Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Grid Impact Analysis of Heavy-Duty Electric Vehicle Charging Stations

This paper presents a grid impact analysis of heavy-duty electric vehicle (EV) charging stations. In this work, heavy-duty EVs have battery capacities high enough to provide a range of 250-500 miles on a single charge, such as long-haul trucks. Heavy-duty EVs will require extremely fast charging rates to reduce charging time and will induce very high charging loads (at the multiple-megawatt scale) if several vehicles charge at the same time. Therefore, analysis is needed to understand the impact of charging station loads on the electric power grid and set the baseline for developing mitigation plans and necessary system upgrades. We develop a systematic procedure to analyze the potential impact of the placement of charging stations on the grid. Charging load is modeled using a DC fast-charging station model. A voltage load sensitivity matrix approach is leveraged to investigate the challenges of placing charging stations on the feeder. Given the charging load profiles and suggested charging station locations, time-series simulations are performed on various connection points on the feeder to understand the impact. The analysis is performed on both the IEEE 34-bus system and a realistic feeder from California. Initial mitigation solutions are developed based on insights from this analysis.

47 OTHER INSTRUMENTATION↗

Advanced Sensor Deployment for Distribution System State Estimation and Fault Identification

Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs) at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring, Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases, distribution system state estimation (DSSE) and fault identification are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1 feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.

distribution system↗

Fault Response of Distributed Energy Resources Considering the Requirements of IEEE 1547-2018

Inverter-based DER responses to faults on the electric power system are different than those of conventional generators and are often poorly understood. Inverter fault responses are largely software-defined, within physics-based constraints. DERs are regulated by standards and grid codes that also constrain their responses. Though fault response of DERs will vary widely, for any DER following any particular standard, a pattern of fault response can be synthesized by observing that particular standard. In this paper, the recently published IEEE 1547-2018 is examined to explore the general fault response of any DER that follows IEEE 1547-2018. Additionally, an IEEE 1547-2018 compliant inverter model is developed and tested in simulation to find the fault response, and that response is compared with the fault response of a commercial off-the-shelf inverter.

41 EE - Solar Energy Technologies Office (EE-4S)↗

A Generalized Nuclear Code of Accounts for Cost Estimation Standardization

This is a joint INL-EPRI study. Link to corresponding page at the Electric Power Research Institute (EPRI): https://www.epri.com/research/products/000000003002028937 Recent Advanced Reactor (AR) designs typically offer features and attributes that depart from traditional water-cooled reactors in terms of fuel forms, coolants, structural materials, size, safety margins, and other important design and operational aspects. These departures, relative to the industry experience, will likely present a challenge for potential owner-operators when evaluating one or more AR designs for commercial deployment on a like-for-like basis. This is further exacerbated with new classes of reactors gaining prominence (e.g., microreactors) and new emerging applications (e.g., floating barge reactors or space propulsion reactors). The differences in design-specific technologies are compounded by the differences in approach to cost estimation. The lack of consistency in build up toward cost estimates creates a challenge when comparing competing concepts and evaluating their associated cost drivers. The outcome of a 2019 Scoping Study conducted by the Electric Power Research Institute (EPRI) indicated the need for a cost modeling guide (CMG), which would be underpinned by a technology-neutral and inclusive Generalized Nuclear Code of Accounts (GN-COA). A code of accounts (COA) is a tool by which costs are identified in even more specific categories, providing clarity on what specific costs are included in an estimate. A parallel independent effort was meanwhile taking place at Idaho National Laboratory via funding by the Systems Analysis Integration (SA&I) campaign of the Office of Nuclear Energy under the U.S. Department of Energy (U.S. DOE-NE) to also update the COA structure to enable more flexibility and encompass a wider variety of reactor technologies. After being made aware of these synergistic efforts, the two parties decided to combine efforts and develop a joint new standard format for nuclear cost estimation that builds on previous structures. This document describes the development of this joint GN-COA and provides guidance on the implementation of the tool, which is provided as the associated GN-COA Excel document. The main attributes of this novel COA format are that all items are functionally defined (in order to be technology and application agnostic) and grouped into logical arrangements that facilitate the tabulation of costs for reactor constructions under consideration. The intent is for the GN-COA to form a standard that is endorsed by future vendors and customers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Characterization of Fe-6Si Soft Magnetic Alloy Produced by Laser-Directed Energy Deposition Additive Manufacturing

Abstract Commercial electrical steels, Fe-Si alloys with < 4 wt.% Si, are inexpensive and efficient materials for electrical power conversion. Further efficiency improvements require increasing the silicon concentration to 6 wt.%, at which point the material becomes brittle and difficult to form by conventional rolling and sheet fabrication methods. Additive manufacturing stands to overcome challenges with commercial manufacturing techniques by leveraging near-net-shape fabrication. The wide array of process conditions provides additive manufacturing with increased flexibility, enabling control over the microstructure and mechanical properties. This work explores the microstructures and magnetic properties of ring-shaped Fe-Si alloys produced using concentric and cross-hatch tool paths on a laser-directed energy deposition additive manufacturing system. Concentric-built samples exhibit elongated grain structures while cross-hatch-built samples comprise lower aspect ratio grain structures. Thermal finite element analysis simulations model the stress conditions produced by the different scan path geometries. Microhardness measurements probe the mechanical properties as a function of anneal temperature, providing a qualitative understanding of the intergranular defect density. Soft magnetic properties measured under quasistatic and AC conditions show frequency- and microstructure-dependent coercivity and permeability. Finally, analysis of the core loss quantifies how the build strategies and thermal treatments influence efficiency in electrical power conversion applications. Understanding the influences of scan path geometry and thermal treatment provides a pathway towards application of additively manufactured soft magnetic materials.

Adamczyk, Jesse M.↗

Development of combined function dipole-quadrupole PMQs magnets for NSLS-II upgrade

This paper focuses on the R&D performed for the development of permanent magnets-based dipoles-quadrupoles combined function magnets (PMQs) for the future NSLSII upgrade “complex bend” lattice (CB). This new lattice uses PMQs that provide both bending (dipole) and strong focusing (quadrupole) magnetic field on the electron beam. The permanent magnet (PM) technology is suitable for the high magnetic field strengths (0.5 T, 130 T/m) required for such combine function magnets. PM technology leads to a compact magnet design that is essential in realizing the complex bend lattice concept, as well as a passive magnet solution which does not require electrical power supply reducing power consumption by ~ 80% (from 1.7 MW to 0.3 MW for NSLS-II). Two PMQs magnets designs are under consideration: A hybrid design that use both PM and soft iron poles, and Halbach type that is a pure PM design. Both PMQs designs present challenges in achieving the specified magnetic field quality due to their higher sensitivity to errors (mechanical tolerances and PM properties). This paper presents cost-effective designs and prototypes results for hybrid and Halbach PMQs, addressing various technical challenges while meeting the field requirements of the complex bend lattice for the NSLS-II upgrade.

N'gotta, Patrick [Brookhaven]↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

LENS: Learning Enabled Network Synthesis

RTRC and UMD have developed novel machine learning based methods under the ARPA-E DIFFERENTIATE program for rapid acceleration of hypothesis generation in complex architecture design spaces involving both discrete choices of component inclusion and interconnection and continuous parametric decisions. The project named Learning Enabled Network Synthesis (LENS) further demonstrated the developed methods on challenging electrical power converter design problems by identifying the most suitable circuit topologies and simultaneously selecting the most appropriate components to achieve optimized design of power converter with improved performances. We demonstrated that LENS could enable exploration of very large design space of circuit topologies and components by addressing the limitations of conventional design process in non-linear, high switching speed, multi-dimensional power converter design and optimization. The key innovation developed in LENS is the seamless integration of statistical learning and logical reasoning techniques and building on the individual strengths of these techniques for rapid hypothesis discovery. The main component of LENS comprises of: 1) Graph Reasoning Engine (GRE) to enforce composition rules that rapidly reject all discrete architectures that are composed incorrectly and generates an adaptive database of feasible designs which can be used by ML modules, 2) Graph Generative Learning module which is a deep neural network based generative model for graph architectures which can enable design space exploration beyond the dataset generated by the GRE, 3) Graph Reduced Order Model (ROM) for graph domains for accelerating computation of output metrics, and 4) Active learning and Rule Discovery module for sample efficient learning and extracting logical rules from the learned ML models which will be integrated in the GRE to enhance the filtering effectiveness. LENS approach can be applied to any design domains where designs can be represented as multi-attribute graphs. The LENS team integrated the various technical innovations listed above into an optimization pipeline and exercised the optimization pipeline on the converter design problem. The LENS project demonstrated that the developed AI/ML technologies can be used to generate novel converter circuits >45x faster than experts on chosen use-cases. This can enable faster design space exploration and identification of new designs which are not considered by experts due to the increasing design space complexity. This has significant potential impact on the public and energy needs of the country. It is currently estimated that 30% of all electrical powers generated passes through power converters. The future estimate is that 80% of all power generated would be passing through converters. LENS fills a critical gap in this space since by accelerating the design process the designers would be able to generate more efficient converters which can lead to significant energy savings for the country.

42 ENGINEERING↗

Technology Pathways Could Help Drive the U.S. West Coast Grid's Exposure to Hydrometeorological Uncertainty

Abstract Previous studies investigating deep decarbonization of bulk electric power systems and wholesale electricity markets have not sufficiently explored how future grid pathways could affect the grid's vulnerability to hydrometeorological uncertainty on multiple timescales. Here, we employ a grid operations model and a large synthetic weather ensemble to “stress test” a range of future grid pathways for the U.S. West Coast developed by ReEDS, a well‐known capacity planning model. Our results show that gradual changes in the underlying capacity mix from 2020 to 2050 can cause significant “re‐ranking” of weather years in terms of annual wholesale electricity prices (with “good” years becoming bad, and vice versa). Nonetheless, we find the highest and lowest ranking price years in terms of average electricity price remain mostly tied to extremes in hydropower availability (streamflow) and load (summer temperatures), with the strongest sensitivities related to drought. Seasonal dynamics seen today involving spring snowmelt and hot, dry summers remain well‐defined out to 2050. In California, future supply shortfalls in our model are concentrated in the evening and occur mostly during periods of high temperature anomalies in late summer months and in late winter; in the Pacific Northwest, supply shortfalls are much more strongly tied to negative streamflow anomalies. Under our more robust sampling of stationary hydrometeorological uncertainty, we also find that the ratio of dis‐patchable thermal (i.e., natural gas) capacity to wind and solar required to ensure grid reliability can differ significantly from values reported by ReEDS.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dose Rate Effects on Degradation of Nuclear Power Plant Electrical Cable Insulation at a Common Dose

The intent of this report is to address an identified knowledge gap in relating accelerated aging of nuclear electrical cables to service aging: dose rate effects (DRE). Here, DRE refer to gamma radiation-induced polymer degradation being a function of dose rate in addition to total absorbed dose. The concern raised is that historical qualification conducted at higher dose rates to simulate service lifetime may underestimate insulation degradation that occurs at lower dose rates in service. In the work described herein, common nuclear cable insulation materials—cross-linked polyethylene (XLPE) and ethylene propylene diene elastomer (EPDM)—were subjected to accelerated aging at ambient temperature (26°C) at different gamma dose rates of 100, 200 and 1800 Gy/h for select exposure durations to achieve constant total doses of 170, 210 and 300 kGy to evaluate DRE. First, the cable insulation material types investigated are described. Then, the accelerated aging experimental process involving gamma irradiation applied to the insulation specimens at room temperature and different dose rates is discussed. Then, the experimental characterization techniques used to perform this work are elucidated. These include elongation at break (EAB), mass change, yellowness index (YI), carbonyl index (CI), density, indenter modulus (IM), and relaxation constant (t). Theory of polymer degradation is discussed, and characterization results and discussion are provided. Finally, concluding remarks are made. The findings from this work and cited prior work reveal that DRE are material dependent, even between similar material categories (e.g., XLPE). In the case of the EPDM studied, degradation of ductility was observed to be greater at higher dose rate for the same total dose, indicating accelerated gamma aging to be more conservative than extended aging. Thus, conclusions regarding the conservatism of historical qualification likely require additional consideration for specific materials and conditions in question. The results of this study support the contention that, due to inherent limitations and uncertainties associated with prediction of cable remaining useful life from accelerated aging experiments, trending of installed cable insulation health status will be more practical and useful for safe and efficient cable aging management repair and replace decisions than lifetime prediction from historical qualification. The combination of material robustness demonstrated by the qualification process and ongoing monitoring of cable health status combine to provide confidence in continued safe use of existing nuclear cables. Additional research into effective and efficient condition monitoring methods for non-destructive evaluation of installed cables is needed to support aging cable management, including material studies to inform interpretation of measured results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Findings on subtask 1.6 – basin electric carbon storage research project: novel monitoring techniques

The Energy & Environmental Research Center (EERC) led a study to validate novel and emerging technologies as commercial monitoring techniques for application in carbon dioxide (CO 2 ) injection operations. This applied research was conducted at Basin Electric Power Cooperative’s (Basin Electric’s) active CO 2 -injection operations in Beulah, North Dakota, in two phases. The EERC previously completed a set of baseline (preinjection) activities in Phase 1, which included 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; and 5) advanced wellbore-monitoring methods.

54 ENVIRONMENTAL SCIENCES↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Roadmap for Advanced Power System Measurements

Conditions in the electric power grid are changing rapidly. Changes are driven, in particular, by the increased penetration of renewable resources in the generation mix. Part of the solution to dealing with the changing conditions is the better use of measurement systems, taking advantage of the better understanding of measurements that was heralded by digital technology. Another part of the solution is the communication of samples of the directly observable voltages and currents by means of continuous point-on-wave values. The increased bandwidth capability of such a system allows more complicated measurement models to be built at the point of use. Additional measurements and analyses can then be performed. This Roadmap hinges on these two aspects of measuring: improved measurements supported by high-bandwidth (raw data) communications. Following an introduction to the overall subject, the report explores the impact of what can be thought of as the digital revolution in measurement. In essence, that revolution has served to clarify ideas about measurement and is continuing to lead to improved processes. An extensive survey of the relevant literature was performed . Webinars were held to learn from the wider community of practitioners. Based on this information, a number of gaps were identified whose continued existence would hamper the solution of the challenges now facing measurement and communication in the power grid. The underlying value propositions are interoperability (presently not very satisfactory in many measurements); greater (and less challenging) adoption of distributed energy resources; and improved international competitiveness. Underlying all that, of course, is progress toward a more reliable and resilient power system. The identified gaps were addressed in four major thrusts: technology deployment and demonstration, education, instrumentation testing and standards, and analytical methods. For each of the thrusts, multiple goals are defined to guide the implementation. The thrusts were designed to close gaps and unlock high-value use cases. After discussing the literature review, gap analysis, high-value use cases, and research thrusts in chapters 2-5, the report culminates in chapter 6 with a roadmap that links each aspect together to form a unified plan. Developing a research portfolio aligned with this plan will ensure that advanced measurement systems are in place to support reliable operation of the power system as it modernizes.

24 POWER TRANSMISSION AND DISTRIBUTION↗