Search NASA⌕ Search

SEARCH · Search NASA

Results for “Conditional Point Sampling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

278 records · Page 16

Development of an ERT‐Based Framework for Bentonite Buffers Monitoring From Laboratory Tests: 1. Characterizing Thermal–Hydrological–Mechanical Processes

Abstract Bentonite clay is widely used in engineered barrier systems for the permanent disposal of high‐level radioactive waste due to its low permeability, high swelling capacity, and thermal stability. However, the complex thermal‐hydrological‐mechanical (THM) processes induced by heating from decaying radioactive waste and hydration from surrounding rock can lead to heterogeneous changes that are difficult to measure and predict. This study develops an Electrical Resistivity Tomography (ERT)‐based framework for monitoring THM processes, progressing from sample‐scale to bench‐scale tests, to inform field‐scale applications. Sample‐scale tests analyzed small bentonite samples under controlled variations in water content, temperature, and porosity to establish fundamental resistivity relationships. Bench‐scale tests involved larger bentonite columns subjected to heating (up to 200°C) and hydration under controlled pressure, simulating repository conditions. ERT measurements, complemented by X‐ray CT imaging, temperature monitoring, and tracing sensors, revealed coupled THM processes, such as hydration‐induced compression, swelling, and thermal gradients, leading to complex resistivity patterns. The results demonstrate the potential of ERT for capturing THM‐induced resistivity changes, though challenges remain in upscaling and quantitative analysis. This study evaluates laboratory test capabilities and proposes future improvements for understanding THM‐induced resistivity responses. A conceptual framework for ERT implementation in field‐scale monitoring is presented, synthesizing findings from both scales and exploring how ERT data can inform long‐term modeling and reduce prediction uncertainties. Overall, this ERT‐based framework offers a robust method for monitoring bentonite buffers, aiding in early issue detection and supporting the safe long‐term disposal of radioactive waste in geological repositories, while highlighting the need for future development. Plain Language Summary Bentonite clay is crucial in engineered barrier systems (EBS) for containing high‐level radioactive waste due to its ability to absorb water, swell, seal and remain stable under high temperatures. When bentonite absorbs water and heats up from radioactive decay, it experiences complex changes in its physical and mechanical properties. Understanding these changes is important for ensuring the long‐term safety and effectiveness of EBS. This study used Electrical Resistivity Tomography (ERT), a non‐invasive method that measures electrical conductivity to monitor these changes during laboratory experiments. The ERT data revealed significant variations in resistivity corresponding to changes in water content, temperature, and density, providing detailed spatial and temporal insights into the behavior of bentonite. These findings enhance our ability to predict the long‐term performance of bentonite barriers, ensuring the safe containment of radioactive waste. By improving our understanding of bentonite's behavior, this research supports the development of more reliable and effective barrier systems for radioactive waste disposal, protecting the environment and public health. Key Points ERT monitoring was employed to capture resistivity changes in bentonite during controlled heating and hydration experiments, providing insights into THM processes ERT data reveal significant resistivity changes correlated with water content, temperature, and mechanical effects, enhancing the understanding of THM dynamics in bentonite This study explores the potential of the framework for application in field‐scale EBS monitoring, emphasizing the need for integrating additional geophysical methods for comprehensive subsurface imaging

Chen, Hang↗

High-throughput spin-bath characterization of spin defects in semiconductors

Detailed knowledge of the local environments of spin defects in semiconductors, such as nitrogenvacancy (NV) centers in diamond or divacancies in silicon carbide, is crucial for optimizing control and entanglement protocols in quantum sensing and information applications. However, at present a direct experimental characterization of individual defect environments is not scalable, as conventional spin-bath measurements are time consuming and difficult to automate. Achieving high-throughput characterization requires short experiments to probe the spin bath. However, with fewer and noisier measurements, the inverse problem of recovering spin-bath properties from measured data becomes ill posed, with multiple spin baths having a high likelihood of yielding the same data. In this work, we present a set of computational tools to resolve the ill-posed inverse problem of recovering the atomic positions and hyperfine couplings of random nuclei surrounding spin defects from sparse, noisy experimental coherence data, which can be obtained in hours. Here, we use a trans-dimensional Bayesian approach that incorporates ab initio data to yield full posterior distributions over nuclear spin environments, enabling robust recovery from limited data. We also provide practical tools and guidelines to determine the limits of detectability for hyperfine couplings under specific dynamical decoupling sequences and sampling conditions. In addition, we demonstrate how the tools developed here, in combination with ab initio simulations of spin baths, can guide the design of efficient experimental protocols for application-specific high-throughput screening. To showcase the utility of our approach, we apply it to design fast dynamical decoupling experiments to characterize the spin baths often individual NV centers in diamond. While the primary focus is on accelerating spin-bath characterization of spin defects, this Bayesian approach also lays the foundation for digital-twin studies of spin defects, where a virtual model of the spin-defect system evolves in real time with ongoing experimental measurements. Together, the set of tools we designed and applied paves the way for scalable deployment of spin defects in semiconductors for quantum sensing and information applications.

Bayesian methods↗

Mercury Speciation During Vitrification of LAW

n this work, laboratory and engineering-scale tests were conducted that mimic the reactive environment of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) low activity waste (LAW) melter and off-gas system in order to assess the speciation of mercury at select points in the processing system. The experimental protocols, test equipment, feed materials used, and rationale for testing are detailed in the Test Plan for this work. Particular attention was paid to the amount and speciation of mercury in submerged bed scrubber (SBS) solutions, which are intended to be recycled back to the melter feed at the WTP. Results are presented from detailed mercury analysis of these solutions using Environmental Protection Agency (EPA) Method 1630 and modifications to this method for dimethyl mercury and methyl mercury as well as EPA Method 1631 and modifications to this method for total, dissolved, elemental, suspended, and ionic mercury. Testing was conducted in two separate sets of experiments: (1) One set of tests (crucible-scale furnace tests) that involved heating small batches of mercury-spiked melter feed in crucibles to determine the amount of mercury retained in the glass and the species of mercury in the exhaust gases; (2) A second set of tests (DM10 melter tests) was planned that involved creating LAW melter plenum gas compositions using the DM10 melter system, injecting mercury into the off-gas stream, and passing that stream though a reactor that simulates various plenum gas conditions. Operational issues led to the need to use one of the VSL DM100 melters in place of the planned DM10 melter for these tests. The speciation of mercury after exposure to those conditions was monitored. In both sets of tests, the exhaust gases were run through a scrubber that was intended to mimic the LAW SBS in order to determine how much of the mercury exiting the melter would be retained in the primary off-gas system fluids and in what form. After passing through the SBS, the exhaust stream was analyzed to determine particulate, ionic, elemental, and total mercury passing downstream of the SBS. In tests employing gases derived from the DM100 melter that were spiked with elemental mercury, the processing system provided gas temperatures and residence times that are representative of the WTP LAW vitrification system in order to assess the effect of those conditions on mercury speciation. The Decontamination Factor (DF) across the system in the tests with mercury-spiked DM100 melter exhaust was determined using the analytical data from EPA Method 30B (Fluegas Adsorption Mercury Speciation (FAMS TM )) exhaust samples and the amount of mercury detected in the SBS solutions. Mercury species used in melter feed crucible scale tests were divalent (chloride and iodide), monovalent (chloride and fluoride), and elemental mercury. Individual tests included only a single form of mercury in the feed. The results for total mercury mass balances in the crucible tests are also presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Yield From Iowa's First Commercial Miscanthus Fields: Implications of Spatial Variability for Productivity and Sustainability Beyond Research Plots

The cultivation of sterile giant miscanthus (Miscanthus × giganteus, M × g) for bioenergy and bioproducts has expanded into grain-cropped land in the United States (US) as local markets developed for this high-yielding perennial grass (10–30 Mg DM ha −1 ). However, the magnitude of spatial and temporal variability in yield within US Corn Belt fields, along with impacts on economic return and sustainable land management, is poorly understood. This study established a diagnostic model relating remote sensing-derived vegetation indices to ground truth data from 105 hand-harvested stem biomass samples, which were strategically selected to represent the full range of vegetation index observations. The high-resolution satellite-sensed vegetation indices captured > 90% of the yield variation measured within fields. This model was then used to predict yield variability and assess economic performance across four of the first commercial M × g fields in the Corn Belt state of Iowa, US. Significant spatial variability in biomass dry matter (DM) yields (9.3–18.1 Mg DM ha −1 ) and net profits ($\$$83 to $\$$1211.5 ha −1 ) was observed. All fields were profitable in all site-years. When low profit occurred, it was explained by limited management experience of the crop in Iowa. The breakeven yield at a selling price of $\$$130 Mg −1 varied from 9.0–12.1 Mg ha −1 at 15% moisture content (7.6–10.3 Mg DM ha −1 ). Breakeven prices ranged from $\$$73 to $\$$122.4 Mg −1 , matching ranges used in the Department of Energy Billion Ton Report (US Department of Energy, 2023). Notably, M × g yield and profits were commensurate with grain crops particularly with favorable precipitation. This study provides insight on the M × g management “learning curve”, performance on marginal land and in drought conditions, and demonstrates that addressing yield gaps, reducing costs, and implementing precision agriculture strategies can enhance profitability. These findings emphasize the value of remote sensing technologies in guiding sustainable and competitive commercial-scale M × g production.

60 APPLIED LIFE SCIENCES↗

CHESS 2025: Leaf Area Index (LAI) for meadow, shrub, tree, and understory vegetation

This dataset contains Leaf Area Index (LAI) measurements made as part of the Colorado Headwaters Ecological Spectroscopy Study (CHESS) during June and July of 2025. Data were collected in the Upper Gunnison Basin, Colorado, across three study domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). Field observations of LAI were collected within 72 hours of airborne data collection by the National Ecological Observatory Network’s Aerial Observation Platform (NEON AOP). The NEON AOP collected waveform LiDAR (Light Detection and Ranging) and imaging spectrometer data in 426 spectral bands from the visible to shortwave infrared. LAI measurements were collected using the LICOR LAI-2200C Plant Canopy Analyzer following protocols outlined in the instrument manual (LI-COR 2019). Sampling targeted four distinct vegetation types: meadows, shrubs, trees, and aspen forest understory. We have archived data separately by site type because different field methods were used for each. At meadow sites, measurements were made at the four corners of 1m x 1m plots, with the instrument moving inward toward the center of the plot. At shrub sites, we measured the canopies of individual shrubs. At tree sites, we made measurements within a 10m x 10m subplot centered around a focal tree, with 30 observations taken on a regular grid. At aspen understory sites, we measured overstory trees following the tree protocol and understory herbaceous vegetation following the meadow protocol. All measurements included above-canopy (A) and below-canopy (B) readings, with specific protocols for scattering correction measurements in direct-sun conditions. Data were processed using the R package `rlai` (Worsham 2025). This package includes functions to calculate LAI, gap fraction, apparent clumping factor (Ω), scattering correction, and other canopy metrics. Package contents: Full file descriptions appear in ‘flmd.csv’. Files named according to the convention ‘lai_*_summary_data_cleaned.csv’ contain summary values of LAI, apparent clumping factor (Ωapp), and scattering correction factors for each site. These are the analysis-ready products that most data users will work with. Files named ‘lai_*_metadata_cleaned.csv’ contain additional site-level observations made during field collection. We have also archived intermediate and supplementary data for users who wish to check our processing approach or apply alternative methods. ‘raw_lai_2200C.zip’ contains the raw files as read from the LI-COR instrument, with no processing applied, in TXT format. The zip archive contains subdirectories by site type, which are further subdivided by sampling area. Filenames correspond to the sampling site number. ‘intermediate_results.zip’ contains detailed output from the processing routines, in JSON format. The zip archive contains subdirectories by site type; filenames correspond to the sampling site number. ‘scattering_correction_logs.zip’ contains logfiles from the implementation of Kobayashi et al.'s (2013) scattering correction algorithm. The logfiles report values of several parameters at each iteration of the algorithm, as the model converges toward a stable solution. They are intended for users who want to verify scattering correction performance. The zip archive contains subdirectories by site type; filenames correspond to the sampling site number. ‘spot_checks.csv’ reports LAI and other values for a small number of files processed with LI-COR FV2200 software (LI-COR 2013) using the same control parameters as in our R-based approach. Additional metadata are provided in a data dictionary describing column names and definitions (dd.csv), and in a file-level metadata file (flmd.csv). All zip files can be expanded with common archive utilities. TXT, CSV, and JSON files can be ingested into R or Python computing environments or read in common text editor utilities. Geospatial information: Geospatial data for mapping measurement site locations are in the files CHESS_polygons_lai_UTM.geojson, CHESS_polygons_shrub_UTM.geojson, and CHESS_polygons_meadow_UTM.geojson in the companion geospatial package for the 2025 CHESS campaign, ‘CHESS 2025: Location data for field observations and sampling’ (Henderson et al., 2026). CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. Funding Acknowledgement: Field and remote-sensing data acquisition was performed under a grant from the National Aeronautics and Space Administration (80NSSC24K1005). This work was also supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231. * Todorov and Worsham are co–first authors.

2018 NEON and 2025 CHESS Campaigns↗

Water Observations of Flow/No-Flow for the East-Taylor Watershed, Colorado (June-July 2025 and 2026)

This dataset provides multi-year, ground-truth visual observations of surface water flow/no-flow conditions within the East-Taylor Watershed, Colorado, collected during June and July of 2025 and 2026. In June and July 2025, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function Scientific Focus Area (SFA) and Rocky Mountain Biological Laboratory (RMBL) Colorado Headwaters Ecological Spectroscopy Study (CHESS) campaign (further details are provided within the CHESS Project Description). We obtained 377 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. These ground-truth observations were collected to validate classification maps from remote sensing data and model results within the East-Taylor Watershed. In 2025, flow/no-flow measurements were collected using a field-based app for the CHESS Campaign (Zerion iForm). Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included information about visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, and beaver activity. For 2025 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2025_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2025_Water_Observations_Locations.kmz); (3) photos (.jpg and .jpeg) of the water observation points, organized by location, contained within 2025_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2025_Water_Observation_Protocols.pdf). In June and July 2026, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function SFA project. We obtained 365 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. The 2026 observations focused on collecting repeat measurements at the 2025 flow/no-flow observation locations conducted as part of the CHESS campaign. These ground-truth observations were collected to understand differences in flow/no-flow in 2026, given the unprecedented 2026 drought in Colorado. In 2026, flow/no-flow measurements were collected using ArcGIS (Geographic Information System) Survey123. Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included repeat information from the 2025 water observation effort, including visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, beaver activity, and a new metadata component of estimated stream depth (for select locations). For 2026 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2026_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2026_Water_Observations_Locations.kmz); (3) photos (.jpg) of the water observation points, organized by location, contained within 2026_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2026_Water_Observation_Protocols.pdf). For 2025 and 2026 water observations, this dataset contains: (1) a location metadata file (locations.csv); (6) a file-level metadata (flmd.csv) file that lists each file contained in the dataset with associated metadata; and (7) a data dictionary (dd.csv) file that contains column/row headers used throughout the files along with a definition, units, and data type. CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231. 2026-09-02: This dataset was updated to include 2026 water observation measurements. The 2025 observation files were also updated to ensure a consistent file naming convention across water observation years.

2018 NEON and 2025 CHESS Campaigns↗

NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for radionuclide-contaminated soil to be transported from the Plutonium Valley Dispersion Sites Contamination Area (CA) because of both wind and storm water runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Plutonium Valley Dispersion Sites Corrective Action Unit (CAU) 366. The DRI task was intended to identify the likely mechanism(s) of transport and determine the meteorological conditions that might cause the movement of radionuclide-contaminated soils. The emphasis of the work was on collecting sediment transported by channelized storm runoff and measuring airborne dust concentrations and associated wind conditions. These data will facilitate an appropriate post-closure monitoring program. In 2011, DRI installed meteorological monitoring stations north and south of the Plutonium Valley CA—known as Pu Valley North and Pu Valley South, respectively—as well as a fluvial sediment sampling station within the CA. Since installation, temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, volumetric soil moisture content, and airborne particulate concentrations have been collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters were recorded for each 10-minute interval. The sediment sampling station included an automatically activated sampling pump with collection bottles for suspended sediment, which was activated when sufficient flow was present in the channel, and passive traps for bedload material that was transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2019. During the FY2019 (October 1, 2018, through September 30, 2019) reporting period, the warmest month was July and the coldest month was February. Monthly total solar radiation was highest in June or July (depending on the station) and lowest in December. Monthly mean wind speeds were highest during February. At the Pu Valley North station, winds were commonly northerly, northwesterly, and southerly. At the Pu Valley South station, the wind direction was more variable and winds frequently came from most directions, excluding westerly and northwesterly winds. Winds above 15.0 miles per hour (mph) (24.1 kilometers per hour [km/hr]) were frequently southerly at both stations, and less-frequent strong winds were northerly (at the Pu Valley South station) or northwesterly (at the Pu Valley North station). Monthly average relative humidity ranged from 18 percent in August to 62 percent in January and February. Monthly total precipitation ranged from zero at both stations in September to 2.23 inches (in) (56.6 millimeters [mm]) during February at the Pu Valley South station and 2.09 in (53.1 mm) during March at the Pu Valley North station. From October 1, 2018, through September 30, 2019, the total precipitation was 8.23 in (209 mm) and 8.15 in (207 mm) at the Pu Valley South and Pu Valley North stations, respectively. The largest daily precipitation totals of 1.46 in (37.1 mm) and 1.14 in (29.0 mm) occurred at the Pu Valley South and Pu Valley North stations, respectively, on March 6, 2019. However, the ISCO autosampler was not activated during any storm event in FY2019 because the channel water depth measurements were insufficient for suspended sediment sample collection. Additionally, because no significant flow through the channel was indicated, no bedload samples were collected. Light breezes of 0.0 mph to 5.0 mph (0.0 km/hr to 8.0 km/hr) occurred most frequently (approximately 55 percent to 57 percent of the time). The frequency of occurrence diminished exponentially as the wind speed increased such that winds in excess of 25.0 mph (40.2 km/hr) occurred less than 0.01 percent of the time. Winds in excess of 15.0 mph (24.1 km/hr) were most commonly southerly, which is likely controlled by the topography of the valley because topographic highs define the east and west sides of the valley and converge toward the north.The concentrations of PM2.5 (particulate matter with an aerodynamic diameter ≤2.5 micrometers [μm]) and PM10 (particulate matter with an aerodynamic diameter ≤10 μm) in the air generally increase as wind speed increases. However, the particle profiler at the Pu Valley South station regularly malfunctioned, which resulted in poor data quality and a limited period of record within FY2019. Therefore, discussion of the annual dust observations is mostly limited to the Pu Valley North station. At the Pu Valley North station, significant increases in windblown dust concentrations were observed when wind speeds exceeded 15.0 mph (24.1 km/hr), especially during southerly winds. When all wind speeds were considered, high dust concentrations at the Pu Valley North station were frequently associated with northerly, northwesterly, or southerly winds. The majority of PM10 transport at the Pu Valley North station occurred when winds were blowing northerly and northwesterly because of the high frequency of winds up to 15.0 mph (24.1 km/hr). The ratio of PM10 to PM2.5 is a qualitative indicator of the proximity of dust sources to the observation point and the values of the PM10 to PM2.5 ratio tend to be higher nearer to the source. The PM10 to PM2.5 ratio increased from 1.2 to 2.8 with higher wind speeds at the Pu Valley North station. This increase suggests that some locally sourced PM10 was present in the air when local winds exceeded 15.0 mph (24.1 km/hr). Local dust suspension is interpreted during major dust events when peaks in the PM10 to PM2.5 ratio occur simultaneously with the maximum wind speed and the peak PM10 concentration. Analysis of the five major dust events in FY2019 revealed that northerly winds were dominant in three events and southerly winds were dominant in two events. Local suspension of dust within Plutonium Valley is suspected to have occurred during two of the five major events (April 9, 2019, and September 28 to 29, 2019), and a nonlocal source of dust is presumed for the three other major dust events (October 14, 2018; May 16, 2019; and September 2, 2019). The three suspected regional dust transport events exhibited winds that typically did not exceed the 15.0 mph (24.1 km/hr) wind speed threshold for local dust transport and featured PM10 to PM2.5 ratios that indicate large-scale regional dust transport. Similar event characteristics (e.g., wind speed and PM10 concentration) were observed at air monitoring stations approximately 70 mi (113 km) to the northwest within the Tonopah Test Range (TTR). Therefore, these three regional events may not reflect transport from the Plutonium Valley CA. Routine monitoring of meteorological and hydrologic parameters at Plutonium Valley has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition has been completed, and both Pu Valley North and Pu Valley South meteorological stations within Plutonium Valley as well as the ISCO autosampler station within the CA were removed on October 14, 2019.

54 ENVIRONMENTAL SCIENCES↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗