness of the four cities program seems to have been established. Above all, the inter-personal relationships between the advisors and their interfaces in city government appear to be functioning smoothly. The establishment of such mutual respect, trusts, and confidences are believed essential to the success of the program.

Ervin, G. F.↗

Continual improvement: A bibliography with indexes, 1992-1993

This bibliography lists 606 references to reports and journal articles entered into the NASA Scientific and Technical Information Database during 1992 to 1993. Topics cover the philosophy and history of Continual Improvement (CI), basic approaches and strategies for implementation, and lessons learned from public and private sector models. Entries are arranged according to the following categories: Leadership for Quality, Information and Analysis, Strategic Planning for CI, Human Resources Utilization, Management of Process Quality, Supplier Quality, Assessing Results, Customer Focus and Satisfaction, TQM Tools and Philosophies, and Applications. Indexes include subject, personal author, corporate source, contract number, report number, and accession number.

Source record↗

Recommended Changes to Interval Management to Achieve Operational Implementation

A 19-day flight test of an Interval Management (IM) avionics prototype was conducted in Washington State using three aircraft to precisely achieve and maintain a spacing interval behind the preceding aircraft. NASA contracted with Boeing, Honeywell, and United Airlines to build this prototype, and then worked closely with them, the FAA, and other industry partners to test this prototype in flight. Four different IM operation types were investigated during this test in the en route, arrival, and final approach phases of flight. Many of the IM operations met or exceeded the design goals established prior to the test. However, there were issues discovered throughout the flight test, including the rate and magnitude of IM commanded speed changes and the difference between expected and actual aircraft deceleration rates.

Baxley, Brian↗

Interoperability and Concepts of Operation Assessment for Space Relay Services and Partnerships

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.

Eric J Knoblock↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

An investigation of transitional management problems for the NSTS at NASA

This quarterly report summarizes the ideas and concepts developed by the University of Houston team with the collaboration and support of the Management Integration Offices of NASA. In addition it is hoped that this report will help to stimulate the healthy problem solving process already present at NASA. This is the second report in the fourth year of the research contract. The main aim of the work is to assist the National Space Transportation System (NSTS) in finding ways and means of moving into a truly operational era in the sense of routine timely production of flights. The reader who seeks an understanding of the concepts presented is encouraged to read the reports of the last three years. The overall strategy of this effort is to: (1) search the literature for applications of transition management and other related issues, (2) conduct investigations into the experiences of the industries with the transition management, and (3) to adapt the information found in (1) and (2) above into a form useful to NASA while at the same time applying industrial engineering and engineering management expertise to problems and issues as they emerge.

Hunsucker, John↗

Speaking Volumes About 3-D

In 1999, Genex submitted a proposal to Stennis Space Center for a volumetric 3-D display technique that would provide multiple users with a 360-degree perspective to simultaneously view and analyze 3-D data. The futuristic capabilities of the VolumeViewer(R) have offered tremendous benefits to commercial users in the fields of medicine and surgery, air traffic control, pilot training and education, computer-aided design/computer-aided manufacturing, and military/battlefield management. The technology has also helped NASA to better analyze and assess the various data collected by its satellite and spacecraft sensors. Genex capitalized on its success with Stennis by introducing two separate products to the commercial market that incorporate key elements of the 3-D display technology designed under an SBIR contract. The company Rainbow 3D(R) imaging camera is a novel, three-dimensional surface profile measurement system that can obtain a full-frame 3-D image in less than 1 second. The third product is the 360-degree OmniEye(R) video system. Ideal for intrusion detection, surveillance, and situation management, this unique camera system offers a continuous, panoramic view of a scene in real time.

Source record↗

Advanced long term cryogenic storage systems

Long term, cryogenic fluid storage facilities will be required to support future space programs such as the space-based Orbital Transfer Vehicle (OTV), Telescopes, and Laser Systems. An orbital liquid oxygen/liquid hydrogen storage system with an initial capacity of approximately 200,000 lb will be required. The storage facility tank design must have the capability of fluid acquisition in microgravity and limit cryogen boiloff due to environmental heating. Cryogenic boiloff management features, minimizing Earth-to-orbit transportation costs, will include advanced thick multilayer insulation/integrated vapor cooled shield concepts, low conductance support structures, and refrigeration/reliquefaction systems. Contracted study efforts are under way to develop storage system designs, technology plans, test article hardware designs, and develop plans for ground/flight testing.

Brown, Norman S.↗

Preliminary Error Characterization and Parametric Error Model for the Automatic Dependent Surveillance - Contract Extended Projected Profile Message

A critical component of Trajectory-Based Operations (TBO) is the ability for a consistent and accurate 4-dimensional trajectory (4DT) to be shared and synchronized between airborne and ground systems as well as amongst various ground automation systems. The Aeronautical Telecommunication Network—Baseline 2 (ATN-B2) standard defines the Extended Projected Profile (EPP) trajectory that can be sent via Automatic Dependent Surveillance-Contract (ADS-C) from an aircraft to ground automation. The EPP trajectory message contains a representation of the reference trajectory from an aircraft’s Flight Management System (FMS). In this work, a set of scenarios were run in a high-fidelity aircraft and FMS simulation to perform an initial characterization of EPP trajectory errors under a given set of conditions. The parameters investigated were the route length, route type, wind magnitude error, wind direction error, and with and without a required time-of-arrival (RTA) constraint. In addition, linear regression was used to identify a set of EPP error models for the cross-track, vertical, and time errors.

Guerreiro, Nelson M.↗

Navigation, guidance, and control systems for V/STOL aircraft.

The development of digital autopilots and integrated avionics systems, applicable to many classes of vehicles and missions, was undertaken by Sperry Flight Systems in the mid-sixties. The first application of the system was planned for automatic flight control in the U.S. supersonic transport; the termination of that program, however, thwarted any flight experience. The second application, which has additional navigation and energy management functions, is an airborne simulator of the space shuttle vehicle. The latter system underwent a series of successful flight tests in a CV-990 aircraft under contract with NASA. The third application, which has new electronic displays, air data computation, and time-constrained guidance (i.e., specified position and altitude at a specified time), is in the DOT/NASA STOLAND test program. The STOLAND system is described specifically in this paper.

Osder, S. S.↗

NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

Hoover, Jay C.↗

Earth Observations to Assess Impact of Hurricane Katrina on John C. Stennis Space Center

The peril from hurricanes to Space Operations Centers is real and is forecast to continue; Katrina, Rita, and Wilma of 2005 and Charley, Frances, Ivan, and Jeanne of 2004 are sufficient motivation for NASA to develop a multi-Center plan for preparedness and response. As was demonstrated at SSC (Stennis Space Center) in response to Hurricane Katrina, NASA Centers are efficiently activated as local command centers, playing host to Federal and State agencies and first responders to coordinate and provide evacuation, relocation, response, and recovery activities. Remote sensing decision support provides critical insight for managing NASA infrastructure and for assisting Center decision makers. Managers require geospatial information to manage the federal city. Immediately following Katrina, SSC s power and network connections were disabled, hardware was inoperative, technical staff was displaced and/or out of contact, and graphical decision support tools were non-existent or less than fully effective. Despite this circumstance, SSC EOC (Emergency Operations Center) implemented response operations to assess damage and to activate recovery plans. To assist Center Managers, the NASA ASP (Applied Sciences Program) made its archive of high-resolution data over the site available. In the weeks and months after the immediate crisis, NASA supplemented this data with high-resolution, post-Katrina imagery over SSC and much of the affected coastal areas. Much of the high-resolution imagery was made available through the Department of Defense Clear View contract and was distributed through U.S. Geological Survey Center for Earth Resources Observation and Science "Hurricane Katrina Disaster Response" Web site. By integrating multiple image data types with other information sources, ASP applied an all-source solutions approach to develop decision support tools that enabled managers to respond to critical issues, such as expedient access to infrastructure and deployment of resources, provision of temporary shelter, logistical control of critical supplies, and the mobilization and coordination of assets from ground crews to aircraft/airspace management. Furthermore, ASP developed information products that illustrate risks to SSC's infrastructure from surge, inundation, and flood. Current plans include developing wind-risk prototype products for refinement and adoption into EOC plans.

Graham, William D.↗

IT Project Management and Systems Engineering Internship

In the summer of 2009 I had the privilege of participating in the NASA INSPIRE program and during the summer of 2010 I was hired by ASRC Aerospace, a NASA contractor on the USTDC contract, as an Engineering Aide. These experiences combined inspired me to pursue a career in engineering and a goal to work as a NASA engineer and astronaut.

Cardamone, Lauren↗