Search NASA⌕ Search

SEARCH · Search NASA

Results for “Component Of The Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Phenix Power Plant Decommissioning Project - Removal of Core and Neutron Blanket Components

Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009 in accordance with the reactor operating program with a mean availability of 80%. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase corresponds to the initial operations undertaken to remove the maximum of hazardous materials. During this phase, subject to the standard operating methodological procedures, all the fuel in the plant will be removed and most of the other reactor core elements and other removable components (primary pumps, intermediate heat exchangers, control rod mechanisms, etc.) will be also dismantled and packaged in accordance with the available disposition routes. The core elements include fissile and fertile subassemblies, steel reflectors, and lateral neutron shielding rods. About half the lateral neutron shielding rods are accessible using the existing handling equipment; specific development work will be necessary to remove the others. Multiple engineering studies are in progress concerning the removal of the core elements. They address safety concerns taking into account thermal and seismic stresses, waste management including radiological characterization of the objects to be removed and the specification of suitable disposal routes (interim storage or disposal facilities), and scenario studies with the definition of each stage of the waste removal process. All these aspects are discussed in this paper. The feasibility of removing the core elements has been demonstrated with regard to handling and safety. A new handling arm is now being developed to remove the inaccessible core elements. The new earthquake safety calculations completed in 2006 did not reveal any insurmountable difficulties. Major work remains to characterize the core elements and determine the capacity of the disposition routes. The characterization program now in progress will validate the core element activation levels, but must be supplemented by a program to characterize the surface contamination from the primary sodium system. Concerning the disposition routes, several specific containers and shipping casks must be developed; engineering studies are now in progress to obtain the necessary approvals.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transportation of Large Wind Components: A Review of Existing Geospatial Data

This report features the geospatial data component of a larger project evaluating logistical and infrastructure requirements for transporting oversized and overweight (OSOW) wind components. The goal of the larger project was to assess the status and opportunities for improving the infrastructure and regulatory practices necessary to transport wind turbine towers, blades, and nacelles from current and potential manufacturing facilities to end-use markets. The purpose of this report is to summarize existing geospatial data on wind component transportation infrastructure and to provide a data gap analysis, identifying areas for further analysis and data collection.

17 WIND ENERGY↗

Charged Wellbore Casing Controlled Source Electromagnetics (CWC-CSEM) for Reservoir Imaging and Monitoring (Final report)

This project addresses the needs of the U.S. Department of Energy (DOE) to develop advanced monitoring technologies and protocols to track the fate of subsurface carbon dioxide (CO2) plumes for carbon storage. Specifically, the project seeks to develop and test a unique and novel system of technologies consisting of electromagnetic data acquisition, coupled multiphysics imaging, and reservoir model enhancement to understand the migration and long-term distribution of CO2 in the subsurface. The overarching objective is to develop an integrated approach for long term monitoring of carbon storage. The two main components of the project include the methodology development and the test of the method at a field site. The methodology component consists of 1) developing the field procedure and protocol for collecting time-lapse controlled-source electromagnetic (CSEM) data with source electric current injected into the subsurface through wellbore casings; 2) building of background 3D electrical conductivity utilizing multiple sources of data such as supplemental surface transient EM (TEM) surveys, well-logs, and seismic structural information, for enhancing CSEM signal from reservoir depths; and 3) coupled multiphysics simulations and inversion of CSEM data constrained by production data and by structural information from seismic imaging of the reservoir and overlying formations. The testing component used the field site of Bell Creek Oil Field, which served both as a field laboratory for the method development as well as a test site to evaluate the CSEM signal strengths and the methodology developed in this research project. We have accomplished all the proposed tasks and developed the methodology as planned. These include the procedure for time-lapse CSEM data acquisition, data processing techniques, integration with 3D conductivity model building, fast reservoir simulation for history matching using machine learning, and interpreting CSEM data with coupling to the reservoir modeling. Collectively, the outcome of these tasks form a coherent workflow that can be applied to monitor dedicated carbon storage in saline reservoirs. The testing component evaluated the applicability and limitations of the method, and concluded that the method would be ideal for monitoring dedicated carbon storage sites utilizing saline reservoirs.

54 ENVIRONMENTAL SCIENCES↗

Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

13 HYDRO ENERGY↗

Probabilistic Structural Analysis and Reliability Using NESSUS With Implemented Material Strength Degradation Model

This project included both research and education objectives. The goal of this project was to advance innovative research and education objectives in theoretical and computational probabilistic structural analysis, reliability, and life prediction for improved reliability and safety of structural components of aerospace and aircraft propulsion systems. Research and education partners included Glenn Research Center (GRC) and Southwest Research Institute (SwRI) along with the University of Texas at San Antonio (UTSA). SwRI enhanced the NESSUS (Numerical Evaluation of Stochastic Structures Under Stress) code and provided consulting support for NESSUS-related activities at UTSA. NASA funding supported three undergraduate students, two graduate students, a summer course instructor and the Principal Investigator. Matching funds from UTSA provided for the purchase of additional equipment for the enhancement of the Advanced Interactive Computational SGI Lab established during the first year of this Partnership Award to conduct the probabilistic finite element summer courses. The research portion of this report presents the cumulation of work performed through the use of the probabilistic finite element program, NESSUS, Numerical Evaluation and Structures Under Stress, and an embedded Material Strength Degradation (MSD) model. Probabilistic structural analysis provided for quantification of uncertainties associated with the design, thus enabling increased system performance and reliability. The structure examined was a Space Shuttle Main Engine (SSME) fuel turbopump blade. The blade material analyzed was Inconel 718, since the MSD model was previously calibrated for this material. Reliability analysis encompassing the effects of high temperature and high cycle fatigue, yielded a reliability value of 0.99978 using a fully correlated random field for the blade thickness. The reliability did not change significantly for a change in distribution type except for a change in distribution from Gaussian to Weibull for the centrifugal load. The sensitivity factors determined to be most dominant were the centrifugal loading and the initial strength of the material. These two sensitivity factors were influenced most by a change in distribution type from Gaussian to Weibull. The education portion of this report describes short-term and long-term educational objectives. Such objectives serve to integrate research and education components of this project resulting in opportunities for ethnic minority students, principally Hispanic. The primary vehicle to facilitate such integration was the teaching of two probabilistic finite element method courses to undergraduate engineering students in the summers of 1998 and 1999.

Bast, Callie C.↗

Final Report

The purpose of this project was to develop tools and techniques to improve the ability of computational scientists to investigate and correct problems (bugs) in their programs. Specifically, the University of Maryland component of this project focused on the problems associated with the finite number of bits available in a computer to represent numeric values. In large scale scientific computation, numbers are frequently added to and multiplied with each other billions of times. Thus even small errors due to the representation of numbers can accumulate into big errors. However, using too many bits to represent a number results in additional computation, memory, and energy costs. Thus it is critical to find the right size for numbers. This project focused on several aspects of this general problem. First, we developed a tool to look for cancelations, the catastrophic loss of precision in numbers due to the addition of two numbers whose actual values are close to each other, but whose representation in a computer is identical or nearly so. Second, we developed a suite of tools to allow programmers to identify exactly how much precision is required for each operation in their program. This tool allows programmers to both verify that enough precision is available, but more importantly find cases where extra precision could be eliminated to allow the program to use less memory, computer time, or energy. These tools use advanced binary modification techniques to allow the analysis of actual optimized code. The system, called Craft, has been applied to a number of benchmarks and real applications.

97 MATHEMATICS AND COMPUTING↗

Hydrate research activities that both support and derive from the monitoring station/sea-floor Observatory, Mississippi Canyon 118, northern Gulf of Mexico

A permanent observatory has been installed on the seafloor at Federal Lease Block, Mississippi Canyon 118 (MC118), northern Gulf of Mexico. Researched and designed by the Gulf of Mexico Hydrates Research Consortium (GOM-HRC) with the geological, geophysical, geochemical and biological characterization of in situ gas hydrates systems as the research goal, the site has been designated by the Bureau of Ocean Energy Management as a permanent Research Reserve where studies of hydrates and related ocean systems may take place continuously and cooperatively into the foreseeable future. The predominant seafloor feature at MC118 is a carbonate-hydrate complex, officially named Woolsey Mound for the founder of both the GOM-HRC and the concept of the permanent seafloor hydrates research facility, the late James Robert “Bob” Woolsey. As primary investigator of the overall project until his death in mid-2008, Woolsey provided key scientific input and served as chief administrator for the Monitoring Station/ Seafloor Observatory (MS-SFO). This final technical report presents highlights of research and accomplishments to date. Although not all projects reached the status originally envisioned, they are all either complete or positioned for completion at the earliest opportunity. All Department of Energy funds have been exhausted in this effort but, in addition, leveraged to great advantage with additional federal input to the project and matched efforts and resources. This report contains final reports on all subcontracts issued by the University of Mississippi, Administrators of the project, Hydrate research activities that both support and derive from the monitoring station/sea-floor Observatory, Mississippi Canyon 118, northern Gulf of Mexico, as well as status reports on the major components of the project. All subcontractors have fulfilled their primary obligations. Without continued funds designated for further project development, the Monitoring Station/Seafloor Observatory is in danger of lapsing into disuse. However, for the present, interest in the site on the continental slope is healthy and The Center for Marine Resources and Environmental Technology continues to coordinate all activity at the MS/SFO as arranged through the BOEM in 2005. Field and laboratory research projects and findings are reviewed, new technologies and tests described. Many new sensors, systems and two custom ROVs have been developed specifically for this project. Characteristics of marine gas hydrates are dramatically more refined than when the project was initiated and include appear in sections entitled Accomplishments, Products and Publications.

03 NATURAL GAS↗

Analyses of Scenarios for Past and Possible Future Aircraft Emissions

This project contains several components to work with the NASA AEAP program in better definition of scenarios for aircraft emissions and in determining the sensitivity of the atmosphere to such emissions. Under this project, Don Wuebbles continues as chair of the Operations and Emissions Scenarios Committee for AEAP. We are also coordinating with the International Civil Aviation Organization (ICAO) to ensure the highest quality possible in the emissions scenarios promoted by the Emissions Scenarios committee. We continue to help coordination of NASA AEAP with international activities. This includes work with ICAO towards international analysis of aircraft emissions inventories; performing analyses to compare and evaluate databases of aircraft emissions developed for NASA and by various international groups and from these analyses, develop guidelines for future emissions scenarios development. Special sensitivity analyses, using our two-dimensional chemical-transport model of the global troposphere and stratosphere, have been used to determine potential sensitivity of further enhancements that could be made to emissions scenarios development. The latter studies are to be used in prioritizing further emissions scenario development.

Wuebbles, Donald J.↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Friction Stir Scribe Joining of CFRP to Aluminum (Abstract)

The objective of this project is to develop and demonstrate friction stir scribe (FSS) joining of carbon fiber reinforced polymer (CFRP) to aluminum on light-duty vehicle body-in-white (BIW) joints. The project will also overcome the major obstacles of implementing FSS technology in a fully 3-D production robotic work cell and demonstrate the required CFRP-aluminum joint strengths in industrially relevant light-duty, BIW components. Specifically the project will develop the critical process technology, models and tools necessary to advance the FSS method through experimentation, validation at the laboratory scale, and integration into a production-like robotic environment. The ultimate goal is to demonstrate the technology on industrially relevant components based on process development and numerical simulation performed at scale.

42 ENGINEERING↗

Spectrophotovoltaic orbital power generation, phase 2

A subscale model of the spectral splitting concentrator system with 10" aperture is defined and designed. The model is basically a scaled down version of Phase 1 design with an effective concentration ratio up to 1000:1. The system performance is predicted to be 21.5% for the 2 cell GaAs/Si system, and 20% for Si/GaAs at AM2 using realistic component efficiencies. Component cost of the model is projected in the $50K range. Component and system test plans are also detailed.

Lo, S. K.↗

A Comparative Study of Direct and Indirect Additive Manufacturing Approaches for the Production of a Wind Energy Component

Additive manufacturing (AM) was developed in the 1980s to create three-dimensional prototypes through layer-wise approaches to fabrication. Since then, these approaches have seen improvements in both materials and processing technologies. To date, there are now 7 types of additive manufacturing processes and hundreds of materials, which can be directly printed – going directly from digital design to fabricated components. In this project, Oak Ridge National Laboratory (ORNL), Vestas Wind Systems, and The National Renewable Energy Laboratory (NREL) collaborated to evaluate the effectiveness of state-of-the-art large-scale AM processes in the production of a structural component for use in a wind turbine nacelle, through both direct and indirect manufacturing approaches. Here, experienced AM design engineers detail techniques for AM design, including topology optimization (TO), support minimization, reverse engineering, and techniques for mitigating poor interlaminar performance. Fabrication of the components is presented, including printing parameters and postprocessing, and followed with full-scale component testing by a 3rd party testing laboratory. To evaluate the potential of the developed approaches, a complete techno-economic analysis is provided which evaluates the cost of these techniques given current and near to long-term projections of AM system capabilities.

17 WIND ENERGY↗

Fuel Cell Powered Lift Truck

This project, entitled “Recovery Act: Fuel Cell-Powered Lift Truck Sysco (Houston) Fleet Deployment”, was in response to DOE funding opportunity announcement DE-PS36-08GO98009, Topic 7B, which promotes the deployment of fuel cell powered material handling equipment in large, multi-shift distribution centers. This project promoted large-volume commercialdeployments and helped to create a market pull for material handling equipment (MHE) powered fuel cell systems. Specific outcomes and benefits involved the proliferation of fuel cell systems in 5-to 20-kW lift trucks at a high-profile, real-world site that demonstrated the benefits of fuel cell technology and served as a focal point for other nascent customers. The project allowed for the creation of expertise in providing service and support for MHE fuel cell powered systems, growth of existing product manufacturing expertise, and promoted existing fuel cell system and component companies. The project also stimulated other MHE fleet conversions helping to speed the adoption of fuel cell systems and hydrogen fueling technology. This document also contains the lessons learned during the project in order to communicate the successes and difficulties experienced, which could potentially assist others planning similar projects.

30 DIRECT ENERGY CONVERSION↗

Multi-Source Machine Learning and Thermoplastics Enhanced Aerostructure Manufacturing (mTEAM)

RTX Technology Research Center (RTRC), together with Collins Aerospace (Collins) and Oak Ridge National Laboratory (ORNL) has developed an Artificial Intelligence (AI) / Machine Learning (ML) guided solution to advance the manufacturing and assembly of high performance and lightweight thermoplastic composite (TPC) aerospace products. The solution aims to lower risk, cost and lead time for induction heating based welding and consolidation processes for TPC structure. The cost and lead time of part and material specific process development for induction welding (IW) and induction consolidation will be reduced by replacing traditional empirical methods with optimization methods that merge AI/ML and physics-based process simulations and process experiments with sensing and controls. TPC-IW process development is empirical in nature, and uncertainties in material & process behavior exist near & far from the induction coil. Physics-based simulations can be leveraged directly for process optimization but can be too computationally expensive to run in high fidelity and real time to do robust process optimization. The key impact of successful TPC induction consolidation and welding is cost & lead time reduction for part & material specific consolidation and welding recipes. This is an enabler for more rapid deployment of TPC structures via joining assembly, which can reduce energy & cost intensive usage of autoclaves & ovens. The solution aimed to advance the U.S. Department of Energy’s interests in using thermoplastics and automation in composite manufacturing for improvement of products for existing markets via increased production speeds, reduced costs, and lowered use of energy. Welded TPC structures can offer significant weight & energy savings for high-value commercial aerospace & industrial applications compared to metal & thermoset composite structures assembled by mechanical fastening and/or adhesive bonding. The project was organized into two Budget Periods. Budget Period 1 (BP1) was 15 months and its goal was to perform ML process optimization framework development & deployment on lab-coupon aerostructure components. A Go/No-Go Review was performed at the end of BP1 to verify fulfilment of key tasks & milestones to justify a Go Decision to move into the next Budget Period. Budget Period 2 (BP2) was 12 months and its goal was the deployment of the ML framework for ML process optimization of pilot industrial scale aerostructure components. The overall project aim was to develop & demonstrate ML-enhanced modeling framework that learns process-property mapping from multiple data sources at different fidelities. During BP1, the team accomplished key tasks & milestones to demonstrate the concept of multi-source ML for TPC aerostructure consolidation and assembly. First, the team completed documentation of induction based TPC heating requirements including baseline metrics to compare measured results against. Next the team completed demonstration of data generation from physics-based simulations for ML surrogate model generation and demonstrated the integration of physics-based simulation data into multi-source AI/ML algorithms. In parallel, the team established the lab-coupon scale induction welding system and completed a process to label and reduce generated data from physics-based simulation and experiments for ML surrogate models to enable multi-source ML model training & testing. To complete BP1, the team integrated physics-based simulation data and experimental data into multi-source ML algorithms. This was based on the team completing ML deployment of the induction welding on a lab system at RTRC and AI/ML deployment on existing induction welding line at Collins. ORNL visited both Collins and RTRC sites to witness the TPC induction welding process. Then, ORNL designed and constructed a new version of their vision-based sensing system better adapted to acquire process signals of the TPC induction welding process for process anomaly and defect detection. In BP2, the team accomplished key tasks & milestones to scale up multi-source ML for TPC aerostructure consolidation and assembly from the lab-coupon scale to the pilot-industrial scale. In BP2, the team demonstrated real time anomaly & defect detection via experiments performed by ORNL & RTRC. The team completed ML-optimization heating trials for TPC induction consolidation at Collins, and the team confirmed pilot industrial scale experimental data from Collins was compatible with the developed ML pipeline from RTRC. The team completed sub-element scale ML process optimization demonstration at RTRC, where the team leveraged RTRC’s robotic TPC welding setup to de-risk the ML process optimization by performing ML analysis of recorded temperatures to account for complex part features. Then, the team applied its ML-derived control strategies and ML process optimization framework at Collins to the pilot-industrial scale on a demo skin-stiffener part representative of a nacelle aerostructure fan cowl section. The key innovation is the AI/ML framework enabling effective process development of high performance, lightweight, energy efficient TPCs for composite aircraft structures.

36 MATERIALS SCIENCE↗

Elementary and middle school science improvement project

The Alabama A & M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted in response to a need to improve the ability of North Alabama teachers to teach science effectively using the experimental or hands-on approach. The major component of the project was a two-week workshop. Follow-up visits were made to the classrooms of many of the participating teachers to obtain information on how the program was being implemented in the classroom. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcomes are addressed.

Mcguire, Saundra Yancy↗

U.S. Coast Guard and Florida Power & Light Successfully Implement a Multi-Site UESC Project

As the largest component of the Department of Homeland Security (DHS), more than 42,000 active-duty members of the U.S. Coast Guard safeguard the nation’s maritime interests. Consequently, Coast Guard facilities represent about 60 percent of the DHS shore energy use portfolio. Under the National Energy Conservation Policy Act (NECPA) and Executive Order 13423, the Coast Guard has reduced its facility energy intensity year-on-year, achieving a fiscal year (FY) 2012 reduction of 28.6 percent from a FY 2003 baseline.

Coast Guard, Florida, Power, Light, UESC, Project↗

A Non-Invasive Approach for Elucidating the Spatial Distribution of In-Situ Stress in Deep Subsurface Geologic Formations Considered for CO 2 Storage (Task 3 Report Laboratory Characterization of Stress Dependent Wavespeed)

This report presents a summary of Task 3 (Laboratory Experimental Characterization of Stress Dependent Wavespeed in Rocks and Application for In-Situ Stress Estimation) of the project titled “A Non-Invasive Approach for Elucidating the Spatial Distribution of In-Situ Stress in Deep Subsurface Geologic Formations Considered for CO 2 Storage”. The main objective of this component of the project was to employ non-destructive techniques to determine how compressional (P)-wave and shear (S)-wave propagation velocities are related to triaxial-stress conditions in laboratory test samples of targeted reservoir rocks. The overarching principle is that such laboratory measurements can provide a basis whereby field measurements of wave-propagation velocities in rocks can be used to ascertain the stress state that would be expected to generate the observed wave-propagation behavior.

58 GEOSCIENCES↗

Deriving Earth science products from SSM/I

There are 3 components to this project. The first is the production of a quality controlled Level-1 data product for the Special Sensor Microwave Imager (SSM/I). Second is the generation of research quality ocean products. The 3rd component is studying the feasibility of obtaining both wind speed and wind direction from satellite microwave radiometers. The status of the three studies are discussed briefly. Time series of the SSM/I physical temperatures, receiver gains, and noise figures were studied in order to access the stability and integrity of the sensor data. A physically based retrieval algorithm was used to compute ocean products from the SSM/I Level-1 data. It simultaneously finds the near surface wind speed, the columnar water vapor, and the columnar liquid water. A wind direction signal was found in the SSM/I brightness temperature.

Wentz, Frank J.↗