Search NASA⌕ Search

SEARCH · Search NASA

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

X-38 V201 Avionics Architecture

The X-38 is an experimental NASA project developing a core human capable spacecraft at a fraction of the cost of any previous human rated vehicle. The first operational derivative developed from the X-38 program will be the International Space Station (ISS) Crew Return Vehicle (CRV). Although the current X-38 vehicles are designed as re-entry vehicles only, the option exists to modify the vehicle for uses as an upward vehicle launched from an expendable launch vehicle or from the X-33 operational derivative. The Operational CRV, that will be derived from the X-38 spaceflight vehicle, will provide an emergency return capability from the International Space Station (ISS). The spacecraft can hold a crew of up to seven inside a pressurized cabin. The CRV is passively delivered to ISS, stays up to three year on-orbit attached to ISS in a passive mode with periodic functional checkout, before separation from ISS, de-orbit, entry and landing. The X-38 Vehicle 201 (V201) is being developed at NASA/JSC to demonstrate key technologies associated with the development of the CRV design. The X-38 flight test will validate the low cost development concept by demonstrating the entire station departure, re-entry, guidance and landing portions of the CRV mission. All new technologies and subsystems proposed for CRV will be validated during either the on orbit checkout or flight phases of the X-38 space flight test. The X-38 subsystems are required to be similar to those subsystems required for the CRV to the greatest extent possible. In many cases, the subsystems are identical to those that will be utilized on the Operational CRV.

Bedos, Thierry↗

PROPULSE 980: A Hydrogen Peroxide Enrichment System

The PROPULSE 980 unit is a transportable processing plant that enriches aerospace grade hydrogen peroxide from 90% to 98% final concentration. The unit was developed by Degussa-H Is, in cooperation with Orbital, NASA Marshall Space Center, and NASA Stennis Space Center. The system is a self-contained unit that houses all of the process equipment, instrumentation and controls to perform the concentration operation nearly autonomously. It is designed to produce non-bulk quantities of 98% hydrogen peroxide. The enrichment unit design also maintains system, personnel and environmental safety during all aspects of the enrichment process and final product storage. As part of the Propulse 980 checkout and final buyoff, it will be disassembled at the Degussa-H Is Corporation plant in Theodore, AL, transported to the Stennis Space Center, reassembled and subjected to a series of checkout tests to verify design objectives have been met. This paper will summarize the basic project elements and provide an update on the present status of the project.

Boxwell, Robert↗

MODIS Status

The Moderate Resolution Imaging Spectroradiometer (MODIS) was sent into orbit on the Earth Observing System (EOS) Terra spacecraft in December 1999. The MODIS began taking observations on February 24, 2000. Instrument checkout and characterization progressed to the point in the Fall of 2000 along with the checkout of algorithms so that approximately 40 products for land, ocean and atmosphere studies on global and regional scales were and are now being produced systematically. These products are now designated "beta", products indicating that they are still being examined and validated, but in most cases are amenable to examination by the scientific and applications community to further assess their utility and provide feedback to the validation process and the MODIS Science Team. It is expected that many products will progress to "provisionally useful" or fully "validated" status by mid-year 2001. one goal is to produce a systematically processed data set by the end of 2001 from MODIS extends from November 2000 through October 2001. Overall the MODIS instrument and the associated data processing systems are performing well. The many examples of MODIS observations indicate that the prospect for highly useful and exciting studies of the Earth-atmosphere system using MODIS data looks very good.

Salomonson, Vincent V.↗

Static and Wind Tunnel Aero-Performance Tests of NASA AST Separate Flow Nozzle Noise Reduction Configurations

This report presents the results of cold flow model tests to determine the static and wind tunnel performance of several NASA AST separate flow nozzle noise reduction configurations. The tests were conducted by Aero Systems Engineering, Inc., for NASA Glenn Research Center. The tests were performed in the Channels 14 and 6 static thrust stands and the Channel 10 transonic wind tunnel at the FluiDyne Aerodynamics Laboratory in Plymouth, Minnesota. Facility checkout tests were made using standard ASME long-radius metering nozzles. These tests demonstrated facility data accuracy at flow conditions similar to the model tests. Channel 14 static tests reported here consisted of 21 ASME nozzle facility checkout tests and 57 static model performance tests (including 22 at no charge). Fan nozzle pressure ratio varied from 1.4 to 2.0, and fan to core total pressure ratio varied from 1.0 to 1.19. Core to fan total temperature ratio was 1.0. Channel 10 wind tunnel tests consisted of 15 tests at Mach number 0.28 and 31 tests at Mach 0.8. The sting was checked out statically in Channel 6 before the wind tunnel tests. In the Channel 6 facility, 12 ASME nozzle data points were taken and 7 model data points were taken. In the wind tunnel, fan nozzle pressure ratio varied from 1.73 to 2.8, and fan to core total pressure ratio varied from 1.0 to 1.19. Core to fan total temperature ratio was 1.0. Test results include thrust coefficients, thrust vector angle, core and fan nozzle discharge coefficients, total pressure and temperature charging station profiles, and boat-tail static pressure distributions in the wind tunnel.

Mikkelsen, Kevin L.↗

Verifying Data Integrity of Electronically Scanned Pressure Systems at the NASA Glenn Research Center

The proper operation of the Electronically Scanned Pressure (ESP) System critical to accomplish the following goals: acquisition of highly accurate pressure data for the development of aerospace and commercial aviation systems and continuous confirmation of data quality to avoid costly, unplanned, repeat wind tunnel or turbine testing. Standard automated setup and checkout routines are necessary to accomplish these goals. Data verification and integrity checks occur at three distinct stages, pretest pressure tubing and system checkouts, daily system validation and in-test confirmation of critical system parameters. This paper will give an overview of the existing hardware, software and methods used to validate data integrity.

Panek, Joseph W.↗

STS 110 Mission Highlights Resource Tape

A continuation of 'STS 110 Mission Highlights Resource Tape'. This video, Part 3 of 4, shows footage from flight days 6 through 9 of STS-110. The spacecrew includes Michael J. Bloomfield, Commander Stephen N. Frick, Pilot; Jerry L. Ross, Mission Specialist; Steven L. Smith, Mission Specialist; Ellen Ochoa, Mission Specialist; Lee M.E. Morin, Mission Specialist; Rex J. Walheim, Mission Specialist. On flight day 6, Ross and Morin conduct an EVA (extravehicular activity) to secure a tripod like strut to the S0 Truss of the International Space Station (ISS). They also move the drag link and keel pins from one face of the Truss to the other to free the rail on the truss for a railcar to move. Smith installs a camera onto the CANADARM robotic arm on flight day 7, and on flight day 8 the restraints are removed from the railcar connected to the S0 Truss in preparation for checkout. The checkout of the railcar is shown, including its inaugural run. Ross and Morin conduct another EVA on flight day 9 to complete the outfitting of the S0 Truss Structure. Notable footage includes views of Ross and Morin at work from the helmet-mounted camera on Ross' EVA suit, including close-ups of the pistol grip tool, CANADARM 2 onboard the ISS lit at sunrise, a 'diamond ring' effect formed by the Sun between the Earth's limb and the ISS, a brief shot of the Yucatan peninsula, and a end-to-end pan down the length of the ISS. The activities from other flights days can be seen on "STS 110 Mission Highlights Resource Tape" Part 1 of 4 (internal ID 2002137575), "STS 110 Mission Highlights Resource Tape" Part 2 of 4 (internal ID 2002137573), and "STS 110 Mission Highlights Resource Tape" Part 4 of 4 (internal ID 2002137517).

Source record↗

Utilizing the US Lab Nadir Research Window for Remote Sensing Operations with The Window Observational Research Facility (WORF)

The Window Observational Research Facility (WORF) is an ISPR-based rack facility designed to take advantage of the high optical quality US Lab Nadir research window. The WORF is based on the ISS Expedite the Processing of Experiments to Space Station (EXPRESS) rack mechanical structure and electronic systems. The WORF has a unique payload volume located at the center of the rack that provides access to the window. The interior dimensions of the payload volume are 34-in. (86.36 cm) wide by 33-in. (83.82 cm) high by 23-in. (58.42 cm) deep. This facility supports the deployment of payloads such as 9 in. aerial photography cameras and 12 in. diameter optical equipment. The WORF coupled with the optical quality of the United States Lab window support the deployment of various payload disciplines. The WORF provides payloads with power, data command and control, air cooling, water cooling, and video processing. The WORF's payload mounting surfaces and interfaces include the interior payload mounting shelf and the interior and exterior aircraft-like seat tracks. The payload mounting shelf is limited to a maximum mass of 136 kg (299 pounds). The WORF can accommodate large payloads such as the commonly used Leica-Heerbrug RC-30 aerial photography camera (whose dimensions are 53.3 cm (21-in.) wide by 50.8 cm (20-in.) deep by 76.2 cm (30-in.) long). The performance characteristics of the WORF allow it to support an array of payload disciplines. The WORF provides a maximum of 3 Kw at 28 Vdc and has a maximum data rate of 10 Mbps. The WORF's unique payload volume is designed to be light-tight, down to 2.8 x 10(exp -11) Watts/cm2/steradian, and have low-reflective surfaces. This specially designed WORF interior supports payload investigations that observe low-light-level phenomenon such as aurora. Although the WORF rack does not employ any active rack isolation (i.e., vibration dampening) technology, the rack provides a very stable environment for payload operations (on the order of X microradians). The facility's software is capable of being updated during its period of deployment. The WORF project also includes a Suitcase Simulator to allow for a payload developer to verify data interfaces at his development site, a trainer rack for astronauts to learn how to operate the WORF prior to flight, and the use of the EXPRESS Functional Checkout Units to allow for payload checkout at the KSC prior to launch.

Turner, Richard↗

The Extension of ISS Resources for Multi-Discipline Subrack Payloads

The EXpedite the processing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette M.↗

Hybrid Residual Flexibility/Mass-Additive Method for Structural Dynamic Testing

A large fixture was designed and constructed for modal vibration testing of International Space Station elements. This fixed-base test fixture, which weighs thousands of pounds and is anchored to a massive concrete floor, initially utilized spherical bearings and pendulum mechanisms to simulate Shuttle orbiter boundary constraints for launch of the hardware. Many difficulties were encountered during a checkout test of the common module prototype structure, mainly due to undesirable friction and excessive clearances in the test-article-to-fixture interface bearings. Measured mode shapes and frequencies were not representative of orbiter-constrained modes due to the friction and clearance effects in the bearings. As a result, a major redesign effort for the interface mechanisms was undertaken. The total cost of the fixture design, construction and checkout, and redesign was over $2 million. Because of the problems experienced with fixed-base testing, alternative free-suspension methods were studied, including the residual flexibility and mass-additive approaches. Free-suspension structural dynamics test methods utilize soft elastic bungee cords and overhead frame suspension systems that are less complex and much less expensive than fixed-base systems. The cost of free-suspension fixturing is on the order of tens of thousands of dollars as opposed to millions, for large fixed-base fixturing. In addition, free-suspension test configurations are portable, allowing modal tests to be done at sites without modal test facilities. For example, a mass-additive modal test of the ASTRO-1 Shuttle payload was done at the Kennedy Space Center launch site. In this Technical Memorandum, the mass-additive and residual flexibility test methods are described in detail. A discussion of a hybrid approach that combines the best characteristics of each method follows and is the focus of the study.

Tinker, M. L.↗

STS-112/Atlantis/ISS 9A Pre-Launch - Launch On-Orbit - Landing - Crew Egress

The video starts with an introduction of the crew of Space Shuttle Atlantis on STS-112 at their customary pre-flight meal. The crew consists of Commander Jeffrey Ashby, Pilot Pam Melroy, and Mission Specialists David Wolf, Sandra Magnus, Piers Sellers, and Fyodor Yurchikhin. The crew is then shown during suit-up, while exiting the Operations and Checkout Building to board the Astrovan, and during ingress and seating. Launch views include: Beach Tracker, VAB, PAD-B, Tower-1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, OTV-170, OTV-171, and External Tank Camera. On-orbit footage includes the Atlantis orbiter docking with the ISS (International Space Station). The video shows clips of extravehicluar activities (EVAs), and some of the tasks performed during the mission. Footage included shows the installation of the S1 Truss onto the ISS with the Space Station Remote Manipulator System (Canadarm 2), Canadarm 2 carrying the Ammonia Tank Assembly prior to connection, the checkout of the Thermal Radiator Rotary Joint, the soft docking of an S-Band antenna, and the deployment of the S1 Radiator. An onboard repair of the ISS humidity separator is also shown. Landing views include: VAB, Tower 1, Mid-Field, Runway South End, Runway North End, Tower-2, Cocoa Beach DOAMS, and PPOV. Kennedy Space Center managers greet the crew upon arrival, and Commander Ashby gives a brief speech while standing with his crew members.

Source record↗

EXPRESS Rack: The Extension of International Space Station Resources for Multi-Discipline Subrack Payloads

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette↗

High-Flow Jet Exit Rig Designed and Fabricated

The High-Flow Jet Exit Rig at the NASA Glenn Research Center is designed to test single flow jet nozzles and to measure the appropriate thrust and noise levels. The rig has been designed for the maximum hot condition of 16 lbm/sec of combustion air at 1960 R (maximum) and to produce a maximum thrust of 2000 lb. It was designed for cold flow of 29.1 lbm/sec of air at 530 R. In addition, it can test dual-flow nozzles (nozzles with bypass flow in addition to core flow) with independent control of each flow. The High- Flow Jet Exit Rig was successfully fabricated in late 2001 and is being readied for checkout tests. The rig will be installed in Glenn's Aeroacoustic Propulsion Laboratory. The High-Flow Jet Exit Rig consists of the following major components: a single component force balance, the natural-gas-fueled J-79 combustor assembly, the plenum and manifold assembly, an acoustic/instrumentation/seeding (A/I/S) section, a table, and the research nozzles. The rig will be unique in that it is designed to operate uncooled. The structure survives the 1960 R test condition because it uses carefully selected high temperature alloy materials such as Hastelloy-X. The lower plenum assembly was designed to operate at pressures to 450 psig at 1960 R, in accordance with the ASME B31.3 piping code. The natural gas-fueled combustor fires directly into the lower manifold. The hot air is directed through eight 1-1/2-in. supply pipes that supply the upper plenum. The flow is conditioned in the upper plenum prior to flowing to the research nozzle. The 1-1/2-in. supply lines are arranged in a U-shaped design to provide for a flexible piping system. The combustor assembly checkout was successfully conducted in Glenn's Engine Component Research Laboratory in the spring of 2001. The combustor is a low-smoke version of the J79 combustor used to power the F4 Phantom military aircraft. The natural gas-fueled combustor demonstrated high-efficiency combustion over a wide range of operating conditions. This wide operating envelope is required to support the testing of both single- and dual-flow nozzles. Key research goals include providing simultaneous, highly accurate acoustic, flow, and thrust measurements on jet nozzle models in realistic flight conditions, as well as providing scaleable acoustic results. The High-Flow Jet Exit Rig is a second-generation high-flow test rig. Improvements include cleaner flow with reduced levels of particulate, soot, and odor. Choked-flow metering is required with plus or minus 0.25-percent accuracy. Thrust measurements from 0 to 2000 lbf are required with plus or minus 0.25-percent accuracy. Improved acoustics will be achieved by minimizing noise through large pipe bend radii, lower internal flow velocities, and microdrilled choke plates with thousands of 0.040-in.- diameter holes.

Buehrle, Robert J.↗

Activation of the E1 Ultra High Pressure Propulsion Test Facility at Stennis Space Center

After a decade of construction and a year of activation the El Ultra High Pressure Propulsion Test Facility at NASA's Stennis Space Center is fully operational. The El UHP Propulsion Test Facility is a multi-cell, multi-purpose component and engine test facility . The facility is capable of delivering cryogenic propellants at low, high, and ultra high pressures with flow rates ranging from a few pounds per second up to two thousand pounds per second. Facility activation is defined as a series of tasks required to transition between completion of construction and facility operational readiness. Activating the El UHP Propulsion Test Facility involved independent system checkouts, propellant system leak checks, fluid and gas sampling, gaseous system blow downs, pressurization and vent system checkouts, valve stability testing, valve tuning cryogenic cold flows, and functional readiness tests.

Messer, Bradley↗

Processing and Preparation of Advanced Stirling Convertors for Extended Operation at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.

Oriti, Salvatore M.↗

Processing and Preparation of Advanced Stirling Convertors for Extended Operation

The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.

Oriti, Salvatore M.↗

Dawn: An Ion-Propelled Journey to the Beginning of the Solar System

The Dawn mission is designed to perform a scientific investigation of the two heaviest mainbelt asteroids Vesta and Ceres. These bodies are believed to preserve records of the physical and chemical conditions present during the formation of the solar system. The mission uses an ion propulsion system to enable the single Dawn spacecraft and its complement of scientific instruments to orbit both of these asteroids. Dawn's three science instruments - the gamma ray and neutron detector, the visible and infrared mapping spectrometer, and the primary framing camera - were successfully tested after launch and are functioning normally. The ion propulsion system includes three ion thrusters of the type flown previously on NASA's Deep Space 1 mission. A minimum of two ion thrusters is necessary to accomplish the Dawn mission. Checkout of two of the ion thrusters was completed as planned within 30 days after launch. This activity confirmed that the spacecraft has two healthy ion thrusters. While further checkout activities are still in progress, the activities completed as of the end of October indicate that the spacecraft is well on its way toward being ready for the start of the thrusting-cruise phase of the mission beginning December 15th.

Vesta↗

Generating Safety-Critical PLC Code From a High-Level Application Software Specification

The benefits of automatic-application code generation are widely accepted within the software engineering community. These benefits include raised abstraction level of application programming, shorter product development time, lower maintenance costs, and increased code quality and consistency. Surprisingly, code generation concepts have not yet found wide acceptance and use in the field of programmable logic controller (PLC) software development. Software engineers at Kennedy Space Center recognized the need for PLC code generation while developing the new ground checkout and launch processing system, called the Launch Control System (LCS). Engineers developed a process and a prototype software tool that automatically translates a high-level representation or specification of application software into ladder logic that executes on a PLC. All the computer hardware in the LCS is planned to be commercial off the shelf (COTS), including industrial controllers or PLCs that are connected to the sensors and end items out in the field. Most of the software in LCS is also planned to be COTS, with only small adapter software modules that must be developed in order to interface between the various COTS software products. A domain-specific language (DSL) is a programming language designed to perform tasks and to solve problems in a particular domain, such as ground processing of launch vehicles. The LCS engineers created a DSL for developing test sequences of ground checkout and launch operations of future launch vehicle and spacecraft elements, and they are developing a tabular specification format that uses the DSL keywords and functions familiar to the ground and flight system users. The tabular specification format, or tabular spec, allows most ground and flight system users to document how the application software is intended to function and requires little or no software programming knowledge or experience. A small sample from a prototype tabular spec application is shown.

Source record↗

Cryogenic Pressure Control Modeling for Ellipsoidal Space Tanks

A computational fluid dynamics (CFD) model is developed to simulate pressure control of an ellipsoidal-shaped liquid hydrogen tank under external heating in normal gravity. Pressure control is provided by an axial jet thermodynamic vent system (TVS) centered within the vessel that injects cooler liquid into the tank, mixing the contents and reducing tank pressure. The two-phase cryogenic tank model considers liquid hydrogen in its own vapor with liquid density varying with temperature only and a fully compressible ullage. The axisymmetric model is developed using a custom version of the commercially available FLOW-31) software. Quantitative model validation is ,provided by engineering checkout tests performed at Marshall Space Flight Center in 1999 in support of the Solar Thermal Upper Stage_ Technology Demonstrator (STUSTD) program. The engineering checkout tests provide cryogenic tank self-pressurization test data at various heat leaks and tank fill levels. The predicted self-pressurization rates, ullage and liquid temperatures at discrete locations within the STUSTD tank are in good agreement with test data. The work presented here advances current CFD modeling capabilities for cryogenic pressure control and helps develop a low cost CFD-based design process for space hardware.

Lopez, Alfredo↗