Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Design and Development of Low Weight, Titanium Aluminide Airfoils for High Performance Industrial Gas Turbines meeting 65% Combined Cycle Efficiency (Final Report)

This project funded under DOE-FOA-0001816 was performed with the intent of evaluating the potential of utilizing a low density, high specific strength Titanium Aluminide (TiAl) alloy in a large annulus last stage gas turbine blade with the intent of improving combined cycle gas turbine efficiency toward a goal of reaching 65% efficiency. The project consisted of identifying a potentially suitable TiAl material for manufacture of such a large blade by investment casting. This included estimation of design properties for the selected alloy, trade studies using a baseline design created for a nickel based alloy cast in the TiAl alloy to evaluate potential design changes required for the use of this material and optimization of a prototype design for the same baseline application using the selected TiAl alloy. Several rounds of optimization were completed with the intent of meeting the baseline design targets with a resulting design that showed at least equivalent performance in terms of creep, LCF/TMF, HCF and aerodynamic damping potential. While it was found that significant reductions in blade loading on the disk were possible, the design resulting from the optimization met most lifing targets at the baseline size, but showed a reduction in margins in some areas in comparison to the Ni-based baseline design. Additionally, it was found that the low strain tolerance of the TiAl alloy for temperatures at and below the operational temperature of the attachment resulted in marginal, although still acceptable, creep rupture performance of the design. Due to results indicating the reduced potential for increasing turbine annulus compared to expectations a Phase II award was not proposed and it is not recommended to pursue additional design optimization efforts until further material advances with TiAl materials are achieved.

03 NATURAL GAS↗

A standard capsule design for structural material testing in the Advanced Test Reactor

Nuclear materials testing is commonly completed in various material test and research reactors throughout the world, including the Advanced Test Reactor (ATR), but the current capsule design, analysis, and fabrication process can take years to complete. To decrease the costs and time associated with materials testing, a standard capsule has been designed which houses various specimen geometries and allows irradiation in virtually any ATR test position. The standard capsule features locking end caps which connect and lock together to form the capsule stack, eliminating the need for a basket and maximizing the quantity of specimens which are contained within the capsule. A customizable internal gas gap provides thermal resistance between the specimens and reactor coolant, making specimen temperatures from approximately 370 to 1000 K achievable. The flexibility of the capsule design allows experimenters to choose irradiation positions based off desired neutron flux, with typical fluences per cycle ranging from 8.8x10 19 to 2.3x10 21 n/cm 2 , depending on experiment position. Here this paper presents and discusses the standard capsule design and analysis.

36 MATERIALS SCIENCE↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Process for Carbon Dioxide Conversion to Fuel

In this project, TDA developed a new mixed metal oxide-based sorbent that converts CO2 (captured from coal fired power plants) to CO, which can then be combined with renewable H2 generated by water electrolysis or H2 from steam methane reforming to produce different liquid fuels. TDA’s absorbent-based CO2 conversion process uses a redox process, which splits the catalytic reforming of methane with CO2 reaction into two stages: CO2 reduction to CO and CH4 reforming into H2 and CO which eliminates the equilibrium limitations. The CO produced in the two-stage reactor system can then be further reacted with renewable H2 to produce methanol, naphtha, diesel, or gasoline. We worked with the Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI) to design and develop the liquid fuel synthesis process that is built around this new material. We demonstrated the techno-economic viability of the new sorbent based redox process to convert CO2 into synthesis gas by demonstrating continuous carbon dioxide reduction in a prototype test system for over 585 hours while converting up to 10 kg CO2/day. With the successful completion of the R&D effort, the technology is now ready for a larger pilot-scale demonstration and the technology readiness has been raised from TRL 3 to TRL 5. In collaboration with UCI, we completed a high-fidelity process design and economic analysis. The required sale price (RSP) for gasoline (Case 1 NG-MTG) is $4.91/gal and naphtha and diesel (Case 2 NG-FT) are $4.23/gal and $6.07/gal, respectively, on a 2011 dollar basis. To put these costs in perspective, the California prices in current dollars (with its strict specifications) for regular grade gasoline from last year to current year have varied from a low of $3.10/gal in January 2021 to a high of $5.76/gal in March 2022, while prices for diesel from last year to current year have varied from a low of $3.40/gal in January 2021 to a high of $6.41/gal in May 2022 according to the U.S. Energy Information Agency data. It should be noted that the gasoline and diesel produced by these designs of Case 1 and Case 2 would be of very high quality and both nitrogen and sulfur free. These RSPs are based on a cost of imported electricity of $64/MWh based on the low-end current wind generated electricity cost (Genevieve 2011). This cost is by far the largest component of the variable costs used in computing the RSPs. A sensitivity analysis of these RSPs to the cost of imported electricity shows that the cost of the imported electricity has a significant effect on the RSPs. The life cycle analysis (LCA) shows that the total cradle-to-gate CO2 emissions for both liquid fuels (diesel and gasoline) were negative, indicating that overall more CO2 is consumed than released during production of the fuel from CO2 feed stack for both cases (-296 kgCO2 per MT gasoline for Case 1 and -705 kgCO2 per MT diesel for Case 2). On a cradle-to-grave comparison, the use of diesel produced using TDA’s process (2,457 kgCO2 per MT diesel) would release 37.6% less CO2 compared to petroleum based diesel (3,937 kgCO2 per MT diesel) while the use of gasoline produced using TDA’s process (2,792 kgCO2 per MT gasoline) would release 29.3% less CO2 compared to petroleum based gasoline (3,946 kgCO2 per MT gasoline). With the successful completion of the R&D effort, the technology is now ready for a bench-scale demonstration and the technology readiness has been raised from TRL 3 (Analytical and experimental critical function and/or characteristic proof of concept) to TRL 5 (Laboratory scale similar system validation in relevant environment).

20 FOSSIL-FUELED POWER PLANTS↗

Interactive Mesh Generation and Comparison Tools for Nuclear Energy Advanced Modeling & Simulation Phase I. Final Report

The promise of computer simulations for nuclear reactor designs is the opportunity to speed up the design process while also improving safety, providing more detail and higher fidelity, reducing cost, minimizing schedule risk, and avoiding many other potential problems; because simulations have the potential to be much less expensive and time-consuming than traditional development – where scale models and physical tests require construction and long lead times – it is possible to consider more alternatives and complete more comprehensive assessments before the design is finalized and constructed. As more design scenarios are studied by simulation, the speed that simulations promise is only available as long as bottlenecks are addressed for these scenarios. A frequent bottleneck is the amount of human labor required to describe the shape of the objects being designed and decompose the shape into simple elements, such as hexahedra, that are small enough to capture the physical phenomena of interest without being so small that even fast computers cannot perform the simulation in a reasonable amount of time. Recently, techniques for creating all-hexahedral decompositions have been developed, but they require some human input. Many simulation codes prefer all-hexahedral decompositions, so we proposed to evaluate the feasibility of these techniques on nuclear reactor geometries to see whether they required too much human input to be commercially viable. Our study concluded that they can be made viable with some additional software tools to reduce the amount of user input required.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced HLW Glass Property-Composition Models – Phase 2

As a continuation of the Phase 1 HLW model development work as part of a phased approach to enhance and expand HLW glass property-composition models, additional data were collected for the HLW glass dataset and used to revise the models developed during Phase 1. These data are for glasses that are collectively referred to as ORP-2014 glasses. The sources of additional data for the Phase 2 work included: (i) actively designed glasses formulated to support various glass studies at VSL since the completion of Phase 1; and (ii) glasses from two statistically designed matrices to supplement the existing HLW compositional space. The Phase 2 matrix design was intended to augment and improve the coverage in the high aluminum region.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heat Exchanger Design for Waste Heat Recovery using Additive Manufacturing

With anticipated increases in global energy use and their associated emissions, there are many efforts to improve the emissions and efficiency of many industrial processes through waste heat recovery (WHR). To maximize improvements, the heat exchangers in WHR power cycles must be designed and optimized for a given heat source. Meanwhile, additive manufacturing (AM) is a single part manufacturing technique that provides the opportunity to develop unique and complex heat exchanger designs. Consequently, this work centers on the modeling, design, optimization, and testing of AM shell and tube heat exchangers for WHR. Specifically, a modified one-dimensional (1+1-D) and three-dimensional (3-D) heat exchanger models were developed and validated, with the 1+1-D model serving as the basis for design optimization. After modifications to the design to allow for AM, heat exchanger geometry optimizations were completed, targeting increased effectiveness across a range of physical parameters. Of the designs considered, nine were additively manufactured using Ti5553, and then tested using an external heat source and working fluid. Experimentally, the nineteen-tube, zero-baffle heat exchanger displayed the best overall performance, with the effects of dimensional accuracy, surface roughness, and baffles in the other designs also indicated. Next, the experimental results were used as inputs for the 1+1-D model. Although the original model was able to predict fluid outlet temperatures within 5% differences, larger variations in the heat exchanger performance parameters, temperature differences, and pressure drop necessitated optimizing the pressure drop and heat transfer calculations within the model. Thus, the resulting improved model was able to predict the heat transfer rates, heat source temperature difference, and effectiveness within 15% differences, while showing improvements in the pressure drops and working fluid temperature differences. The improved model serves as the foundation for future work to improve the design and performance of AM heat exchangers.

Spickler, Bailey Ann↗

A New Process for Carbon Dioxide Conversion to Fuel

In this project, TDA developed a new mixed metal oxide-based sorbent that converts CO 2 (captured from coal fired power plant) to CO, which can then be combined with renewable H 2 generated by water electrolysis to produce different liquid fuels. TDA’s absorbent-based CO 2 conversion process uses a redox process, which splits the reverse water gas shift reaction steps into two stages: CO 2 reduction to CO and H 2 oxidation to H 2 O and eliminates the equilibrium limitations. The CO produced in the two-stage reactor system can then be further reacted with renewable H 2 to produce methanol, naphtha, diesel, or gasoline. We worked with the Gas Technology Institute (GTI) and Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI) to design and develop the liquid fuel synthesis process that is built around this new material. We demonstrated the techno-economic viability of the new sorbent based redox process to convert CO 2 into synthesis gas by: 1) demonstrating continuous carbon dioxide reduction in a prototype test system for over 500 hours while converting up to 0.4 kg CO 2 /day. With the successful completion of the R&D effort, the technology is now ready for a larger pilot-scale demonstration and the technology readiness has been raised from TRL 3 to TRL 5. In collaboration UCI, we also completed a high-fidelity process design and economic analysis. The required selling price (RSP) for methanol (Case 1 H2-MeOH) is $\$$3.06/gal, naphtha and diesel (Case 2 H2-FT) are $\$$6.21/gal and $\$$8.91/gal, and for gasoline (Case 3 H2-MTG) is $\$$6.96/gal on a 2011 dollar basis. To put these costs in perspective, the recent (June 2020) U.S. price for methanol made from natural gas is about $\$$1.19/gal according to Methanex, a major methanol producer in North America. The recent (June 2, 2020) California prices for gasoline and diesel with California’s strict specifications are $\$$3.35/gal and $\$$3.73/gal according to the U.S. Energy Information Agency. On the other hand, it should be noted that the gasoline and diesel produced by the designs of Case 2 and Case 3 would be both nitrogen and sulfur free. These RSPs are based on a cost of imported electricity of $\$$64/MWh based on the low-end current wind generated electricity cost (Genevieve and Ramsden, Wind Electrolysis: Hydrogen Cost Optimization, Technical Report, June 2011, NREL/TP-5600-50408). This cost is by far the largest component of the variable costs used in computing the RSPs. The cost of the imported electricity has to approach zero for the RSP to be competitive for methanol produced in Case 1 and naphtha and diesel produced in Case 2 while the cost of electricity has to be less than $\$$10/MWh for gasoline produced in Case 3.

01 COAL, LIGNITE, AND PEAT↗

Designing monitoring networks for local earthquakes

Abstract Seismic networks are essential for monitoring local earthquakes in connection to industrial activities, including wastewater injection and CO2 sequestration. Because these networks are typically deployed for short periods of time at specific sites, it is beneficial to develop best practices for efficient and effective installation and monitoring. Such standards are available for regional earthquake and microseismic monitoring, but not readily available for local scale (tens of kilometer scale) monitoring. Once the region of interest has been determined, the key parameters for establishing a network are available monitoring station locations, site noise, and site utility. Networks should be designed based on the project monitoring goals for earthquake magnitude and density. Herein, a network was established at the Patterson and Hartland Oil Fields in western Kansas in association with a US Department of Energy CarbonSAFE carbon capture and sequestration research project. We employed observations from an analog local network, the Wellington Earthquake Monitoring Network in south-central Kansas, to assess site noise and estimate earthquake detection thresholds for the Patterson and Hartland fields. Noise from oil production facilities was evaluated, concluding that oil lease sites are suitable for monitoring small local earthquakes (M1-M3). The network was designed to have a magnitude of completeness of M1 while using station locations on existing field operator leases. Fifteen months of continuous network operation demonstrates reliable and efficient local earthquake monitoring and provides best practices recommendations for similar operations.

58 GEOSCIENCES↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Overcoming challenges to support US resumption of high specific activity cobalt-60

Domestic production of high specific activity 60 Co was halted after a target rupture in 2012 at the Advanced Test Reactor (ATR). The Isotope Program (IP) within the US Department of Energy (DOE) Office of Science tasked a multilaboratory team of researchers and managers from Oak Ridge and Idaho National Laboratories with the redesign the radioisotope capsule. The objective of this effort was to create a more robust and reliable design, compared to the pre-2012 target. The team successfully completed this task to produce the DOE-IP cobalt (Co) production capsule design. Furthermore, 66 capsules were successfully fabricated by Oak Ridge National Laboratory (ORNL) and delivered to Idaho National Laboratory (INL) for irradiation in the ATR between January 2014 and October 2016. This paper describes the efforts of the team to prepare and disposition the two initial DOE-IP Co production capsules that were processed in March 2020. These efforts include performing accurate production predictions, experimentally validating predictions with assay measurements, shipping with the Orano-furnished Battelle Energy Alliance Research Reactor shipping package, and disassembling capsules at the isotope vendor site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

An Initial Assessment of the Design Margins of Different ASME Section III, Division 5 Design Rules

This report develops a method for assessing the design margin of the ASME Section III, Division 5 Class A design rules, focusing on a definition of margin as the ratio between the actual, expected component life and the ASME design life. Full inelastic finite element simulations with a complete damage model capturing the available creep, creep-fatigue, fatigue, and tension test failure data produce the expected component lives, which can then be compared to corresponding ASME design calculations. The focus of this particular work is on Alloy 617 and the ASME creep-fatigue design rules, but the approach is general and could be applied to other design limits and to other materials. A margin assessment of a representative Alloy 617 component shows the ASME creep-fatigue design rules applied to this component have a margin of 10 on design life. The report describes several challenges in completing a more comprehensive margin assessment of the ASME rules, in particular challenges in developing probabilistic assessment methods for high temperature structural components. The report details these challenge and discusses the immediate possibilities of the deterministic margin assessment method developed here.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic Model of Active Front-End Converters with 2DOF-PI Controllers for DC Bus Voltage Control

In most of the research, a conventional one degree-of-freedom type proportional-integral controller (1DOF-PI) is used for the regulation of the dc bus voltage in an Active Front-End Converter (AFEC). This paper proposes a two degree-of-freedom type proportional-integral controller (2DOF-PI) for the regulation of dc bus voltage in an AFEC. Such a controller eliminates the left-half plane (LHP) zero in the command-to-output transfer function for dc bus voltage regulation that is inherent to the conventional 1DOF-PI for this application. The dynamic model of an AFEC in the synchronous reference frame (SRF) is presented. An inner current control and outer dc voltage control loop is built for controlling the AFEC. Vector-control scheme is employed to achieve decoupled control of direct-axis and quadrature-axis currents. The outer dc voltage control loop is designed with a 2DOF-PI to complete the control system. Transfer function (TF) of the controller is derived based on the presented model and used to calculate the controller gains. Transient and steady state performance of the designed controllers are investigated in MATLAB/Simulink and results presented.

Thapa, Anup↗

Improving Marine Energy Production Through Commercialization of a Low Cost, Drag-Reducing Slippery Coating (CRADA 679 Abstract)

Marine energy capture systems offer great promise for providing clean energy, but they operate in a challenging and dynamic environment and must be optimized to the highest extent possible. Computational studies predict that drag reduction on marine energy and blue economy systems will result in meaningful improvements in energy efficiency. Based on extensive coating experience, PNNL is proposing to bring to market a new drag-reducing coating called Superhydrophobic Lubricant-Infused Drag-Efficient Coating – SLIDE-Coat. PNNL has a deep knowledge base regarding this class of slippery coatings, and we have a group of enthusiastic industry partners who have committed to partnering, conducting field testing, and providing well over 50% cost share. In addition to validating the technology, the team will create a commercialization roadmap to ensure the commercial success of the technology after the government-sponsored two-year program is complete. The main technical goal is to design, manufacture, and experimentally validate a new coating that can reduce hydrodynamic skin friction drag by 20%. The main commercialization goal is to develop a roadmap that identifies activities needed to complete SLIDE-Coat’s development after the conclusion of this project. Year 1 will focus on adaptation and modification of the existing SLIC coating system to optimize drag reduction and assessment and quantification of drag reduction on relevant materials in a laboratory setting. Year 2 will focus on optimizing and demonstrating drag reduction with preferred coatings. The manufacturability, ease of application, adhesion to relevant surfaces, and consistency will be assessed. Quantification of drag reduction on prototype materials in a relevant marine field setting will be executed.

16 TIDAL AND WAVE POWER↗

Mooring System Cost Estimates for Wave Energy Farms in Shared Mooring Arrays

As wave energy converters (WECs) become more advanced and cost-efficient, so too must their mooring systems. A key question in the development plans for WECs is the cost of the mooring system, particularly for large wave farms. WEC devices deployed in a WEC farm array, where each device can be connected by shared mooring lines in various array layouts, have potential to reduce mooring system costs significantly. This paper presents the modeling and designing of mooring systems for large WEC arrays and the calculation of the cost of each mooring system to determine the change in cost as the number of WECs in a farm increases. A baseline mooring system for a single floating oscillating water column (OWC) WEC was developed for this analysis. The mooring system utilizes four anchored mooring lines connected to a square assembly of wire rope mooring lines, supported by four floating buoys, and attached to the floating WEC by four polyester rope mooring lines. This assembly, referred to as a floating cell, can be tiled to form various rectangular WEC arrays. The objective of this analysis is to determine how the mooring system cost changes as more WECs are added to an array layout, each with their own interconnected floating cell. To do this, complete mooring systems need to be designed for each WEC array layout. To narrow down the design space of a WEC array mooring system, a couple assumptions were made. It was assumed that the floating cell parameters of the baseline design were to stay constant across all floating cells in the WEC array. It was also assumed that the anchored mooring lines would be of the baseline configuration, a predominantly chain mooring line with a short section of polyester rope near the fairlead, and a drag-embedment anchor. These anchored lines were assumed to extend from the outer edges of the WEC array, inline with the headings of the wire rope mooring lines of the floating cells, or diagonal if extending from a corner of the WEC array. Full mooring systems were designed for 2xN and NxN WEC array layouts and efficiently simulated in the mooring dynamics simulation tool, MoorDyn, to ensure all dynamic constraints were met. The system costs were calculated and then refined by shortening unnecessary chain line lengths and reducing the chain diameters of the downstream anchored mooring lines. It was found that, in general, mooring system costs per WEC decrease when WECs are installed in an array. Compared to the baseline mooring system for a single WEC, the 2x3 mooring system array had the lowest mooring system cost per WEC, reducing the cost per WEC by 59%. The 3x3 and 4x4 array mooring systems also saw significant reductions in cost per WEC but had negligible cost savings between the two designs, primarily because the larger 4x4 mooring system requires larger chain diameters, which increases cost. These results provide an interesting glimpse into modeling, designing, and calculating the cost of mooring systems for large WEC arrays.

cost↗

Warm Unit Stand Analysis for Proton Improvement Project II

The Proton Improvement Project II, commonly referred to as PIP II, is a linear accelerator overhaul at Fermilab to eventually double the output of its existing proton beam to continue to be the leading force in high energy physics. The proton beam is created through a series of high frequency cryomodules that must be connected utilizing a combination of magnets and vacuum pumps to ensure the beam is properly aligned. A housing mechanism for the magnets and vacuum pumps (Warm Units) will be placed between the cryomodules for realignment and require multiple stages of 6 degree-of-freedom adjustment options, to ensure that the beam alignment can fit all realistic requirements. Extensive testing and design modifications on the Warm Unit stand was completed to confirm not only the strength of the unit in nominal configuration, but also at each possible adjustment orientation for each 6 degree-of-freedom option. Structural analysis was also completed for various unique loading conditions i ncluding transportation loading and confirming the unit satisfies international building code. Simultaneously, testing and design modifications were done to confirm that the frequency modes of the system resided outside of concern ranges, which is determined by Fermilab safety codes and is set to exceed 15 Hz. Design changes that simultaneously stiffen the system to raise the lowest frequency modes while expanding access for technicians and allow for easier fabrication were developed and implemented into the Warm Unit stand. Various relationships between the design changes and the overall vibrational patterns were also developed for future use and study as the rest of PIP II matures.

43 PARTICLE ACCELERATORS↗