Search NASA⌕ Search

SEARCH · Search NASA

Results for “LUNAR LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Recovery from Missed Thrust During Gateway's NRHO Insertion Using Auxiliary Propulsion

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

missed thrust↗

Algorithmic Detection of Elemental Biosignatures

Machine learning models that classify a sample as indicative or non-indicative of life could play an important role in life-detection missions. Their predictions result from agnostic algorithms and thereby add redundancy to judgements resulting from human expertise. Additionally, their important features can reveal the most informative measurements within the operational constraints of a life-detection mission. The Ladder of Life Detection (Neveu 2018) identifies the need for an understanding of how combinations of multiple biosignatures affect overall confidence. The present work provides a starting point to answer this need, and future work will expand the data types to obtain even more predictive combinations of features. Elemental abundance was chosen as a starting set of features due to its availability in diverse sample types, which are needed to train a generalizable model. A standardized dataset was collected, including 35 non-indicative, e.g., lunar rock, basalt; 19 indicative mixed, e.g., seawater, agricultural soil; 46 indicative non-alive, e.g., coal, chalk; and 10 indicative alive, e.g., biofilm, bacteria. This dataset could be valuable for complementary biosignature research. The samples were standardized to the same limit of detection of a simulated mission scenario. Four classification models were used: k-nearest neighbors (KNN), logistic regression (LR), linear support vector machines (SVM), and Gaussian naïve Bayes (GNB). To obtain feature importances, KNN was run on three principal components of the training data and LR and SVM were run with L1 and L2 regularization. The performances and feature importances of the six model variants on 40:60 train to validation ratios were assessed with Monte Carlo simulations. ROC AUC and mean accuracy scores ranged between 82% - 94%, with sensitivity greater than specificity. For indicative of life predictors, all models had C and Ca as strong and Cl as medium; a majority of models had N, K, and P as medium. For non-indicative of life predictors, all models had Si as strong, and a majority of models had Mg, Al, and Ti as medium. Varied elements were Fe (slightly non-indicative), H (slightly indicative), O (widely varied), Na, Mn, and S. These results serve as a proof of concept and suggest important elemental signals beyond merely the CHNOPS of Earth-based life.

Algorithmic↗

Gateway Program Status and Overview

This paper provides an overview and status of Gateway, which will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis program. Gateway is a destination for deep space crew expeditions and science investigations, as well as a port for deep space transportation – for landers en route to the lunar surface or spacecraft embarking to destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of each component of Gateway: The Power and Propulsion Element, the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; an Airlock; and Exploration ExtraVehicular Activity (xEVA). Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on ISS, Gateway is an evolution of this extraordinary partnership that leverages the capabilities of each partner to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple international partners, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

HDU Deep Space Habitat (DSH) Overview

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project Deep Space Habitat (DSH) analog that will be field-tested during the 2011 Desert Research and Technologies Studies (D-RATS) field tests. The HDU project is a technology pull project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU Pressurized Excursion Module (PEM) that was field tested in the 2010 D-RATS, adding habitation functionality to the prototype unit. The 2010 configuration of the HDU-PEM consisted of a lunar surface laboratory module that was used to bring over 20 habitation-related technologies together in a single platform that could be tested as an advanced habitation analog in the context of mission architectures and surface operations. The 2011 HDU-DSH configuration will build upon the PEM work, and emphasize validity of crew operations (habitation and living, etc), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The HDU project consists of a multi-center team brought together in a skunkworks approach to quickly build and validate hardware in analog environments. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 analog field test will include Multi Mission Space Exploration Vehicles (MMSEV) and the DSH among other demonstration elements to be brought together in a mission architecture context. This paper will describe overall objectives, various habitat configurations, strategic plan, and technology integration as it pertains to the 2011 field tests.

Kennedy, Kriss J.↗

Gateway Program Status and Overview

This paper provides an overview and status of the Gateway, which will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis program. Gateway is a destination for deep space crew expeditions and science investigations, as well as a port for deep space transportation – for landers en route to the lunar surface or spacecraft embarking to destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop the Gateway. This paper will provide an overview of each component of the Gateway: The Power and Propulsion Element, the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; an Airlock; and Exploration ExtraVehicular Activity (xEVA). Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on ISS, the Gateway is an evolution of this extraordinary partnership that leverages the capabilities of each partner to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple international partners, this paper will also provide a status of the Gateway multilateral governance structure and international agreements.

Gateway↗

Regenerative Life Support Systems for Exploration Habitats: Unique Capabilities and Challenges to Enable Long-Duration-Mission Habitats Beyond Low Earth Orbit

The Artemis I launch of NASA’s Space Launch System and Orion crew vehicle will mark a major milestone in the agency’s efforts to return humans to the Moon. Work is underway on the Human Landing System that will carry the next astronauts to the lunar surface, and the lunar orbiting Gateway that will host science and serve as a platform to support sustained human presence on the Moon and ultimately crewed missions to Mars. Two decades of continuous human presence on the International Space Station has provided a wealth of experience operating, upgrading, and demonstrating advanced Regenerative Environmental Control and Life Support Systems (Regen ECLSS). However, habitats that enable sustained lunar surface presence and transit to Mars will encounter many unique conditions and challenges. System characteristics including reliability, maintainability, mass, and power become significantly more critical. Operating environments associated with lower total pressure, low gravity, contingency protocols, and extensive un-crewed and dormant periods impose additional functionality requirements and alter the performance of certain critical systems. Integration and combined operations with other elements such as orbiting outposts, logistics suppliers, and mobility platforms impact capability and interface requirements. Limits on allocated water and oxygen consumable mass influence the need for higher levels of water and oxygen recovery from waste products. Impacts and challenges these unique exploration circumstances impose on the suite of Regen ECLSS systems are explored and discussed herein.

David F Howard↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15-year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Preparation of a Frozen Regolith Simulant Bed for ISRU Component Testing in a Vacuum Chamber

In-Situ Resource Utilization (ISRU) systems and components have undergone extensive laboratory and field tests to expose hardware to relevant soil environments. The next step is to combine these soil environments with relevant pressure and temperature conditions. Previous testing has demonstrated how to incorporate large bins of unconsolidated lunar regolith into sufficiently sized vacuum chambers. In order to create appropriate depth dependent soil characteristics that are needed to test drilling operations for the lunar surface, the regolith simulant bed must by properly compacted and frozen. While small cryogenic simulant beds have been created for laboratory tests, this scale effort will allow testing of a full 1m drill which has been developed for a potential lunar prospector mission. Compacted bulk densities were measured at various moisture contents for GRC-3 and Chenobi regolith simulants. Vibrational compaction methods were compared with the previously used hammer compaction, or "Proctor", method. All testing was done per ASTM standard methods. A full 6.13 m3 simulant bed with 6 percent moisture by weight was prepared, compacted in layers, and frozen in a commercial freezer. Temperature and desiccation data was collected to determine logistics for preparation and transport of the simulant bed for thermal vacuum testing. Once in the vacuum facility, the simulant bed will be cryogenically frozen with liquid nitrogen. These cryogenic vacuum tests are underway, but results will not be included in this manuscript.

Klenhenz, Julie↗

Gateway Element and Payload Materials Outgassing Analyses: HALO, HERMES, and ERSA

Gateway was intended to be humanity’s first space station around the Moon, but its development has been paused as the National Aeronautics and Space Administration (NASA) shifts focus to achieving the United States’ National Space Policy goals. Instead of an orbiting lunar outpost, NASA will now pursue the development of a lunar surface base to support a sustained human presence on the Moon. Before the program’s pause, Gateway’s Induced Environments team worked to ensure payloads and elements (i.e., modules) complied with induced environment requirements. Methods developed and insights gained from this work will have applicability to NASA’s Moon Base and the potential repurposing of Gateway elements and payloads, as well as to induced environments modeling for future space stations. The Gateway program’s induced environment included molecular contamination, electric thruster plume sputter and redeposition, and lunar dust transfer from the Human Landing System (HLS). Primary sources of external molecular contamination included materials outgassing, chemical thruster plume contamination, and vacuum venting. The focus of this paper will be on element- and payload-level materials outgassing analyses performed for Gateway Configuration 1, extending the previously-developed framework for Gateway system-level external molecular contamination modeling. Gateway Configuration 1 consisted of the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). It also included payloads like the European Radiation Sensor Array (ERSA) attached to PPE and the Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES) attached to HALO. The element- and payload-level analyses to be introduced in this paper for HALO, HERMES, and ERSA enabled high-fidelity descriptions of Gateway’s external molecular contamination environment. Approaches to geometric modeling, meshing, outgassing rate assignment, molecular transport modeling, and analysis methodology will be presented. Element and payload contaminant deposition onto sensitive Gateway receiver surfaces will be summarized and results compared to induced environment requirements. While these results incorporate refinements made over the course of the program, they were not intended to be final. Therefore, modeling assumptions and inputs, potential improvements, and lessons-learned will be documented to inform future work on Moon Base, repurposed elements and payloads, and other space stations.

Gateway↗

Cargo Assured Access to International Space Station

Boeing's Cargo Assured Access logistics delivery system will provide a means to transport cargo to/from the International Space Station, Low Earth Orbit and the moon using Expendable Launch Vehicles. For Space Station, this capability will reduce cargo resupply backlog during nominal operations (e.g., supplement Shuttle, Progress, ATV and HTV) and augment cargo resupply capability during contingency operations (e.g., Shuttle delay and/or unavailability of International Partner launch or transfer vehicles). This capability can also provide an autonomous means to deliver cargo to lunar orbit, a lunar orbit refueling and work platform, and a contingency crew safe haven in support of NASA's new Exploration Initiative.

Smith, David A.↗

Crew Launch Vehicle (CLV) Avionics and Software Integration Overview

On January 14, 2004, the President of the United States announced a new plan to explore space and extend a human presence across our solar system. The National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop and field a Constellation Architecture that will bring the Space Exploration vision to fruition. The Constellation Architecture includes a human-rated Crew Launch Vehicle (CLV) segment, managed by the Marshall Space Flight Center (MSFC), comprised of the First Stage (FS), Upper Stage (US), and Upper Stage Engine (USE) elements. The CLV s purpose is to provide safe and reliable crew and cargo transportation into Low Earth Orbit (LEO), as well as insertion into trans-lunar trajectories. The architecture's Spacecraft segment includes, among other elements, the Crew Exploration Vehicle (CEV), managed by the Johnson Space Flight Center (JSC), which is launched atop the CLV. MSFC is also responsible for CLV and CEV stack integration. This paper provides an overview of the Avionics and Software integration approach (which includes the Integrated System Health Management (ISHM) functions), both within the CLV, and across the CEV interface; it addresses the requirements to be met, logistics of meeting those requirements, and the roles of the various groups. The Avionics Integration and Vehicle Systems Test (ANST) Office was established at the MSFC with system engineering responsibilities for defining and developing the integrated CLV Avionics and Software system. The AIVST Office has defined two Groups, the Avionics and Software Integration Group (AVSIG), and the Integrated System Simulation and Test Integration Group (ISSTIG), and four Panels which will direct trade studies and analyses to ensure the CLV avionics and software meet CLV system and CEV interface requirements. The four panels are: 1) Avionics Integration Panel (AIP), 2) Software Integration Panel, 3) EEE Panel, and 4) Systems Simulation and Test Panel. Membership on the groups and panels includes the MSFC representatives from the requisite engineering disciplines, the First Stage, the Upper Stage, the Upper Stage Engine projects, and key personnel from other NASA centers. The four panels will take the results of trade studies and analyses and develop documentation in support of Design Analysis Cycle Reviews and ultimately the System Requirements Review.

Monell, Donald W.↗

Desert Research and Technology Studies (D-RATS) 2022 Test Report

The primary purpose of the 2022 Desert Research and Technology Studies (D-RATS 22) analog mission field test was to provide data and recommendations regarding how pressurized rover (PR) design, cabin configuration, driving modes, timeline constraints, and mission operations can be acceptably implemented to support future Artemis missions that include a PR. The goal of these evaluations was to provide first order feedback and data on design concepts currently being traded as options for future pressurized rover flight prototypes. The Japan Aerospace Exploration Agency (JAXA) may provide a PR for future Artemis missions. One of the primary objectives of D-RATS 2022 was to share with the JAXA PR team the processes and protocols by which NASA has learned to successfully evaluate rover concepts through integrated HITL evaluations over the past 20+ years, so that JAXA could apply any applicable lessons learned to their PR design, development, testing, and evaluation.

analog↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗

The Moon as a Stepping Stone to Human Mars Missions

Human space mission designers stretching back to von Braun and beyond have envisioned the moon as a waypoint to the more challenging missions to Mars. The moon is seen as a potential proving ground for technologies, equipment and operations, and a venue upon which to learn the art of surface exploration. Mars missions are years in duration with very limited Earth return opportunities, but the moon provides the opportunity to perfect exploration concepts while being only a few days from Earth. Though the environment and gravity differ from Mars, and will thereby not provide a perfectly analogous environment, the remoteness, limited logistics, and harsh conditions on the Moon provide an environment that can be used to stress many systems that will be used or will be extensible to hardware and operations that will be used on Mars. This paper begins by describing the systems, or options for systems, that together comprise a human Mars architecture. With this human Mars operational concept as a basis of comparison, each of these systems is analyzed in the context of a range of potential exploration missions that first targets lunar exploration experience, examining how the lunar experience can be best used to prepare for the eventual human mission to Mars. The paper concludes with a concise summary of specific areas that have the strongest applicability between exploration experience on the lunar surface and extensibility to human Mars exploration.

Connolly, John F.↗

Stowage Assessment of the Common Habitat Baseline Variants

This paper performs a stowage assessment of the four baseline variants of the Common Habitat, a SLS-derived long duration, multi-mission habitat. The Common Habitat can be utilized as a lunar surface outpost, a Mars surface outpost, or an in-space habitat for Mars transit flights. The paper will discuss the stowage philosophy applied to all baseline variants of the Common Habitat and will discuss the approaches taken to domain-specific stowage, bulk stowage, and fluid and gas stowage. Water and air stowage for the closed loop ECLS subsystem is described across the four variants. Stowage of other supplies, consumables, and equipment is also described across the four variants and based on logistics sizing studies, a self-contained mission endurance is predicted for each variant – e.g. how long a mission each can support without a docked logistics module. Finally, follow-on assessments, including a habitability evaluation, are discussed along with specific stowage issues relevant to these assessments.

Deep space habitat↗

Development Of 12 Kw Hall Thrusters for Nasa Lunar Gateway Power And Propulsion Element

NASA is embarking on a new and exciting era of human exploration to the Moon and its vicinity. As part of the Artemis program, NASA is developing the lunar Gateway, an orbiting platform in Near Rectilinear Halo Orbit (NRHO) about the Moon. The first two elements of the Gateway will be launched in 2024 and will be transferred from a high Earth orbit to the NRHO via the use of Solar Electric Propulsion (SEP). The SEP system is located on the Power and Propulsion Element (PPE) which will provide up to 60 kW of power. Aerojet Rocketdyne is developing the 12 kW flight Hall thrusters to be used for transferring the PPE and the Habitat and Logistics Outpost (HALO) module to NRHO. Work is continuing on the development testing, and these results will be described in the paper. The project has also recently completed its critical design review and is transitioning to the fabrication of the three flight thrusters. The 12 kW Hall thrusters are being developed under the NASA Advanced Electric Propulsion System (AEPS) program. As part of the AEPS program, AR built two Engineering Test Unit (ETU) Hall thrusters based on the NASA HERMeS engine and conducted a series of tests to validate the design. One series of tests focused on environments and functional testing, while the other series was mainly focused on long duration test blocks. Results from these tests were used to compare with NASA data from the HERMeS thruster. The comparison of the test results showed no change to the critical performance and lifetime parameters, which enabled the next phase of the program to proceed. Currently testing is continuing on the Engineering Development Units (EDU) as part of the flight qualification activities. The successful completion of the CDR serves as the starting point for the flight thruster fabrication, which is now underway to support the launch of the Gateway modules in 2024. The development and qualification of the AEPS 12 kW Hall thrusters is proceeding well. As the program completes CDR and transitions into flight builds of the three 12 kW Hall thrusters that will be used to transfer the combined PPE and HALO stack to the NRHO, the results of the development testing are reviewed in this presentation, and a status of the program and future plans is provided. The launch of the two Gateway modules and the transfer of this large payload to cislunar orbit will mark a significant milestone in electric propulsion, as it will demonstrate the ability of SEP to transfer very large payloads over great distances. This establishes the precedent that could lead to cargo transfers from the Earth to the Moon or even to Mars using SEP.

Hall thrusters↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat that uses the Space Launch System core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The primary consideration applied for down-selection was the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments was performed to compare the four variants. A stowage assessment developed a standard logistics module and then considered the amounts of water to be stored in each variant. It then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. A functional analysis identified and compared the living and working functions across the four habitat, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the four variants and also ranked the variants for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond was predicted and acceptability of various aspects of contingency response was evaluated, comparing the four variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data was shown to favor the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full SLS liquid oxygen tank.

Habitability↗