Search NASA⌕ Search

SEARCH · Search NASA

Results for “Infrastructure deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

A Case Study on the Challenges and Opportunities for the Deployment of PHM Capabilities in Existing Engineering Systems

The field of Prognostics and Health Management (PHM) of engineering systems has experienced considerable growth over the last decade. From benefits associated with faster and more powerful hardware in the form of wireless sensors, edge devices, and general computing capabilities (GPU’s and cloud computing), to development of powerful algorithms for anomaly detection and remaining useful life (RUL) estimation, the number of engineering systems featuring advanced diagnostics and prognostics capabilities continues to grow at an increasingly faster pace. However, the deployment of PHM capabilities as part of the upgrade of existing engineering systems presents multiple challenges to the PHM practitioner charged with retrofitting such systems. Issues include a lack of specific instrumentation needed to capture the signals of interest; insufficient data and sampling rates required for fault detection and diagnosis, and for detection of failure/degradation indicators; and difficulties in the identification of a system’s nominal behavior as a result of age induced degradation. Today’s PHM practitioner must be able to quickly identify and assess these types of issues to effectively evaluate and select the optimal PHM strategies required to achieve the desired results. This paper presents results from the preliminary evaluation of the High-Pressure Gas Facility (HPGF) infrastructure at NASA’s Stennis Space Center in Hancock County, Mississippi. This evaluation is part of a feasibility study conducted prior to the deployment of prognostics and diagnostics capabilities in the pumps skids of the liquid nitrogen (LN2) system of the HPGF.

Condition Based Maintenance↗

Full-scale validation gaps and opportunities for low-head hydropower: a review and perspective

Hydropower is undergoing technological innovation as future development increasingly targets low-head sites (<10 m), primarily through retrofits, rehabilitation, and upgrades of existing infrastructure. This shift toward smaller systems creates a timely opportunity: unlike conventional large projects, many emerging low-head technologies may be small enough for direct full-scale validation. Full-scale testing is particularly important for environmental mitigation technologies, including fish passage, sediment continuity, and water-quality improvements, whose performance is difficult to assess reliably using reduced-scale models. Yet adoption remains constrained by the limited risk-bearing capacity of small hydropower owners, discouraging manufacturers from bringing unvalidated technologies to market. This review and perspective paper examines hydropower trends driving innovation, selected emerging technologies, conventional testing methods, and current U.S. testing capabilities as a case study. We then evaluate the gap between existing capabilities and the needs of low-head powertrains and environmental mitigation measures. Many technologies exceed existing facility flow capacities; in the U.S., the highest combined head–flow capability is limited to 5.66 m3/s, compared with median and 90th-percentile low-head turbine-unit flows of 14.3 and 60 m3/s. To mitigate this gap, we advocate repurposing large, retired, or underused hydraulic infrastructure as full-scale testing facilities to reduce first-adoption risk and support sustainable low-head hydropower deployment.

Tseng, Chien-Yung [Colorado State University, Fort↗

PHALANX: Expendable Projectile Sensor Networks for Planetary Exploration

Technologies enabling long-term, wide-ranging measurement in hard-to-reach areas are a critical need for planetary science inquiry. Phenomena of interest include flows or variations in volatiles, gas composition or concentration, particulate density, or even simply temperature. Improved measurement of these processes enables understanding of exotic geologies and distributions or correlating indicators of trapped water or biological activity. However, such data is often needed in unsafe areas such as caves, lava tubes, or steep ravines not easily reached by current spacecraft and planetary robots. To address this capability gap, we have developed miniaturized, expendable sensors which can be ballistically lobbed from a robotic rover or static lander - or even dropped during a flyover. These projectiles can perform sensing during flight and after anchoring to terrain features. By augmenting exploration systems with these sensors, we can extend situational awareness, perform long-duration monitoring, and reduce utilization of primary mobility resources, all of which are crucial in surface missions. We call the integrated payload that includes a cold gas launcher, smart projectiles, planning software, network discovery, and science sensing: PHALANX. In this paper, we introduce the mission architecture for PHALANX and describe an exploration concept that pairs projectile sensors with a rover “mothership.” Science use cases explored include reconnaissance using ballistic cameras, volatiles detection, and building timelapse maps of temperature and illumination conditions. Strategies to autonomously coordinate constellations of deployed sensors to self-discover and localize with peer ranging (i.e. a “local GPS”) are summarized, thus providing communications infrastructure beyond-line-of-sight (BLOS) of the rover. Capabilities were demonstrated through both simulation and physical testing with a terrestrial prototype. The approach to developing a terrestrial prototype is discussed, including design of the launching mechanism, projectile optimization, micro-electronics fabrication, and sensor selection. Results from early testing and characterization of commercial-off-the-shelf (COTS) components are reported. Nodes were subjected to successful burn-in tests over 48 hours at full logging duty cycle. Integrated field tests were conducted in the Roverscape, a half-acre planetary analog environment at NASA Ames, where we tested up to 10 sensor nodes simultaneously coordinating with an exploration rover. Ranging accuracy has been demonstrated to be within +/-10cm over 20m using commodity radios when compared to high-resolution laser scanner ground truthing. Evolution of the design, including progressive miniaturization of the electronics and iterated modifications of the enclosure housing for streamlining and optimized radio performance are described. Finally, lessons learned to date, gaps toward eventual flight mission implementation, and continuing future development plans are discussed.

Dille, Michael↗

Consequence Based Framework for Deployment of Cloud Solutions in the Digital Energy Transition

This study proposes a framework for evaluating cloud computing deployment in the electric sector, focusing on the digital transition of energy systems. It assesses the implications of cloud technology adoption, particularly in terms of security, operational resilience, and efficiency. The paper introduces a framework for consequence-driven applied risk analysis, enabling utilities to prioritize and mitigate potential threats effectively, and responsibly deploy cloud applications. It also discusses the shared responsibility model in cloud computing, highlighting the need for collaborative security efforts. The research aims to provide utilities with a strategic assessment tool for cloud adoption, emphasizing the importance of security culture in enhancing cloud computing's role in critical infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

Three-Dimensional Planetary Surface Tracking Based on a Simple Ultra-Wideband Impulse-Radio Infrastructure

Several prototype ultra-wideband (UWB) impulse-radio (IR) tracking systems are currently under development at NASA Johnson Space Center (JSC). These systems are being studied for use in tracking of Lunar/Mars rovers and astronauts during early exploration missions when satellite navigation systems (such as GPS) are not available. To date, the systems that have been designed and tested are intended only for two-dimensional location and tracking, but these designs can all be extended to three-dimensional tracking with only minor modifications and increases in complexity. In this presentation, we will briefly review the design and performance of two of the current 2-D systems: one designed specifically for short-range, extremely high-precision tracking (approximately 1-2 cm resolution) and the other designed specifically for much longer range tracking with less stringent precision requirements (1-2 m resolution). We will then discuss a new multi-purpose system design based on a simple UWB-IR architecture that can be deployed easily on a planetary surface to support arbitrary three-dimensional localization and tracking applications. We will discuss utilization of this system as an infrastructure to provide both short-range and long-range tracking and analyze the localization performance of the system in several different configurations. We will give theoretical performance bounds for some canonical system configurations and compare these performance bounds with both numerical simulations of the system as well as actual experimental system performance evaluations.

Barton, Richard J.↗

Scientific frontiers of agrivoltaic cropping systems

Agrivoltaic (AV) systems integrate agriculture with electricity conversion through photovoltaic (PV) modules. Compared with conventional ground-mounted PV systems, AV systems can reduce land-use competition and offer agronomic and economic advantages, such as more stable crop production and additional farm income. However, AV systems can decrease agricultural performance and are typically 20-90% costlier to install than conventional PV systems. Here, in this Review, we analyse the implementation of AV cropping systems to preserve agricultural activities and highlight challenges and barriers. The global electricity potential of AV systems is ~66-385 PWh annually, depending on PV technology and installation density, if deployed in the most suitable areas, without accounting for grid availability. Scaling up has been hindered by crop selection for shading conditions, decreased energy conversion per unit of land area and issues with social acceptance, landscape impact and environmental sustainability. These issues can be addressed by developments such as wavelength-selective PV; system configurations, such as optimizing module spacing to reduce shading; and operational methods, such as optimizing tracking strategies and integrating agricultural infrastructure. Cross-sector policies can support AV systems by addressing the needs of diverse stakeholders over shared land resources. Further development will require collaboration among the design, performance, deployment and systems research communities.

14 SOLAR ENERGY↗

Prime Time for Model-Predictive Control? Assessing the Technical and Market Readiness of Advanced Controls in Buildings

Despite three decades of extensive research and field testing that have consistently validated the benefits of Model Predictive Control (MPC) in building applications, the technology has seen limited market adoption. This paper evaluates the readiness of MPC for widespread deployment, showcases recent demonstrations and field tests across diverse building types, including residential, small commercial, large commercial, and campus settings. Our results demonstrate that MPC can optimize system operations to achieve load shifting, minimize curtailment of on-site generation, and reduce energy costs by up to 80 %, while maintaining or improving occupant comfort. We also show that MPC can effectively control large assets, such as MW-sized thermal storage systems, and respond to dynamic pricing signals. However, achieving scale remains difficult due to labor-intensive workflows, reliance on a “PhD-in-the-loop” for MPC design and maintenance, susceptibility to fragile data infrastructure, and persistent workforce education and acceptance barriers. To bridge this gap, we outline a transition from bespoke, labor intensive prototypes toward streamlined, segment-targeted deployment strategies that leverage model templates, semantic tools, and generative AI. By automating control configuration and reducing engineering effort, these recommendations provide a pathway for transforming successful research demonstrations into scalable, market ready solutions for MPC-based controls.

Pritoni, Marco↗

Architecting the Communication and Navigation Networks for NASA's Space Exploration Systems

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. A key objective of the missions is to grow, through a series of launches, a system of systems communication, navigation, and timing infrastructure at minimum cost while providing a network-centric infrastructure that maximizes the exploration capabilities and science return. There is a strong need to use architecting processes in the mission pre-formulation stage to describe the systems, interfaces, and interoperability needed to implement multiple space communication systems that are deployed over time, yet support interoperability with each deployment phase and with 20 years of legacy systems. In this paper we present a process for defining the architecture of the communications, navigation, and networks needed to support future space explorers with the best adaptable and evolable network-centric space exploration infrastructure. The process steps presented are: 1) Architecture decomposition, 2) Defining mission systems and their interfaces, 3) Developing the communication, navigation, networking architecture, and 4) Integrating systems, operational and technical views and viewpoints. We demonstrate the process through the architecture development of the communication network for upcoming NASA space exploration missions.

Bhassin, Kul B.↗

SAIGE-GPU: accelerating genome- and phenome-wide association studies using GPUs

Genome-wide association studies (GWAS) at biobank scale are computationally intensive, especially for admixed populations requiring robust statistical models. SAIGE is a widely used method for generalized linear mixed-model GWAS but is limited by its CPU-based implementation, making phenome-wide association studies impractical for many research groups. We developed SAIGE-GPU, a GPU-accelerated version of SAIGE that replaces CPU-intensive matrix operations with GPU-optimized kernels. The core innovation is distributing genetic relationship matrix calculations across GPUs and communication layers. Applied to 2068 phenotypes from 635 969 participants in the Million Veteran Program, including diverse and admixed populations, SAIGE-GPU achieved a 5-fold speedup in mixed model fitting on supercomputing infrastructure and cloud platforms. We further optimized the variant association testing step through multi-core and multi-trait parallelization. Deployed on Google Cloud Platform and Azure, the method provided substantial cost and time savings. Source code and binaries are available for download at https://github.com/saigegit/SAIGE/tree/SAIGE-GPU-1.3.3. A code snapshot is archived at Zenodo for reproducibility (DOI: [10.5281/zenodo.17642591]). SAIGE-GPU is available in a containerized format for use across HPC and cloud environments and is implemented in R/C++ and runs on Linux systems.

Rodriguez, Alex [Argonne National Laboratory (ANL)↗

Low-cost Manufacturing of Semitransparent CdTe PV for Building Integration

Solar has been demonstrated to be a robust renewable energy source, constituting a significant portion of the United States’ renewable energy portfolio. Despite its growth across residential, commercial, and utility sectors over the past decades, it remains a small fraction of the overall energy infrastructure. Challenges persist in fully harnessing solar power to meet the nation's escalating energy demands. Among these challenges lies the hurdle of efficiently distributing large quantities of solar-generated electricity to densely populated regions with the highest energy needs and costs. Traditional utility-scale arrays demand extensive land, a luxury often unavailable in metropolitan areas. Consequently, installations must be situated at a distance, necessitating additional infrastructure for electricity transmission to service areas. While metropolitan landscapes lack sprawling open spaces suitable for conventional utility-scale solar deployment, they offer a different resource: windows. Semitransparent photovoltaic window technology has the potential to not only bolster the grid's energy capacity, but to also provide HVAC and economic advantages to building owners. However, commercial availability of building-integrated photovoltaic windows remains limited. Silicon based photovoltaics currently dominate the solar market but adapting them for use in windows poses a variety of engineering and economic challenges such as relatively low power density, high costs associated with custom manufacturing, and aesthetic considerations. Addressing these challenges, this project explored the use of laser ablation patterning to manufacture cost-effective, high-efficiency, semitransparent Cadmium Telluride photovoltaic modules. Results showcased the potential of this methodology in developing photovoltaic windows and other innovative semitransparent PV applications. The ablation manufacturing technique demonstrated great versatility in achieving different patterns and levels of visible light transmission, and the power loss due to ablation was nearly directly proportional to the amount of material removed. Furthermore, the manufacturing process for Cadmium Telluride modules already has established advantages in material and energy efficiency, and the conversion of a standard submodule to semitransparent essentially requires a single additional process step, ensuring scalability. It is important to note that during this work, Toledo Solar experienced substantial organizational upheaval stemming from a lawsuit with First Solar. An external investigation led the board of directors to remove and replace the previous management team, and several other members of the staff elected to depart as well, including the then acting Principle Investigator on this project. The remaining Toledo Solar team attempted to recover from the disruption and deliver on the remaining tasks, but upon its own review, the Department of Energy ruled the project in default and terminated the contract in December 2023.

14 SOLAR ENERGY↗

The Workforce Readiness Index: A Local and Regional Assessment Tool for Energy Sector Preparedness

Building up a workforce that is properly trained and adequately sized is essential to ensuring that the deployment of energy generation sources in the United States meets future energy demand. Workforce development to support supply chain or large infrastructure investments typically occurs at a local level. However, there is a critical gap in understanding where and to what extent regional workforces are equipped to meet the needs of an energy industry. The Workforce Readiness Index ("the index") was developed to assess and compare energy sector workforce readiness across the United States at the county level to provide granular information to various stakeholders such as industry members, state decision makers, and training program developers. Workforce readiness is defined as the ability to recruit from the general labor market, transition workers with comparable skill sets, and train a workforce using scalable or existing training programs near a specific location. Therefore, the index evaluates readiness levels based on the likelihood that a county possesses the workforce development infrastructure needed to support the occupations required by an energy-related industry or sector. Furthermore, the index offers a standardized yet flexible approach that captures regional variations and highlights local strengths and challenges.

17 WIND ENERGY↗

Robotic Precursor Missions for Mars Habitats

Infrastructure support for robotic colonies, manned Mars habitat, and/or robotic exploration of planetary surfaces will need to rely on the field deployment of multiple robust robots. This support includes such tasks as the deployment and servicing of power systems and ISRU generators, construction of beaconed roadways, and the site preparation and deployment of manned habitat modules. The current level of autonomy of planetary rovers such as Sojourner will need to be greatly enhanced for these types of operations. In addition, single robotic platforms will not be capable of complicated construction scenarios. Precursor robotic missions to Mars that involve teams of multiple cooperating robots to accomplish some of these tasks is a cost effective solution to the possible long timeline necessary for the deployment of a manned habitat. Ongoing work at JPL under the Mars Outpost Program in the area of robot colonies is investigating many of the technology developments necessary for such an ambitious undertaking. Some of the issues that are being addressed include behavior-based control systems for multiple cooperating robots (CAMPOUT), development of autonomous robotic systems for the rescue/repair of trapped or disabled robots, and the design and development of robotic platforms for construction tasks such as material transport and surface clearing.

Huntsberger, Terry↗

Video Guidance Sensor for Surface Mobility Operations

Robotic systems and surface mobility will play an increased role in future exploration missions. Unlike the LRV during Apollo era which was an astronaut piloted vehicle future systems will include teleoperated and semi-autonomous operations. The tasks given to these vehicles will run the range from infrastructure maintenance, ISRU, and construction to name a few. A common task that may be performed would be the retrieval and deployment of trailer mounted equipment. Operational scenarios may require these operations to be performed remotely via a teleoperated mode,or semi-autonomously. This presentation describes the on-going project to adapt the Automated Rendezvous and Capture (AR&C) sensor developed at the Marshall Space Flight Center for use in an automated trailer pick-up and deployment operation. The sensor which has been successfully demonstrated on-orbit has been mounted on an iRobot/John Deere RGATOR autonomous vehicle for this demonstration which will be completed in the March 2008 time-frame.

Fernandez, Kenneth R.↗

DeepLynx Ecosystem 2025

Poor data integration and governance continue to plague complex engineering projects, resulting in missed cost, schedule, and performance targets. Departments operate in isolated systems with manual data exchange, creating fragmented information that compounds errors and leads to significant delays and cost overruns. The DeepLynx ecosystem addresses these challenges through an open-source, modular data management platform that transforms fragmented project data into an integrated digital thread. Built on a federated microservice architecture, the ecosystem comprises seven specialized tools centered around DeepLynx Nexus, a unified data catalog with hierarchical organization and graph-based navigation capabilities. The ecosystem includes: DeepLynx Stream for real-time timeseries data ingestion from industrial sources; DeepLynx Ingest for governed data uploads with formal review workflows; DeepLynx Lattice for ontology-based entity and relationship extraction; DeepLynx Run for workflow orchestration and secure AI/ML compute; DeepLynx Visualize for 3D digital twin visualization; and DeepLynx Insight for AI-assisted document analysis with traceable, grounded responses. Deployable in cloud, on-premise, or hybrid environments using containerized Docker applications and Helm charts, the DeepLynx ecosystem provides flexible infrastructure that adapts to organizational requirements. By consolidating project data into a unified data lake with role-based access controls and OAuth2 authentication, DeepLynx enables digital thread and digital twin capabilities that improve decision-making, reduce risk, and support complex engineering workflows throughout the project lifecycle.

42 - ENGINEERING↗

Edge at the Pier: EPCAPE Software-Defined Sensing Field Campaign Report

The Eastern Pacific Cloud Aerosol Precipitation Experiment (EPCAPE) was aimed to enhance the understanding of cloud and aerosol properties in the region surrounding La Jolla, California. To address challenges in data collection and processing from various instruments, an edge computing device known as Waggle Sage Node (WSN) was deployed at the Ellen Browning Scripps Memorial Pier. WSN is a distributed-sensing platform designed to collect and analyze environmental data at the edge. Sage is a multi-agency-supported project that designs and builds a new kind of national-scale reusable cyberinfrastructure to enable artificial intelligence (AI) at the edge based on the Waggle platform. Sponsors include the U.S. Department of Energy (DOE) Advanced Scientific Computing Research (ASCR), DOE National Nuclear Security Administration (NNSA), DOE Biological and Environmental Research (BER) through DOE Artificial Intelligence for Earth System Predictability (AI4ESP), Argonne Laboratory-Directed Research and Development (LDRD). Sage (https://sagecontinuum.org/) is funded as a National Science Foundation Mid-Scale Research Infrastructure (MSRI) project (https://www.nsf.gov/awardsearch/showAward?AWD_ID=1935984). This robust, multi-architecture edge computing platform facilitated environmental monitoring during the campaign. This report details the scientific objectives, deployment process, and key results of integrating Waggle into the EPCAPE field campaign.

54 ENVIRONMENTAL SCIENCES↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗