Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Connection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Demonstration of a fault impact reduction control module for wind turbines

Abstract. Traditionally, wind turbines in distributed applications make control decisions as isolated systems. They generally provide maximum power output during operation and manage internal faults with little consideration of the rest of the power system. Although fault detection and tolerance schemes are widely researched and implemented, controls to ameliorate such faults are uncommon in research and industry. The rapid shutdown of a wind turbine in a large transmission-connected wind plant will have a minimal impact on a large power system, but in a microgrid or isolated grid context the abrupt loss of a single wind turbine may cause grid instability and high stress on the system. This paper demonstrates a fault impact reduction control (FIRC) module for a wind turbine, which implements wider warning thresholds around fault thresholds. When the turbine crosses a warning threshold, the controller sends its predicted action to the grid controller, which facilitates the grid operator’s response to a potential wind turbine fault and then takes appropriate action to ameliorate the fault. Various test cases demonstrate the controller action under a variety of faults, and various scenarios demonstrate the grid benefit of an FIRC in both microgrid- and grid-connected contexts. The FIRC maximizes wind turbine generation and eases generation transition under a variety of fault scenarios. The FIRC module is easy to integrate with most existing controllers, just requiring derate capability, and can be easily modified to include the various warnings and thresholds that the user desires. This analysis is mainly performed in a MATLAB-Simulink-based research wind turbine model and is also implemented in the existing LabVIEW-based controller of the same research turbine at NREL.

17 WIND ENERGY↗

Power Decoupling Method for Voltage Source Inverters Using Grid Voltage Modulated Direct Power Control in Unbalanced System

The grid voltage modulated direct power control (GVM-DPC) is a novel power regulation method for grid-connected voltage source inverters (VSI). However, interactions between real and reactive powers still exist in GVM-DPC under unbalanced grid voltage condition, which may deteriorate its transient performance. Here, this article proposes a power decoupling method for GVM-DPC-based VSI in unbalanced systems based on the dynamic feedforward power compensation strategy, which can reduce the coupling magnitudes of real and reactive powers in the transient stages. First, the power coupling mechanism of positive and negative sequence real and reactive powers of VSI under the unbalanced voltage condition is analyzed. Then, the power coupling magnitudes (PCM) are derived according to relationships among the positive sequence components of real power, reactive power and point of common coupling (PCC) voltages. Next, the PCM are compensated into the GVM-DPC for the better decoupling performance. Furthermore, a stability analysis of the proposed control system is studied based on the impedance model, and a comparison with the traditional power decoupling method based on virtual impedance is conducted to show the superiority of the proposed method. Finally, simulations, hardware-in-loop test and experiment are conducted to validate the effectiveness of the proposed method.

42 ENGINEERING↗

Distributed Control Strategy to Achieve Synchronized Operation of an Islanded MG

To seamlessly transition a microgrid (MG) from islanded to grid-connected mode, it is necessary to synchronize the magnitude, frequency, and phase of the MG voltage to the voltage of the main grid. In this paper, we present a distributed control strategy to achieve synchronized operation of an islanded MG supported by multiple controllable distributed generators (DGs). The proposed method utilizes pinning-based consensus algorithm to ensure explicit coordination between magnitude, frequency and phase angle regulation, while ensuring proportional power sharing. System frequency is regulated by all the DGs in proportion to their capacity, while a selected DG eliminates the phase and magnitude regulation errors. Controller design criteria is based on small-signal stability analysis. Here, the proposed control strategy is implemented in hardware controllers and its effectiveness is demonstrated using a real-time hardware-in-the-loop MG testbed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Hybrid Fuel Cell and Battery Storage Power Management for Grid-Interactive EV Charging Station

With the increasing adoption of renewable energy sources in grid-interactive Electric Vehicle (EV) charging stations, the role of energy storage systems has become critical. While large energy storage systems have mitigated the intermittency of renewable energy, integrating multi-source energy management with prioritized charging can further enhance the reliability of charging stations (CS). This paper presents a decentralized energy management (DEM) approach combining battery energy storage (BES) and fuel cell (FC) systems using a rule-based line resistance correction droop (LRCD) control technique. The proposed droop control dynamically adjusts the gain to balance the state-of-charge (SoC) of the BES, enhancing power support longevity and improving battery life under varying capacity conditions by reducing current stress. Additionally, the paper addresses the challenges of using fuel cells in linear regions to optimize efficiency and manage various charging scenarios. The CS integrates unity power factor grid interaction, and power support for auxiliary loads, maintaining harmonic distortion within 5% during grid islanding. The approach evaluates DC bus voltage regulation under various scenarios of PV array power fluctuations and dynamic load variations, in both grid-connected and standalone operations. In conclusion, the proposed control strategy is validated on a laboratory prototype through various dynamic load variation and grid islanding scenarios.

Khalid, Mohd [Oak Ridge National Laboratory (ORNL)↗

Analysis and design of DC-link capacitor in cascaded H-bridge multilevel active front-end converter

Medium-voltage grid-tied systems often use a cascaded H-bridge multi-level active front-end. In this converter, dc link bus capacitors play an important role in stabilizing the converter and enabling both active and reactive power injections. The present work provides analytical expressions for the capacitor current, which are essential for optimizing system design (especially capacitor size vs. lifetime). Then, the expression is incorporated into the grid connected bidirectional power system model. Consequently, this work contributes to the guiding principles to choose accurate dc link capacitor ratings against grid-side power delivery requirements. DC-link capacitors come with an expiration date which is dependent on the operating power and voltage values. Lack of information about the lifetime of the dc-link capacitor creates uncertainty in the duration of online operation of the converter, thus increasing the probability of a contingency outage. The lifetime of the capacitor can range from only a few seconds of online operation of the station due to under-sizing, to a compromised quality of power flowing through other solid state devices which may not have been designed for the transients that are caused by over-sizing of the dc-link capacitor. A better estimate of the lifetime of these capacitors can help maximize usage and maintain scheduled outages more efficiently, without disruption in service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Stability-Enhancing Method for Grid-Forming Inverters Under Current Limiting

The primary controller of a grid-forming (GFM) inverter governs the internal reference voltage and angle, which enables the inverter to naturally synchronize and share power with the connected grid; however, during disturbances on the grid caused by, e.g., line faults, overloading, or frequency and phase shifts, a GFM inverter can be pushed into a current-limited operation to protect the device against thermal damage. This can lead to a windup of the internal reference frequency generated by the primary controller and cause a total loss of synchronism with the grid. Here, to make the primary controller of GFM inverters more robust against transient instability, this paper proposes a method that manipulates the reference signals governed by the primary controller by introducing the concept of fictitious power. The fictitious power counteracts the integrator windup in the primary controller, which enables the current-limited inverter to conceive a stable operating point. This method is benchmarked against five state-of-the-art GFM inverter stabilization methods to evaluate its stability-enhancing performance. Full-order electromagnetic-transient simulations and experimental results of a hardware inverter test setup validate the benefits of the method to improve the transient stability of GFM inverters in the face of grid disturbances.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Oscillation Risks of Grid-Following and Grid-Forming Inverter-Based Resources in Series-Compensated Networks

Here, this paper investigates the dynamic behavior of a grid-connected inverter-based resource (IBR) when connected radially to a series compensated line. Potential interactions between the series compensation and the IBR have been identified for both types: grid-following (GFL) or grid-forming (GFM). The study begins with electromagnetic transient (EMT) simulations to demonstrate stability issues. Subsequently, nonlinear analytical models are formulated in the dq frame, validated against the EMT simulation, and leveraged to assess eigenvalues and participation factors. Influencing factors of the dominant oscillation modes have been identified. The analysis results show that series compensation may make a mode associated with the synchronization unit unstable. Furthermore, customized feedback systems are built for the synchronizing loop. Series compensation can increase the sensitivity of the voltage phase angle towards the synchronizing angle, and introduce phase lag in the real power response towards the synchronizing angle. These factors may cause interactions with the phase-locked loop in GFL-IBR systems and with power-based synchronization in GFM-IBR systems, potentially leading to instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Exchange Pre-Conference Workshop: Distributed Energy Technologies for Resilience and Cost Savings

Distributed energy resources (DERs) include renewable energy (RE) technologies, storage, and combined heat and power (CHP). DERs can provide revenue streams and savings while grid connected. Savings may allow for the incorporation of additional microgrid components. When integrated into a microgrid, DERs can increase survival time during a grid outage when fuel supplies are limited.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improving Distribution Resiliency with Microgrids and State and Parameter Estimation

Modern society relies on low-cost reliable electrical power, both to maintain industry, as well as provide basic social services to the populace. When major disturbances occur, such as Hurricane Katrina or Hurricane Sandy, the nation’s electrical infrastructure can experience significant outages. To help prevent the spread of these outages, as well as facilitating faster restoration after an outage, various aspects of improving the resiliency of the power system are needed. Two such approaches are breaking the system into smaller microgrid sections, and to have improved insight into the operations to detect failures or mis-operations before they become critical. Breaking the system into smaller sections of microgrid islands, power can be maintained in smaller areas where distribution generation and energy storage resources are still available, but bulk power generation is no longer connected. Additionally, microgrid systems can maintain service to local pockets of customers when there has been extensive damage to the local distribution system. However, microgrids are grid connected a majority of the time and implementing and operating a microgrid is much different than when islanded. This report discusses work conducted by the Pacific Northwest National Laboratory that developed improvements for simulation tools to capture the characteristics of microgrids and how they can be used to develop new operational strategies. These operational strategies reduce the cost of microgrid operation and increase the reliability and resilience of the nation’s electricity infrastructure. In addition to the ability to break the system into microgrids, improved observability into the state of the distribution grid can make the power system more resilient. State estimation on the transmission system already provides great insight into grid operations and detecting abnormal conditions by leveraging existing measurements. These transmission-level approaches are expanded to using advanced metering infrastructure and other distribution-level measurements to create a three-phase, unbalanced distribution state estimation approach. With distribution-level state estimation, the grid can be operated more efficiently, and outages or equipment failures can be caught faster, improving the overall resilience and reliability of the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

REopt Lite Web Tool

NREL developed a free, publicly available web version of the REopt (TM) renewable energy integration and optimization platform called REopt Lite. REopt Lite recommends the optimal size and dispatch strategy for grid-connected photovoltaics (PV) and battery storage at a site. It also allows users to explore how PV and storage can increase a site's resiliency during a grid outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Wind Considerations from the IEEE 1547-2018 Revision

The revision of the U.S. interconnection Standard IEEE 1547 in 2018 (IEEE 1547-2018) has added new interconnection and interoperability requirements for grid-connected distributed wind generators (DWG / wind turbines) and all other distributed energy resources (DERs). These new requirements will enable distributed wind generators to provide greater benefits to electric grid operators and DER operators, but also presents new challenges for the testing and certification of DWG systems. This report provides a summary of recent interconnection standard revisions from a DWG perspective, outlines the potential benefits to the power system from the revisions, evaluates the main concerns from a DWG manufacturer’s perspective, and provides general industry guidance related to IEEE 1547-2018 adoption.

17 WIND ENERGY↗

Scoping Study: Networked Microgrids

This report presents a scoping study for networked microgrids which are defined as "Interoperable groups of multiple Advanced Microgrids that become an integral part of the electricity grid while providing enhanced resiliency through self-healing, aggregated ancillary services, and real-time communication." They result in optimal electrical system configurations and controls whether grid-connected or in islanded modes and enable high penetrations of distributed and renewable energy resources. The vision for the purpose of this document is: "Networked microgrids seamlessly integrate with the electricity grid or other Electric Power Sources (EPS) providing cost effective, high quality, reliable, resilient, self-healing power delivery systems."

24 POWER TRANSMISSION AND DISTRIBUTION↗

CERTS Microgrid Laboratory Test Bed

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2) an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources. These techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations,and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. The results from these tests are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or more of the CERTS Microgrid concepts. Future planned microgrid work involves unattended continuous operation of the microgrid for 30 to 60 days to determine how utility faults impact the operation of the microgrid and to gage the power quality and reliability improvements offered by microgrids.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CERTS Microgrid Laboratory Test Bed

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1 a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2 an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3 a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Grid and Wind Transient Ride Through Assessment of Type-5 Synchronous Wind Turbine

The integration of the inverter-based renewable energy resources is increasing and replacing conventional synchronous generators in the evolving bulk power system (BPS), impacting the system inertia along the way. Also, the limited over-current capability of power electronic converters continues to deteriorate the grid strength of the evolving power systems. Type-5 wind turbines have the potential to mitigate these problems because this configuration interfaces with the grid through a synchronous generator; hence, its operation and consequent grid impacts might mimic the conventional synchronous generator. The drivetrain of this type of turbines, however, is different from the more common Type-3 and Type-4 turbines. A hydraulic torque converter and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine drivetrain, to isolate the wind speed variations at the wind turbine rotor from the grid connected generator side. This supports the synchronous operation of the generator. However, high fidelity models of Type-5 wind turbine drivetrain including these core components are not openly and widely available for grid integration and transient stability studies. Moreover, Type-5 turbines are not commonly deployed and hence its power generation and frequency stability characteristics are not widely publicized. This hinders appropriate assessment of Type-5 wind power plant's contribution to bulk grid resilience. This work provides transient stability assessment of a standalone Type-5 wind turbine. Normal operation and grid transient studies are performed to see the step load change and wind speed disturbance impacts on the Type-5 drivetrain and generation dispatch. Preliminary results show that Type-5 wind turbines can support load changes of between 0.6 p.u to 1.15 p.u. Beyond this point, the synchronization of the generator starts to deviate from its set point.

17 - WIND ENERGY↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗