Search NASA⌕ Search

SEARCH · Search NASA

Results for “DECISION ELEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Nonlinear Dynamic Analyses of STS-1 Forward RCS Oxidizer Tank Structural Failure

At liftoff of the first Space Shuttle mission, a strong ignition overpressure pulse excited the stack. The frequency of the experienced pressure wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. As result of this unexpected loading, an oxidizer tank support strut in the orbiter’s forward reaction control system module failed in buckling under axial compression, which could have led to loss of the mission, crew, and vehicle. This incident is investigated in more detail using linear and nonlinear finite element analyses, complementing previous analyses with classical structural mechanics. The results of these analyses are examined to provide additional insight into the accident and to better inform future design decisions for modern space vehicle systems and structures.

Space Shuttle↗

Analysis of Convair 990 rejected-takeoff accident with emphasis on decision making, training and procedures

This paper analyzes a NASA Convair 990 (CV-990) accident with emphasis on rejected-takeoff (RTO) decision making, training, procedures, and accident statistics. The NASA Aircraft Accident Investigation Board was somewhat perplexed that an aircraft could be destroyed as a result of blown tires during the takeoff roll. To provide a better understanding of tire failure RTO's, The Board obtained accident reports, Federal Aviation Administration (FAA) studies, and other pertinent information related to the elements of this accident. This material enhanced the analysis process and convinced the Accident Board that high-speed RTO's in transport aircraft should be given more emphasis during pilot training. Pilots should be made aware of various RTO situations and statistics with emphasis on failed-tire RTO's. This background information could enhance the split-second decision-making process that is required prior to initiating an RTO.

Batthauer, Byron E.↗

Research directions in large scale systems and decentralized control

Control theory provides a well established framework for dealing with automatic decision problems and a set of techniques for automatic decision making which exploit special structure, but it does not deal well with complexity. The potential exists for combining control theoretic and knowledge based concepts into a unified approach. The elements of control theory are diagrammed, including modern control and large scale systems.

Tenney, R. R.↗

Adaptive process control using fuzzy logic and genetic algorithms

Researchers at the U.S. Bureau of Mines have developed adaptive process control systems in which genetic algorithms (GA's) are used to augment fuzzy logic controllers (FLC's). GA's are search algorithms that rapidly locate near-optimum solutions to a wide spectrum of problems by modeling the search procedures of natural genetics. FLC's are rule based systems that efficiently manipulate a problem environment by modeling the 'rule-of-thumb' strategy used in human decision making. Together, GA's and FLC's possess the capabilities necessary to produce powerful, efficient, and robust adaptive control systems. To perform efficiently, such control systems require a control element to manipulate the problem environment, and a learning element to adjust to the changes in the problem environment. Details of an overall adaptive control system are discussed. A specific laboratory acid-base pH system is used to demonstrate the ideas presented.

Karr, C. L.↗

Adaptive Process Control with Fuzzy Logic and Genetic Algorithms

Researchers at the U.S. Bureau of Mines have developed adaptive process control systems in which genetic algorithms (GA's) are used to augment fuzzy logic controllers (FLC's). GA's are search algorithms that rapidly locate near-optimum solutions to a wide spectrum of problems by modeling the search procedures of natural genetics. FLC's are rule based systems that efficiently manipulate a problem environment by modeling the 'rule-of-thumb' strategy used in human decision-making. Together, GA's and FLC's possess the capabilities necessary to produce powerful, efficient, and robust adaptive control systems. To perform efficiently, such control systems require a control element to manipulate the problem environment, an analysis element to recognize changes in the problem environment, and a learning element to adjust to the changes in the problem environment. Details of an overall adaptive control system are discussed. A specific laboratory acid-base pH system is used to demonstrate the ideas presented.

Karr, C. L.↗

Genetic algorithms in adaptive fuzzy control

Researchers at the U.S. Bureau of Mines have developed adaptive process control systems in which genetic algorithms (GA's) are used to augment fuzzy logic controllers (FLC's). GA's are search algorithms that rapidly locate near-optimum solutions to a wide spectrum of problems by modeling the search procedures of natural genetics. FLC's are rule based systems that efficiently manipulate a problem environment by modeling the 'rule-of-thumb' strategy used in human decision making. Together, GA's and FLC's possess the capabilities necessary to produce powerful, efficient, and robust adaptive control systems. To perform efficiently, such control systems require a control element to manipulate the problem environment, an analysis element to recognize changes in the problem environment, and a learning element to adjust fuzzy membership functions in response to the changes in the problem environment. Details of an overall adaptive control system are discussed. A specific computer-simulated chemical system is used to demonstrate the ideas presented.

Karr, C. Lucas↗

An applications-oriented approach to the development of virtual environments

The field of Virtual Reality (VR) is diverse, ranging in scope from research into fundamental enabling technologies to the building of full-scale entertainment facilities. However, the concept of virtual reality means many things to many people. Ideally, a definition of VR should derive from how it can provide solutions to existing challenges in building advanced human computer interfaces. The measure of success for VR lies in its ability to enhance the assimilation of complex information, whether to aid in difficult decision making processes, or to recreate real experiences in a compelling way. This philosophy is described using an example from a VR-based advertising project. The common and unique elements of this example are explained, though the fundamental development process is the same for all virtual environments that support information transfer. In short, this development approach is an applications oriented approach that begins by establishing and prioritizing user requirements and seeks to add value to the information transfer process through the appropriate use of VR technology.

Crowe, Michael X.↗

High Speed Research: Propulsion Project Accomplishments

This past year has been one of great accomplishment for the propulsion element of NASA's High Speed Research (HSR) Program. The HSR Program is a NASA/industry partnership to develop the high-risk/high-payoff airframe and propulsion technologies applicable to a second-generation supersonic commercial transport, or High Speed Civil Transport (HSCT). The propulsion element, which also involves industry partners, is managed by the NASA Lewis Research Center. These technologies will contribute greatly to U.S. industry's ability to make an informed product launch decision for an HSCT vehicle. Specific NASA Lewis accomplishments in 1997 include: 1. Small-scale combustor sector tests conducted in Lewis' Engine Research Building contributed to the evolution of approaches to developing a combustor with ultralow NOx emissions. 2. Components were tested in Lewis' CE-9 facility (in Lewis' Engine Research Building) to assess the performance of candidate ceramic matrix composite (CMC) materials in this realistic combustion environment. Test results were promising, and acceptable levels of structural durability were demonstrated for the ceramic matrix composite material tested. Ceramic matrix composites continue to show great promise for use in HSCT combustor liners. 3. Engine emissions tests in Lewis' Propulsion Systems Laboratory provided insight into other classes of emissions (e.g., particulates and aerosols) which will be important to control in HSCT propulsion system designs. 4. Small-scale nozzle tests conducted in Lewis' Aero-Acoustic Propulsion Laboratory are contributing to the design of a low-noise, high-performance mixer/ejector nozzle configuration for HSCT engines. Over 18,000 hours of durability testing were completed in Lewis' materials laboratories to evaluate superalloy and g-titanium aluminide performance for HSCT nozzle applications. A two-dimensional supersonic inlet concept was tested in Lewis' 10- by 10-Foot Supersonic Wind Tunnel. The extensive database and the knowledge gained contributed to the selection of a two-dimensional inlet as the preferred inlet concept for the HSR Program.

Shaw, Robert J.↗

Portable Simulator for On-Board International Space Station Emergency Training

The crew on-board the International Space Station (ISS) have to be prepared for any possible emergency. The emergencies of most concern are a fire, depressurization or a toxic atmosphere. The crew members train on the ground before launch but also need to practice their emergency response skills while they are on orbit for 6 months. On-Board Training (OBT) events for emergency response proficiency used to require the crew and ground teams to use paper "scripts" that showed the path through the emergency procedures. This was not very realistic since the participants could read ahead and never deviate from this scripted path. The new OBT emergency simulator allows the crew to view dynamic information on an iPad only when it would become available during an event. The simulator interface allows the crew member to indicate hatch closures, don and doff masks, read pressures, and sample smoke or atmosphere levels. As the crew executes their actions using the on-board simulator, the ground teams are able to monitor those actions via ground display data flowing through the ISS Ku Band communication system which syncs the on-board simulator software with a ground simulator which is accessible in all the control centers. The OBT Working Group (OBT WG), led by the Chief Training Office (CTO) at Johnson Space center is a Multilateral working group with partners in Russia, Japan, Germany and U.S.A. The OBTWG worked together to create a simulator based on these principles: (a) Create a dynamic simulation that gives real-time data feedback; (b) Maintain real-time interface between Mission Control Centers and crew during OBTs; (c) Provide flexibility for decision making during drill execution; (d) Materially reduce Instructor and Flight Control Team man-hour costs involved with developing, updating, and maintaining emergency OBT cases/scenarios; and (e) Introduce an element of surprise to emergency scenarios so the team can't tell the outcome of the case by reading ahead in a paper script. This paper details some of the background as the project evolved with the International Partners. It also provides more details on how the simulator information for the crew is also shared with the ground teams. Finally, the paper will discuss how this remote simulator concept can be useful for future, longer term space missions.

Bolt, Kathy↗

Exploration Atmosphere Demonstration of A Multi-Functional Integrated Medical Device (Tempus Pro)

INTRODUCTION The Exploration Medical Capability (ExMC) element within the Human Research Program and the Exploration Medical Integrated Product Team (XMIPT) within the Mars Campaign Office seek to advance medical system design and risk-informed decision-making for exploration missions. This includes assessment of candidate devices and their compatibility within a variety of increasingly Earth-independent medical scenarios. The Tempus Pro (Remote Diagnostic Technologies, Ltd., Philips Corp., Farnborough, UK) is a commercial-off-the-shelf (COTS), multi-functional integrated medical device capable of vital signs monitoring, with built-in procedure support (iAssist), patient record and telemedicine communication features, and medical imaging (e.g., camera, laryngoscope, ultrasound) that meets multiple exploration medical capability needs. One of several hypobaric atmospheres being considered for exploration vehicles is 8.2 psi with 34% oxygen. To assess the useability of the Tempus Pro in such environments by individuals without formal medical training, the unit was tested in May and June of 2023 at the Johnson Space Center 20-Foot Exploration Atmosphere Chamber in conjunction with the Exploration Atmospheres-2 (EA-2) study. TECHNOLOGY DEMONSTRATION Eight subjects in the EA-2 study were assigned roles as the caregiver or patient – or both in the case of a self-exam – and caregivers were asked to place sensors for 3-Lead ECG, non-invasive blood pressure (NIBP), pulse oximetry (SpO2), and temperature using Tempus Pro’s iAssist. Depending on the procedure, additional tasks included an oropharyngeal exam of the throat with the laryngoscope and capturing ultrasound images of a cardiac subxiphoid view or of the user’s choice from a pre-specified list. Scenarios ranged from remote-guided to fully autonomous operations and surveyed the effectiveness of support, amount of support desired, and importance of support by type (e.g., written crew procedures, iAssist and device guidance, remote console guidance, etc.). Feedback from the subjects and the support personnel was also gathered to inform future designs for training and support and to determine what operations are plausible given different levels of each. An unweighted NASA task load index (TLX) was used to profile the demands of using the device, however the sample size does not support statistics. The research was exploratory in nature and qualitative information was the main goal. Calibration checks on the Tempus Pro were conducted before and after chamber testing to ensure the device was in useable condition. RESULTS All subjects performed their tasks successfully and found the Tempus Pro easy to use with the support provided. The calibration checks outside the chamber showed that the Tempus Pro remained unchanged and measurements inside the chamber were within normal values. Caregivers taking the NASA TLX reported mean scores ≤ 41/100 showing the tasks to be undemanding and less demanding with repeated use (~20/100). Novice users were able to easily connect sensors and take vital signs with the guidance from Tempus Pro’s iAssist feature. For more complex tasks, such as the oropharyngeal exam and ultrasound image acquisition, guidance beyond iAssist was needed, primarily from a supporting physician. Feedback on the importance of support types varied by person and scenario but greater than 50% of the support used by each was non-native to the device. Overall opinions were positive, but the ultrasound users expressed a lack of confidence in their results and 3 out of 4 desired more time, training, or support. Subjects found the sensors to be comfortable and comparable to prior experiences with such devices, except for the blood pressure cuff, which squeezed too tightly for uncomfortably long periods. Many observations provoked discussion, especially regarding ultrasound, that will aide decisions about future demonstrations.

R. S. Miller↗

Decentralized and Asynchronous Planning for Cooperative Practices in High Altitude Digitally Enabled Operations

Cooperative practices will likely be foundational to future digitally enabled airspace operations characterized by decentralized and asynchronous decision-making. This paper explores the implementation of cooperative practices in high-altitude airspace. The digitally enabled operations framework, under exploratory investigation by NASA as a potential new operating mode, which is enabled and dependent on digital technologies and information sharing, may create new operational possibilities for a wide range of vehicle types and missions. An essential element of the operating mode framework under investigation, cooperative practices, could empower operators to manage critical functions such as deconfliction, equitable airspace usage, and demand-capacity balancing. The use of cooperative practices would involve asynchronous flight information sharing and decentralized conflict management by operators, representing a major change from traditional air traffic services that use synchronous surveillance information to support centralized decision-making by air traffic controllers. This paper details three key components for implementing cooperative practices for decentralized, digitally enabled operations: (a) intent modeling and sharing, (b) conflict detection, and (c) cooperative deconfliction.

cooperative operating practics↗

SLS Test Stand Site Selection

Test site selection is a critical element of the design, development and production of a new system. With the advent of the new Space Launch System (SLS), the National Aeronautics and Space Administration (NASA) had a number of test site selection decisions that needed to be made early enough in the Program to support the planned Launch Readiness Date (LRD). This case study focuses on decisions that needed to be made in 2011 and 2012 in preparation for the April 2013 DPMC decision about where to execute the Main Propulsion Test that is commonly referred to as "Green Run." Those decisions relied upon cooperative analysis between the Program, the Test Lab and Center Operations. The SLS is a human spaceflight vehicle designed to carry a crew farther into space than humans have previously flown. The vehicle consists of four parts: the crew capsule, the upper stage, the core stage, and the first stage solid rocket boosters. The crew capsule carries the astronauts, while the upper stage, the core stage, and solid rocket boosters provide thrust for the vehicle. In other words, the stages provide the "lift" part of the lift vehicle. In conjunction with the solid rocket boosters, the core stage provides the initial "get-off-the-ground" thrust to the vehicle. The ignition of the four core stage engines and two solid rocket boosters is the first step in the launch portion of the mission. The solid rocket boosters burn out after about 2 minutes of flight, and are then jettisoned. The core stage provides thrust until the vehicle reaches a specific altitude and speed, at which point the core stage is shut off and jettisoned, and the upper stage provides vehicle thrust for subsequent mission trajectories. The integrated core stage primarily consists of a liquid oxygen tank, a liquid hydrogen tank, and the four core stage engines. For the SLS program, four RS-25 engines were selected as the four core stage engines. The RS-25 engine is the same engine that was used for Space Shuttle. The test plan for the integrated core stage was broken down into several segments: Component testing, system level testing, and element level testing. In this context, components are items such as valves, controllers, sensors, etc. Systems are items such as an entire engine, a tank, or the outer stage body. The core stage itself is considered to be an element. The rocket engines are also considered an element. At the program level, it was decided to perform a single green run test on the integrated core stage prior to shipment of it to Kennedy Space Center (KSC) for use in the EM-1 test flight of the SLS vehicle. A green run test is the first live fire of the new integrated core stage and engine elements - without boosters of course. The SLS Program had to decide where to perform SLS green run testing.

Crowe, Kathryn↗

Task allocation in a distributed computing system

A conceptual framework is examined for task allocation in distributed systems. Application and computing system parameters critical to task allocation decision processes are discussed. Task allocation techniques are addressed which focus on achieving a balance in the load distribution among the system's processors. Equalization of computing load among the processing elements is the goal. Examples of system performance are presented for specific applications. Both static and dynamic allocation of tasks are considered and system performance is evaluated using different task allocation methodologies.

Seward, Walter D.↗

Using APEX to Model Anticipated Human Error: Analysis of a GPS Navigational Aid

The interface development process can be dramatically improved by predicting design facilitated human error at an early stage in the design process. The approach we advocate is to SIMULATE the behavior of a human agent carrying out tasks with a well-specified user interface, ANALYZE the simulation for instances of human error, and then REFINE the interface or protocol to minimize predicted error. This approach, incorporated into the APEX modeling architecture, differs from past approaches to human simulation in Its emphasis on error rather than e.g. learning rate or speed of response. The APEX model consists of two major components: (1) a powerful action selection component capable of simulating behavior in complex, multiple-task environments; and (2) a resource architecture which constrains cognitive, perceptual, and motor capabilities to within empirically demonstrated limits. The model mimics human errors arising from interactions between limited human resources and elements of the computer interface whose design falls to anticipate those limits. We analyze the design of a hand-held Global Positioning System (GPS) device used for radical and navigational decisions in small yacht recalls. The analysis demonstrates how human system modeling can be an effective design aid, helping to accelerate the process of refining a product (or procedure).

VanSelst, Mark↗

Implications of Contingency Planning Support for Weather and Icing Information

A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

Vigeant-Langlois, Laurence↗

Shuttle Program Loads Integration: Going From Concept to Operations and Staying Successful

From the beginning of the Shuttle Program to its end, integrated loads and dynamics analyses and tests have been critical in shaping the vehicle design and operational decisions for NASA and its customers. Starting with scaled models and simple mathematical simulations of the structural dynamics, engineers defined the required structural stiffness and predicted the limit loads for each element of the system. Early structural tests provided reasonable confidence that the models and predictions were good. The first launch of the Space Shuttle brought surprises, though, when the ignition overpressure event caused a forward fuel tank support strut to buckle, among several unexpected effects. The launch pad and other ground equipment became an integral part of the system integration, especially where the acoustic and pressure environments of ignition and lift-off were concerned. Following the Challenger accident, operating limits were changed in response to new understandings of how the integrated system performed. Controlling loads while maximizing performance was a key tenet of the Performance Enhancement design process, which enabled construction of the International Space Station. During the return to flight after the Columbia accident, engineers grew to understand that loads during the roll maneuver were also important to the vehicle s structural margin and life. At this point the crawler transport from the Vehicle Assembly Building to the launch pad also became a part of the integrated loads analysis. Even in the last years of the Space Shuttle Program, new data still provided interesting insights into this complicated and fascinating spaceship. This paper will present some examples of the important findings by the team of specialists that supported the Integrated Loads and Dynamics Panel for the Space Shuttle Program.

Bernstein, Karen↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of a new, unmatched capability for deep space exploration, with launch readiness planned for 2018. The initial Block 1 configuration of the Space Launch System will more than double the mass and volume to Low Earth Orbit (LEO) of any launch vehicle currently in operation - with a path to evolve to the greatest capability ever developed. The program formally began in 2011. The vehicle successfully passed Preliminary Design Review (PDR) in 2013, Key Decision Point C (KDPC) in 2014 and Critical Design Review (CDR) in October 2015 - nearly 40 years since the last CDR of a NASA human-rated rocket. Every major SLS element has completed components of test and flight hardware. Flight software has completed several development cycles. RS-25 hotfire testing at NASA Stennis Space Center (SSC) has successfully demonstrated the space shuttle-heritage engine can perform to SLS requirements and environments. The five-segment solid rocket booster design has successfully completed two full-size motor firing tests in Utah. Stage and component test facilities at Stennis and NASA Marshall Space Flight Center are nearing completion. Launch and test facilities, as well as transportation and other ground support equipment are largely complete at NASA's Kennedy, Stennis and Marshall field centers. Work is also underway on the more powerful Block 1 B variant with successful completion of the Exploration Upper Stage (EUS) PDR in January 2017. NASA's approach is to develop this heavy lift launch vehicle with limited resources by building on existing subsystem designs and existing hardware where available. The systems engineering and integration (SE&I) of existing and new designs introduces unique challenges and opportunities. The SLS approach was designed with three objectives in mind: 1) Design the vehicle around the capability of existing systems; 2) Reduce work hours for nonhardware/ software activities; 3) Increase the probability of mission success by focusing effort on more critical activities.

Hutt, John J.↗

X-33 Leading the Way to VentureStar(Trademark) in this Decade

The X-33, reusable space plane technology demonstrator is on course to begin the flights of the X-33 by the end of 2002 that will serve as a basis for industry and government decisions that could lead to VentureStar(Trademark). Lockheed Martin has placed the VentureStar(Trademark) LLC in it's Space Company and is now competing in an industry wide effort that will permit NASA to select a Second Generation RLV source by 2005. This move provides the focus for firm business planning needed to enable the decision by the time X-33 flies in mid 2002 and possibly with upgraded technologies a year or so later. Since the IAF 50th Congress in Amsterdam, most of the major hardware elements of X-33 have been through their assembly and test. The flight liquid oxygen tank was the first major element to complete final assembly. Aerospike Engine qualification testing has progressed successfully through its test objectives and the two flight engines are in preparation to be delivered to the Assembly Facility in Palmdale. All Thermal Protection System (TPS) metallic panels have completed qualification testing and have been delivered to Palmdale and all remaining TPS elements have been assembled and are ready for delivery. Flight Software and Avionics have been delivered and are in integration testing. In November 1999, the first graphite composite liquid hydrogen tank experienced a debond between the tank inner skin and the honeycomb core in testing. This tank had completed its third successful cryogenic and loads testing at MSFC. Replacement liquid hydrogen tanks have completed design and are in fabrication. The resulting delay from this change of design for the liquid hydrogen tank will be approximately two years.

Austin, Robert E.↗