273 records · Page 16

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Systems Analysis of Biomass and Coal Co-firing Power Plants with Deep Carbon Capture Toward Net-zero Emissions

Achieving a net-zero emission economy in the United States requires integrating diverse low-carbon and negative-emission technologies into the existing fossil fuel-dominant power fleet. Potential technologies from the low-carbon portfolio include renewable power, fossil power with carbon capture and storage (CCS), bioenergy with CCS (BECCS), and direct air capture (DAC). Renewable power is a clean energy source but has to pair with costly battery storage to provide dispatchable electricity. Fossil power with CCS offers dispatchable electricity yet still relies on DAC to offset residual emissions, even when deploying deep CCS with more than 90% CO2 capture. Coal-biomass co-firing with CCS, a subset of BECCS, is a reliable energy production technology that can be retrofitted from existing electricity generation units (EGUs). Power plant retrofit maximizes the use of the current U.S. coal power fleet without the need for large-scale deployment of new renewable power, battery storage, or DAC. Retrofitting coal-biomass co-firing with deep CCS in EGUs is a promising option, but not a universal solution. Biomass co-firing at a power plant introduces economic challenges and indirectly poses pressure on land and water resources. Meanwhile, retrofitting deep CCS affects plant efficiency and raises electricity generation costs. Overall, the technical feasibility and economic viability of plant retrofits vary across EGUs, as they are contingent upon the regional availability of biomass, unit-specific characteristics, site-specific fuel supply costs, and adjacent CO2 storage potential. Government incentives like 45Q can improve the retrofit viability, though the impact requires further quantification. A comprehensive analysis at the unit level is essential to address the question regarding the fate of the U.S. coal-fired electricity generation fleet toward the net-zero emission goal. This study conducts a systematic techno-economic-environmental assessment of EGUs to identify the viability of biomass co-firing and deep CCS retrofits in the U.S. coal-fired power fleet. Specifically, it characterizes the techno-economic performance of deep carbon capture, estimates life cycle greenhouse gas (GHG) emissions, and conducts a fleet-level assessment on retrofit viability. The key objectives are (1) to estimate the unit-specific performance and retrofitted cost under various biomass co-firing levels and CO2 capture rates; (2) to determine the possibility of reaching net-zero emission at the fleet level; (3) to quantify the cumulative capacities that are suitable for plant retrofits under current and future biomass supply scenarios; and (4) to improve the understanding of policy impacts on such retrofits to help the power sector’s transition to a net-zero economy. Techno-economic Model of Deep Carbon Capture. This study develops the performance and economic models for Monoethanolamine-based post-combustion CO2 capture at 95–99% capture rates. The process is simulated in Aspen Plus, analyzing the performance of carbon capture technology by varying the plant sizes, solvent lean loading, CO2 concentrations, and flue gas inlet temperature. Based on the key inputs and output parameters of CO2 capture, a reduced-order performance model of deep carbon capture is formulated. In addition, an engineering-economic model integrating the performance metrics is developed to estimate the capital as well as operation and maintenance (O&M) costs. Capital cost estimations follow the framework of the Integrated Environmental Control Model (IECM) and incorporate data regressions from three technical reports by IECM, the National Energy Technology Laboratory (NETL), and the National Renewable Energy Laboratory. The O&M cost estimation utilizes the actual inventory consumption rate and labor requirements. Both performance and cost models are embedded into IECM v13.0-beta, a fossil-fuel power plant modeling tool. Life Cycle Assessment of Power Plants. This study estimates the GHG emissions of power plants through life cycle assessment (LCA). The LCA scope includes fuel supply, combustion-based power generation, and CO2 transport and storage. The fuel-based life cycle module is designed following the framework of the NETL Unit Process Library and CO2U LCA Guidance Toolkit. The module is then incorporated into IECM v13.0-beta. The process-based LCA is applied to estimate the GHG emissions of coal and biomass supply, coal- and coal-biomass co-firing power plant operation, as well as CO2 pipeline transport and geographical sequestration. An uncertainty analysis is conducted to quantify the variability and uncertainty associated with the LCA using the Latin Hypercube Sampling (LHS) method. Fleet-level Assessment. This study evaluates the technical and economic feasibility of selected coal-fired EGUs, examines the role of tax credits in retrofit viability, and assesses the competitiveness of retrofitted units against other low-carbon options. Unit screening identifies EGUs for the study, focusing on new, efficient baseload units with air pollution controls. The power plant databases are then established to organize unit-specific information on performance and operating conditions from the relevant public databases. Biomass for co-firing retrofits is selected based on home and neighboring county availability, ensuring sustained operation with at least a 5% co-firing level. The CO2 storage site is determined by state-level storage potential, with ArcGIS Pro and NETL CO2 Saline Storage Cost Model used to identify the optimal balance between the nearest transport distances and affordable storage costs. The latest IECM v13.0-beta is then employed to configure and evaluate the eligible EGUs with or without the deployment of deep CCS and biomass co-firing. A supply curve is established to illustrate the cumulative installed capacity suitable for retrofits at different cost levels. A sensitivity analysis on tax credits for carbon sequestration is performed. Finally, a unit-level cost comparison is conducted among retrofitted plants, renewable power with battery storage, and abated fossil fuels with DAC. Expected Results. This study evaluates the technical, economic, and environmental metrics of each EGU across an array of CO2 capture rates and biomass co-firing level scenarios. Unit-level comparisons will identify critical factors influencing technical performance. The supply curves with and without tax incentives will provide insights into the impact of tax credits on biomass co-firing and CCS deployment. The cost comparisons with renewables and DAC-retrofit will assess the competitiveness of the retrofitted units. Life cycle emissions from each unit will be assessed to identify the scenarios under which net-zero emissions can be achieved. These analyses are expected to determine the total coal-fired capacity suitable for serving as a low-carbon energy source with or without tax incentives. The study results are novel in identifying optimal unit-specific strategies for producing carbon-neutral power, whether through retrofitting EGUs with deep CCS, biomass co-firing, DAC, or installing renewable power with battery. The findings will provide insight into nationwide efforts to ensure reliable, affordable, and low-carbon electricity. It also will inform investment decisions and policies in the deployment of deep carbon capture and negative emission technologies for a net-zero energy future.

Biomass Co-firing↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗