Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELAY LINE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

On the Location of the gamma-Ray Outburst Emission in the BL Lacertae Object AO 0235 + 164 Through Observations Across the Electromagnetic Spectrum

We present observations of a major outburst at centimeter, millimeter, optical, X-ray, and gamma-ray wavelengths of the BL Lacertae object AO 0235+164. We analyze the timing of multi-waveband variations in the flux and linear polarization, as well as changes in Very Long Baseline Array images at A = 7 mm with approx.0.15 milliarcsec resolution. The association of the events at different wavebands is confirmed at high statistical significance by probability arguments and Monte Carlo simulations. A series of sharp peaks in optical linear polarization, as well as a pronounced maximum in the 7 mm polarization of a superluminal jet knot, indicate rapid fluctuations in the degree of ordering of the magnetic field. These results lead us to conclude that the outburst occurred in the jet both in the quasi-stationary "core" and in the superluminal knot, both parsecs downstream of the supermassive black hole. We interpret the outburst as a consequence of the propagation of a disturbance, elongated along the line of sight by light-travel time delays, that passes through a standing recollimation shock in the core and propagates down the jet to create the superluminal knot. The multi-wavelength light curves vary together on long timescales (months/ years), but the correspondence is poorer on shorter timescales. This, as well as the variability of the polarization and the dual location of the outburst, agrees with the expectations of a multi-zone emission model in which turbulence plays a major role in modulating the synchrotron and inverse Compton fluxes.

Agudo, Ivan↗

ORION: Microwave water vapor radiometer subsystem design

Electrical path delay caused by atmospheric water vapor may be a limiting error source for geodetic measurements made with VLBI. Direct measurement of atmospheric water vapor is necessary to obtain path delay correction required by the ORION project. A dual channel water vapor radiometer is described which operates at frequencies near the 22 GHz water vapor line and is capable of collecting data that permits calculation of path delay within 2 cm accuracy.

Mckinney, R. P.↗

On-line diagnosis of unrestricted faults

A formal model for the study of on-line diagnosis is introduced and used to investigate the diagnosis of unrestricted faults. A fault of a system S is considered to be a transformation of S into another system S' at some time tau. The resulting faulty system is taken to be the system which looks like S up to time tau, and like S' thereafter. Notions of fault tolerance error are defined in terms of the resulting system being able to mimic some desired behavior as specified by a system similar to S. A notion of on-line diagnosis is formulated which involves an external detector and a maximum time delay within which every error caused by a fault in a prescribed set must be detected. It is shown that if a system is on-line diagnosable for the unrestricted set of faults then the detector is at least as complex, in terms of state set size, as the specification. The use of inverse systems for the diagnosis of unrestricted faults is considered. A partial characterization of those inverses which can be used for unrestricted fault diagnosis is obtained.

Meyer, J. F.↗

Review of Teleoperator Research

A predictor display to overcome time lag problems with remote control systems is discussed. The video picture is a (necessarily) time-delayed picture from the remote location, generated as a coherent frame (snapshot) so that all picture elements in a single scan are delayed the same. The computer-generated graphics is a line drawing of the present configuration of the manipulator arm, vehicle or other device. The latter is generated by using the same control signals which are sent to the remote manipulator (device) to drive a computer model of it. The computer model is drawn on the video display in exactly the same location as where it will actually be after a one-way time delay and where it will be seen to be on the video after one round-trip time delay. If one waits at least one round-trip delay without moving, both the graphics model and the video picture of the manipulator (device) are seen to coincide. The predictor technque proved to work well and was shown for time delays in the 1-3 second range to reduce completion times for a variety of manipulation tasks by 50-150 percent reliably.

Sheridan, T. B.↗

MGGPOD: a Monte Carlo Suite for Modeling Instrumental Line and Continuum Backgrounds in Gamma-Ray Astronomy

Intense and complex instrumental backgrounds, against which the much smaller signals from celestial sources have to be discerned, are a notorious problem for low and intermediate energy gamma-ray astronomy (approximately 50 keV - 10 MeV). Therefore a detailed qualitative and quantitative understanding of instrumental line and continuum backgrounds is crucial for most stages of gamma-ray astronomy missions, ranging from the design and development of new instrumentation through performance prediction to data reduction. We have developed MGGPOD, a user-friendly suite of Monte Carlo codes built around the widely used GEANT (Version 3.21) package, to simulate ab initio the physical processes relevant for the production of instrumental backgrounds. These include the build-up and delayed decay of radioactive isotopes as well as the prompt de-excitation of excited nuclei, both of which give rise to a plethora of instrumental gamma-ray background lines in addition t o continuum backgrounds. The MGGPOD package and documentation are publicly available for download. We demonstrate the capabilities of the MGGPOD suite by modeling high resolution gamma-ray spectra recorded by the Transient Gamma-Ray Spectrometer (TGRS) on board Wind during 1995. The TGRS is a Ge spectrometer operating in the 40 keV to 8 MeV range. Due to its fine energy resolution, these spectra reveal the complex instrumental background in formidable detail, particularly the many prompt and delayed gamma-ray lines. We evaluate the successes and failures of the MGGPOD package in reproducing TGRS data, and provide identifications for the numerous instrumental lines.

Weidenspointner, G.↗

Video method for studying optical fields

Approach for measuring intensity distribution in optical field records pattern with vidicon and then displays it on oscilloscope, using vertical sweep as trigger. Single horizontal lines in field can be isolated by using sweep delay feature of oscilloscope.

Mezrich, R. S.↗

Graphics enhanced computer emulation for improved timing-race and fault tolerance control system analysis

A computer simulation system has been developed for the Space Shuttle's advanced Centaur liquid fuel booster rocket, in order to conduct systems safety verification and flight operations training. This simulation utility is designed to analyze functional system behavior by integrating control avionics with mechanical and fluid elements, and is able to emulate any system operation, from simple relay logic to complex VLSI components, with wire-by-wire detail. A novel graphics data entry system offers a pseudo-wire wrap data base that can be easily updated. Visual subsystem operations can be selected and displayed in color on a six-monitor graphics processor. System timing and fault verification analyses are conducted by injecting component fault modes and min/max timing delays, and then observing system operation through a red line monitor.

Szatkowski, G. P.↗

Assessment of CFD-based Response Surface Model for Ares I Supersonic Ascent Aerodynamics

The Ascent Force and Moment Aerodynamic (AFMA) Databases (DBs) for the Ares I Crew Launch Vehicle (CLV) were typically based on wind tunnel (WT) data, with increments provided by computational fluid dynamics (CFD) simulations for aspects of the vehicle that could not be tested in the WT tests. During the Design Analysis Cycle 3 analysis for the outer mold line (OML) geometry designated A106, a major tunnel mishap delayed the WT test for supersonic Mach numbers (M) greater than 1.6 in the Unitary Plan Wind Tunnel at NASA Langley Research Center, and the test delay pushed the final delivery of the A106 AFMA DB back by several months. The aero team developed an interim database based entirely on the already completed CFD simulations to mitigate the impact of the delay. This CFD-based database used a response surface methodology based on radial basis functions to predict the aerodynamic coefficients for M > 1.6 based on only the CFD data from both WT and flight Reynolds number conditions. The aero team used extensive knowledge of the previous AFMA DB for the A103 OML to guide the development of the CFD-based A106 AFMA DB. This report details the development of the CFD-based A106 Supersonic AFMA DB, constructs a prediction of the database uncertainty using data available at the time of development, and assesses the overall quality of the CFD-based DB both qualitatively and quantitatively. This assessment confirms that a reasonable aerodynamic database can be constructed for launch vehicles at supersonic conditions using only CFD data if sufficient knowledge of the physics and expected behavior is available. This report also demonstrates the applicability of non-parametric response surface modeling using radial basis functions for development of aerodynamic databases that exhibit both linear and non-linear behavior throughout a large data space.

Hanke, Jeremy L.↗

On the design of airfoils in which the transition of the boundary layer is delayed

A method is presented for designing suitable thickness distributions and mean camber lines for airfoils permitting extensive chordwise laminar flow. Wind tunnel and flight tests confirming the existence of laminar flow; possible maintenance of laminar flow by area suction; and the effects of wind tunnel turbulence and surface roughness on the promotion of premature boundary layer transition are discussed. In addition, estimates of profile drag and scale effect on maximum lift of the derived airfoils are made.

BOUNDARY LAYER CONTROL - AIRFOILS↗

Mark 3 VLBI system: Tropospheric calibration subsystems

Tropospheric delay calibrations are implemented in the Mark 3 system with two subsystems. Estimates of the dry component of tropospheric delay are provided by accurate barometric data from a subsystem of surface meteorological sensors (SMS). An estimate of the wet component of tropospheric delay is provided by a water vapor radiometer (WVR). Both subsystems interface directly to the ASCII Transceiver bus of the Mark 3 system and are operated by the control computer. Seven WVR's under construction are designed to operate in proximity to a radio telescope and can be commanded to point along the line-of-sight to a radio source. They should provide a delay estimate that is accurate to the + or - 2 cm level.

Resch, G. M.↗

Unseeded Scalar Velocity Measurements for Propulsion Flows

Unseeded molecular tagging methods based on single-photon processes that produce long tag lines (>50 mm) have been recently developed and demonstrated by the Combustion Laser Diagnostics Group (Mechanical Engineering Department) at Vanderbilt University [1,2]. In Ozone Tagging Velocimetry (OTV) a line of ozone (O3) is produced by a single photon from a pulsed narrowband argon fluoride (ArF) excimer laser operating at - 193 nm. After a known time delay, t, the position of the displaced (convected in the flow field) O3 tag line is revealed by photodissociation of O3 and subsequent fluorescence of O2, caused by a pulsed laser sheet from a krypton fluoride (KrF) excimer laser operating at - 248 nm. Intensified CCD camera images of the fluorescence are taken from the initial and final tag line locations thus providing unobtrusive means of establishing a velocity profile in the interrogated flow field. The O3 lines are "written" and subsequently "read" by the following reactions:

Pitz, Robert W.↗

HEAO 1 observations of gamma-ray lines from a solar flare

HEAO 1 observed gamma radiation, including the 2.223 MeV line of deuterium and the 4.43 MeV line of C-12, from a white-light solar flare of 1978 July 11. Line strengths over a 4 minute integration were 1.00 + or - 0.29 and 0.18 + or - 0.07 photons/sq cm s, respectively, and the continuum in the 1-5 MeV range fitted a spectrum 10 E to the -3rd photons/sq cm s keV. The 2.2 MeV line lagged 94 + or - 30 s behind the gamma-ray continuum, which itself was delayed about 20 s from the hard X-ray (not less than 40 keV) and microwave fluxes. This is the second flare for which both MeV-range lines and continuum have been observed, and the first for which simultaneous white-light observations exist. The prompt gamma-ray line (4.43 MeV) can be directly interpreted as an energy deposition of not greater than 7 x 10 to the 26th ergs per sec by energetic protons at photospheric depths. This is insufficient to maintain the white-light continuum by normal photospheric emission mechanisms.

Hudson, H. S.↗

No Compton Reflection In a Chandra/RXTE Observation of Mkn 509: Implications for the Fe-K Line Emission From Accreting X-Ray Sources

We report the results of simultaneous Chandra and RXTE observations of the Seyfert 1 galaxy Mkn 509. We deconvolve the broad and narrow Fe-K emission-line components for which we measure rest-frame equivalent widths of 119+/-18 eV and 57+/-13 eV respectively. The broad line has a FWHM of 57,600((sup 14,400)(sub -21,000)) km/s and the narrow line is unresolved, with an upper limit on the FWHM of 4,940 km/s. Both components must originate in cool matter since we measure rest-frame center energies of 6.36((sup +0.13)(sub -0.12)) keV and 6.42+/-0.01 keV for the broad and narrow line respectively. This rules out He-like and H-like Fe for the origin of both the broad and narrow lines. If, as is widely accepted, the broad Fe-K line originates in Thomson-thick matter (such as an accretion disk), then one expects to observe spectral curvature above approximately 10 keV, (commensurate with the observed broad line), characteristic of the Compton-reflection continuum. However our data sets very stringent limits on deviations of the observed continuum from a power law. Light travel-time delays cannot be invoked to explain anomalies in the relative strengths of the broad Ferry line and Compton-reflection continuum since they are supposed to originate in the same physical location. We are forced to conclude that both the broad and narrow Fe-K lines had to originate in Thomson-thin matter during our observation. This result, for a single observation of just one source, means that our understanding of Fe K line emission and Compton reflection from accreting X-ray sources in general needs to be re-examined. For example, if an irradiated accretion disk existed in Mkn 509 at the time of the observations, the lack of spectral curvature above approximately 10 keV suggests two possibilities. Either the disk was Thomson-thick and highly ionized, having negligible Fe-K line emission and photoelectric absorption or the disk was Thomson-thin producing some or all of the broad Fe-K line emission. In the former case, the broad Fe-K line had to have produced in a Thomson-thin region elsewhere. In both cases the predicted spectral curvature above approximately 10 keV is negligible. An additional implication of our results is that any putative obscuring torus in the system, required by unification models of active galaxies, must also be Thomson-thin. The same applies to the optical broad line region (BLR) if it has a substantial covering factor.

Yaqoob, Tahir↗

Lightning testing at the subsystem level

Testing at the subsystem or black box level for lightning hardness is required if system hardness is to be assured at the system level. The often applied philosophy of lighting testing only at the system level leads to extensive end of the line design changes which result in excessive costs and time delays. In order to perform testing at the subsystem level two important factors must be defined to make the testing simulation meaningful. The first factor is the definition of the test stimulus appropriate to the subsystem level. Application of system level stimulations to the subsystem level usually leads to significant overdesign of the subsystem which is not necessary and may impair normal subsystem performance. The second factor is the availability of test equipment needed to provide the subsystem level lightning stimulation. Equipment for testing at this level should be portable or at least movable to enable efficient testing in a design laboratory environment. Large fixed test installations for system level tests are not readily available for use by the design engineers at the subsystem level and usually require special operating skills. The two factors, stimulation level and test equipment availability, must be evaluated together in order to produce a practical, workable test standard. The neglect or subordination of either factor will guarantee failure in generating the standard. It is not unusual to hear that test standards or specifications are waived because a specified stimulation level cannot be accomplished by in-house or independent test facilities. Determination of subsystem lightning simulation level requires a knowledge and evaluation of field coupling modes, peak and median levels of voltages and currents, bandwidths, and repetition rates. Practical limitations on test systems may require tradeoffs in lightning stimulation parameters in order to build practical test equipment. Peak power levels that can be generated at specified bandwidths with standard electrical components must be considered in the design and costing of the test system. Stimulation tests equipment and test methods are closely related and must be considered a test system for lightning simulation. A non-perfect specification that can be reliably and repeatedly applied at the subsystem test level is more desirable than a perfect specification that cannot be applied at all.

Luteran, Frank↗

Generating Submillimeter-Wave Frequencies From Laser Pulses

Semiconductor photoconductive switches generate electrical pulses containing submillimeter-wavelength carrier signals (frequency between 300 and 3,000 GHz) and harmonics thereof when illuminated with short-rise-time pulses from lasers. Device of this type used as local oscilator in heterodyne submillimeter-wave receiver. Electrical output of device coupled via transmission line, waveguide, or antenna to mixer circuitry of receiver. Phase delays between optically activated semiconductor switches determine output carrier frequencies. N electrical pulses generated by each laser pulse. Thus, fundamental output frequency is N times laser-pulse-repetition rate.

Spencer, Michael G.↗

Reconfigurable Microwave Phase Delay Element for Frequency Reference and Phase-Shifter Applications

A technique was developed to provide a reconfigurable high-precision micro - wave electrical phase delay for resonators and phase shifters. The invention employs multiple branches of transmission lines with open-ended or ground-ended terminations as configurable bits or digits. This technique minimizes the errors due to limited precision of switching devices. In addition, the proposed linear analytical approach significantly produces a much simpler design than that of other prior inventions at the time of this reporting. Microwave components such as filters, phase delay elements, or resonators require a method that can accurately adjust their frequency responses. Most tuning techniques offer very wide frequency tuning range; however, it is often difficult and expensive to tune their response in a very narrow operating frequency, especially when the tuning element reaches its minimum discrete step due to fabrication tolerances. The problem becomes worse as the operating frequency is in mm-wave frequency range (>26 GHz). The electrical tuning sensitivity of a microwave line is dependent on the position of the tuning element with respect to the reference termination. By placing this tuning element away from this reference with the main transmission line connecting the two elements together the sensitivity of the tuning element can change significantly. This concept can be used in the system that requires multiple tuning sensitivities. In this case, multiple tuning branches are superimposed in the main transmission line. The proposed invention allows the transmission-line electrical length to be accurately programmed using switching elements that have limited accuracy. The invention consists of multiple branches of transmission lines connected to discrete switching devices with open-ended terminations. They are used as discrete tuning elements. These elements are connected to the main microwave transmission line and are separated by a well-defined electrical degree spacing. Each branch is programmed to have different electrical degree sensitivity, such as a combination of discrete steps in each branch, which results in a reflective line with a unique effective phase response. To reduce the number of switching devices, it is desirable to program the devices in binary configuration where each branch represents one bit in the base-2 number system. This invention allows the transmission line electrical length to be tuned precisely with customizable sensitivity based on the known sensitivity of the base tuning circuit. The tuning resolution is dependent on the distance among tuning branches.

Hsieh, Wen-Ting↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗