Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Renewable Energy Contingencies in Power Systems: Concept and Case Study

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a co-optimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources.

Mohar Chattopadhyay↗

Event-Driven Modeling and Execution of Robotic Activities and Contingencies in the Europa Lander Mission Concept Using BPMN

TRACE (Traceable Robotic Activity Composer and Executive) is a tool designed to address the model-ing, verification, and execution of planned and con-tingent activities during robotic space missions. These activities can be modeled (i.e., planned) graph-ically in TRACE using the Business Process Model and Notation (BPMN) language. This standardized language is used to model a sequence of robotic ac-tivities tied together by logical constructs, events, and time. TRACE includes verification tools to en-sure feasibility before mission models are executed by TRACE’s executive, which is integrated into the autonomy subsystem via a connector. In this paper, we describe TRACE in detail as it would apply to a conceptual Europa Lander surface mission with planned excavation and sample collection activities, as well as, contingency activities when execution is off-nominal—all highlighting our novel use of BPMN as a lingua franca for the pipeline from mis-sion planning to autonomous execution.

Lim, Grace↗

Resilient Transmission Hardening Planning in a High Renewable Penetration Erra

Hardening components in transmission systems is a practice to improve system resilience against possible disturbances caused by natural disasters. In a power system with a very high penetration of renewable energy, the system hardening will be further complicated by the uncertainty and variability of renewable energy. In this paper, we study the transmission line hardening planing problem in the context of probabilistic power flows injected by the high penetration of renewable energy. We assume that the probabilistic information of renewable energy is incomplete and ambiguous and propose a data-driven approach to approximate the renewable uncertainty sets. We then extend the N - 1 security criteria to multiple simultaneous contingencies and seek to prepare a hardening plan for the worst-case scenarios. A two-stage data-driven stochastic model is formulated by considering the joint worst-case wind output distribution and transmission line contingencies. Then, we apply the Column-and-Constraints generation method to solve the proposed model. To test the effectiveness of the proposed approach, we conduct experiments on 24-bus and 118-bus test systems. We numerically show that the data-driven approach can effectively address the uncertainty ambiguity and the proposed approach can produce effective hardening plans that improve the system resilience.

Column-and-Constraint generation↗

Contingency contractor optimization. Phase 2, requirements document

This document represents the results of Task 1 (Requirements Elicitation) in Phase 2 of the Contingency Contractor Optimization project. The aim of the overall effort is to create a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). The goal of Phase 2 is to develop an electronic storyboard prototype of a tool for use in conjunction with the strategic planning framework of the SSA that can be used for communication with senior decision makers and other strategic contract support stakeholders.

Jones, Katherine A.↗

Contingency contractor optimization Phase 2, model description and formulation

The goal of Phase 2 the OSD ATL Contingency Contractor Optimization project is to create a prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. Additional features allow the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements and recommend where investments in manpower capabilities might minimize the overall total force costs in future operations.

Gearhart, Jared L.↗

Contingency Contractor Optimization: Phase 3, Model Description and Formulation

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗

Contingency contractor optimization.

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗

Orbit lifetime characteristics for Space Station

The factors that influence the orbital lifetime characteristics of the NASA Space Station are discussed. These include altitude, attitude, launch date, ballistic coefficient, and the presence of large articulating solar arrays. Examples from previous program systems studies are presented that illustrate how each factor affects Station orbit lifetime. The effect of atmospheric density models on orbit lifetime predictions is addressed along with the uncertainty of these predictions using current trajectory analysis of the Long Duration Exposure Facility spacecraft. Finally, nominal reboost altitude profiles and fuel requirement considerations are presented for implementing a reboost strategy based on planned Shuttle Orbiter rendezvous strategy and contingency considerations.

Deryder, L.↗

SPASIM: A Spacecraft Simulator

The SPAcecraft SIMulator (SPASIM) simulates the functions and resources of a spacecraft to quickly perform conceptual design (Phase A) trade-off and sensitivity analyses and uncover any operational bottlenecks during any part of the mission. Failure modes and operational contingencies can be evaluated allowing operational planning (what-if scenarios) and optimization for a range of mission scenarios. The payloads and subsystems are simulated, using a hierarchy of graphical models, in terms of how their functions affect resources such as propellant, power, and data. Any of the inputs and outputs of the payloads and subsystems can be plotted during the simulation or stored in a file so they can be used by other programs. Most trade-off analyses, including those that compare current versus advanced technology, can be performed by changing values in the parameter menus. However, when a component is replaced by one with a different functional architecture, its graphical model can also be modified or replaced by drawing from a component library. SPASIM has been validated using several spacecraft designs that were at least at the Critical Design Review level. The user and programmer guide, including figures, is available on line as a hypertext document. This is an easy-to-use and expandable tool which is based on MATLAB(R) and SIMULINK(R). It runs on Silicon Graphics Inc. workstations and personal computers with Windows 95(TM) or NT(TM).

Liceaga, Carlos A.↗

Evaluations of Three Methods for Remote Training

Long duration space missions require a change in training methods and technologies. For Shuttle missions, crew members could train for all the planned procedures, and carry documentation of planned procedures for a variety of contingencies. As International Space Station (ISS) missions of three months or longer are carried out, many more tasks will need to be performed for which little or no training was received prior to launch. Eventually, exploration missions will last several years, and communications with Earth will have long time delays or be impossible at times. This series of three studies was performed to identify the advantages and disadvantages of three types of training for self-instruction: video-conferencing; multimedia; and virtual reality. These studies each compared two types of training methods, on two different types of tasks. In two of the studies, the subject's were in an isolated, confined environment analogous to space flight; the third study was performed in a laboratory.

Woolford, B.↗

Evaluation of Candidate Materials for a High-Temperature Stirling Convertor Heater Head

The Department of Energy (DOE) and NASA have identified Stirling Radioisotope Generators (SRG) as a candidate power system for use on long-duration, deep-space science missions and Mars rovers. One of the developments planned for an upgraded version of the current SRG design is to achieve higher efficiency by increasing the overall operating temperature of the system. Currently, the SRG operates with a heater head temperature of 650 C and is fabricated from the nickel base superalloy 718. This temperature is at the limit of Alloy 718's capability, and any planned increase in temperature will be contingent on identifying a more capable material from which to fabricate the heater head. To this end, an assessment of material candidates was performed assuming a range of heater head temperatures. The chosen alternative material candidates will be discussed, along with the development efforts needed to ensure that these materials can meet the demanding system requirements of long-duration operation in hostile environments.

Bowman, Randy↗

RTO Technical Publications: A Quarterly Listing

A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

Source record↗

Candidate Materials Evaluated for a High-Temperature Stirling Convertor Heater Head

The Department of Energy and NASA have identified Stirling Radioisotope Generators (SRGs) as a candidate power system for use on long-duration, deep-space science missions and Mars rovers. One of the developments planned for an upgraded version of the current SRG design is to achieve higher efficiency by increasing the overall operating temperature of the system. Currently, the SRG operates with a heater head temperature of 650 C and is fabricated from the nickel-base superalloy 718. The current operating temperature is at the limit of alloy 718 s capability, and any planned increase in temperature will be contingent on identifying a more capable material from which to fabricate the heater head. To this end, personnel at the NASA Glenn Research Center are evaluating advanced materials for a high-temperature heater head to allow a higher convertor temperature ratio and, thus, increase the system efficiency. A generic list of properties that were used to screen the candidate materials follows: (1) creep, (2) fabricability, (3) helium gas containment, (4) long-term stability and compatibility, (5) ability to form a hermetical closeout seal, and (6) ductility and toughness.

Bowman, Randy R.↗

Mars Science Laboratory Propulsive Maneuver Design and Execution

The NASA Mars Science Laboratory (MSL) rover, Curiosity, was launched on November 26, 2011 and successfully landed at the Gale Crater on Mars. For the 8-month interplanetary trajectory from Earth to Mars, five nominal and two contingency trajectory correction maneuvers (TCM) were planned. The goal of these TCMs was to accurately deliver the spacecraft to the desired atmospheric entry aimpoint in Martian atmosphere so as to ensure a high probability of successful landing on the Mars surface. The primary mission requirements on maneuver performance were the total mission propellant usage and the entry flight path angle (EFPA) delivery accuracy. They were comfortably met in this mission. In this paper we will describe the spacecraft propulsion system, TCM constraints and requirements, TCM design processes, and their implementation and verification.

maneuver↗

Summary of Technical Interchange Meetings (TIMs) Designed to Enable Earth Independent Medical Operations (EIMO)

The Exploration Medical Capability Element (ExMC) in NASA’s Human Research Program hosted a series of TIMs in 2023-2024 designed to stimulate discussion around specific topics with the goal of enabling EIMO. In context of the thematic constituent elements of EIMO, namely pre-mission planning, acute/emergent/prolonged medical decision making, supply/resource management and task load management, subject matter experts from industry, academia and government (NASA and other Agencies) provided valuable and actionable guidance and recommendations. Earth-based medical experts will remain indispensable for pre-mission planning, however, management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets to enable support of astronaut health and performance and reduce overall mission risk. Key to achieving these enhancements is providing an integrated data system platform capable of utilizing multiple data streams in concert with a variety of on-board databases and passive monitoring of video and wearable sensors to enable a multi-modal, agentic AI-based clinical decision support system (CDSS) to support crew medical officer (CMO) medical decision-making. The EIMO series of TIMs (I-V) have proven to be instructive and portend a significant paradigm shift will be necessary to maintain crew health and performance on exploration class missions. Importantly, since the expected paradigm shift will be significantly different from the methods of operation that have been employed for the majority of missions from the inception of human spaceflight to date, any proposed methods must be deployed in the setting of ongoing operations early and be “tested, reviewed and practiced” while reliable back-up is available to facilitate an Enterprise-wide level of comfort and acceptance. Serious constraints on data transmission coupled with a large and expanding universe of on-board medical informatics data streams will necessitate implementation of a CDSS to supplant the current reliance on support provided by ground-based SMEs. Establishment of trust in the system by CMO/crew and the ground-based medical support team will be essential. Co-development of a CDSS with industry partners will assure that state of the art tools can be employed, and industry efficiencies can be leveraged. Training regimens, materials and tools must evolve to be responsive (just-in-time training) and facilitate autonomous execution of procedures. Proficiency metrics should be established and be based on validated competencies or milestones as opposed to a prescribed number of training hours. Training should be prioritized for broad, translatable skills that have universal application across a variety of medical conditions. Repetition was deemed to be the key to achieving proficiency and emphasis should lie in procedural training which is known to extinguish more rapidly than diagnostic skills. Advanced tools, e.g., extended reality, can provide more realistic and effective training. Use of advanced probabilistic risk assessment tools will be essential to optimize the medical system capability while carefully balancing risk relative to mass/power/volume limitations. Importance of factoring use-life of medical supplies and maintaining awareness of redundancy and opportunity to re-purpose under off nominal situations was emphasized. Consideration of adopting optimized performance standards vs. “good-enough” performance thresholds is warranted. The use of legacy systems as opposed to creating new systems may be preferable. Managing task load and associated cognitive load will be essential to maintain operational safety and behavioral health. ExMC aspires to create a shared EIMO paradigm and strategic vision for advancing medical system design through novel technologies, training, protocols, and support capabilities, built upon the spirit of successful strategies and innovations over the past six decades of space medicine operations.

Jay Lemery↗

Security constrained optimal power shutoff for wildfire risk mitigation

Abstract Electric grid faults are increasingly the source of ignition for major wildfires. To reduce the likelihood of such ignitions in high risk situations, utilities use preemptive de‐energization of power lines, commonly referred to as Public Safety Power Shutoffs (PSPS). Besides raising challenging trade‐offs between power outages and wildfire safety, PSPS removes redundancy from the network at a time when component faults are likely to happen. This may leave the network particularly vulnerable to unexpected line faults that may occur while the PSPS is in place. Previous works have not explicitly considered the impacts of these outages. To address this gap, the Security Constrained Optimal Power Shutoff problem is proposed which uses post‐contingency security constraints to model the impact of unexpected line faults when planning a PSPS. This model enables, for the first time, the exploration of a wide range of trade‐offs between both wildfire risk and pre‐ and post‐contingency load shedding when designing PSPS plans, providing useful insights for utilities and policy makers considering different approaches to PSPS. The efficacy of the model is demonstrated using the EPRI 39‐bus system as a case study. The results highlight the potential risks of not considering security constraints when planning PSPS and show that incorporating security constraints into the PSPS design process improves the resilience of current PSPS plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗