Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Data Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

276 records · Page 16

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Deep Cyber-Physical Situational Awareness for Energy Systems: A Secure Foundation for Next-Generation Energy Management

This document provides the final report for the CYPRES project. The purpose is (1) to highlight and summarize its major accomplishments and (2) to provide guidance on how its outcomes have informed and can inform important additional research and technology transfer. The goal of CYPRES was the research, development, and demonstration of a security-oriented next generation cyber-physical EMS for electric power systems that detects malicious and abnormal events through the fusion of cyber and physical data. To achieve this, the CYPRES project team researched, developed, and built a prototype of the solution, referred to as the CYPRES EMS. The CYPRES EMS is a proof-of-concept cyber-physical platform that demonstrates the management of the energy system, communications, security, and cyber-physical grid modeling and analytics. As part of the capabilities of the CYPRES EMS, the team designed and developed a suite of power system applications for monitoring, risk analyses, detection, and control that are inherently cyberaware. At its core, the project aimed to research, develop, and demonstrate a security-oriented next-generation cyber-physical Energy Management System (EMS) capable of detecting malicious and abnormal events through the innovative fusion of cyber and physical data. This approach represents a fundamental shift from traditional EMS, reimagining how critical infrastructure can be protected through unified cyber-aware and physics-aware secure data flow pipelines. The project’s cornerstone deliverable, the CYPRES EMS, serves as a proof-of-concept cyber-physical platform that revolutionizes the management of energy systems, communications, security, and cyber-physical grid modeling and analytics. This prototype implements a comprehensive suite of power system applications for monitoring, risk analyses, detection, and control, all designed with inherent cyber awareness. The system’s architecture extends from end-devices in the field through to control center applications, establishing a secure and resilient control framework that addresses the challenges posed by diverse devices of unknown trustworthiness connecting to modern power systems. Through this innovative approach to deep cyber-physical situational awareness, the CYPRES project not only advances the state-of-the-art in energy infrastructure protection but also establishes a new paradigm for how EMS can be designed, deployed, and operated in an increasingly complex threat landscape. The findings and developments from this project provide crucial insights for stakeholders across the energy sector, offering a blueprint for enhancing the reliability and resilience of our nation’s critical energy infrastructure in the face of evolving cyber threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

PETSc/TAO Users Manual Revision 3.25

This manual describes the use of the Portable, Extensible Toolkit for Scientific Computation (PETSc) and the Toolkit for Advanced Optimization (TAO) for the numerical solution of partial differential equations (PDEs) and related problems on high-performance computers. PETSc/TAO is a suite of data structures and routines that provide the building blocks for implementing large-scale application codes on parallel (and serial) computers. PETSc uses the MPI standard for all distributed memory communication.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

DOE Repository Metadata Profile (DRMP): A Metadata Framework for Advancing Interoperability and AI Readiness Across Scientific Repositories

The Department of Energy (DOE) funds a diverse and distributed ecosystem of repositories that steward scientific data, publications, and software across its research programs, user facilities, and national laboratories. While significant progress has been made in standardizing dataset-level metadata, the metadata describing repositories themselves (their identity, governance, access interfaces, policies, and technical capabilities) remains inconsistent and fragmented across DOE-funded systems. This variability limits discoverability, interoperability, automated validation, and AI-driven analysis, all of which are increasingly essential for modern scientific workflows. To address this gap, the DOE Data Curation Working Group (DCWG) developed the DOE Repository Metadata Profile (DRMP). The DRMP is a practical, community-driven framework that defines how repositories can describe themselves in a consistent, machine-actionable, and scalable manner. The DRMP is not a new metadata schema. Instead, it is a mapping profile and structured element set capturing the essential characteristics of DOE repositories. It harmonizes repository-level metadata across six widely adopted community schemas: RE3Data; DCAT-US v3; Schema.org; Dublin Core; DataCite 4.6; and PREMIS 3.0. This harmonization eliminates reinvention and enables interoperability within DOE and across the broader scientific ecosystem. A core objective of the DRMP is to reduce burden on repositories by allowing them to reuse their existing metadata through a Rosetta-style crosswalk rather than redesigning local implementations. The profile introduces a three-level conformance model that supports incremental adoption: • Level 1 – Minimum Viable Record (MVR): foundational identification elements required for workflows, project registration, and basic repository presence. • Level 2 – Interoperable: structured metadata enabling alignment with national and international discovery systems. • Level 3 – AI-Ready: enhanced provenance, policy transparency, fixity, semantic context, and capabilities that support automated reasoning, model training governance, and machine-assisted curation. To support implementation, the DRMP includes JSON Schema definitions, OpenAPI patterns, and MCP templates that allow repositories to publish machine-readable metadata directly within existing platforms. These resources are modular and lightweight, enabling adoption without major architectural change. Adopting the DRMP enables repositories to: • Enhance discoverability and interoperability by aligning identifiers, classifications, and descriptive elements across widely used schema standards. • Support federated discovery and cross-registration across DOE systems, Data.gov, and international catalogs. • Enable AI agents and workflow orchestration systems to interpret repository-level metadata within the American Science Cloud (AmSC) through Model Context Protocol (MCP)-based context publication. • Demonstrate alignment with DOE’s open science, stewardship, and FAIR data priorities. This guidance represents a community-driven step forward. Through voluntary adoption and continued feedback, the DRMP advances a cohesive, machine-actionable description of DOE repositories that supports FAIR data practices, preparing the infrastructure for AI-enabled research, and strengthening the discoverability and reuse of DOE’s scientific outputs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗