Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

A2E2G (Atmosphere to Electrons to the Grid platform) [SWR-23-22]

A2E2G is a platform that integrates 1) forecasting tools to account for weather uncertainty, with 2) aerodynamic wind plant models to account for wake dynamics and wind plant operation, and 3) economic models to advise on operation for a wind power plant that offers grid services in addition to energy. The A2E2G platform can be used as a high-level controller for a wind plant for market participation and real-time wind plant control. The A2E2g platform is a holistic Python tool with modules that can be run to 1) advise on market participation and 2) control and operate a wind power plant in real time. The A2E2g framework assumes two stages: the first stage is in day-ahead and the second stage is in real-time. Managing uncertainty is key in the first stage and managing variability is key in the second stage. The different components have models written and developed in the Python programming language. The code is assembled into a Python package and can be easily downloaded and installed from the A2E2g repository (https://github.com/NREL/a2e2g).

Sinner, Michael↗

Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems (Final Report)

This is the end of project report for the DOE Project DE-FE-0027844 “Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems”. The objectives of the project were to develop several technologies required for the mass adoption of Solid Oxide Fuel Cell systems for medium to large power generation applications. The key achievements of this project were: 1) Development of fuel cells with complete internal fuel reforming capability. 2) Fuel cell power scale up with production of cells with larger active areas. 3) Assembly of an integrated 5 kW modular stack platform capable of installation into medium to large power systems. 4) Demonstration of a 10 kW Fuel Cell Power System utilizing the integrated 5 kW modular stack platform. 5) Cost modelling to show system cost of $1,500/kW are achievable at production volumes. 6) Development of cathode air poison getters for reduced degradation and extended fuel cell life. 7) Assessment of fuel poison on anode degradation, particularly poisons frequently produced from the process of gasification of coal. The Cummins led Voice of Customer (VOC) work identified several significant markets for natural gas powered fuel cell systems, where the end customer is interested in reducing energy consumption and emissions, or increasing reliability of electrical supply. Data centers and truck Auxiliary Power Units (APU) were highlighted as 2 key future markets for fuel cell systems.

30 DIRECT ENERGY CONVERSION↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Novel PV Array System Design to Accelerate Solar Deployment, Reduce LCOE, Reduce Land Use Competition, and Increase Siting Flexibility

The increasing demand for solar energy faces significant barriers, including inefficient construction processes, high project costs limiting LCOE reductions, and diminishing availability of "good" sites with favorable interconnection. Conventional solar installations are often constrained by long construction timelines and the need for flat, large plots. Furthermore, the industry struggles with a shortage of skilled labor. Planted Solar aims to address these challenges by fundamentally transforming solar deployment from a construction project into a streamlined manufacturing process. Our novel approach combines high-density racking, integrated terrain-following design software, and installation automation. Unlike competing solutions that either assist with standard array assembly or offer dense packing without terrain adaptability or automation, Planted's technology uniquely brings together a new array product with in-place automated manufacturing to achieve the lowest possible cost, greater site flexibility, and accelerated deployment.

14 SOLAR ENERGY↗

Review of European microgravity measurements

AA In a French/Russion cooperation, CNES developed a microgravity detection system for analyzing the Mir space station micro-g-environment for the first time. European efforts to characterize the microgravity (1/9) environment within a space laboratory began in the late seventies with the design of the First Spacelab Mission SL-1. Its Material Science Double Rack was the first payload element to carry its own tri-axial acceleration package. Even though incapable for any frequency analysis, the data provided a wealth of novel information for optimal experiment and hardware design and operations for missions to come. Theoretical investigations under ESA contract demonstrated the significance of the detailed knowledge of micro-g data for a thorough experiment analysis. They especially revealed the high sensitivity of numerous phenomena to low frequency acceleration. Accordingly, the payloads of the Spacelab missions D-1 and D-2 were furnished with state-of-the-art detection systems to ensure frequency analysis between 0.1 and 100 Hz. The Microgravity Measurement Assembly (MMA) of D-2 was a centralized system comprising fixed installed as well as mobile tri-axial packages showing real-time data processing and transmission to ground. ESA's free flyer EURECA carried a system for continuous measurement over the entire mission. All EURECA subsystems and experimental facilities had to meet tough requirements defining the upper acceleration limits. In a French/Russion cooperation, CNES developed a mi crogravity detection system for analyzing the Mir space station micro-g-environment for the first time. An approach to get access to low frequency acceleration between 0 and 0.02 Hz will be realized by QSAM (Quasi-steady Acceleration Measurement) on IML-2, complementary to the NASA system Spacelab Acceleration Measurement System SAMS. A second flight of QSAM is planned for the Russian free flyer FOTON.

Hamacher, Hans↗

Large Scale Testing of a Foam/Multilayer Insulation Thermal Control System (TCS) for Cryogenic Upper Stages

The development of high energy cryogenic upper stages is essential for the efficient delivery of large payloads to various destinations envisioned in future programs. A key element in such upper stages is cryogenic fluid management (CFM) advanced development/technology. Due to the cost of and limited opportunities for orbital experiments, ground testing must be employed to the fullest extent possible. Therefore, a system level test bed termed the Multipurpose Hydrogen Test Bed (MHTB), which is representative in size and shape (3 meter diameter by 3 meter long with a volume of 18 cubic meters) of a fully integrated space transportation vehicle liquid hydrogen propellant tank has been established. To date, upper stage studies have often baselined the foam/multilayer insulation (FMLI) combination concept; however, hardware experience with the concept is minimal and was therefore selected for the MHTB. The foam element (isofoam SS-1 171 with an average thickness of 3.5 centimeters) is designed to protect against ground hold/ascent flight environments, and allows for the use of a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required with MLI in cryogenic applications. The MLI (45 layers of Double Aluminized Mylar with Dacron spacers) provides protection in the vacuum environment of space and is designed for an on-orbit storage period of 45 days. Several unique features were incorporated in the MLI concept and included: variable density MLI (reduces weight and radiation losses by changing the layer density), larger but fewer DAM perforations for venting during ascent to orbit (reduces radiation losses), and roll wrap installation of the MLI with a commercially established process to lower assembly man-hours and reduce seam heat leak. Thermal performance testing of the MHTB TCS was conducted during three test series conducted between September 1995 and May 1996. Results for the ground hold portion of the tests were as expected producing an average heat leak of 63 WattS/M2 at an average foam surface temperature of 170 K. The results of the simulated orbit hold test interval produced heat leaks ranging from 0.085 to 0.22 Watts/squareM at warm boundary temperatures of 164K and 305K, respectively. When compared to the performance for a traditional MLI system, a 60% reduction in orbital heat leak or boiloff was measured. Overall, the MHTB TCS demonstrated satisfactory performance for all mission phases required of a cryogenic upper stage.

Hastings, Leon↗

Operation of an ADR Using Helium Exchange Gas as a Substitute for a Failed Heat Switch

The Soft X-ray Spectrometer (SXS) is one of four instruments on the Japanese Astro-H mission, which is currently planned for launch in late 2015. The SXS will perform imaging spectroscopy in the soft X-ray band (0.3-12 keV) using a 6 6 pixel array of microcalorimeters cooled to 50 mK. The detectors are cooled by a 3-stage adiabatic demagnetization refrigerator (ADR) that rejects heat to either a superfluid helium tank (at 1.2 K) or to a 4.5 K Joule-Thomson (JT) cryocooler. Four gas-gap heat switches are used in the assembly to manage heat flow between the ADR stages and the heat sinks. The engineering model (EM) ADR was assembled and performance tested at NASA/GSFC in November 2011, and subsequently installed in the EM dewar at Sumitomo Heavy Industries, Japan. During the first cooldown in July 2012, a failure of the heat switch that linked the two colder stages of the ADR to the helium tank was observed. Operation of the ADR requires some mechanism for thermally linking the salt pills to the heat sink, and then thermally isolating them. With the failed heat switch unable to perform this function, an alternate plan was devised which used carefully controlled amounts of exchange gas in the dewar's guard vacuum to facilitate heat exchange. The process was successfully demonstrated in November 2012, allowing the ADR to cool the detectors to 50 mK for hold times in excess of 10 h. This paper describes the exchange-gas-assisted recycling process, and the strategies used to avoid helium contamination of the detectors at low temperature.

Adiabatic demagnetization↗

Status of the Four Bed Carbon Dioxide Scrubber ISS Technology Demonstration

The Four Bed Carbon Dioxide Scrubber flight demonstration is presently operating onboard the International Space Station. After being launched in August and activated in September 2021, the system has been removing metabolic CO2 from the cabin as a supplement and replacement for other CO2 removal systems, specifically the two Carbon Dioxide Removal Assemblies. This paper describes on-orbit operations and changes (including installation of the Calnetix blower) during 2022 and early 2023. Performance of the system especially as affected by changes in the on-orbit configuration will be described. System reliability, software changes, and ongoing efforts will be summarized.

Life Support↗

Status of the Four Bed Carbon Dioxide Scrubber ISS Technology Demonstration 2022-2023

The Four Bed Carbon Dioxide Scrubber flight demonstration is presently operating onboard the International Space Station. After being launched in August and activated in September 2021, the system has been removing metabolic CO2 from the cabin as a supplement and replacement for other CO2 removal systems, specifically the two Carbon Dioxide Removal Assemblies. This paper describes on-orbit operations and changes (including installation of the Calnetix blower) during 2022 and early 2023. Performance of the system especially as affected by changes in the on-orbit configuration will be described. System reliability, software changes, and ongoing efforts will be summarized.

Life Support↗

Space assembly fixtures and aids

Concepts and requirements for assembly fixtures and aids necessary for the assembly and maintenance of spare platforms were studied. Emphasis was placed on erectable and deployable type structures with the shuttle orbiter as the assembly base. Both single and multiple orbiter flight cases for the platform assembly were considered. Applicable space platform assembly studies were reviewed to provide a data base for establishing the assembly fixture and aids design requirements, assembly constraints, and the development of representative design concepts. Conclusions indicated that fixture requirements will vary with platform size. Larger platforms will require translation relative to the orbiter RMS working volume. The installation of platform payloads and subsystems (e.g., utility distribution) must also be considered in the specification of assembly fixtures and aids.

Bloom, K. A.↗

Process Development for Automated Solar Cell and Module Production. Task 4: Automated Array Assembly

The Automated Lamination Station is mechanically complete and is currently undergoing final wiring. The high current driver and isolator boards have been completed and installed, and the main interface board is under construction. The automated vacuum chamber has had a minor redesign to increase stiffness and improve the cover open/close mechanism. Design of the Final Assembly Station has been completed and construction is underway.

Hagerty, J. J.↗

Pressure-probe assembly for wind tunnels

Rake mounting design reduces aerodynamic-surface discontinuities to a minimum when installed in boundary layer bleed area. Mounting base is not required and, because of simplicity, rake can be manufactured at low cost.

Warfield, R. L.↗

Applied Metrology for the Assembly of the Nb 3 Sn MQXFA Quadrupole Magnets for the HL-LHC AUP

The US HL-LHC Accelerator Upgrade Project (AUP) is building Nb 3 Sn quadrupole magnets, called MQXFA, with plans to install 16 of them in the HL-LHC Interaction Regions. Variability in coil size must be dealt with at the assembly level, which requires timely and repeatable measurement of each coil. In this paper we will present the methodology used for coil measurements and the geometrical size data for the coils that have been measured thus far. We will also show the coil measurements of 8 coils before and after cold test. In conclusion, the Leica AT960-MR laser tracker with Spatial Analyzer software acquired to achieve these measurements has been used elsewhere in the project to great effect.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Space Station Power Generation Investigated in Support of the Beta Gimbal Anomaly Resolution

The International Space Station (ISS) is the largest and most complex spacecraft ever assembled and operated in orbit. The first U.S. photovoltaic module, containing two solar arrays, was launched, installed, and activated in early December 2000. After the first week of continuously rotating the U.S. solar arrays, engineering personnel in the ISS Mission Evaluation Room observed higher than expected electrical currents on the drive motor in one of the Beta Gimbal Assemblies (BGA), the mechanism used to maneuver a U.S. solar array (see the on-orbit photograph). The magnitude of the motor currents continued to increase over time on both BGAs, creating concerns about the ability of the gimbals to continue pointing the solar arrays towards the Sun, a function critical for continued assembly of the ISS. The BGA provides two critical capabilities to the ISS: (1) transfer of electrical power across a rotating joint and (2) positioning of the solar arrays. A number of engineering disciplines convened in May 2001 to address this on-orbit hardware anomaly. Over the course of a year, many scenarios were developed and used. Only two are discussed here: parked arrays and dual-angle mode.

Delleur, Ann M.↗

Reinforcement core facilitates O-ring installation

Reinforcement core holds O-ring in place within a structure while adjacent parts are being assembled. The core in the O-ring adds circumferential rigidity to the O-ring material. This inner core does not appreciably affect the sectional elasticity or gland-sealing characteristics of the O-ring.

Source record↗

Modification of the International Space Station USOS to Support Installation and Activation of the Node 3 Element

The International Space Station (ISS) program is nearing an assembly complete configuration with the addition of the final resource node module in early 2010. The Node 3 module will provide critical functionality in support of permanent long duration crews aboard ISS. The new module will permanently house the regenerative Environment Control and Life Support Systems (ECLSS) and will also provide important habitability functions such as waste management and exercise facilities. The ISS program has selected the Port side of the Node 1 "Unity" module as the permanent location for Node 3 which will necessitate architecture changes to provide the required interfaces. The USOS ECLSS fluid and ventilation systems, Internal Thermal Control Systems, and Avionics Systems require significant modifications in order to support Node 3 interfaces at the Node 1 Port location since it was not initially designed for that configuration. This paper outlines the design, development, certification, and implementation of these changes in support of ISS assembly complete.

Link, Dwight E., Jr.↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗